CN102916431A - Assisted decision making method for load transfer in regional power grid - Google Patents

Assisted decision making method for load transfer in regional power grid Download PDF

Info

Publication number
CN102916431A
CN102916431A CN2012103528091A CN201210352809A CN102916431A CN 102916431 A CN102916431 A CN 102916431A CN 2012103528091 A CN2012103528091 A CN 2012103528091A CN 201210352809 A CN201210352809 A CN 201210352809A CN 102916431 A CN102916431 A CN 102916431A
Authority
CN
China
Prior art keywords
load
power supply
user
loss
turn
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012103528091A
Other languages
Chinese (zh)
Other versions
CN102916431B (en
Inventor
赵昆
贾育培
郎燕生
杨清波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
Original Assignee
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, China Electric Power Research Institute Co Ltd CEPRI filed Critical State Grid Corp of China SGCC
Priority to CN201210352809.1A priority Critical patent/CN102916431B/en
Publication of CN102916431A publication Critical patent/CN102916431A/en
Application granted granted Critical
Publication of CN102916431B publication Critical patent/CN102916431B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides an assisted decision making method for load transfer in a regional power grid. The method comprises the following steps: (1) setting a target power-off device; (2) performing statistics on load information; (3) analyzing a load transfer strategy; and (4) evaluating economic safety. In the method, remote signalling, remote measuring and power grid topology information existing in a dispatching automation system are utilized fully to fastly and exactly generate a load transfer scheme capable of meeting the requirement of economic and safe operation of the power grid, thereby preventing the situations such as load shedding or long-time power off, out-of-limit overload and the like from happening during the load transfer scheme.

Description

Area power grid load transfer aid decision-making method
Technical field
The invention belongs to the power automation field, be specifically related to a kind of area power grid load transfer aid decision-making method.
Background technology
The general closed loop design of area power grid, the open loop operation connects by the stand-by heat switch, structurally generally is rendered as radial pattern.Load transfer is problem common in the area power grid traffic control, have a power failure when running into apparatus overload or equipment fault, during overhaul of the equipments, for improving the power supply reliability to the user, the dispatcher generally is by the scheduling experience or carries out rough manual calculations, then carry out load transfer, the dead electricity load is restored electricity, although solved the problem of dead electricity load restoration power supply by experience, but turn whether optimum for the path, turn whether simple for operation, turn for after operational mode economic security whether, all be uncertain, generally before operation, also need to inquire about related data or record, ageing can not the assurance, especially in case of emergency, the management and running personnel often active demand be accurate succinct object information.
Summary of the invention
For overcoming defects, the invention provides a kind of area power grid load transfer aid decision-making method, take full advantage of already present remote signalling in the dispatch automated system, remote measurement and power network topology information, generate quickly and accurately the scheme of confession that turns that can satisfy the electrical network economy safe operation, avoid in turning for the scheme process, cause load rejection or user to have a power failure for a long time, the situations such as out-of-limit overload occur.
For achieving the above object, the invention provides a kind of area power grid load transfer aid decision-making method, its improvements are, described method comprises the steps:
(1). the Offered target power failure equipments;
(2). the statistics information on load;
(3). analyze lotus and turn for strategy;
(4). the assessment economy and security.
In the optimal technical scheme provided by the invention, in described step 1, described target power failure equipments is the equipment that causes loading and have a power failure, and comprising: faulty equipment and repair apparatus; Target power failure equipments attribute comprises: device name, device type, end factory station and two end factories station.
In the second optimal technical scheme provided by the invention, in described step 2, according to grid structure and power system operating mode, electrical network is carried out topological analysis form computation model; Wherein, topological analysis comprises: factory's station bus analysis and grid analysis.
In the 3rd optimal technical scheme provided by the invention, factory's station bus analysis comprises: according to the folding condition of switch and withdrawing from/returning to form of element, form bus model by node model; What buses the interior node of a certain electric pressure of analyzing a certain factory station is connected into by Closing Switch, and the factory station is divided into several buses.
In the 4th optimal technical scheme provided by the invention, the grid analysis: what subnets the bus of analyzing whole electrical network is connected into by closed branch road; Wherein, every sub-electrical network is the set that the bus of electrical link is arranged, same sub-electrical network of general genus when electric power system normally moves.
In the 5th optimal technical scheme provided by the invention, in described step 3, comprise the steps:
(3-1). the statistics information on load;
(3-2). according to statistics, analysis load turns for strategy.
In the 6th optimal technical scheme provided by the invention, step 3-1 comprises the steps:
(A). before the excision of target power failure equipments, the whole network is carried out Topology Analysis Based one time, and preserve the topological state of each equipment in the ground state situation;
(B). excision target power failure equipments, carry out again Topology Analysis Based, preserve the topological state of each equipment under the current state;
(C). before and after the excision of contrast target power failure equipments, the topological state of circuit, transformer, switch, disconnecting link and bus obtains affected factory station and information on load.
In the 7th optimal technical scheme provided by the invention, step 3-2 comprises the steps:
(a). the load ordering;
(b). determine to turn for task;
(c). the search power supply point;
(d). determine to turn for the path;
(e). topological analysis search power supply point;
(f). overloading analysis;
(g). the load rejection analysis;
(h). determine to turn for scheme.
In the 8th optimal technical scheme provided by the invention, in described step a, according to turning for type load is sorted, if having a power failure, target device turns confession, then all affected loads are sorted high-risk user, responsible consumer, domestic consumer according to significance level; If target device overload, then all affected loads according to meritorious from small to large arranged sequentially of load.
In the 9th optimal technical scheme provided by the invention, in described step b, turn for task and turn confession if target device has a power failure, then all loads of having added up are all forwarded to the zone of normal power supply, to recover the normal safe power supply of power failure load;
Turn for task if target device is crossed idling and supply, then analyze the overload quantity of current goal equipment, load is compared with overload quantity successively according to meritorious order from small to large, find out first meritorious value greater than the load of overload quantity, then this load is for turning the load of confession; In twos combination is compared with overload quantity more from small to large if each load is gained merit less than overload quantity, successively back and forth until find the load that will turn confession.
In the tenth optimal technical scheme provided by the invention, in described step c, has the power supply point that turns for ability according to turning to filter out for task, calculate the voltage of each power supply point and the voltage difference absolute value that supplies load place bus when forward, getting the minimum power supply point of its value turns for load, and calculate the cyclization impulse current, if do not find power supply point to go to step e.
In the more preferably technical scheme provided by the invention, in described steps d, search turns for the path according to power supply point, and cumulative switch motion number of times is judged whether the switch motion number of times reaches the upper limit, skips to step g if reach the upper limit, otherwise gone to step f.
Provided by the invention second more preferably in the technical scheme, in described step e, adopt the search of topology search technology when forward for the equipment switch of task periphery as increasing power supply point newly, and then screen power supply point from rotating function power and two angles of impulse current; If find power supply point then go to steps d, otherwise go to step g.
The provided by the invention the 3rd more preferably in the technical scheme, in described step f, judges whether current power supply point associate device transships, if overload is returned step a, otherwise goes to step h; Wherein, the power supply point associate device comprises: circuit and transformer.
The provided by the invention the 4th more preferably in the technical scheme, in described step g, carries out overloading analysis, and the computation overload amount is according to domestic consumer, responsible consumer, high-risk user's successively load rejection of order, until accumulated value is more than or equal to overload quantity.
The provided by the invention the 5th more preferably in the technical scheme, in described step 5, from the economy of switch motion number of times, network loss, 3 angles assessments of load rejection amount load transfer scheme; And from impulse current, get rid of the fail safe that user, 3 angles of out-of-limit angle weigh load transfer.
The provided by the invention the 6th more preferably in the technical scheme, and the economy from switch motion number of times, network loss, 3 angles assessments of load rejection amount load transfer scheme designs following valuation functions and economic index valuation functions:
Switch motion number of times valuation functions:
f cb = n cb n cb _ max - - - ( 1 )
The network loss valuation functions:
f loss = f loss _ now - f loss _ base f loss _ base - - - ( 2 )
The load rejection valuation functions:
f loseload = p load _ lose p load _ tran - - - ( 3 )
The economic evaluation function:
f economy=exp[-(a 1f cb+a 2f loss+a 3f lossload)] (4)
Formula (1) is in (4): n CbBe switch motion number of times, n Cb_maxBe the switch motion number of times upper limit, f Loss_nowFor turning the whole network active power loss after supplying, f Loss_baseFor turning for front the whole network active power loss p Load_lossBe meritorious load rejection amount, p Load_tranFor turning the burden with power amount of confession, n Vio_baseFor turning for front voltage out-of-limit number n Vio_nowTurn for rear voltage out-of-limit number f EconomyFor turning for scheme economic index function, a 1, a 2, a 3Be respectively weight.
The provided by the invention the 7th more preferably in the technical scheme, from impulse current, get rid of the fail safe that user, 3 angles of out-of-limit angle weigh load transfer, designs following valuation functions and fail safe economic index valuation functions:
Cyclization impulse current valuation functions:
f i = 1 ( i max > = i set ) 0 ( i max < i set ) - - - ( 5 )
Get rid of user's valuation functions:
f loseuser = user hr + user vip user hr _ all + user vip _ all - - - ( 6 )
The voltage out-of-limit valuation functions:
f vio = | v vio _ now - v vio _ base | max ( v vio _ now , v vio _ base ) - - - ( 7 )
The safety indexes valuation functions:
f safe=exp[-(a 4f i+a 5f loseuser+a 6f vio)] (8)
Formula (5) is in (8): f iBe cyclization impulse current valuation functions, i MaxBe maximum cyclization impulse current, i SetBe feeder line fast tripping protection setting value; f LoseuserFor getting rid of user's valuation functions, user HrFor successfully not turning the high-risk number of users of confession, user in the load transfer process VipFor successfully not turning the responsible consumer number of confession, user in the load transfer process Hr_allBe high-risk total number of users in the transfer task, user Vip_allBe responsible consumer sum in the transfer task, v Vio_nowTurn for rear voltage out-of-limit number v Vio_baseTurn for front voltage out-of-limit number a 4, d 5, a 6Be respectively weight.
Compared with the prior art, a kind of area power grid load transfer aid decision-making method provided by the invention, flexible Offered target device type, faulty equipment, repair apparatus, out-of-limit equipment can be simulated the operating problem of actual electric network, carry out the load transfer analysis; The quick load Information Statistics by topological analysis technique, can be added up affected information on load according to the target device rapid analysis; Turn for route searching, can combine path search techniques with the load transfer expert system, find optimum to turn for the path; Path search techniques adopts and turns continuously the confession technology, has avoided owing to the out-of-limit or overload situations that turns for the information that causes, guarantees to turn for the path security reliability; Perfect economic security assessment, can carry out from aspects such as switch motion number of times, network loss, impulse current, load rejection, out-of-limit situations the economy and security assessment, turn for after the economy of operational mode and fail safe quantize to show, the dispatcher can be recognized turn the risk class for scheme; For the dispatcher provides load transfer strategy report, the dispatcher can be made things convenient for and comprehensively understand the load transfer scheme information; The method embodies regional load and turns for tactful rapidity, accuracy and reliability, take full advantage of already present remote signalling in the dispatch automated system, remote measurement and power network topology information, generate quickly and accurately the scheme of confession that turns that can satisfy the electrical network economy safe operation, avoid in turning for the scheme process, cause load rejection or user to have a power failure for a long time, the situations such as out-of-limit overload occur; The load transfer aid decision belongs to intellectual analysis and the aid decision of dispatch automated system and uses, main purpose is based on trouble hunting or transships out-of-limit equipment, carry out influenced information on load statistics, turn for analysis of strategies based on expert system and topology search technology, can take full advantage of expert system turns for the path to find fast, consider to turn the newly-increased overload situations for causing in the process, the load that causes overload is turned continuously for analyzing.To turning for scheme of generating, carry out the economy and security assessment of load transfer scheme from indexs such as switch motion number of times, network loss, impulse current, load rejection, out-of-limit situations.
Description of drawings
Fig. 1 is the schematic flow sheet of area power grid load transfer aid decision-making method.
Fig. 2 is load transfer Policy Table structure chart.
Fig. 3 is the schematic flow sheet of statistics information on load.
Fig. 4 is the schematic diagram of economy and security assessment.
Fig. 5 is the detailed process schematic diagram of load transfer aid decision-making method.
Embodiment
Term and definition
Power supply point: the stand-by heat switch of periphery, dead electricity district.
Turn for the path: the sequence of movement of switch.
Turn for capacity: the line load rate of power supply point.
Network element: switch, unit, load, capacitor or reactor, transformer and circuit etc. all become network element.Wherein transformer, circuit and switch etc. are called the both-end element, and transformer and circuit are called again series arm; Unit, load, capacitor or reactor etc. are called single-ended element, are called again parallel branch.
Node: be the tie-point of network element, element is connected into electrical network by mutual public node.
The expert system definition: according to electrical network history run experience, definition load transfer strategy expert system.
Load group definition: according to electrical network day-to-day operation experience, the switching situation of load, have the identical load that turns for the path and be defined as the load group in the load transfer process, the essential information of load group comprises load group number, load name, meritorious, idle, affiliated factory station.When carrying out the load transfer program, meritorious value and idle value can be refreshed according to the data section.
High-risk user refers to cause personal injury, device damage, will produce waste product, and the production order can not be recovered for a long time, and people's lives occur chaotic, for high-risk user, take the measure of interruption of power supply; Responsible consumer refers to cause a large amount of underproduction, will make the affected user of people's lives, also takes the measure of interruption of power supply for responsible consumer; What all did not belong to high-risk user, responsible consumer all belongs to domestic consumer.
Shown in Fig. 1,5, a kind of area power grid load transfer aid decision-making method comprises the steps:
(1). the Offered target power failure equipments; (2). the statistics information on load; (3). analyze lotus and turn for strategy; (4). the assessment economy and security.
As shown in Figure 2, power supply turns for path definition: based on the load group, according to topological connection relation, operation of power networks experience, for each group load defines power supply and turns for the path.The factory station is defined as power supply, if there are a plurality of power supply sources that turn in the load group, then defines priority according to operating experience for respectively turning power supply source; After having determined that each turns power supply source, for belonging to the turning for path definition priority of same power supplies.
The Offered target power failure equipments: the target power failure equipments is the cause of load transfer, and the equipment that namely causes loading and have a power failure comprises faulty equipment, repair apparatus etc.Target power failure equipments attribute comprises device name, device type, end factory station, two end factories station.Can select a plurality of equipment, dissimilar equipment.
Equipment is set to the target power failure equipments, namely the target power failure equipments is defined as the object that load transfer is analyzed.
The trend parameter arranges: adopt trend to calculate turning the scheme after supplying, carry out verification.The parameter setting that trend is calculated comprises meritorious convergence precision, idle convergence precision and maximum iteration time.
Statistics information on load: based on the target power failure equipments that sets, according to grid structure and power system operating mode, at first electrical network is carried out topological analysis and form computation model, then search for affected factory station and information on load.
Topological analysis: node model is also referred to as physical model, and it is the original description to network, this model of input data; Bus model is also referred to as computation model, and it and network equation link together.Bus model changes with on off state.It is exactly according on off state and the network element state process by the bus model of the node model generation electrical network of electrical network that network connection is analyzed.
The power system network Topology Analysis Based is divided into two basic steps:
Factory's station bus analysis: according to the folding condition of switch and withdrawing from/returning to form of element, form bus model by node model.Function is that what buses the interior node of a certain electric pressure of analyzing a certain factory station is connected into by Closing Switch, consequently the factory station is divided into several buses.Bus is to be closed the node set that the logic branch road links together.
Grid is analyzed: what subnets the bus of analyzing whole electrical network is connected into by closed branch road, and every sub-electrical network is the set that the bus of electrical link is arranged, same sub-electrical network of general genus when electric power system normally moves.
Information on load statistics: the topological status attribute of define grid element obtains the topological state of each network element by Topology Analysis Based.As shown in Figure 3, the information on load system mainly can be divided into three steps:
At first before the excision of target power failure equipments, the whole network is carried out Topology Analysis Based one time, and preserve the topological state of each equipment in the ground state situation;
Then excise the target power failure equipments, again carry out Topology Analysis Based, preserve the topological state of each equipment under the current state;
By before and after the excision of contrast target power failure equipments, the topological state of other network elements obtains affected factory station and information on load at last.
The load transfer analysis of strategies: based on the area power grid characteristics, according to operation of power networks experience and typical case, definition load transfer Policy Table, responsible consumer and high-risk user form the substance of expert system.
Turn for strategy and have a power failure and two kinds of apparatus overloads turn the confession type and analyze from equipment.Based on expert system and topology search technology, turn for analysis of strategies.Consider to turn the new overload for causing in the process, adopt to turn continuously the confession technology, the concrete analysis process is as follows:
A. load ordering
The information on load statistical function is searched for affected information on load by the topology search technology.According to turning for type load is sorted, turn confession if target device has a power failure, then all affected loads are sorted high-risk user, responsible consumer, domestic consumer according to significance level; If target device overload, then all affected loads according to meritorious from small to large arranged sequentially of load.
B. determine to turn for task
Turn confession if target device has a power failure, then turning for task is exactly the zone that all loads of having added up is all forwarded to normal power supply, to recover the normal safe power supply of power failure load.
If target device is crossed the idling confession, then at first analyze the overload quantity of current goal equipment, load is compared with overload quantity successively according to meritorious order from small to large, find out first meritorious value greater than the load of overload quantity, this load is the load that will turn confession.In twos combination is compared with overload quantity more from small to large if each load is gained merit less than overload quantity, successively back and forth until find the load that will turn confession.
C. expert system is searched for power supply point
Turn economy and fail safe for mode for improving computational speed and assurance, preferentially adopt the method search power supply point of expert system, have the power supply point that turns for ability according to turning to filter out for task.Calculate the voltage of each power supply point and the voltage difference absolute value that supplies load place bus when forward, get the minimum power supply point of its value and turn for load, and calculating cyclization impulse current.If do not find power supply point to go to step e.
D. determine to turn for the path
Search turns for the path according to power supply point, and cumulative switch motion number of times is judged whether the switch motion number of times reaches the upper limit, skips to step g if reach the upper limit, otherwise gone to step f.
E. topological analysis is searched for power supply point (considering the change of operational mode)
Adopt the search of topology search technology when the stand-by heat switch conduct newly-increased power supply point of forward for the task periphery, and then from rotating function power and two angle screenings of impulse current power supply point.If find power supply point to turn steps d, if do not find power supply point to go to step g.
F. overloading analysis
Judge whether current power supply point associate device transships, if overload is returned step a, otherwise go to step h.
G. load rejection analysis
At first carry out overloading analysis, the computation overload amount is according to load important procedure domestic consumer, responsible consumer, the successively load rejection of high-risk user order from low to high, until accumulated value is more than or equal to overload quantity.
H. determine to turn for scheme
As shown in Figure 4, the process of economy and security assessment is as follows:
From the economy of switch motion number of times, network loss, 3 angle assessments of load rejection amount load transfer scheme, and design following valuation functions and economic index valuation functions.
Switch motion number of times valuation functions:
f cb = n cb n cb _ max - - - ( 1 )
The network loss valuation functions:
f loss = f loss _ now - f loss _ base f loss _ base - - - ( 2 )
The load rejection valuation functions:
f loseload = p load _ lose p load _ tran - - - ( 3 )
The economic evaluation function:
f economy=exp[-(a 1f cb+a 2f loss+a 3f lossload)] (4)
Formula (1) is in (4): n CbBe switch motion number of times, n Cb_maxBe the switch motion number of times upper limit, f Loss_nowFor turning the whole network active power loss after supplying, f Loss_baseFor turning for front the whole network active power loss p Load_lossLoad rejection amount (gaining merit), p Load_tranBe the load (gaining merit) that will turn confession, n Vio_baseFor turning for front voltage out-of-limit number n Vio_nowTurn for rear voltage out-of-limit number.f EconomyFor turning for scheme economic index function.a 1, a 2, a 3Be respectively weight.
Wherein, f CbOn be limited to 1, switch motion number of times upper limit n Cb_maxCan be set by the user, can pass through n to the consideration of switch action frequency Cb_maxAnd a 1The common adjustment is so consider the life-span of switch and the complexity f of operation CbTax is with larger weight a 1=0.3; Network loss valuation functions f LossCan find out that by formula its value can just can bear, when its value can improve economic index when negative, consider to turn for after operational mode can't be permanent so f LossTax is with less weight a 2=0.2; Consider the purpose of load transfer for guaranteeing the reliability of customer power supply, therefore tax is with f LossloadLarger weight a 3=0.5.
From impulse current, get rid of user (important and high-risk user), 3 angles of out-of-limit angle are weighed the fail safe of load transfer, and design following valuation functions and fail safe economic index valuation functions.
Cyclization impulse current valuation functions:
f i = 1 ( i max > = i set ) 0 ( i max < i set ) - - - ( 5 )
Get rid of user's valuation functions:
f loseuser = user hr + user vip user hr _ all + user vip _ all - - - ( 6 )
The voltage out-of-limit valuation functions:
f vio = | v vio _ now - v vio _ base | max ( v vio _ now , v vio _ base ) - - - ( 7 )
The safety indexes valuation functions:
f safe=exp[-(a 4f i+a 5f loseuser+a 6f vio)] (8)
Formula (5) is in (8): f iCyclization impulse current valuation functions, i MaxMaximum cyclization impulse current, i SetFeeder line fast tripping protection setting value; f LoseuserFor getting rid of user's valuation functions, user HrFor successfully not turning the high-risk number of users of confession, user in the load transfer process VipFor successfully not turning the responsible consumer number of confession, user in the load transfer process Hr_allBe high-risk total number of users in the transfer task, user Vip_allBe responsible consumer sum in the transfer task, v Vio_nowTurn for rear voltage out-of-limit number v Vio_baseTurn for front voltage out-of-limit number a 4, a 5, a 6Be respectively weight.
Wherein, if maximum cyclization impulse current greater than setting value, then can not cyclization, therefore as impulse current a during greater than setting value 4=1, otherwise a 4=0.The purpose of load transfer namely guarantees user's reliable power supply, and therefore getting rid of user's valuation functions should give larger weight a 5=0.6, and a 6=0.4.
Setting the optimum index of economy is 1, and the optimum index of fail safe is 1, and economic index and safety indexes lower limit all are 0.9, namely need to consider the feasibility of load transfer scheme when desired value is lower than 0.9.
What need statement is that content of the present invention and embodiment are intended to prove the practical application of technical scheme provided by the present invention, should not be construed as the restriction to protection range of the present invention.Those skilled in the art can do various modifications, be equal to and replace or improve inspired by the spirit and principles of the present invention.But these changes or modification are all in the protection range that application is awaited the reply.

Claims (18)

1. an area power grid load transfer aid decision-making method is characterized in that, described method comprises the steps:
(1). the Offered target power failure equipments;
(2). the statistics information on load;
(3). analyze lotus and turn for strategy;
(4). the assessment economy and security.
2. method according to claim 1 is characterized in that, in described step 1, described target power failure equipments is the equipment that causes loading and have a power failure, and comprising: faulty equipment and repair apparatus; Target power failure equipments attribute comprises: device name, device type, end factory station and two end factories station.
3. method according to claim 1 is characterized in that, in described step 2, according to grid structure and power system operating mode, electrical network is carried out topological analysis form computation model; Wherein, topological analysis comprises: factory's station bus analysis and grid analysis.
4. method according to claim 3 is characterized in that, factory's station bus analysis comprises: according to the folding condition of switch and withdrawing from/returning to form of element, form bus model by node model; What buses the interior node of a certain electric pressure of analyzing a certain factory station is connected into by Closing Switch, and the factory station is divided into several buses.
5. method according to claim 3 is characterized in that, the grid analysis: what subnets the bus of analyzing whole electrical network is connected into by closed branch road; Wherein, every sub-electrical network is the set that the bus of electrical link is arranged, same sub-electrical network of general genus when electric power system normally moves.
6. method according to claim 1 is characterized in that, in described step 3, comprises the steps:
(3-1). the statistics information on load;
(3-2). according to statistics, analysis load turns for strategy.
7. method according to claim 6 is characterized in that, step 3-1 comprises the steps:
(A). before the excision of target power failure equipments, the whole network is carried out Topology Analysis Based one time, and preserve the topological state of each equipment in the ground state situation;
(B). excision target power failure equipments, carry out again Topology Analysis Based, preserve the topological state of each equipment under the current state;
(C). before and after the excision of contrast target power failure equipments, the topological state of circuit, transformer, switch, disconnecting link and bus obtains affected factory station and information on load.
8. method according to claim 6 is characterized in that, step 3-2 comprises the steps:
(a). the load ordering;
(b). determine to turn for task;
(c). the search power supply point;
(d). determine to turn for the path;
(e). topological analysis search power supply point;
(f). overloading analysis;
(g). the load rejection analysis;
(h). determine to turn for scheme.
9. method according to claim 8 is characterized in that, in described step a, according to turning for type load is sorted, turn confession if target device has a power failure, then all affected loads are sorted high-risk user, responsible consumer, domestic consumer according to significance level; If target device overload, then all affected loads according to meritorious from small to large arranged sequentially of load.
10. method according to claim 8 is characterized in that, in described step b, turns for task and turns confession if target device has a power failure, and then all loads of having added up is all forwarded to the zone of normal power supply, to recover the normal safe power supply of power failure load;
Turn for task if target device is crossed idling and supply, then analyze the overload quantity of current goal equipment, load is compared with overload quantity successively according to meritorious order from small to large, find out first meritorious value greater than the load of overload quantity, then this load is for turning the load of confession; In twos combination is compared with overload quantity more from small to large if each load is gained merit less than overload quantity, successively back and forth until find the load that will turn confession.
11. method according to claim 8, it is characterized in that, in described step c, has the power supply point that turns for ability according to turning to filter out for task, calculate the voltage of each power supply point and the voltage difference absolute value that supplies load place bus when forward, get the minimum power supply point of its value and turn for load, and calculate the cyclization impulse current, if do not find power supply point to go to step e.
12. method according to claim 8 is characterized in that, in described steps d, search turns for the path according to power supply point, and cumulative switch motion number of times is judged whether the switch motion number of times reaches the upper limit, skips to step g if reach the upper limit, otherwise gone to step f.
13. method according to claim 8, it is characterized in that, in described step e, adopt the search of topology search technology when the equipment switch conduct newly-increased power supply point of forward for the task periphery, and then from rotating function power and two angle screenings of impulse current power supply point; If find power supply point then go to steps d, otherwise go to step g.
14. method according to claim 8 is characterized in that, in described step f, judges whether current power supply point associate device transships, if overload is returned step a, otherwise goes to step h; Wherein, the power supply point associate device comprises: circuit and transformer.
15. method according to claim 8 is characterized in that, in described step g, carries out overloading analysis, the computation overload amount is according to domestic consumer, responsible consumer, high-risk user's successively load rejection of order, until accumulated value is more than or equal to overload quantity.
16. method according to claim 1 is characterized in that, in described step 5, from the economy of switch motion number of times, network loss, 3 angle assessments of load rejection amount load transfer scheme; And from impulse current, get rid of the fail safe that user, 3 angles of out-of-limit angle weigh load transfer.
17. method according to claim 16 is characterized in that, the economy from switch motion number of times, network loss, 3 angle assessments of load rejection amount load transfer scheme designs following valuation functions and economic index valuation functions:
Switch motion number of times valuation functions:
f cb = n cb n cb _ max - - - ( 1 )
The network loss valuation functions:
f loss = f loss _ now - f loss _ base f loss _ base - - - ( 2 )
The load rejection valuation functions:
f loseload = p load _ lose p load _ tran - - - ( 3 )
The economic evaluation function:
f economy=exp[-(a 1f cb+a 2f loss+a 3f lossload)] (4)
Formula (1) is in (4): n CbBe switch motion number of times, n Cb_maxBe the switch motion number of times upper limit, f Loss_nowFor turning the whole network active power loss after supplying, f Loss_baseFor turning for front the whole network active power loss p Load_lossBe meritorious load rejection amount, p Load_tranFor turning the burden with power amount of confession, n Vio_baseFor turning for front voltage out-of-limit number n Vio_nowTurn for rear voltage out-of-limit number f EconomyFor turning for scheme economic index function, a 1, a 2, a 3Be respectively weight.
18. method according to claim 16 is characterized in that, from impulse current, get rid of the fail safe that user, 3 angles of out-of-limit angle weigh load transfer, designs following valuation functions and fail safe economic index valuation functions:
Cyclization impulse current valuation functions:
f i = 1 ( i max > = i set ) 0 ( i max < i set ) - - - ( 5 )
Get rid of user's valuation functions:
f loseuser = user hr + user vip user hr _ all + user vip _ all - - - ( 6 )
The voltage out-of-limit valuation functions:
f vio = | v vio _ now - v vio _ base | max ( v vio _ now , v vio _ base ) - - - ( 7 )
The safety indexes valuation functions:
f safe=exp[-(a 4f i+a 5f loseuser+a 6f vio)] (8)
Formula (5) is in (8): f iBe cyclization impulse current valuation functions, i MaxBe maximum cyclization impulse current, i SetBe feeder line fast tripping protection setting value; f LoseuserFor getting rid of user's valuation functions, user HrFor successfully not turning the high-risk number of users of confession, user in the load transfer process VipFor successfully not turning the responsible consumer number of confession, user in the load transfer process Hr_allBe high-risk total number of users in the transfer task, user Vip_allBe responsible consumer sum in the transfer task, v Vio_nowTurn for rear voltage out-of-limit number v Vio_baseTurn for front voltage out-of-limit number a 4, a 5, a 6Be respectively weight.
CN201210352809.1A 2012-09-20 2012-09-20 Assisted decision making method for load transfer in regional power grid Active CN102916431B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210352809.1A CN102916431B (en) 2012-09-20 2012-09-20 Assisted decision making method for load transfer in regional power grid

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210352809.1A CN102916431B (en) 2012-09-20 2012-09-20 Assisted decision making method for load transfer in regional power grid

Publications (2)

Publication Number Publication Date
CN102916431A true CN102916431A (en) 2013-02-06
CN102916431B CN102916431B (en) 2015-01-21

Family

ID=47614711

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210352809.1A Active CN102916431B (en) 2012-09-20 2012-09-20 Assisted decision making method for load transfer in regional power grid

Country Status (1)

Country Link
CN (1) CN102916431B (en)

Cited By (32)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103514364A (en) * 2013-08-01 2014-01-15 国网上海市电力公司 Overloading assistant decision-making computing method of power grid equipment considering load transfer actions
CN103544652A (en) * 2013-09-26 2014-01-29 广东电网公司中山供电局 Power grid industry classification load automatic statistical method and system
CN103928926A (en) * 2014-04-28 2014-07-16 国网宁夏电力公司宁东供电公司 Load transferring system and method during power distribution network fault
CN104201675A (en) * 2014-09-19 2014-12-10 国家电网公司 Automatic load switching and restoring method for overloaded circuit
CN104218582A (en) * 2014-09-25 2014-12-17 国网上海市电力公司 Power distribution network load conversion method based on line cutting
CN104280666A (en) * 2014-10-29 2015-01-14 国网上海市电力公司 Auxiliary load transfer decision system used after medium voltage distribution network line breaks down
CN104332999A (en) * 2014-11-21 2015-02-04 国家电网公司 Automatic main grid power supply transferring strategy generation method for regional power grid
CN104362615A (en) * 2014-10-17 2015-02-18 国家电网公司 Non-fault segment power supply recovery method based on information platform
CN104778632A (en) * 2015-03-31 2015-07-15 国网福建省电力有限公司 Intelligent decision making aiding method and system for transfer power supply
CN104821582A (en) * 2015-05-21 2015-08-05 广东电网有限责任公司惠州供电局 Power distribution network load transfer optimization method and system based on non-linear integer programming
CN105552898A (en) * 2016-01-05 2016-05-04 东方电子股份有限公司 Load transfer method for power distribution network
CN106157170A (en) * 2016-07-06 2016-11-23 北京中恒博瑞数字电力科技有限公司 A kind of electric power system dispatching method of controlling operation thereof based on power supply reliability
CN106451422A (en) * 2016-09-30 2017-02-22 国网江西省电力公司电力科学研究院 Simple 10kV distribution line load transfer risk assessment platform
CN107025524A (en) * 2016-12-30 2017-08-08 国电南瑞科技股份有限公司 Consider the apparatus overload aid decision-making method of load power supply reliability requirement
CN107346886A (en) * 2016-12-06 2017-11-14 广东电网有限责任公司云浮供电局 Distribution network load turns to supply method and system
CN108233370A (en) * 2017-12-28 2018-06-29 李淑芹 One kind turns for method for optimizing route
CN109066701A (en) * 2018-08-09 2018-12-21 国网浙江省电力有限公司温州供电公司 A kind of balancing the load method and system
CN109510205A (en) * 2019-01-04 2019-03-22 国网江苏省电力有限公司宿迁供电分公司 A kind of distribution network load turns for decision Analysis method
CN109672171A (en) * 2018-12-06 2019-04-23 国网天津市电力公司 Eliminate the Automatic Control Strategy of 500kV transformer overload
CN109742850A (en) * 2018-12-04 2019-05-10 广东电网有限责任公司 A method of telegram in reply of meeting an urgent need under the disaster scenario based on EMS
CN109784612A (en) * 2018-11-26 2019-05-21 国电南瑞科技股份有限公司 Match integrated area power grid on-line intelligence analysis decision method based on ground
CN110211445A (en) * 2019-04-30 2019-09-06 国家电网有限公司 A kind of distribution network load turns to apply training system for control
CN110601188A (en) * 2019-09-20 2019-12-20 国网天津市电力公司 Rapid processing method for large-area power failure of power distribution network based on optimal regional load transfer strategy
CN110676844A (en) * 2019-09-29 2020-01-10 许昌许继软件技术有限公司 Intelligent power distribution network load transfer method and device
CN111682534A (en) * 2020-06-17 2020-09-18 广东电网有限责任公司 Method for analyzing batch transfer scheme of feeder lines of power distribution network
CN111915138A (en) * 2020-07-02 2020-11-10 天津理工大学 Method and device for decision-making of closed loop of power distribution network based on measure priority
CN111967736A (en) * 2020-07-30 2020-11-20 许继集团有限公司 Transformer substation load shedding control method and system based on big data platform
CN112234603A (en) * 2020-09-08 2021-01-15 广东电网有限责任公司江门供电局 Heavy overload checking method for open-loop power grid load transfer decision
CN112398129A (en) * 2020-12-04 2021-02-23 广东电网有限责任公司 Power grid post-accident risk control aid decision-making method and device and storage medium
CN113783185A (en) * 2021-08-19 2021-12-10 国网四川省电力公司 Method for quickly reconstructing power distribution network
WO2022052142A1 (en) * 2020-09-08 2022-03-17 广东电网有限责任公司江门供电局 Method for path sorting in load transfer decision-making for open-loop power grid
CN114565297A (en) * 2022-03-03 2022-05-31 国网山东省电力公司临沂供电公司 Join in marriage automatic check balance tool of net power failure maintenance plan

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104332993B (en) * 2014-11-13 2016-06-08 南京四方亿能电力自动化有限公司 A kind of intelligent distribution type feeder automation load transfer method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102063657A (en) * 2010-12-23 2011-05-18 中国电力科学研究院 Operating level and power supplying capability evaluation method for urban electric distribution network
CN102354977A (en) * 2011-10-20 2012-02-15 湖南省电力公司科学研究院 Feeder fault handling method

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102063657A (en) * 2010-12-23 2011-05-18 中国电力科学研究院 Operating level and power supplying capability evaluation method for urban electric distribution network
CN102354977A (en) * 2011-10-20 2012-02-15 湖南省电力公司科学研究院 Feeder fault handling method

Cited By (50)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103514364B (en) * 2013-08-01 2016-09-07 国网上海市电力公司 The grid equipment overload aid decision computational methods of meter and load transfer measure
CN103514364A (en) * 2013-08-01 2014-01-15 国网上海市电力公司 Overloading assistant decision-making computing method of power grid equipment considering load transfer actions
CN103544652A (en) * 2013-09-26 2014-01-29 广东电网公司中山供电局 Power grid industry classification load automatic statistical method and system
CN103544652B (en) * 2013-09-26 2017-06-23 广东电网公司中山供电局 Power grid industry classification load automatic statistical method and system
CN103928926A (en) * 2014-04-28 2014-07-16 国网宁夏电力公司宁东供电公司 Load transferring system and method during power distribution network fault
CN103928926B (en) * 2014-04-28 2016-04-13 国网宁夏电力公司宁东供电公司 Load transfer plan system and method during distribution network failure
CN104201675A (en) * 2014-09-19 2014-12-10 国家电网公司 Automatic load switching and restoring method for overloaded circuit
CN104201675B (en) * 2014-09-19 2016-04-27 国家电网公司 A kind of load of overload circuit is poured out and restoration methods automatically
CN104218582A (en) * 2014-09-25 2014-12-17 国网上海市电力公司 Power distribution network load conversion method based on line cutting
CN104362615A (en) * 2014-10-17 2015-02-18 国家电网公司 Non-fault segment power supply recovery method based on information platform
CN104280666A (en) * 2014-10-29 2015-01-14 国网上海市电力公司 Auxiliary load transfer decision system used after medium voltage distribution network line breaks down
CN104332999A (en) * 2014-11-21 2015-02-04 国家电网公司 Automatic main grid power supply transferring strategy generation method for regional power grid
CN104778632A (en) * 2015-03-31 2015-07-15 国网福建省电力有限公司 Intelligent decision making aiding method and system for transfer power supply
CN104821582A (en) * 2015-05-21 2015-08-05 广东电网有限责任公司惠州供电局 Power distribution network load transfer optimization method and system based on non-linear integer programming
CN105552898A (en) * 2016-01-05 2016-05-04 东方电子股份有限公司 Load transfer method for power distribution network
CN105552898B (en) * 2016-01-05 2018-02-02 东方电子股份有限公司 A kind of distribution network load turns supplier's method
CN106157170A (en) * 2016-07-06 2016-11-23 北京中恒博瑞数字电力科技有限公司 A kind of electric power system dispatching method of controlling operation thereof based on power supply reliability
CN106157170B (en) * 2016-07-06 2019-11-19 北京中恒博瑞数字电力科技有限公司 A kind of electric power system dispatching method of controlling operation thereof based on power supply reliability
CN106451422A (en) * 2016-09-30 2017-02-22 国网江西省电力公司电力科学研究院 Simple 10kV distribution line load transfer risk assessment platform
CN106451422B (en) * 2016-09-30 2018-11-06 国网江西省电力公司电力科学研究院 A kind of easy 10kV distribution lines load transfer risk assessment platform
CN107346886A (en) * 2016-12-06 2017-11-14 广东电网有限责任公司云浮供电局 Distribution network load turns to supply method and system
CN107346886B (en) * 2016-12-06 2020-02-04 广东电网有限责任公司云浮供电局 Power distribution network load transfer method and system
CN107025524B (en) * 2016-12-30 2020-11-03 国电南瑞科技股份有限公司 Equipment overload auxiliary decision-making method considering load power supply reliability requirement
CN107025524A (en) * 2016-12-30 2017-08-08 国电南瑞科技股份有限公司 Consider the apparatus overload aid decision-making method of load power supply reliability requirement
CN108233370B (en) * 2017-12-28 2021-12-10 国网思极数字科技(北京)有限公司 Supply transfer path optimization method
CN108233370A (en) * 2017-12-28 2018-06-29 李淑芹 One kind turns for method for optimizing route
CN109066701B (en) * 2018-08-09 2022-02-22 国网浙江省电力有限公司温州供电公司 Load balancing method and system
CN109066701A (en) * 2018-08-09 2018-12-21 国网浙江省电力有限公司温州供电公司 A kind of balancing the load method and system
CN109784612A (en) * 2018-11-26 2019-05-21 国电南瑞科技股份有限公司 Match integrated area power grid on-line intelligence analysis decision method based on ground
CN109742850A (en) * 2018-12-04 2019-05-10 广东电网有限责任公司 A method of telegram in reply of meeting an urgent need under the disaster scenario based on EMS
CN109672171A (en) * 2018-12-06 2019-04-23 国网天津市电力公司 Eliminate the Automatic Control Strategy of 500kV transformer overload
CN109510205A (en) * 2019-01-04 2019-03-22 国网江苏省电力有限公司宿迁供电分公司 A kind of distribution network load turns for decision Analysis method
CN109510205B (en) * 2019-01-04 2021-01-12 国网江苏省电力有限公司宿迁供电分公司 Power distribution network load transfer auxiliary decision analysis method
CN110211445B (en) * 2019-04-30 2021-06-08 国家电网有限公司 Power distribution network load transfer control application training system
CN110211445A (en) * 2019-04-30 2019-09-06 国家电网有限公司 A kind of distribution network load turns to apply training system for control
CN110601188A (en) * 2019-09-20 2019-12-20 国网天津市电力公司 Rapid processing method for large-area power failure of power distribution network based on optimal regional load transfer strategy
CN110601188B (en) * 2019-09-20 2023-03-03 国网天津市电力公司 Rapid processing method for large-area power failure of power distribution network based on optimal regional load transfer strategy
CN110676844A (en) * 2019-09-29 2020-01-10 许昌许继软件技术有限公司 Intelligent power distribution network load transfer method and device
CN110676844B (en) * 2019-09-29 2022-04-05 许昌许继软件技术有限公司 Intelligent power distribution network load transfer method and device
CN111682534A (en) * 2020-06-17 2020-09-18 广东电网有限责任公司 Method for analyzing batch transfer scheme of feeder lines of power distribution network
CN111915138A (en) * 2020-07-02 2020-11-10 天津理工大学 Method and device for decision-making of closed loop of power distribution network based on measure priority
CN111915138B (en) * 2020-07-02 2023-05-30 天津理工大学 Method and device for loop closing decision of power distribution network based on measure priority
CN111967736A (en) * 2020-07-30 2020-11-20 许继集团有限公司 Transformer substation load shedding control method and system based on big data platform
WO2022052142A1 (en) * 2020-09-08 2022-03-17 广东电网有限责任公司江门供电局 Method for path sorting in load transfer decision-making for open-loop power grid
CN112234603A (en) * 2020-09-08 2021-01-15 广东电网有限责任公司江门供电局 Heavy overload checking method for open-loop power grid load transfer decision
CN112398129A (en) * 2020-12-04 2021-02-23 广东电网有限责任公司 Power grid post-accident risk control aid decision-making method and device and storage medium
CN112398129B (en) * 2020-12-04 2023-09-05 广东电网有限责任公司 Auxiliary decision-making method, device and storage medium for risk control after power grid accident
CN113783185A (en) * 2021-08-19 2021-12-10 国网四川省电力公司 Method for quickly reconstructing power distribution network
CN113783185B (en) * 2021-08-19 2023-11-24 国网四川省电力公司 Quick reconstruction method for power distribution network
CN114565297A (en) * 2022-03-03 2022-05-31 国网山东省电力公司临沂供电公司 Join in marriage automatic check balance tool of net power failure maintenance plan

Also Published As

Publication number Publication date
CN102916431B (en) 2015-01-21

Similar Documents

Publication Publication Date Title
CN102916431B (en) Assisted decision making method for load transfer in regional power grid
Zheng et al. Regression tree for stability margin prediction using synchrophasor measurements
CN103001328B (en) Fault diagnosis and assessment method of intelligent substation
Zhao et al. Power system fault diagnosis based on history driven differential evolution and stochastic time domain simulation
Khoshkhoo et al. On-line dynamic voltage instability prediction based on decision tree supported by a wide-area measurement system
CN102346437B (en) For monitoring the system and method for automated system
CN102570450B (en) Static reliability assessment method for complex power grid
CN111049266B (en) Intelligent second-level power restoration method and system for regulation and control service
CN103413044A (en) Substation measurement information based method for estimating local topology of electric power system
CN104166940A (en) Method and system for assessing power distribution network operation risk
CN104112076A (en) Fuzzy mathematics based operational risk assessment method and fuzzy mathematics based operational risk assessment system
US20220308573A1 (en) System and method for predicting failure in a power system in real-time
CN103728569B (en) A kind of accumulator capacity Forecasting Methodology based on multifactor Grey Relational Model
CN103745080A (en) Power grid operation human factor reliability assessment method and device based on Bayesian model
Guo et al. Evidence-based approach to power transmission risk assessment with component failure risk analysis
Aminifar et al. State-of-the-art in synchrophasor measurement technology applications in distribution networks and microgrids
Garau et al. ICT reliability modelling in co-simulation of smart distribution networks
Janssen et al. Monitoring, protection and fault location in power distribution networks using system-wide measurements
CN113837423A (en) Power grid operation situation prediction method based on energy internet electric power big data
Stewart et al. Integrated multi-scale data analytics and machine learning for the distribution grid and building-to-grid interface
CN116739550A (en) Intelligent auxiliary decision-making method and system for rush repair
Cirio et al. On‐line dynamic security assessment to mitigate the risk of blackout in the Italian power system
Salkuti Performance analysis methods in smart grids: an overview
CN104361422A (en) Power consumer power quality data collection method based on economic evaluation
Ge et al. Smart Distribution Network Situation Awareness for High-Quality Operation and Maintenance: A Brief Review. Energies 2022, 15, 828

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant