CN102913000B - Method for development and utilization of underground space by building moving - Google Patents
Method for development and utilization of underground space by building moving Download PDFInfo
- Publication number
- CN102913000B CN102913000B CN201210405916.6A CN201210405916A CN102913000B CN 102913000 B CN102913000 B CN 102913000B CN 201210405916 A CN201210405916 A CN 201210405916A CN 102913000 B CN102913000 B CN 102913000B
- Authority
- CN
- China
- Prior art keywords
- build
- building
- underground
- displacement
- basement
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
The invention discloses a method for development and utilization of underground space by building moving. The method includes: in order to guarantee that moving rails can serve as a member of a new garage, proposing underground structure bearing members, wherein the axes of the underground structure bearing members are dead in line with those of bearing members in the moving direction of a moved building; since bracket girders and the moving rails are frame columns or twin beams and two rails on two sides of walls, proposing the top ends of the underground structure bearing members as corbels overhung towards two sides to support rail beams on two sides above the corbels, and enabling channel beams laid on the rail beams to serve as the moving rails; moving the moved building to an assigned position of a new basement top to enable the moved building to be connected with the new basement; and constructing top plates of the new underground garage and the basement. By the aid of the method, development and utilization of the underground space are completed during movement of the building, so that existing buildings are protected, and land utilization ratio is increased. Besides, the moving rails are utilized as the underground space members, so that construction materials are saved.
Description
Technical field
The present invention relates to a kind of building displacement technology, especially a kind of building moving develops the method for the underground space.
Background technology
At present, develop in order, rationally, comprehensively, efficiently existing building Underground Space Resource, become and expand infrastructure capacity, improve Comprehensive Disaster Prevention for Cities ability, improve land utilization efficiency and the most effectively one of the approach economizing the land resource.How New Buildings, according to the requirement of urban planning, has considered the development and utilization of the underground space.But a large amount of existing buildings is because historical reason, lacks perspective and do not design underground parking etc., along with parking difficulty has appearred in the increase of automobile quantity.Therefore be, an arduousness and urgent task to the exploitation of the existing building underground space.
Building moving technology be by existing building integral shift to new address, solved in urban development, remove and retain between contradiction, protected the historical building that has historical relic to be worth.But in shifting process; displacement need to be laid to new address from building former address with track always; in order to ensure that track has enough bearing capacities and non-deformability (rigidity); track is made the strip foundation of width the same as original constructure base and buried depth conventionally; when building moves on to behind position, this track is conventionally understood landfill, is abandoned.If the Soft Soil Layer under displacement track is very thick, in order to ensure the rigidity of track, conventionally Soft Soil Layer is all dug out, just expose construction displacement track after hard soil layer, the engineering quantity of displacement track is huge, abandons and can cause huge waste after displacement.In addition, after displacement, former address need be built new building conventionally, in new building basement building course, needs displacement dismantling of track, cleaning, can increase again extra-pay.
The beam that underpins that building moving adopts adopts both sides to clamp the form of original wall body or frame column more.Therefore, displacement track is also is mostly in the form of the two-rail of original wall body or frame column both sides, has not only taken a large amount of constructional materialss, if be left the structural element of the newly-built underground space, also taken and can utilize space, has reduced space service efficiency.
Summary of the invention
The object of the invention is for overcoming above-mentioned the deficiencies in the prior art; provide a kind of building moving to develop the method for the underground space; the method has completed underground space development utilization in building moving process; both protected existing building; improve again the utilization rate in soil; the double member that does the underground space of track that simultaneously makes to be shifted, has saved constructional materials.
For achieving the above object, the present invention adopts following technical proposals:
A kind of building moving develops the method for the underground space, from using function, after displacement, the building below underground space is built up the basement of storeroom function more, the underground space of Around Buildings is built up underground garage more, it after basement builds up, is the underground space of the multiple tracks body of wall of strip foundation, and underground garage part is for vehicles while passing, convenient parking, build up beam, the plate of large space, the frame construction of post composition, the displacement orbit construction that is about to displacement building becomes the structure with the underground space; Concrete technical scheme is as follows:
1) for ensureing that displacement track can serve as the member in newly-built garage and use, plan to build underground structure supporting member (plan to build underground garage frame column, plan to build basement wall) axis should with displacement building moving direction on the dead in line of supporting member; Be the displacement frame column of building or the twin beams of body of wall both sides, the form of two-rail owing to underpining beam and displacement track, plan to build the bracket of encorbelmenting in underground structure supporting member (plan to build underground garage frame column, plan to build basement wall) Wei Xiang both sides, top, support the rail beam of the both sides of top, rail beam upper berth channel-section steel is as displacement track;
The Intensity Design of rail beam is except considering the load in building moving process, the load acting on also should be considered as newly-built underground garage back timber time; The rigidity of rail beam should ensure that the deflection deformation of building moving process meets code requirement;
2) in the time planning to build underground structure supporting member (plan to build underground garage frame column, plan to build basement wall) and can not all overlap with the supporting member axis in displacement building moving direction, what axis did not overlap plan to build underground structure supporting member (plan to build underground garage frame column, plan to build basement wall) top builds up single-beam, monorail, and arranges up roller bearing and underpin beam; The frame column of corresponding displacement building or the load of load bearing wall by with the linking beam that underpins beam and be connected, be delivered to and plan to build Underground Garage Pillar top and underpin beam from the beam that underpins of displacement building supporting member both sides; Dead in line plan to build the bracket that underground structure supporting member (plan to build underground garage frame column, plan to build basement wall) is still encorbelmented to both sides according to top, support the method for the rail beam of the both sides of top;
3) displacement building, to the on-station position on newly-built basement top, is connected displacement building with newly-built basement;
4) the construct top board of newly-built underground garage and basement.
The invention has the beneficial effects as follows, the present invention unites two into one the basement of displacement track and New Buildings, can ensure the safety that displacement is built, and has reduced again construction costs.The present invention has completed underground space development utilization in displacement building process, has both protected existing building, has improved again the utilization rate in soil, and the double member that does the underground space of track that simultaneously makes to be shifted, has saved constructional materials.Encorbelment and reduced compared with the design of two-rail and the scheme of initial two-rail the taking of the underground space in single post capital both sides, economic and social benefit is outstanding.
Brief description of the drawings
Fig. 1 is the plan view of planning to build basement and underground garage;
Fig. 2 is the elevation of planning to build basement, underground garage and displacement building;
When Fig. 3 is displacement track and Underground Garage Pillar dead in line, garage post and displacement architectural section;
When Fig. 4 is displacement track and Underground Garage Pillar dead in line, underpin the layout plan of beam and linking beam;
Fig. 5 is transposition of partial track and underground garage mast axis while not overlapping, garage post and displacement architectural section;
Fig. 6 is transposition of partial track and underground garage mast axis while not overlapping, underpins the layout plan of beam and linking beam;
Wherein 1---plan to build underground garage frame column; 2---plan to build basement wall; 3---the bracket of the support chosen from post displacement track; 4---displacement track; 5---underpin beam; 6---roller bearing; 7---the frame column (or load bearing wall) of displacement building; 8---linking beam, what 9. axis did not overlap plans to build underground structure.
Detailed description of the invention
Below in conjunction with drawings and Examples, the present invention is further described.
Embodiment 1:
As Figure 1-Figure 4, building moving develops the method for the underground space, from using function, after displacement, the building below underground space is built up the basement of storeroom function more, the underground space of Around Buildings is built up underground garage more, it after storeroom builds up, is the underground space of the multiple tracks body of wall of strip foundation, and underground garage part is for vehicles while passing, convenient parking, build up beam, the plate of large space, the frame construction of post composition, the displacement orbit construction that is about to displacement building becomes the structure with the underground space; Concrete technical scheme is as follows:
1) be the member use that guarantee displacement track can be served as newly-built garage, plan to build underground structure supporting member (plan to build underground garage frame column 1, plan to build basement wall 2) axis and the dead in line of the supporting member 7 in building moving direction that is shifted; Owing to underpining beam 5 and displacement track 4 for planning to build underground structure supporting member (plan to build underground garage frame column 1, the plan to build basement wall 2) twin beams of both sides, the form of two-rail, plan to build the encorbelment bracket 3 of (choose from post support displacement track) of underground structure supporting member (plan to build underground garage frame column 1, plan to build basement wall 2) Wei Xiang both sides, top, support the rail beam of the both sides of top, rail beam upper berth channel-section steel is as displacement track 4;
The Intensity Design of rail beam is except considering the load in building moving process, the load acting on also should be considered as newly-built underground garage back timber time; The rigidity of rail beam should ensure that the deflection deformation of building moving process meets code requirement;
2) displacement building, to the on-station position on newly-built basement top, is connected displacement building with newly-built basement;
3) the construct top board of newly-built underground garage and basement.
Embodiment 2:
As shown in Fig. 1,2,5,6, building moving develops the method for the underground space, from using function, after displacement, the building below underground space is built up the basement of storeroom function more, the underground space of Around Buildings is built up underground garage more, it after basement builds up, is the underground space of the multiple tracks body of wall of strip foundation, and underground garage part is for vehicles while passing, convenient parking, build up beam, the plate of large space, the frame construction of post composition, the displacement orbit construction that is about to displacement building becomes the structure with the underground space; Concrete technical scheme is as follows:
1) in the time planning to build underground structure supporting member (plan to build underground garage frame column 1, plan to build basement wall 2) and can not all overlap with the axis of the supporting member 7 in displacement building moving direction, what axis did not overlap plan to build underground structure 9 supporting members (plan to build underground garage frame column 1, plan to build basement wall 2) top builds up single-beam, monorail, and arranges up roller bearing 7 and underpin beam 5; The load of the frame column of corresponding displacement building or load bearing wall 7 by with the linking beam 8 that underpins beam 5 and be connected, the beam 5 that underpins that holds thing reconstruct part both sides from displacement building is delivered to and plans to build Underground Garage Pillar top and underpin beam;
2) displacement building is to the on-station position on newly-built basement top, and displacement building is connected with newly-built basement.
3) the construct top board of newly-built underground garage and basement.
By reference to the accompanying drawings the specific embodiment of the present invention is described although above-mentioned; but not limiting the scope of the invention; one of ordinary skill in the art should be understood that; on the basis of technical scheme of the present invention, those skilled in the art do not need to pay various amendments that creative work can make or distortion still in protection scope of the present invention.
Claims (1)
1. the method for a building moving exploitation underground space, it is characterized in that, from using function, after displacement, the building below underground space is built up the basement of storeroom function, the underground space of Around Buildings is built up underground garage more, it after basement builds up, is the underground space of the multiple tracks body of wall of strip foundation, and underground garage part is for vehicles while passing, convenient parking, build up beam, the plate of large space, the frame construction of post composition, the displacement orbit construction that is about to displacement building becomes the structure with the underground space; Concrete technical scheme is as follows:
1) for ensureing that displacement track can serve as the member in newly-built garage and use, plan to build underground structure supporting member plan to build underground garage frame column and plan to build basement wall axis should with displacement building moving direction on the dead in line of supporting member; Be the frame column of displacement building or the twin beams of body of wall both sides, the form of two-rail owing to underpining beam and displacement track, planning to build underground structure supporting member plans to build underground garage frame column and plans to build the bracket of encorbelmenting in Wei Xiang both sides, basement wall top, support the rail beam of the both sides of top, rail beam upper berth channel-section steel is as displacement track;
The rigidity of rail beam should ensure that the deflection deformation of building moving process meets code requirement;
2) plan to build underground garage frame column and plan to build basement wall and displacement when building supporting member axis in direction of displacement and can not all overlapping when planning to build underground structure supporting member, what axis did not overlap plan to build, and underground structure supporting member plan to build underground garage frame column, plan to build basement wall top builds up single-beam, monorail, and arranges up roller bearing and underpin beam; The frame column of corresponding displacement building or the load of load bearing wall by with the linking beam that underpins beam and be connected, be delivered to and plan to build underground garage frame column top and underpin beam from the beam that underpins of displacement building supporting member both sides; The underground structure supporting member of planning to build of dead in line is planned to build underground garage frame column, is planned to build the bracket that basement wall is still encorbelmented to both sides according to top, supports the method for the rail beam of the both sides of top;
3) displacement building, to the on-station position on newly-built basement top, is connected displacement building with newly-built basement;
4) the construct top board of newly-built underground garage and basement.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210405916.6A CN102913000B (en) | 2012-10-23 | 2012-10-23 | Method for development and utilization of underground space by building moving |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201210405916.6A CN102913000B (en) | 2012-10-23 | 2012-10-23 | Method for development and utilization of underground space by building moving |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102913000A CN102913000A (en) | 2013-02-06 |
CN102913000B true CN102913000B (en) | 2014-08-06 |
Family
ID=47611548
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201210405916.6A Active CN102913000B (en) | 2012-10-23 | 2012-10-23 | Method for development and utilization of underground space by building moving |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102913000B (en) |
Families Citing this family (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103437566B (en) * | 2013-08-30 | 2015-06-17 | 山东建筑大学 | Supporting steel pipe device of underground added layer of existing building and installing method of supporting steel pipe device |
CN103912134B (en) * | 2014-03-21 | 2016-09-14 | 上海建工四建集团有限公司 | Existing building underground space structure and construction method in situ |
CN105888292B (en) * | 2014-05-10 | 2017-12-12 | 河南省建设集团有限公司 | Frame structure building is without underpining integral translating method |
CN105625747B (en) * | 2015-12-17 | 2018-06-01 | 上海建工一建集团有限公司 | The construction method that basement is removed in reconstruction project |
RU2628357C1 (en) * | 2016-11-11 | 2017-08-16 | Игорь Васильевич Беккерев | Method of structure movement |
CN107503550B (en) * | 2017-08-31 | 2023-04-07 | 河南工业大学 | Take half underground grain horizontal warehouse of pull rod system |
CN107503552B (en) * | 2017-08-31 | 2023-04-14 | 河南工业大学 | Semi-underground grain horizontal warehouse with quality and warehouse separation |
CN111075224B (en) * | 2019-12-20 | 2022-04-05 | 华东建筑设计研究院有限公司 | Method for creating construction site for developing underground space under existing building group |
CN113638617B (en) * | 2021-08-06 | 2023-03-28 | 山东建筑大学 | Method for underground layer-adding during trailer shifting |
CN113668893B (en) * | 2021-08-31 | 2023-03-14 | 山东建筑大学 | Horizontal-position underground storey-adding method for frame structure building |
CN113668892B (en) * | 2021-08-31 | 2023-03-14 | 山东建筑大学 | Underground storey-adding method for downhill displacement of frame structure building |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH084034A (en) * | 1994-06-24 | 1996-01-09 | Takenaka Komuten Co Ltd | Basement skeleton building construction in inverted construction work of building |
JP2000291030A (en) * | 1999-04-13 | 2000-10-17 | Kajima Corp | Construction method for underground structure |
CN2402764Y (en) * | 1999-01-23 | 2000-10-25 | 李海森 | Building or structure integral moving device |
JP2001262595A (en) * | 2000-03-22 | 2001-09-26 | Kajima Corp | Building construction method of underground building frame |
CN1970897A (en) * | 2005-11-23 | 2007-05-30 | 张准胜 | Method and device for building underground space structure for established building by using public land |
KR100909990B1 (en) * | 2008-07-07 | 2009-07-30 | 윤인병 | Loop structure using steel materials and constructing method thereof |
CN101922254A (en) * | 2010-08-11 | 2010-12-22 | 中国市政工程东北设计研究总院 | Assembled square-barrel multi-layer concrete underground garage and manufacturing method thereof |
CN102071813A (en) * | 2010-11-18 | 2011-05-25 | 杭州岩土工程有限公司 | Method for constructing underground garage under old building |
CN102127974A (en) * | 2011-04-18 | 2011-07-20 | 上海现代建筑设计(集团)有限公司 | Design and construction method of additional cellar under existing building |
CN201981552U (en) * | 2011-03-24 | 2011-09-21 | 江苏新筑预应力工程有限公司 | Underground garage structure system with large-span prestressed reinforced concrete frame |
CN102720373A (en) * | 2012-06-13 | 2012-10-10 | 山东建筑大学 | Building displacement turning method |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA1242064A (en) * | 1985-03-21 | 1988-09-20 | Ian Moffat | Method of adding extra floors on existing buildings |
-
2012
- 2012-10-23 CN CN201210405916.6A patent/CN102913000B/en active Active
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH084034A (en) * | 1994-06-24 | 1996-01-09 | Takenaka Komuten Co Ltd | Basement skeleton building construction in inverted construction work of building |
CN2402764Y (en) * | 1999-01-23 | 2000-10-25 | 李海森 | Building or structure integral moving device |
JP2000291030A (en) * | 1999-04-13 | 2000-10-17 | Kajima Corp | Construction method for underground structure |
JP2001262595A (en) * | 2000-03-22 | 2001-09-26 | Kajima Corp | Building construction method of underground building frame |
CN1970897A (en) * | 2005-11-23 | 2007-05-30 | 张准胜 | Method and device for building underground space structure for established building by using public land |
KR100909990B1 (en) * | 2008-07-07 | 2009-07-30 | 윤인병 | Loop structure using steel materials and constructing method thereof |
CN101922254A (en) * | 2010-08-11 | 2010-12-22 | 中国市政工程东北设计研究总院 | Assembled square-barrel multi-layer concrete underground garage and manufacturing method thereof |
CN102071813A (en) * | 2010-11-18 | 2011-05-25 | 杭州岩土工程有限公司 | Method for constructing underground garage under old building |
CN201981552U (en) * | 2011-03-24 | 2011-09-21 | 江苏新筑预应力工程有限公司 | Underground garage structure system with large-span prestressed reinforced concrete frame |
CN102127974A (en) * | 2011-04-18 | 2011-07-20 | 上海现代建筑设计(集团)有限公司 | Design and construction method of additional cellar under existing building |
CN102720373A (en) * | 2012-06-13 | 2012-10-10 | 山东建筑大学 | Building displacement turning method |
Also Published As
Publication number | Publication date |
---|---|
CN102913000A (en) | 2013-02-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102913000B (en) | Method for development and utilization of underground space by building moving | |
CN101886479B (en) | Underground storey-adding process of frame structural building by one-by-one independent foundation underpinning method | |
CN102094649B (en) | Method for constructing underground space by shield-shallow buried covered excavation composite method | |
CN103215894B (en) | Portable interim prestressed stretch-draw anchor block | |
CN104131565A (en) | Construction method of using down-top method for excavating earthworks in top-down construction | |
CN202273169U (en) | Trestle | |
CN1089008A (en) | Method for moving house | |
CN204715366U (en) | A kind of large-area deep foundation pit subregion is along the support system under inverse operating mode | |
CN211314228U (en) | A assembled lining cutting structure for highway tunnel | |
CN110387889B (en) | Multi-arch foundation pit supporting method for strip-shaped deep foundation pit | |
CN103233426A (en) | Bailey beam support free of buttress in soft foundation and supporting method thereof | |
CN203640061U (en) | Node connecting structure of reinforced concrete column of basement | |
CN205369043U (en) | Long span steel case back pushes away construction and uses interim bearing structure | |
CN102433842A (en) | Construction method for erecting thin-wall U-shaped girder of rail transit | |
CN102776840B (en) | Mal-position assembly in-position method of truss bridge | |
CN102979318B (en) | Method of displacement and shock-insulation location for building with sliding supports | |
CN103924981A (en) | Single-arch large-span shallow-buried excavation tunnel reinforcing system and construction method thereof | |
CN201554026U (en) | Metro steel surrounding purlin | |
CN203866688U (en) | Full-steel hollow assembly-type overpass | |
CN205530345U (en) | Modular many storehouses utility tunnel structure | |
CN210152663U (en) | Modular rectangle top iron structure | |
CN205711786U (en) | Big cross section porous overlength cast-in-place box culvert formwork system | |
CN201010846Y (en) | Cover plate of covered-over digging method | |
CN205046668U (en) | Connected node suitable for frame supported shear wall structure reverse construction | |
CN203822326U (en) | Reinforcing system for single-arch and large-span type shallowly buried and darkly excavated tunnel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |