CN102913208B - Method for building bushing inner-sieve-tube artificial natural gas migration passage between gas reservoirs - Google Patents

Method for building bushing inner-sieve-tube artificial natural gas migration passage between gas reservoirs Download PDF

Info

Publication number
CN102913208B
CN102913208B CN201210430296.1A CN201210430296A CN102913208B CN 102913208 B CN102913208 B CN 102913208B CN 201210430296 A CN201210430296 A CN 201210430296A CN 102913208 B CN102913208 B CN 102913208B
Authority
CN
China
Prior art keywords
gas
gas reservoir
reservoir
well
developed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201210430296.1A
Other languages
Chinese (zh)
Other versions
CN102913208A (en
Inventor
谢玉洪
马勇新
马文宏
王琴
蒋开
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Offshore Oil Corp CNOOC
CNOOC China Ltd Zhanjiang Branch
Original Assignee
China National Offshore Oil Corp CNOOC
CNOOC China Ltd Zhanjiang Branch
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Offshore Oil Corp CNOOC, CNOOC China Ltd Zhanjiang Branch filed Critical China National Offshore Oil Corp CNOOC
Priority to CN201210430296.1A priority Critical patent/CN102913208B/en
Publication of CN102913208A publication Critical patent/CN102913208A/en
Application granted granted Critical
Publication of CN102913208B publication Critical patent/CN102913208B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The invention discloses a method for building a bushing inner-sieve-tube artificial natural gas migration passage between gas reservoirs, and the method is characterized by comprising the following steps of selecting a gas reservoir to be developed which is appropriate to develop inside or surrounding a developed gas field; building a construction well; forming an uncased hole between the gas reservoir to be developed and a production gas reservoir of the developed gas field; loading a bushing inside the uncased hole on the two gas reservoir well sections; conducting well cementing for an annular well section between the uncased hole and the loaded bushing; forming a perforation hole on the two gas reservoir well sections in the bushing well section after the well cementing by utilizing a perforation gun; and loading a sieve tube into the bushing well section, and setting a bridge plug above or in front of the two gas reservoir well sections after the sieve tube is loaded to seal, so that the bushing inner-sieve-tube migration passage is formed. The bushing inner-sieve-tube artificial natural gas migration passage is conveniently built between the reservoir sand of the production gas reservoir of the developed gas field and the selected gas reservoir to be developed, and the economy and efficiency in development of the selected gas reservoir to be developed inside or surrounding the offshore developed gas field can be realized.

Description

Between gas reservoir, set up the method for sieve tube type artificial natural gas migration pathway in sleeve pipe
Technical field
The present invention relates to a kind of method of the construction of natural gas fields, specifically a kind of method of setting up sieve tube type artificial natural gas migration pathway in sleeve pipe between gas reservoir.
Background technology
In THE WESTERN SOUTH CHINA SEA marine site, develop gas field inner or around, had a lot of small-scale gas reservoirs, Abnormal High Pressure Gas Reservoirs, low permeability gas reservoir and high containing CO 2gas reservoir not yet drops into exploitation, and its overall reserves are on a grand scale.Due in the selected above-mentioned four kinds of gas reservoirs to be developed of the present invention, gas reservoir development is can gas production few and marine brill completion investment is relatively high on a small scale; The many well-diggings of the low need of Abnormal High Pressure Gas Reservoirs exploitation safety requirements grade high and low infiltration gas reservoir development production capacity and to reservoir transform, high containing CO 2high and the pure hydrocarbon of gas reservoir development requirement for anticorrosion yields poorly, and marine to bore completion investment higher; If increase further increase investment of underwater well head at existing offshore production platform external hanging drilling slot or at existing marine subsea production system; And newly-built offshore production platform or subsea production system construction investment are higher, thereby cause above-mentioned four kinds of marine gas reservoir development deficiencies in economic performance or be difficult to economic development.
At present for the selected small-scale gas reservoir to be developed in sea or Abnormal High Pressure Gas Reservoirs or low permeability gas reservoir or high containing CO 2the development approach of gas reservoir is identical with Determing The Length gas field, all adopts conventional offshore production platform exploitation or subsea production system exploitation.Mainly that at sea production platform or subsea production system bore development well and directly open selected small-scale gas reservoir to be developed or Abnormal High Pressure Gas Reservoirs or low permeability gas reservoir or high containing CO 2gas reservoir, selected small-scale gas reservoir to be developed or Abnormal High Pressure Gas Reservoirs or low permeability gas reservoir or high containing CO 2gas reservoir natural gas is small-scale gas reservoir to be developed or Abnormal High Pressure Gas Reservoirs or the low permeability gas reservoir or high containing CO from selecting under the effect of expansion energy 2gas reservoir flows to the producing pattern boring, and by the directly extraction of flow string quilt of each producing well.In addition, if will, to producing gas reservoir makeup energy, also need to bore special Injection Well.
For the selected small-scale gas reservoir to be developed in sea or Abnormal High Pressure Gas Reservoirs or low permeability gas reservoir or high containing CO 2gas reservoir, there is following shortcoming in existing gas reservoir development method:
1) newly-built production platform or subsea production system drilling well exploitation, from new production platform or subsea production system, be built into and put into production, cycle is long, investment is large, is difficult to realize sea has been developed to small-scale gas reservoir to be developed selected in gas field or around it or Abnormal High Pressure Gas Reservoirs or low permeability gas reservoir or high containing CO 2the economical and effective exploitation of gas reservoir also will cause existing well pattern and the existing production facility of developing gas field production platform or subsea production system to utilize simultaneously.
2) develop gas field production platform without residue well slot or subsea production system without residue underwater well head, also cannot adding and hanging well slots or increase underwater well head, or directly from built production platform or subsea production system drilling well, develop the situation that cannot realize because of reasons such as economy, technology selected small-scale gas reservoir to be developed or Abnormal High Pressure Gas Reservoirs or low permeability gas reservoir or high containing CO 2the reserves of gas reservoir cannot be employed, and the valuable natural gas resource of country will be wasted.
3) whether developed gas field production platform or subsea production system can be used for developing in it or its small-scale gas reservoir to be developed of selecting or Abnormal High Pressure Gas Reservoirs or low permeability gas reservoir or high containing CO around 2gas reservoir, is subject to the drillng operation capabilities limits of relative position and the offshore boring island of the former with the latter.
4) Abnormal High Pressure Gas Reservoirs exploitation and high containing CO 2gas reservoir development is all very high to the pressure security class requirement of relevant materials and requirement for anticorrosion, causes and bores completion and significantly increase of production facility investment, has a strong impact on economic benefit.
Summary of the invention
In order to overcome above-mentioned deficiency, the object of the invention is to provide a kind of set up sieve tube type artificial natural gas migration pathway in sleeve pipe between convenience and high-efficiency, widely used gas reservoir method.
To achieve these goals, the technical solution used in the present invention is as follows:
The method of setting up sieve tube type artificial natural gas migration pathway in sleeve pipe between gas reservoir, is characterized in that, comprises the following steps:
A, at sea developed in gas field development early stage, from selecting in gas field sandstone reservoir physical property to belong to middle and high infiltration, be permeability ﹥ 10mD and the more stable production gas reservoir that distributes, in conjunction with this, produce the sandstone reservoir spatial distribution scope of gas reservoir and the drilling duty of drill ship simultaneously, developing small-scale gas reservoir to be developed or Abnormal High Pressure Gas Reservoirs or low permeability gas reservoir or the high CO of containing that selects to be applicable to the present invention's exploitation in gas field or around it 2gas reservoir.
B, set up construction well: according to selected gas reservoir to be developed with developed the spatial relationship that gas field produces gas reservoir, at the appropriate location on sea drill ship in place, to ocean floor drilling, form the well of constructing;
C, in construction well, carry out drilling well, make the gas reservoir to be developed of selecting and developed gas field and produced between gas reservoir and form bore hole;
D, in bore hole, two gas reservoir well sections are lowered to sleeve pipe;
E, in bore hole and the annular section that is lowered between sleeve pipe, with cement, cement the well;
F, the reservoir well section use perforating gun perforation formation preforation tunnel to two gas reservoirs in the cased well section after well cementation;
In G, the cased well section after well cementation and perforation, be lowered to screen casing;
On H, two gas reservoir well sections after lower screen casing or before beat bridging plug and carry out packing, between two gas reservoirs, set up the artificial migration pathway of sieve tube type in sleeve pipe.
Repeating step C, D, E, F, G and H are setting up sieve tube type artificial natural gas migration pathway in a plurality of sleeve pipes in construction well.
After described step G completes, the working solution in the cased well section after lower screen casing can be discharged.
Beneficial effect of the present invention: the applications expanding of the inventive method sea developed in gas field or its around small-scale gas reservoir to be developed or Abnormal High Pressure Gas Reservoirs or low permeability gas reservoir or high containing CO 2the development approach of gas reservoir, because greatly having reduced development cost, can make marine small-scale gas reservoir or Abnormal High Pressure Gas Reservoirs or the low permeability gas reservoir or high containing CO that in the past can not employ because of reasons such as economy, technology in gas field or around it of having developed 2gas reservoir is achieved successfully effective exploitation, also makes the valuable natural gas resource of country be fully utilized simultaneously, and can improve the marine economic benefit of having developed gas field simultaneously.Its beneficial effect is embodied in following several respects:
1) can not be subject to develop the restriction of gas field production platform or subsea production system position, by suitable ground location drill ship in place and drilling well, developing gas field production Gas Reservoir sand body and the small-scale gas reservoir to be developed of selecting or Abnormal High Pressure Gas Reservoirs or low permeability gas reservoir or high containing CO at sea 2between gas reservoir, set up sieve tube type artificial natural gas migration pathway in sleeve pipe, both can be production gas reservoir makeup energy, saving increase brill Injection Well and the injection required investment of facility of corresponding ground thereof and operation cost, raising production gas reservoir economic recovery, and can realize again sea has been developed to small-scale gas reservoir or Abnormal High Pressure Gas Reservoirs or low permeability gas reservoir or the high CO of containing in gas field or around it 2the economical and effective exploitation of gas reservoir.
2) need not be from production platform or subsea production system drilling well, can reduce drill ship in place with drillng operation difficulty and risk, reduce drilling cost simultaneously.
3) can make full use of and develop the existing well pattern that gas field production platform or subsea production system are produced gas reservoir, in sleeve pipe, the above well section of sieve tube type artificial natural gas migration pathway bridging plug need not completion, can reduce completion period, reduction Completion cost.
4) make full use of the existing production facility of developing gas field production platform or subsea production system, can save development investment.
5) adopt sieve tube type artificial natural gas migration pathway in sleeve pipe, can realize and rely on sea to develop gas field production platform or the marine gas reservoir on a small scale of subsea production system exploitation or Abnormal High Pressure Gas Reservoirs or low permeability gas reservoir or high containing CO 2gas reservoir, neither needs production platform residue well slot and adding and hanging well slots, does not also need subsea production system residue underwater well head or increase underwater well head, does not more need newly-built production platform or subsea production system, can reduce greatly development investment and increase economic efficiency.
Accompanying drawing explanation
Below in conjunction with accompanying drawing, the present invention is described in further detail.
Fig. 1 is the structural representation that the present invention develops;
Fig. 2 is the schematic diagram of sieve tube type artificial natural gas migration pathway in the sleeve pipe shown in Fig. 1.
In figure: 1, selected gas reservoir to be developed; 2, sieve tube type artificial natural gas migration pathway in sleeve pipe; 3, bridging plug; 4, develop gas field and produced gas reservoir; 5, construction well; 6, Multilateral Wells; 7, producing well; 8, production platform; 9, drill ship; 10, sea; 11, bore hole; 12, sleeve pipe; 13, cement; 14, eyelet; 15, screen casing.
The specific embodiment
As shown in Figure 1, between gas reservoir, set up the method for sieve tube type artificial natural gas migration pathway in sleeve pipe, comprise the following steps:
1) at sea developed in gas field development early stage, from selecting in gas field sandstone reservoir physical property to belong to middle and high infiltration, be permeability ﹥ 10mD and the more stable production gas reservoir 4 that distributes, while is produced the sandstone reservoir spatial distribution scope of gas reservoir 4 and the drilling duty of drill ship 9 in conjunction with this, and at the gas reservoir to be developed 1 of developing in gas field or the applicable the present invention of its selection around develops, gas reservoir or Abnormal High Pressure Gas Reservoirs or low permeability gas reservoir or height contain CO on a small scale 2gas reservoir;
2) according to above-mentioned selected gas reservoir to be developed 1, gas reservoir or Abnormal High Pressure Gas Reservoirs or low permeability gas reservoir or height contain CO on a small scale 2gas reservoir and the spatial relationship of developing gas field production gas reservoir 4, at sea suitable ground location drill ship 9 in place, forms construction well 5;
3) as shown in Figure 2, utilizing construction well 5, is small-scale gas reservoir or Abnormal High Pressure Gas Reservoirs or low permeability gas reservoir or high containing CO at selected gas reservoir to be developed 1 2gas reservoir and developed between the sandstone reservoir that gas field produces gas reservoir 4 and bored bore hole 11, then in bore hole 11, two gas reservoir well sections are lowered to sleeve pipe 12, then in bore hole 11 and the annular section that is lowered between sleeve pipe 12, with cement 13, cement the well, finally the reservoir well section of two gas reservoirs in the sleeve pipe 12 well sections after well cementation is formed to preforation tunnel 14 with perforating gun perforation, in the sleeve pipe 12 well sections after well cementation and perforation, be lowered to screen casing 15;
4) working solution in the cased well section after lower screen casing can be discharged if desired;
5) on two gas reservoir well sections after lower screen casing or before beat bridging plug and carry out packing, between two gas reservoirs, set up the artificial migration pathway of sieve tube type in sleeve pipe.
6) if desired in the non-wiping situation of drill ship, in construction well 5, can set up a plurality of Multilateral Wells 6, utilize a plurality of Multilateral Wells 6 to bore a plurality of bore holes 11, a plurality of bore holes 11 are produced gas reservoir 4 or communicate with same selected gas reservoir to be developed 1 different parts around it or communicate with other a plurality of selected gas reservoirs to be developed 1 around it developing gas field; Then in each bore hole 11, two gas reservoir well sections are lowered to sleeve pipe 12, in each bore hole 11 and the annular section that is lowered between sleeve pipe 12, with cement 13, cement the well; Then the reservoir well section of two gas reservoirs in the cased well section after each well cementation is formed to preforation tunnel 14 with perforating gun perforation, in the sleeve pipe 12 well sections after well cementation and perforation, be lowered to screen casing 15, the working solution in the cased well section after each time screen casing can be discharged if desired; Finally on two gas reservoir well sections after each accordingly lower screen casing or before beat bridging plug 3 and carry out packing, build up sieve tube type artificial natural gas migration pathway 2 in a plurality of sleeve pipes developing between sandstone reservoir that gas field produces gas reservoir 4 and each selected gas reservoir to be developed 1, and discarded construction well 5 and each Multilateral Wells 6.
7) if desired, it is in place that drill ship can move on to new correct position, by above-mentioned steps, sets up sieve tube type artificial natural gas migration pathway 2 in new sleeve pipe.
Small-scale gas reservoir: refer to the gas reservoir of gas pool reserve small scale, its recoverable reserves is 2.5 hundred million sides~2,500,000,000 side only.
Abnormal High Pressure Gas Reservoirs: refer to that gas reservoir pressure is higher than hydrostatic pressure, and the pressure coefficient gas reservoir that is greater than 1.2.
Low permeability gas reservoir: refer to reservoir properties poor be permeability ﹤ 10 * 10 -3u ㎡, utilize conventional mining type to be difficult to the gas reservoir of effective scale exploitation.
High containing CO 2gas reservoir: refer to CO in natural gas 2the gas reservoir of content ﹥ 50%.
Screen casing: refer in the present invention and comprise that general screen casing, high-quality screen casing, calking or cutting seam sieve tube, wire-wrapped screen and restraining liner etc. have the sand control pipe of hole, seam.
Production platform: in offshore oil and gas field Development and Production, carry out the platform of oil and gas gathering, separation and preliminary treatment.
Subsea production system: refer to by the whole series such as underwater well head offshore oil and gas production system that production equipment and seabed pipeline form under water, substantially formed by production tree, well head and manifold, control system, control cable, ROV/ROT etc.
Drill ship: be provided with drilling equipment, can carry out the ship of Offshore Operation under mooring location or dynamic positioning state.
The above is the preferred embodiment of the present invention, certainly can not limit with this interest field of the present invention.It should be pointed out that for those skilled in the art, technical scheme of the present invention is modified or is equal to replacement, do not depart from protection scope of the present invention.

Claims (1)

1. a method of setting up sieve tube type artificial natural gas migration pathway in sleeve pipe between gas reservoir, is characterized in that, comprises the following steps:
A. developed in gas field development early stage at sea, from selecting in gas field sandstone reservoir physical property to belong to middle and high infiltration, be permeability ﹥ 10mD and the more stable production gas reservoir that distributes, in conjunction with this, produce the sandstone reservoir spatial distribution scope of gas reservoir and the drilling duty of drill ship simultaneously, developing in gas field or its gas reservoir of selection small-scale around or Abnormal High Pressure Gas Reservoirs or low permeability gas reservoir or high containing CO 2gas reservoir;
B. set up construction well: according to selected gas reservoir to be developed with developed the spatial relationship that gas field produces gas reservoir, at the appropriate location on sea drill ship in place, to ocean floor drilling, form the well of constructing;
C. in construction well, carry out drilling well, make the gas reservoir to be developed of selecting and developed between gas field production gas reservoir to form bore hole;
D. in bore hole, two gas reservoir well sections are lowered to sleeve pipe;
E. in bore hole and the annular section that is lowered between sleeve pipe, with cement, cement the well;
F. the reservoir well section of two gas reservoirs in the cased well section after well cementation is formed to preforation tunnel with perforating gun perforation;
G. in the cased well section after well cementation and perforation, be lowered to screen casing;
H. on two gas reservoir well sections after lower screen casing or before beat bridging plug and carry out packing, between two gas reservoirs, set up the artificial migration pathway of sieve tube type in sleeve pipe;
Heavy step C, D, E, F, G and H set up sieve tube type artificial natural gas migration pathway in a plurality of sleeve pipes in construction well; After described step G completes, the working solution in the cased well section after lower screen casing is discharged;
Described small-scale gas reservoir refers to that recoverable reserves is 2.5 hundred million sides~2,500,000,000 side's gas reservoir;
Described Abnormal High Pressure Gas Reservoirs refers to that gas reservoir pressure is higher than hydrostatic pressure, and the pressure coefficient gas reservoir that is greater than 1.2;
Described height is containing CO 2gas reservoir refers to CO in natural gas 2the gas reservoir of content ﹥ 50%;
Described low permeability gas reservoir is reservoir permeability ﹤ 10 * 10 -3the gas reservoir of u ㎡.
CN201210430296.1A 2012-11-01 2012-11-01 Method for building bushing inner-sieve-tube artificial natural gas migration passage between gas reservoirs Expired - Fee Related CN102913208B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210430296.1A CN102913208B (en) 2012-11-01 2012-11-01 Method for building bushing inner-sieve-tube artificial natural gas migration passage between gas reservoirs

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210430296.1A CN102913208B (en) 2012-11-01 2012-11-01 Method for building bushing inner-sieve-tube artificial natural gas migration passage between gas reservoirs

Publications (2)

Publication Number Publication Date
CN102913208A CN102913208A (en) 2013-02-06
CN102913208B true CN102913208B (en) 2014-03-26

Family

ID=47611751

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210430296.1A Expired - Fee Related CN102913208B (en) 2012-11-01 2012-11-01 Method for building bushing inner-sieve-tube artificial natural gas migration passage between gas reservoirs

Country Status (1)

Country Link
CN (1) CN102913208B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112343555B (en) * 2020-11-24 2022-11-18 中国海洋石油集团有限公司 Relay well development method for expanding offshore oil and gas reserve utilization range

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0671549A1 (en) * 1994-03-10 1995-09-13 Shell Internationale Researchmaatschappij B.V. Method of producing a fluid from an earth formation
NO303028B1 (en) * 1996-03-12 1998-05-18 Terje Magnussen The subsea installation
AU2003244819A1 (en) * 2003-06-30 2005-01-21 Petroleo Brasileiro S A-Petrobras Method for, and the construction of, a long-distance well for the production, transport, storage and exploitation of mineral layers and fluids
RU2336414C1 (en) * 2007-01-12 2008-10-20 Открытое акционерное общество "Татнефть" им. В.Д. Шашина Method to develop isolated lithologically screened oil-saturated lense
US7900705B2 (en) * 2007-03-13 2011-03-08 Schlumberger Technology Corporation Flow control assembly having a fixed flow control device and an adjustable flow control device
US8316954B2 (en) * 2009-12-22 2012-11-27 Halliburton Energy Services, Inc. Apparatus and method for separating a downhole tubular string into two parts
CN102434129B (en) * 2011-12-24 2014-04-09 大连理工大学 Ultra-deepwater offshore oil-gas engineering developing system and mounting method thereof

Also Published As

Publication number Publication date
CN102913208A (en) 2013-02-06

Similar Documents

Publication Publication Date Title
CN104533287B (en) A kind of fish spicule shape multilevel branch horizontal well shale gas reservoir that bores is drilled well and stimulation system
CN104806217A (en) Combined separated layer fracturing, grouping and layer-combining mining method for coal bed well group
CN113738317A (en) Method for combined exploitation of deep coal bed gas and dry hot rock type geothermal
CN109236186B (en) Well drilling casing and rapid well drilling and completion method for multilateral well of large well
CN201705219U (en) Lateral drilling gravel pack completion string
CN104963671B (en) A kind of fracturing reform method of High angle from formula well reservoir
CN106761606A (en) The asynchronous note CO of different well of symmetrical expression cloth seam2Oil production method
CN110306965A (en) A kind of method for increasing for coal bed gas low yield wellblock
CN101956544A (en) Method for oil extraction in multi-bottom and multi-branch well by artesian injection
CN106761612A (en) The asynchronous water injection oil extraction method of double different wells of pressure break horizontal well of zip mode cloth seam
CN114135265B (en) Low-cost and high-efficiency transformation process method for low-permeability reservoir of offshore oil field
CN102434192A (en) Device and method for enhancing coal seam fracturing effect
CN111810106B (en) Three-inch half-slim hole sidetrack horizontal well efficient staged fracturing method
CN112627723A (en) Ground drilling method for coal bed gas development of coal mine goaf
CN111734359A (en) Natural gas hydrate horizontal branch well exploitation method based on deepwater suction anchor
CN102913203B (en) Method for developing low-permeability gas reservoir
CN102913208B (en) Method for building bushing inner-sieve-tube artificial natural gas migration passage between gas reservoirs
CN115182713B (en) Three-dimensional development method for explosive-tight cutting of shale reservoir three-dimensional horizontal well
CN102913206B (en) Method for building bushing perforation fracturing-type artificial natural gas migration passage between gas reservoirs
CN110984917A (en) Production-increasing water-controlling sand-preventing well completion method for low-permeability reservoir
CN102913207B (en) Method for building inner sieve-tube outer gravel-filled artificial natural gas migration passage
CN102900401B (en) Method for building sleeve perforating manmade natural gas migration channels between gas pools
CN101818619A (en) Well cementation and completion structure and process for cased branch well with temporarily-sealed opening
CN102913204B (en) Method for building sieve-tube outer gravel-filled natural gas migration passage between gas reservoirs
CN102900403B (en) Method for establishing artificial natural gas migration channel between gas reservoirs

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140326

Termination date: 20201101