CN102922193B - Method for positioning and welding roller side door frame - Google Patents

Method for positioning and welding roller side door frame Download PDF

Info

Publication number
CN102922193B
CN102922193B CN201210395707.8A CN201210395707A CN102922193B CN 102922193 B CN102922193 B CN 102922193B CN 201210395707 A CN201210395707 A CN 201210395707A CN 102922193 B CN102922193 B CN 102922193B
Authority
CN
China
Prior art keywords
square steel
steel
locating piece
firm
spot welding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210395707.8A
Other languages
Chinese (zh)
Other versions
CN102922193A (en
Inventor
卢祥城
王康
吴树才
王辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LONKING (SHANGHAI) ROAD CONSTRUCTION MACHINERY CO., LTD.
Original Assignee
LONKING (SHANGHAI) ROAD CONSTRUCTION MACHINERY Co Ltd
Lonking Shanghai Machinery Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LONKING (SHANGHAI) ROAD CONSTRUCTION MACHINERY Co Ltd, Lonking Shanghai Machinery Manufacturing Co Ltd filed Critical LONKING (SHANGHAI) ROAD CONSTRUCTION MACHINERY Co Ltd
Priority to CN201210395707.8A priority Critical patent/CN102922193B/en
Publication of CN102922193A publication Critical patent/CN102922193A/en
Application granted granted Critical
Publication of CN102922193B publication Critical patent/CN102922193B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Automobile Manufacture Line, Endless Track Vehicle, Trailer (AREA)

Abstract

The invention provides a method for positioning and welding a roller side door frame. The method is characterized by comprising the following steps of: positioning a hinge on a corner of the base through a hinge positioning device, positioning each piece of square steel through a positioning block, clamping the square steel by using a clamping device, and fixedly welding the square steel. According to the method, the defects in the prior art are overcome, and the method is convenient in positioning and mounting, high in welding quality and high in working efficiency.

Description

A kind of road roller side door framework fixed-position welding method
Technical field
The present invention relates to a kind of road roller side door framework fixed-position welding method, belong to road roller technical field.
Background technology
When producing road roller side door frame operation, when particularly producing road roller side door frame operation in enormous quantities, location and installation question are comparatively difficult to resolve certainly, because workpiece volume, weight are all larger, dimensional requirement precision is higher, be difficult to when welding assembled ensure the line position size between each parts of product, as the depth of parallelism, perpendicularity, axiality etc. of workpiece, easy welding deformation.Generally, during production can only manual setting-out to the straight depth of parallelism, perpendicularity measured by angle square, drawn line need be aimed at during assembled workpiece, need people with hand steered steady and fixation workpiece two ends, have people's spot welding to fix in addition, its welding quality is comparatively difficult to ensure card, and operating efficiency is low, be difficult to the needs adapting to produce in enormous quantities.
Summary of the invention
The technical problem to be solved in the present invention is to provide the high and road roller side door framework fixed-position welding method that operating efficiency is high of a kind of welding quality.
In order to solve the problems of the technologies described above, technical scheme of the present invention is to provide a kind of road roller side door framework tack welding tipping method, it is characterized in that: the method comprises following 8 steps:
Step 1: hinge is positioned on an angle of base by hinge positioner;
Step 2: the one end of being located the first square steel by the first locating piece, with gripping means grips first square steel, by the other end of the first square steel and hinge spot welding firm;
Step 3: locate the second square steel by the second locating piece, with gripping means grips second square steel, by firm for one end spot welding near the first locating piece of one end of the second square steel and the first square steel; By the 4th locating piece location the 4th square steel, with gripping means grips the 4th square steel, by one end of the 4th square steel and the other end spot welding of the first square steel firm;
Step 4: by the tenth locating piece location the tenth square steel, with gripping means grips the tenth square steel, by one end of the tenth square steel and the other end spot welding of the second square steel firm; By the 8th locating piece location the steel from all directions, with gripping means grips the steel from all directions, by the from all directions one end of steel and the other end spot welding of the 4th square steel firm;
Step 5: by the 9th locating piece location the 9th square steel, with gripping means grips the 9th square steel, by firm for the other end spot welding of one end of the 9th square steel and the tenth square steel, by firm for the other end spot welding of the other end of the 9th square steel and all directions steel;
Step 6: the two ends of the 5th square steel are firm with the tenth square steel, the 4th square steel spot welding respectively;
Step 7: by the 3rd locating piece location third steel, use gripping means grips third steel, the two ends of third steel are firm with the first square steel, the 5th square steel spot welding respectively;
Step 8: unclamp all clamping devices, hangs out the road roller side door framework welded.
Preferably, in described step 1, hinge positioner is made up of the bearing of working in coordination and bearing pin.
In a kind of road roller side door framework fixed-position welding method provided by the invention, square steel locating piece clamps with clamping device after having good positioning, and welds after clamping, and square steel can be prevented to be out of shape, and also ensure that the depth of parallelism, perpendicularity requirement simultaneously.
Method provided by the invention overcomes the deficiencies in the prior art, location and easy for installation, welding quality is high, and operating efficiency is high.
Accompanying drawing explanation
Fig. 1 is a kind of road roller side door framework positioning welding structural representation provided by the invention;
Fig. 2 is A-A sectional view in Fig. 1;
Fig. 3 is B-B sectional view in Fig. 1;
Description of reference numerals
1-first locating piece; 2-second locating piece; 3-the 3rd locating piece; 4-the 4th locating piece; 5-clamping device; 6-hinge positioner; 7-base; 8-the 8th locating piece; 9-the 9th locating piece; 10-the tenth locating piece; 11-first square steel; 12-second square steel; 13-third steel; 14-the 4th square steel; 15-hinge; 16-all directions steel; 17-the 9th square steel; 18-the tenth square steel; 19-the 5th square steel.
Detailed description of the invention
For making the present invention become apparent, hereby with a preferred embodiment, and accompanying drawing is coordinated to be described in detail below.
Fig. 1 is a kind of road roller side door framework positioning welding structural representation provided by the invention, and this road roller side door framework fixed-position welding method comprises following 8 steps:
Step 1: composition graphs 3, is positioned at hinge 15 on an angle of base 7 by hinge positioner 6.Hinge positioner 6 is made up of the bearing of working in coordination and bearing pin, is come the hole of Positioning hinge by the alignment pin of hinge positioner.
Step 2: the one end of being located the first square steel 11 by the first locating piece 1, composition graphs 2, clamps the first square steel with clamping device 5, by the other end of the first square steel 11 and hinge 15 spot welding firm.
First locating piece 1 location is that following locating piece localization method is identical with the first locating piece 1 by locating piece being locked in realization on base 7 with screw.Clamp with clamping device 5 after having good positioning, weld after clamping, prevent it to be out of shape, also ensure that the depth of parallelism, perpendicularity requirement simultaneously, lower same.
Step 3: locate the second square steel 12 by the second locating piece 2, clamp the second square steel with clamping device 5, by firm for one end spot welding near the first locating piece 1 of one end of the second square steel 12 and the first square steel 11; Locate the 4th square steel 14 by the 4th locating piece 4, clamp the 4th square steel with clamping device 5, by firm for the other end spot welding of one end of the 4th square steel 14 and the first square steel 11.
Step 4: locate the tenth square steel 18 by the tenth locating piece 10, clamps the tenth square steel with clamping device 5, by firm for the other end spot welding of one end of the tenth square steel 18 and the second square steel 12; Locate the steel 16 from all directions by the 8th locating piece 8, clamp the steel from all directions with clamping device 5, by the from all directions one end of steel 16 and the other end spot welding of the 4th square steel 14 firm.
Step 5: locate the 9th square steel 17 by the 9th locating piece 9, clamps the 9th square steel with clamping device 5, by firm for the other end spot welding of one end of the 9th square steel 17 and the tenth square steel 18, by firm for the other end spot welding of the other end of the 9th square steel 17 and all directions steel 16.
Step 6: the two ends of the 5th square steel 19 are firm with the tenth square steel 18, the 4th square steel 14 spot welding respectively.
Step 7: locate third steel 13 by the 3rd locating piece 3, clamp third steel with clamping device 5, the two ends of third steel 13 are firm with the first square steel 11, the 5th square steel 19 spot welding respectively.
Step 8: unclamp all clamping devices 5, hangs out the road roller side door framework welded.

Claims (2)

1. a road roller side door framework fixed-position welding method, is characterized in that: the method comprises following 8 steps:
Step 1: hinge (15) is positioned on an angle of base (7) by hinge positioner (6);
Step 2: the one end of being located the first square steel (11) by the first locating piece (1), clamp the first square steel with clamping device (5), by the other end of the first square steel (11) and hinge (15) spot welding firm;
Step 3: locate the second square steel (12) by the second locating piece (2), the second square steel is clamped, by firm for one end spot welding near the first locating piece (1) of one end of the second square steel (12) and the first square steel (11) with clamping device (5); By the 4th locating piece (4) location the 4th square steel (14), with clamping device (5) clamping the 4th square steel, by one end of the 4th square steel (14) and the other end spot welding of the first square steel (11) firm;
Step 4: by the tenth locating piece (10) location the tenth square steel (18), with clamping device (5) clamping the tenth square steel, by one end of the tenth square steel (18) and the other end spot welding of the second square steel (12) firm; By the 8th locating piece (8) location the steel (16) from all directions, with clamping device (5) clamping the steel from all directions, by the from all directions one end of steel (16) and the other end spot welding of the 4th square steel (14) firm;
Step 5: by the 9th locating piece (9) location the 9th square steel (17), with clamping device (5) clamping the 9th square steel, by firm for the other end spot welding of one end of the 9th square steel (17) and the tenth square steel (18), by firm for the other end spot welding in the other end of the 9th square steel (17) and all directions steel (16);
Step 6: the two ends of the 5th square steel (19) are firm with the tenth square steel (18), the 4th square steel (14) spot welding respectively;
Step 7: by the 3rd locating piece (3) location third steel (13), with clamping device (5) clamping third steel, the two ends of third steel (13) are firm with the first square steel (11), the 5th square steel (19) spot welding respectively;
Step 8: unclamp all clamping devices (5), hangs out the road roller side door framework welded.
2. a kind of road roller side door framework fixed-position welding method as claimed in claim 1, is characterized in that: in described step 1, hinge positioner (6) is made up of the bearing of working in coordination and bearing pin.
CN201210395707.8A 2012-10-17 2012-10-17 Method for positioning and welding roller side door frame Active CN102922193B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210395707.8A CN102922193B (en) 2012-10-17 2012-10-17 Method for positioning and welding roller side door frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210395707.8A CN102922193B (en) 2012-10-17 2012-10-17 Method for positioning and welding roller side door frame

Publications (2)

Publication Number Publication Date
CN102922193A CN102922193A (en) 2013-02-13
CN102922193B true CN102922193B (en) 2015-05-20

Family

ID=47637194

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210395707.8A Active CN102922193B (en) 2012-10-17 2012-10-17 Method for positioning and welding roller side door frame

Country Status (1)

Country Link
CN (1) CN102922193B (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105171253B (en) * 2015-08-28 2017-01-04 佛山市南海区广工大数控装备协同创新研究院 A kind of doorframe fixture
CN106392435B (en) * 2016-11-30 2023-04-14 伟顺(中国)机电设备有限公司 Production clamp of generator set and assembly process thereof
CN106363332B (en) * 2016-11-30 2023-03-21 伟顺(中国)机电设备有限公司 Production clamp of generator set instrument cabinet and assembly process thereof
CN108356464A (en) * 2018-02-26 2018-08-03 劲旅环境科技有限公司 A kind of rear door frame group mounted welder assembly

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201095027Y (en) * 2007-08-24 2008-08-06 南车戚墅堰机车有限公司 Total assembling bench for locomotive frame
CN102152050A (en) * 2011-03-21 2011-08-17 南京雷尔伟新技术有限公司 Installing and welding tool for cab
CN102642108A (en) * 2012-05-02 2012-08-22 南京雷尔伟新技术有限公司 Assembly welding tooling for door frame of driver's cab

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE29913407U1 (en) * 1999-07-31 2000-12-21 KUKA Schweissanlagen GmbH, 86165 Augsburg Tensioning device and side wall frame for a vehicle body
KR100460778B1 (en) * 2002-01-14 2004-12-08 주식회사 세원정공 Welding jig for door panel of a car

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201095027Y (en) * 2007-08-24 2008-08-06 南车戚墅堰机车有限公司 Total assembling bench for locomotive frame
CN102152050A (en) * 2011-03-21 2011-08-17 南京雷尔伟新技术有限公司 Installing and welding tool for cab
CN102642108A (en) * 2012-05-02 2012-08-22 南京雷尔伟新技术有限公司 Assembly welding tooling for door frame of driver's cab

Also Published As

Publication number Publication date
CN102922193A (en) 2013-02-13

Similar Documents

Publication Publication Date Title
CN102922193B (en) Method for positioning and welding roller side door frame
CN201026553Y (en) Worktable for welding stage
CN201735990U (en) Welding fixture for left protecting sheet mounting plate and right protecting sheet mounting plate of automobile engine
CN104625548A (en) Positioning fixture for machining pipeline
CN202943402U (en) Clamping tool for welding lower longitudinal beam assembly of front base plate
CN203330618U (en) Belt roller manufacturing assembly line
CN209380144U (en) A kind of welding tool setup of protective fence
CN204397390U (en) A kind of swing arm machine clamp
CN203062172U (en) Weld training control console
CN203566171U (en) Locating clamp for pipeline machining
CN203471241U (en) Automatically regulating welding device
CN203437828U (en) Auxiliary welding device for external plate of car body
CN204248313U (en) A kind of auto panel fixture
CN104625527A (en) Flange welding tool
CN203076837U (en) Bogie supporting plate welding turning tool
CN203418258U (en) Framework-structure workpiece welding table
CN203401249U (en) Bulldozer front protection plate assembly welding tool
CN105312830A (en) Round pipe and round rod welding positioning tool
CN207757107U (en) A kind of quick positioning tooling fixture of the laser welding of variable-angle
CN105855785A (en) Welding positioning fixture
CN203380553U (en) Rotatable welding fixture
CN202877748U (en) Shock absorber oil storing cylinder oil pipe support welding mistake-proof device
CN202555997U (en) Clamping and locating mechanism for hydraulic support automatic welding shift device
CN203566133U (en) Welding test piece clamping support
CN107984139A (en) A kind of front-wheel bag assembly spot welding fixture (SWFX)

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20170118

Address after: 201612 Shanghai City, Songjiang District new town Minyi Road No. 26

Patentee after: LONKING (SHANGHAI) ROAD CONSTRUCTION MACHINERY CO., LTD.

Address before: 201612 Shanghai City, Songjiang District new town Minyi Road No. 26

Patentee before: Lonking (Shanghai) Machinary Manufacturing Co., Ltd.

Patentee before: LONKING (SHANGHAI) ROAD CONSTRUCTION MACHINERY CO., LTD.