CN102910301B - Steel ball racking machine - Google Patents

Steel ball racking machine Download PDF

Info

Publication number
CN102910301B
CN102910301B CN201210396842.4A CN201210396842A CN102910301B CN 102910301 B CN102910301 B CN 102910301B CN 201210396842 A CN201210396842 A CN 201210396842A CN 102910301 B CN102910301 B CN 102910301B
Authority
CN
China
Prior art keywords
steel ball
bearing plate
stay bearing
chamber
racking machine
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210396842.4A
Other languages
Chinese (zh)
Other versions
CN102910301A (en
Inventor
范军
梁万江
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHONGSHAN QIANRUN PRECISION STEEL BALL MANUFACTURING Co Ltd
Original Assignee
ZHONGSHAN QIANRUN PRECISION STEEL BALL MANUFACTURING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHONGSHAN QIANRUN PRECISION STEEL BALL MANUFACTURING Co Ltd filed Critical ZHONGSHAN QIANRUN PRECISION STEEL BALL MANUFACTURING Co Ltd
Priority to CN201210396842.4A priority Critical patent/CN102910301B/en
Publication of CN102910301A publication Critical patent/CN102910301A/en
Application granted granted Critical
Publication of CN102910301B publication Critical patent/CN102910301B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Filling Or Emptying Of Bunkers, Hoppers, And Tanks (AREA)

Abstract

The invention discloses a steel ball racking machine comprising a rack, a funnel arranged on the rack, an upper valve sealing mechanism, a lower valve sealing mechanism, a racking cylinder, an upper chute, a discharge cylinder, a lower chute, a discharge pipe and a control system, wherein the upper valve sealing mechanism comprises a first supporting plate arranged on the rack, a first driving mechanism is arranged on the first supporting plate, a first transmission mechanism is connected to the first driving mechanism, a first propelling mechanism is connected to the first transmission mechanism, and an upper valve is connected to the first propelling mechanism; the discharge cylinder is arranged on the bottom surface of a second supporting plate, a discharge hole is arranged in the discharge cylinder, a material storage cavity is communicated with the discharge hole, and a lower valve can simultaneously seal the outlet of the material storage cavity and the inlet of the discharge hole; the lower chute is arranged on the discharge cylinder, the lower valve is located in the lower chute, and the inlet of the discharge hole is located in the bottom surface of the lower chute; the discharge pipe is connected with the discharge cylinder; and the control system is electrically connected with the first driving mechanism and a second driving mechanism.

Description

A kind of steel ball racking machine
Technical field
The present invention relates to a kind of steel ball dispensing apparatus, particularly a kind of steel ball racking machine.
Background technology
Accurate accurate steel balls is widely used industrial, comprises that the fields such as Aeronautics and Astronautics, bearing, motor, highly sophisticated device, valve, oil, battery all can use.
But the common employing of the packing of accurate steel balls is manually carried out, by the kind of accurate steel balls and specification, be distributed into the pouch of constant weight, be convenient to store, transport and sell, but not only labour intensity is large in artificial packing completely, and efficiency is low.Thereby the inventor, for the problems referred to above, has designed a kind of equipment of automatic subpackaging accurate steel balls, not only packing accurately, safety, and greatly reduce operating personal labour intensity, improved production efficiency, thereby also reduced productive costs.
Summary of the invention
In order to overcome the deficiencies in the prior art, the invention provides a kind of equipment of automatic subpackaging accurate steel balls, thereby reduced operating personal labour intensity, improved production efficiency.
The technical solution adopted for the present invention to solve the technical problems is:
A steel ball racking machine, is characterized in that: comprise
One frame,
One funnel, is arranged in frame,
Valve closing means on one, comprises the first stay bearing plate being arranged in frame, and the first stay bearing plate is provided with the first driver train, on the first driver train, be connected with the first transmission device, on the first transmission device, be connected with the first pushing mechanism, on the first pushing mechanism, be connected with valve
One lower valve closing means, comprises the second stay bearing plate being arranged in frame, and the second stay bearing plate is provided with the second driver train, on the second driver train, be connected with the second transmission device, on the second transmission device, be connected with the second pushing mechanism, on the second pushing mechanism, be connected with lower valve
One minute fitted tube, within this minute, fitted tube is arranged between the first stay bearing plate and the second stay bearing plate, and inside is provided with material stock chamber, and this material stock chamber can be communicated with funnel, and described upper valve can seal the material stock chamber entrance of minute fitted tube,
One upper hopper chute, this upper hopper chute is arranged on minute fitted tube, and described upper valve is positioned at this upper hopper chute, and described material stock chamber entrance is positioned on upper hopper chute bottom surface,
One discharge barrel, this discharge barrel is arranged at the second stay bearing plate bottom surface, in this discharge barrel, is provided with discharge opening, and described material stock chamber communicates with discharge opening, and described lower valve can seal the outlet of material stock chamber and discharge opening entrance simultaneously,
One gliding groove, this gliding groove is arranged on discharge barrel, and described lower valve is positioned at this gliding groove, and described discharge opening entrance is positioned on gliding groove bottom surface,
One discharge nozzle, this discharge nozzle is connected with discharge barrel,
One control system, this control system and the first driver train and the second driver train are electrically connected.
Described material stock chamber comprises a square hole chamber and a circular hole chamber, and described square hole chamber and junction, circular hole chamber are by chamfered transition, and the party's vestibule entrance is positioned on chute bottom surface.
Within described minute, fitted tube comprises a main body, is installed on storing pipe, the connecting bracket in a main body and is installed on the transfer block on connecting bracket, in described cylinder main body, be provided with the first circular hole, connecting bracket is provided with second circular hole identical with the first Circularhole diameter, described circular hole chamber consists of storing tube cavity, the first circular hole and the second circular hole, described square hole chamber is arranged on connecting bracket, and be connected by chamfered transition with the second circular hole, transfer block is provided with the breach identical with square hole chamber cross-sectional sizes, and described upper hopper chute is arranged in transfer block.
Described the first stay bearing plate is provided with switching cylinder, and one end of this switching cylinder is communicated with funnel, and the other end is communicated with a minute fitted tube by the first stay bearing plate.
Described the first transmission device is gear drive.
Described the first transmission device comprises driven wheel and the tooth bar meshing with this driven wheel, and described driver train is connected with driven wheel.
Described the first pushing mechanism comprises the base being relatively arranged on the first stay bearing plate, between base, be fixed with slide-bar, slide-bar is provided with the slide block with this slide-bar bearing fit, described the first transmission device is fixedly connected with this slide block, described upper valve is fixed on slide block, and described the first stay bearing plate is provided with the hole of dodging of dodging slide block.
Described slide block coordinates with slide-bar by linear bearing.
The end of described upper hopper chute and the end of gliding groove are respectively equipped with bump rubber.
The end of described upper valve and the end of lower valve are respectively equipped with chamfering.
The invention has the beneficial effects as follows: the present invention by control system, control that valve closing means is opened and lower valve closing means to the sealing in material stock chamber or unlatching, thereby all steel balls that funnel is bled in material stock chamber pack in minute pack by discharge barrel and discharge nozzle, above-mentioned working process loops, and realize the automatic subpackaging of steel ball, not only packing is accurate, safety, and greatly reduce operating personal labour intensity, improved production efficiency, thereby also reduced productive costs, can bring huge economic benefit for company.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the present invention is further described.
Fig. 1 is three-dimensional view of the present invention;
Fig. 2 is the three-dimensional view of other direction of the present invention;
Fig. 3 is front elevation of the present invention.
Fig. 4 is the exploded view of upper valve closing means;
Fig. 5 is the exploded view of upper valve closing means other direction;
Fig. 6 is the topology view of upper valve closing means;
Fig. 7 is the topology view of upper valve closing means other direction.
The specific embodiment
Referring to figs. 1 through Fig. 7, the invention discloses a kind of steel ball racking machine, comprise a frame 1, for supporting role, one funnel 3, be arranged in frame 1, this funnel 3 is for depositing the steel ball for the treatment of sorting, valve closing means on one, comprise the first stay bearing plate 2 being arranged in frame 1, the first stay bearing plate 2 is provided with the first driver train 5, the first driver train 5 has adopted common electric machine to do propulsion source, on the first driver train 5, be connected with the first transmission device, on the first transmission device, be connected with the first pushing mechanism, on the first pushing mechanism, be connected with valve 6, one lower valve closing means, comprise the second stay bearing plate 25 being arranged in frame 1, the second stay bearing plate 25 is provided with the second driver train 26, on the second driver train 26, be connected with the second transmission device, on the second transmission device, be connected with the second pushing mechanism, on the second pushing mechanism, be connected with lower valve 27, within one minute, fitted tube 4, this minute fitted tube 4 is arranged at 25 of the first stay bearing plate 2 and the second stay bearing plates, inside is provided with material stock chamber, the capacity in material stock chamber is standard configuration, and the steel ball capacity in material stock chamber is identical with minute steel ball capacity of pack, thereby when the steel ball of material stock chamber inner sealing all spills, just fill minute pack of a predetermined dimension, this material stock chamber can be communicated with funnel 3, upper valve 6 can seal the material stock chamber entrance of minute fitted tube, one upper hopper chute 11, this upper hopper chute 11 is arranged on minute fitted tube, upper valve 6 is positioned at this upper hopper chute 11, material stock chamber entrance is positioned on upper hopper chute 11 bottom surfaces, one discharge barrel 28, this discharge barrel 28 is arranged at the second stay bearing plate 25 bottom surfaces, in this discharge barrel 28, be provided with discharge opening (not shown), material stock chamber communicates with discharge opening, lower valve 27 can seal the outlet of material stock chamber and discharge opening entrance simultaneously, one gliding groove (not shown), this gliding groove is arranged on discharge barrel 28, described lower valve 27 is positioned at this gliding groove, described discharge opening entrance is positioned on gliding groove bottom surface, one discharge nozzle 29, this discharge nozzle 29 is connected with discharge barrel 28, the steel ball spilling from material stock chamber finally packs a minute pack into by discharge barrel 28 and discharge nozzle 29, one control system, this control system and the first driver train and the second driver train are electrically connected, operator can operate by control system control convenience.
In this specific embodiment, the first stay bearing plate 2 is provided with switching cylinder 7, one end of this switching cylinder 7 is communicated with funnel 3, and the other end is communicated with a minute fitted tube 4 by the first stay bearing plate 2, and the end being connected with funnel 3 of this switching cylinder 7 is provided with circular groove 8, thereby can with fine cooperation of funnel 3 bottoms, in switching cylinder 7, be provided with and the funnel 3 feed openings square hole 9 of transferring accordingly, this switching cylinder square hole 9 can communicate with material stock chamber by the first stay bearing plate 2 square holes of the size correspondence on the first stay bearing plate 2, material stock chamber comprises a square hole chamber 10 and a circular hole chamber, square hole chamber 10 is for matching with switching cylinder square hole 9, its essence is also to coordinate with the discharging opening of funnel 3, circular hole chamber is to match for the discharge nozzle 29 with follow-up, inclined-plane 12 transition are passed through with junction, circular hole chamber in described square hole chamber 10, and this inclined-plane 12 can be flat incline plane, also can be circular arc inclined-plane, and the party's vestibule entrance is positioned on upper hopper chute 11 bottom surfaces, and communicate with switching cylinder 7 square holes by the first stay bearing plate 2 square holes.Pass through said structure, steel ball can not ensconced the junction in square hole chamber 10 and circular hole chamber, because the cross section in square hole chamber 10 is the cross sections that are greater than circular hole chamber, if there is no the transition on inclined-plane 12, square hole chamber 10 only partly overlaps with cross section, junction, circular hole chamber, lap is outer can form plane, in the time need to changing the specification of steel ball, need first all upper valves 6 to be exited, empty the steel ball of all last specifications, and the steel ball of last specification is likely bound in this plane to leak down while leaking down, and in plant machine with after the steel ball of the rear specification that packs into mix, thereby after causing, the steel ball of a specification packs the steel ball that can sneak into last specification while minute packing into, produce nonconformity and divide pack.
As shown in the figure, for the ease of processing and manufacturing, divide fitted tube 4 to comprise a main body 13, be installed on the storing pipe 30 in a main body, be installed on the connecting bracket 14 in a main body 13 and be installed on the transfer block 15 on connecting bracket 14, in described cylinder main body 13, be provided with the first circular hole 16, connecting bracket 14 is provided with second circular hole 17 identical with the first circular hole 16 diameters, described circular hole chamber is by storing tube cavity, the first circular hole 16 and the second circular hole 17 form, storing tube cavity internal diameter is also identical with the first circular hole 16 diameters, described square hole chamber 10 is connected by inclined-plane 12 transition with the second circular hole 17, and transfer block 15 is provided with the breach identical with square hole chamber 10 cross-sectional sizes, described upper hopper chute 11 is arranged in transfer block 15.
As shown in the figure, because gear transmission is wear-resisting and intensity is high, low price, thereby the first transmission device has adopted gear drive, gear the first transmission device comprises driven wheel 18 and the tooth bar 19 meshing with this driven wheel 18, and described the first driver train 5 is connected with driven wheel 18; The first pushing mechanism comprises the base 20 being relatively arranged on the first stay bearing plate 2,20 of bases are fixed with slide-bar 21, slide-bar 21 is provided with the slide block 22 with this slide-bar 21 bearing fits, upper valve 6 is fixed on slide block 22, the first transmission device is fixedly connected with this slide block 22, described the first stay bearing plate 2 be provided with dodge slide block 22 dodge hole 23, in this specific embodiment, this slide block 22 is to be fixedly connected with the tooth bar 19 in the first transmission device.Better for sliding effect, slide block 22 coordinates with slide-bar 21 by linear bearing.
Upper valve closing means principle of work is: electric motor starting drives driven wheel 18 to rotate, driven wheel 18 drives the tooth bar 19 being engaged with to move, simultaneously, tooth bar 19 band movable sliders 22 are done traveling priority along slide-bar 21, thereby valve 6 is done straight-line motion along upper hopper chute 11 in drive, thereby play the effect in sealing or unlatching material stock chamber.
In the application, lower valve 27 closing means, and the second stay bearing plate 25 of comprising of lower valve 27 closing means, the second driver train 26, the second transmission device, the second pushing mechanism, lower valve 27, gliding groove respectively with corresponding upper valve closing means, and structure, function and the effect of the first stay bearing plate of comprising of upper valve closing means, the first driver train, the first transmission device, the first pushing mechanism, upper valve, upper hopper chute are identical, thereby be not described in detail in this.
In addition, as preferred structure of the present invention, the end of upper hopper chute 11 and the end of gliding groove are respectively equipped with bump rubber (not shown), thereby can avoid valve 6 and upper hopper chute 11 wall collisions or lower valve 27 to cause wearing and tearing with the collision of downslide cell wall; The end of the end of upper valve 6 and lower valve 27 is respectively equipped with chamfering 24, thereby make the end thickness of valve 6 or lower valve 27 be less than diameter of the steel ball, the probability that reduces upper valve 6 or lower valve 27 end collision steel balls, can guarantee that again valve 6 or lower valve 27 have certain thickness.
The working process of this equipment is: pack steel ball in funnel, by control system, controlling the first driver train turns round, thereby in drive, valve exits, material stock chamber is communicated with funnel, lower valve still seals the outlet of material stock chamber simultaneously, and now the steel ball in funnel is full of in material stock chamber, then controls the first driver train 5 runnings by control system, thereby valve puts in drive, sealing material stock chamber entrance; Then control system is controlled the second driver train running, thereby drive lower valve to exit, all steel balls in material stock chamber pack in minute pack by discharge barrel and discharge nozzle, finally, by control system, controlling the second driver train turns round, thereby drive lower valve to put in, thereby start next working cycle.
Above-mentionedly just preferred embodiments more of the present invention are illustrated and described, but embodiments of the present invention are not restricted to the described embodiments, as long as it reaches technique effect of the present invention with essentially identical means, all should belong to protection scope of the present invention.

Claims (10)

1. a steel ball racking machine, is characterized in that: comprise
One frame,
One funnel, is arranged in frame,
Valve closing means on one, comprises the first stay bearing plate being arranged in frame, and the first stay bearing plate is provided with the first driver train, on the first driver train, be connected with the first transmission device, on the first transmission device, be connected with the first pushing mechanism, on the first pushing mechanism, be connected with valve
One lower valve closing means, comprises the second stay bearing plate being arranged in frame, and the second stay bearing plate is provided with the second driver train, on the second driver train, be connected with the second transmission device, on the second transmission device, be connected with the second pushing mechanism, on the second pushing mechanism, be connected with lower valve
One minute fitted tube, within this minute, fitted tube is arranged between the first stay bearing plate and the second stay bearing plate, and inside is provided with material stock chamber, and this material stock chamber can be communicated with funnel, and described upper valve can seal the material stock chamber entrance of minute fitted tube,
One upper hopper chute, this upper hopper chute is arranged on minute fitted tube, and described upper valve is positioned at this upper hopper chute, and described material stock chamber entrance is positioned on upper hopper chute bottom surface,
One discharge barrel, this discharge barrel is arranged at the second stay bearing plate bottom surface, in this discharge barrel, is provided with discharge opening, and described material stock chamber communicates with discharge opening, and described lower valve can seal the outlet of material stock chamber and discharge opening entrance simultaneously,
One gliding groove, this gliding groove is arranged on discharge barrel, and described lower valve is positioned at this gliding groove, and described discharge opening entrance is positioned on gliding groove bottom surface,
One discharge nozzle, this discharge nozzle is connected with discharge barrel,
One control system, this control system and the first driver train and the second driver train are electrically connected.
2. a kind of steel ball racking machine according to claim 1, is characterized in that: described material stock chamber comprises a square hole chamber and a circular hole chamber, and described square hole chamber and junction, circular hole chamber are by chamfered transition, and the party's vestibule entrance is positioned on chute bottom surface.
3. a kind of steel ball racking machine according to claim 2, it is characterized in that: within described minute, fitted tube comprises a main body, be installed on the storing pipe in a main body, connecting bracket and be installed on the transfer block on connecting bracket, in described cylinder main body, be provided with the first circular hole, connecting bracket is provided with second circular hole identical with the first Circularhole diameter, described circular hole chamber is by storing tube cavity, the first circular hole and the second circular hole form, described square hole chamber is arranged on connecting bracket, and be connected by chamfered transition with the second circular hole, transfer block is provided with the breach identical with square hole chamber cross-sectional sizes, described upper hopper chute is arranged in transfer block.
4. a kind of steel ball racking machine according to claim 1, is characterized in that: described the first stay bearing plate is provided with switching cylinder, and one end of this switching cylinder is communicated with funnel, and the other end is communicated with a minute fitted tube by the first stay bearing plate.
5. a kind of steel ball racking machine according to claim 1, is characterized in that: described the first transmission device is gear drive.
6. a kind of steel ball racking machine according to claim 5, is characterized in that: described the first transmission device comprises driven wheel and the tooth bar meshing with this driven wheel, and described driver train is connected with driven wheel.
7. a kind of steel ball racking machine according to claim 1, it is characterized in that: described the first pushing mechanism comprises the base being relatively arranged on the first stay bearing plate, between base, be fixed with slide-bar, slide-bar is provided with the slide block with this slide-bar bearing fit, described the first transmission device is fixedly connected with this slide block, described upper valve is fixed on slide block, and described the first stay bearing plate is provided with the hole of dodging of dodging slide block.
8. a kind of steel ball racking machine according to claim 7, is characterized in that: described slide block coordinates with slide-bar by linear bearing.
9. a kind of steel ball racking machine according to claim 1, is characterized in that: the end of described upper hopper chute and the end of gliding groove are respectively equipped with bump rubber.
10. a kind of steel ball racking machine according to claim 1, is characterized in that: the end of described upper valve and the end of lower valve are respectively equipped with chamfering.
CN201210396842.4A 2012-10-18 2012-10-18 Steel ball racking machine Active CN102910301B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210396842.4A CN102910301B (en) 2012-10-18 2012-10-18 Steel ball racking machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210396842.4A CN102910301B (en) 2012-10-18 2012-10-18 Steel ball racking machine

Publications (2)

Publication Number Publication Date
CN102910301A CN102910301A (en) 2013-02-06
CN102910301B true CN102910301B (en) 2014-04-02

Family

ID=47608922

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210396842.4A Active CN102910301B (en) 2012-10-18 2012-10-18 Steel ball racking machine

Country Status (1)

Country Link
CN (1) CN102910301B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103112731B (en) * 2013-02-20 2015-03-25 中山市乾润精密钢球制造有限公司 Hopper device of steel ball sorting machine
CN103231818B (en) * 2013-04-23 2015-11-11 无锡市飞云球业有限公司 A kind of steel ball automatic packing apparatus
CN104129512A (en) * 2014-07-17 2014-11-05 苏州信文食品有限公司 Spherical food split packaging device
CN104178620B (en) * 2014-08-09 2016-08-24 宁国东方碾磨材料股份有限公司 A kind of steel ball feeding device
CN107031875B (en) * 2017-06-12 2019-02-19 南昌市豪尔科技印刷有限公司 A kind of flint packing machine
CN110963093B (en) * 2019-11-19 2021-06-01 无为县环江铜业有限公司 Copper ball feed divider

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1786496A (en) * 2005-11-23 2006-06-14 江苏省滚动体工程技术研究中心 Cleaning, coating oil, packing wire for steel ball of bearing steel
EP1739017A1 (en) * 2005-06-30 2007-01-03 Euroball S.P.A. Apparatus for filling bearing balls into containers
CN202848046U (en) * 2012-10-18 2013-04-03 中山市乾润精密钢球制造有限公司 Steel ball racking machine

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000264302A (en) * 1999-03-16 2000-09-26 Nippon Steel Corp Steel ball weighing control method
JP5581009B2 (en) * 2009-05-27 2014-08-27 三光機械株式会社 Raw material metering mechanism of multi-row stick type automatic packaging machine

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1739017A1 (en) * 2005-06-30 2007-01-03 Euroball S.P.A. Apparatus for filling bearing balls into containers
CN1786496A (en) * 2005-11-23 2006-06-14 江苏省滚动体工程技术研究中心 Cleaning, coating oil, packing wire for steel ball of bearing steel
CN202848046U (en) * 2012-10-18 2013-04-03 中山市乾润精密钢球制造有限公司 Steel ball racking machine

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
JP特开2000-264302A 2000.09.26
JP特开2010-274938A 2010.12.09

Also Published As

Publication number Publication date
CN102910301A (en) 2013-02-06

Similar Documents

Publication Publication Date Title
CN102910301B (en) Steel ball racking machine
CN207434998U (en) A kind of automatic filling machine
CN206705241U (en) A kind of battery steel shell discharging aligning device
CN202848094U (en) Full-automatic rotating disc type heat sealing machine
CN208842669U (en) Pipettor gun head automatic discharge device
CN102633008A (en) Full-automatic horizontal-type hose seal cap screwing machine
CN204348842U (en) A kind of lithium battery automatic packaging line
CN103240214A (en) Turntable-type packaging tank interior coating machine
CN104553360A (en) Lithium battery code-spurting device
CN102837838B (en) Central distribution quantitative filling machine
CN204039040U (en) High-speed canning all-in-one
CN202848046U (en) Steel ball racking machine
CN204250395U (en) high-viscosity material automatic quantitative packing machine
CN102303288A (en) Auger type steel shot feeding circulator, and metal surface treating apparatus by using the same
CN208913496U (en) A kind of feeding-distribution device
CN210418230U (en) Feeding device based on high accuracy milling machine is used
CN105870472B (en) A kind of alkaline battery enters ring, applies sealing compound integrated apparatus
CN205146376U (en) Milling machine continuous discharge device
CN210710688U (en) Binary aerosol production line
CN205440929U (en) Automatic cartoner of portable pipettor rifle head
CN205797848U (en) Automatic cyclic cleaning antirust permutation equipment
CN103394627A (en) Semi-automatic rivet assembling device
CN104477578B (en) A kind of automatic feeder of indoor apparatus of air conditioner packaging structure
CN109455329B (en) Filling production equipment special for flexible package offset printing ink
CN209476597U (en) A kind of glue applying mechanism of battery power joint weld equipment

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant