CN102913000B - Method for development and utilization of underground space by building moving - Google Patents

Method for development and utilization of underground space by building moving Download PDF

Info

Publication number
CN102913000B
CN102913000B CN201210405916.6A CN201210405916A CN102913000B CN 102913000 B CN102913000 B CN 102913000B CN 201210405916 A CN201210405916 A CN 201210405916A CN 102913000 B CN102913000 B CN 102913000B
Authority
CN
China
Prior art keywords
build
building
underground
displacement
basement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210405916.6A
Other languages
Chinese (zh)
Other versions
CN102913000A (en
Inventor
张鑫
贾强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Jianzhu University
Original Assignee
Shandong Jianzhu University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Jianzhu University filed Critical Shandong Jianzhu University
Priority to CN201210405916.6A priority Critical patent/CN102913000B/en
Publication of CN102913000A publication Critical patent/CN102913000A/en
Application granted granted Critical
Publication of CN102913000B publication Critical patent/CN102913000B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The invention discloses a method for development and utilization of underground space by building moving. The method includes: in order to guarantee that moving rails can serve as a member of a new garage, proposing underground structure bearing members, wherein the axes of the underground structure bearing members are dead in line with those of bearing members in the moving direction of a moved building; since bracket girders and the moving rails are frame columns or twin beams and two rails on two sides of walls, proposing the top ends of the underground structure bearing members as corbels overhung towards two sides to support rail beams on two sides above the corbels, and enabling channel beams laid on the rail beams to serve as the moving rails; moving the moved building to an assigned position of a new basement top to enable the moved building to be connected with the new basement; and constructing top plates of the new underground garage and the basement. By the aid of the method, development and utilization of the underground space are completed during movement of the building, so that existing buildings are protected, and land utilization ratio is increased. Besides, the moving rails are utilized as the underground space members, so that construction materials are saved.

Description

Building moving develops the method for the underground space
Technical field
The present invention relates to a kind of building displacement technology, especially a kind of building moving develops the method for the underground space.
Background technology
At present, develop in order, rationally, comprehensively, efficiently existing building Underground Space Resource, become and expand infrastructure capacity, improve Comprehensive Disaster Prevention for Cities ability, improve land utilization efficiency and the most effectively one of the approach economizing the land resource.How New Buildings, according to the requirement of urban planning, has considered the development and utilization of the underground space.But a large amount of existing buildings is because historical reason, lacks perspective and do not design underground parking etc., along with parking difficulty has appearred in the increase of automobile quantity.Therefore be, an arduousness and urgent task to the exploitation of the existing building underground space.
Building moving technology be by existing building integral shift to new address, solved in urban development, remove and retain between contradiction, protected the historical building that has historical relic to be worth.But in shifting process; displacement need to be laid to new address from building former address with track always; in order to ensure that track has enough bearing capacities and non-deformability (rigidity); track is made the strip foundation of width the same as original constructure base and buried depth conventionally; when building moves on to behind position, this track is conventionally understood landfill, is abandoned.If the Soft Soil Layer under displacement track is very thick, in order to ensure the rigidity of track, conventionally Soft Soil Layer is all dug out, just expose construction displacement track after hard soil layer, the engineering quantity of displacement track is huge, abandons and can cause huge waste after displacement.In addition, after displacement, former address need be built new building conventionally, in new building basement building course, needs displacement dismantling of track, cleaning, can increase again extra-pay.
The beam that underpins that building moving adopts adopts both sides to clamp the form of original wall body or frame column more.Therefore, displacement track is also is mostly in the form of the two-rail of original wall body or frame column both sides, has not only taken a large amount of constructional materialss, if be left the structural element of the newly-built underground space, also taken and can utilize space, has reduced space service efficiency.
Summary of the invention
The object of the invention is for overcoming above-mentioned the deficiencies in the prior art; provide a kind of building moving to develop the method for the underground space; the method has completed underground space development utilization in building moving process; both protected existing building; improve again the utilization rate in soil; the double member that does the underground space of track that simultaneously makes to be shifted, has saved constructional materials.
For achieving the above object, the present invention adopts following technical proposals:
A kind of building moving develops the method for the underground space, from using function, after displacement, the building below underground space is built up the basement of storeroom function more, the underground space of Around Buildings is built up underground garage more, it after basement builds up, is the underground space of the multiple tracks body of wall of strip foundation, and underground garage part is for vehicles while passing, convenient parking, build up beam, the plate of large space, the frame construction of post composition, the displacement orbit construction that is about to displacement building becomes the structure with the underground space; Concrete technical scheme is as follows:
1) for ensureing that displacement track can serve as the member in newly-built garage and use, plan to build underground structure supporting member (plan to build underground garage frame column, plan to build basement wall) axis should with displacement building moving direction on the dead in line of supporting member; Be the displacement frame column of building or the twin beams of body of wall both sides, the form of two-rail owing to underpining beam and displacement track, plan to build the bracket of encorbelmenting in underground structure supporting member (plan to build underground garage frame column, plan to build basement wall) Wei Xiang both sides, top, support the rail beam of the both sides of top, rail beam upper berth channel-section steel is as displacement track;
The Intensity Design of rail beam is except considering the load in building moving process, the load acting on also should be considered as newly-built underground garage back timber time; The rigidity of rail beam should ensure that the deflection deformation of building moving process meets code requirement;
2) in the time planning to build underground structure supporting member (plan to build underground garage frame column, plan to build basement wall) and can not all overlap with the supporting member axis in displacement building moving direction, what axis did not overlap plan to build underground structure supporting member (plan to build underground garage frame column, plan to build basement wall) top builds up single-beam, monorail, and arranges up roller bearing and underpin beam; The frame column of corresponding displacement building or the load of load bearing wall by with the linking beam that underpins beam and be connected, be delivered to and plan to build Underground Garage Pillar top and underpin beam from the beam that underpins of displacement building supporting member both sides; Dead in line plan to build the bracket that underground structure supporting member (plan to build underground garage frame column, plan to build basement wall) is still encorbelmented to both sides according to top, support the method for the rail beam of the both sides of top;
3) displacement building, to the on-station position on newly-built basement top, is connected displacement building with newly-built basement;
4) the construct top board of newly-built underground garage and basement.
The invention has the beneficial effects as follows, the present invention unites two into one the basement of displacement track and New Buildings, can ensure the safety that displacement is built, and has reduced again construction costs.The present invention has completed underground space development utilization in displacement building process, has both protected existing building, has improved again the utilization rate in soil, and the double member that does the underground space of track that simultaneously makes to be shifted, has saved constructional materials.Encorbelment and reduced compared with the design of two-rail and the scheme of initial two-rail the taking of the underground space in single post capital both sides, economic and social benefit is outstanding.
Brief description of the drawings
Fig. 1 is the plan view of planning to build basement and underground garage;
Fig. 2 is the elevation of planning to build basement, underground garage and displacement building;
When Fig. 3 is displacement track and Underground Garage Pillar dead in line, garage post and displacement architectural section;
When Fig. 4 is displacement track and Underground Garage Pillar dead in line, underpin the layout plan of beam and linking beam;
Fig. 5 is transposition of partial track and underground garage mast axis while not overlapping, garage post and displacement architectural section;
Fig. 6 is transposition of partial track and underground garage mast axis while not overlapping, underpins the layout plan of beam and linking beam;
Wherein 1---plan to build underground garage frame column; 2---plan to build basement wall; 3---the bracket of the support chosen from post displacement track; 4---displacement track; 5---underpin beam; 6---roller bearing; 7---the frame column (or load bearing wall) of displacement building; 8---linking beam, what 9. axis did not overlap plans to build underground structure.
Detailed description of the invention
Below in conjunction with drawings and Examples, the present invention is further described.
Embodiment 1:
As Figure 1-Figure 4, building moving develops the method for the underground space, from using function, after displacement, the building below underground space is built up the basement of storeroom function more, the underground space of Around Buildings is built up underground garage more, it after storeroom builds up, is the underground space of the multiple tracks body of wall of strip foundation, and underground garage part is for vehicles while passing, convenient parking, build up beam, the plate of large space, the frame construction of post composition, the displacement orbit construction that is about to displacement building becomes the structure with the underground space; Concrete technical scheme is as follows:
1) be the member use that guarantee displacement track can be served as newly-built garage, plan to build underground structure supporting member (plan to build underground garage frame column 1, plan to build basement wall 2) axis and the dead in line of the supporting member 7 in building moving direction that is shifted; Owing to underpining beam 5 and displacement track 4 for planning to build underground structure supporting member (plan to build underground garage frame column 1, the plan to build basement wall 2) twin beams of both sides, the form of two-rail, plan to build the encorbelment bracket 3 of (choose from post support displacement track) of underground structure supporting member (plan to build underground garage frame column 1, plan to build basement wall 2) Wei Xiang both sides, top, support the rail beam of the both sides of top, rail beam upper berth channel-section steel is as displacement track 4;
The Intensity Design of rail beam is except considering the load in building moving process, the load acting on also should be considered as newly-built underground garage back timber time; The rigidity of rail beam should ensure that the deflection deformation of building moving process meets code requirement;
2) displacement building, to the on-station position on newly-built basement top, is connected displacement building with newly-built basement;
3) the construct top board of newly-built underground garage and basement.
Embodiment 2:
As shown in Fig. 1,2,5,6, building moving develops the method for the underground space, from using function, after displacement, the building below underground space is built up the basement of storeroom function more, the underground space of Around Buildings is built up underground garage more, it after basement builds up, is the underground space of the multiple tracks body of wall of strip foundation, and underground garage part is for vehicles while passing, convenient parking, build up beam, the plate of large space, the frame construction of post composition, the displacement orbit construction that is about to displacement building becomes the structure with the underground space; Concrete technical scheme is as follows:
1) in the time planning to build underground structure supporting member (plan to build underground garage frame column 1, plan to build basement wall 2) and can not all overlap with the axis of the supporting member 7 in displacement building moving direction, what axis did not overlap plan to build underground structure 9 supporting members (plan to build underground garage frame column 1, plan to build basement wall 2) top builds up single-beam, monorail, and arranges up roller bearing 7 and underpin beam 5; The load of the frame column of corresponding displacement building or load bearing wall 7 by with the linking beam 8 that underpins beam 5 and be connected, the beam 5 that underpins that holds thing reconstruct part both sides from displacement building is delivered to and plans to build Underground Garage Pillar top and underpin beam;
2) displacement building is to the on-station position on newly-built basement top, and displacement building is connected with newly-built basement.
3) the construct top board of newly-built underground garage and basement.
By reference to the accompanying drawings the specific embodiment of the present invention is described although above-mentioned; but not limiting the scope of the invention; one of ordinary skill in the art should be understood that; on the basis of technical scheme of the present invention, those skilled in the art do not need to pay various amendments that creative work can make or distortion still in protection scope of the present invention.

Claims (1)

1. the method for a building moving exploitation underground space, it is characterized in that, from using function, after displacement, the building below underground space is built up the basement of storeroom function, the underground space of Around Buildings is built up underground garage more, it after basement builds up, is the underground space of the multiple tracks body of wall of strip foundation, and underground garage part is for vehicles while passing, convenient parking, build up beam, the plate of large space, the frame construction of post composition, the displacement orbit construction that is about to displacement building becomes the structure with the underground space; Concrete technical scheme is as follows:
1) for ensureing that displacement track can serve as the member in newly-built garage and use, plan to build underground structure supporting member plan to build underground garage frame column and plan to build basement wall axis should with displacement building moving direction on the dead in line of supporting member; Be the frame column of displacement building or the twin beams of body of wall both sides, the form of two-rail owing to underpining beam and displacement track, planning to build underground structure supporting member plans to build underground garage frame column and plans to build the bracket of encorbelmenting in Wei Xiang both sides, basement wall top, support the rail beam of the both sides of top, rail beam upper berth channel-section steel is as displacement track;
The rigidity of rail beam should ensure that the deflection deformation of building moving process meets code requirement;
2) plan to build underground garage frame column and plan to build basement wall and displacement when building supporting member axis in direction of displacement and can not all overlapping when planning to build underground structure supporting member, what axis did not overlap plan to build, and underground structure supporting member plan to build underground garage frame column, plan to build basement wall top builds up single-beam, monorail, and arranges up roller bearing and underpin beam; The frame column of corresponding displacement building or the load of load bearing wall by with the linking beam that underpins beam and be connected, be delivered to and plan to build underground garage frame column top and underpin beam from the beam that underpins of displacement building supporting member both sides; The underground structure supporting member of planning to build of dead in line is planned to build underground garage frame column, is planned to build the bracket that basement wall is still encorbelmented to both sides according to top, supports the method for the rail beam of the both sides of top;
3) displacement building, to the on-station position on newly-built basement top, is connected displacement building with newly-built basement;
4) the construct top board of newly-built underground garage and basement.
CN201210405916.6A 2012-10-23 2012-10-23 Method for development and utilization of underground space by building moving Active CN102913000B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210405916.6A CN102913000B (en) 2012-10-23 2012-10-23 Method for development and utilization of underground space by building moving

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210405916.6A CN102913000B (en) 2012-10-23 2012-10-23 Method for development and utilization of underground space by building moving

Publications (2)

Publication Number Publication Date
CN102913000A CN102913000A (en) 2013-02-06
CN102913000B true CN102913000B (en) 2014-08-06

Family

ID=47611548

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210405916.6A Active CN102913000B (en) 2012-10-23 2012-10-23 Method for development and utilization of underground space by building moving

Country Status (1)

Country Link
CN (1) CN102913000B (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103437566B (en) * 2013-08-30 2015-06-17 山东建筑大学 Supporting steel pipe device of underground added layer of existing building and installing method of supporting steel pipe device
CN103912134B (en) * 2014-03-21 2016-09-14 上海建工四建集团有限公司 Existing building underground space structure and construction method in situ
CN105888292B (en) * 2014-05-10 2017-12-12 河南省建设集团有限公司 Frame structure building is without underpining integral translating method
CN105625747B (en) * 2015-12-17 2018-06-01 上海建工一建集团有限公司 The construction method that basement is removed in reconstruction project
RU2628357C1 (en) * 2016-11-11 2017-08-16 Игорь Васильевич Беккерев Method of structure movement
CN107503550B (en) * 2017-08-31 2023-04-07 河南工业大学 Take half underground grain horizontal warehouse of pull rod system
CN107503552B (en) * 2017-08-31 2023-04-14 河南工业大学 Semi-underground grain horizontal warehouse with quality and warehouse separation
CN111075224B (en) * 2019-12-20 2022-04-05 华东建筑设计研究院有限公司 Method for creating construction site for developing underground space under existing building group
CN113638617B (en) * 2021-08-06 2023-03-28 山东建筑大学 Method for underground layer-adding during trailer shifting
CN113668893B (en) * 2021-08-31 2023-03-14 山东建筑大学 Horizontal-position underground storey-adding method for frame structure building
CN113668892B (en) * 2021-08-31 2023-03-14 山东建筑大学 Underground storey-adding method for downhill displacement of frame structure building

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH084034A (en) * 1994-06-24 1996-01-09 Takenaka Komuten Co Ltd Basement skeleton building construction in inverted construction work of building
JP2000291030A (en) * 1999-04-13 2000-10-17 Kajima Corp Construction method for underground structure
CN2402764Y (en) * 1999-01-23 2000-10-25 李海森 Building or structure integral moving device
JP2001262595A (en) * 2000-03-22 2001-09-26 Kajima Corp Building construction method of underground building frame
CN1970897A (en) * 2005-11-23 2007-05-30 张准胜 Method and device for building underground space structure for established building by using public land
KR100909990B1 (en) * 2008-07-07 2009-07-30 윤인병 Loop structure using steel materials and constructing method thereof
CN101922254A (en) * 2010-08-11 2010-12-22 中国市政工程东北设计研究总院 Assembled square-barrel multi-layer concrete underground garage and manufacturing method thereof
CN102071813A (en) * 2010-11-18 2011-05-25 杭州岩土工程有限公司 Method for constructing underground garage under old building
CN102127974A (en) * 2011-04-18 2011-07-20 上海现代建筑设计(集团)有限公司 Design and construction method of additional cellar under existing building
CN201981552U (en) * 2011-03-24 2011-09-21 江苏新筑预应力工程有限公司 Underground garage structure system with large-span prestressed reinforced concrete frame
CN102720373A (en) * 2012-06-13 2012-10-10 山东建筑大学 Building displacement turning method

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA1242064A (en) * 1985-03-21 1988-09-20 Ian Moffat Method of adding extra floors on existing buildings

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH084034A (en) * 1994-06-24 1996-01-09 Takenaka Komuten Co Ltd Basement skeleton building construction in inverted construction work of building
CN2402764Y (en) * 1999-01-23 2000-10-25 李海森 Building or structure integral moving device
JP2000291030A (en) * 1999-04-13 2000-10-17 Kajima Corp Construction method for underground structure
JP2001262595A (en) * 2000-03-22 2001-09-26 Kajima Corp Building construction method of underground building frame
CN1970897A (en) * 2005-11-23 2007-05-30 张准胜 Method and device for building underground space structure for established building by using public land
KR100909990B1 (en) * 2008-07-07 2009-07-30 윤인병 Loop structure using steel materials and constructing method thereof
CN101922254A (en) * 2010-08-11 2010-12-22 中国市政工程东北设计研究总院 Assembled square-barrel multi-layer concrete underground garage and manufacturing method thereof
CN102071813A (en) * 2010-11-18 2011-05-25 杭州岩土工程有限公司 Method for constructing underground garage under old building
CN201981552U (en) * 2011-03-24 2011-09-21 江苏新筑预应力工程有限公司 Underground garage structure system with large-span prestressed reinforced concrete frame
CN102127974A (en) * 2011-04-18 2011-07-20 上海现代建筑设计(集团)有限公司 Design and construction method of additional cellar under existing building
CN102720373A (en) * 2012-06-13 2012-10-10 山东建筑大学 Building displacement turning method

Also Published As

Publication number Publication date
CN102913000A (en) 2013-02-06

Similar Documents

Publication Publication Date Title
CN102913000B (en) Method for development and utilization of underground space by building moving
CN101886479B (en) Underground storey-adding process of frame structural building by one-by-one independent foundation underpinning method
CN102094649B (en) Method for constructing underground space by shield-shallow buried covered excavation composite method
CN103215894B (en) Portable interim prestressed stretch-draw anchor block
CN104131565A (en) Construction method of using down-top method for excavating earthworks in top-down construction
CN202273169U (en) Trestle
CN1089008A (en) Method for moving house
CN204715366U (en) A kind of large-area deep foundation pit subregion is along the support system under inverse operating mode
CN211314228U (en) A assembled lining cutting structure for highway tunnel
CN110387889B (en) Multi-arch foundation pit supporting method for strip-shaped deep foundation pit
CN103233426A (en) Bailey beam support free of buttress in soft foundation and supporting method thereof
CN203640061U (en) Node connecting structure of reinforced concrete column of basement
CN205369043U (en) Long span steel case back pushes away construction and uses interim bearing structure
CN102433842A (en) Construction method for erecting thin-wall U-shaped girder of rail transit
CN102776840B (en) Mal-position assembly in-position method of truss bridge
CN102979318B (en) Method of displacement and shock-insulation location for building with sliding supports
CN103924981A (en) Single-arch large-span shallow-buried excavation tunnel reinforcing system and construction method thereof
CN201554026U (en) Metro steel surrounding purlin
CN203866688U (en) Full-steel hollow assembly-type overpass
CN205530345U (en) Modular many storehouses utility tunnel structure
CN210152663U (en) Modular rectangle top iron structure
CN205711786U (en) Big cross section porous overlength cast-in-place box culvert formwork system
CN201010846Y (en) Cover plate of covered-over digging method
CN205046668U (en) Connected node suitable for frame supported shear wall structure reverse construction
CN203822326U (en) Reinforcing system for single-arch and large-span type shallowly buried and darkly excavated tunnel

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant