CN102896432B - High-altitude big-diameter pipeline vertical section pipe installation method - Google Patents
High-altitude big-diameter pipeline vertical section pipe installation method Download PDFInfo
- Publication number
- CN102896432B CN102896432B CN201110211488.9A CN201110211488A CN102896432B CN 102896432 B CN102896432 B CN 102896432B CN 201110211488 A CN201110211488 A CN 201110211488A CN 102896432 B CN102896432 B CN 102896432B
- Authority
- CN
- China
- Prior art keywords
- pipeline
- vertical section
- pipe
- support platform
- installation method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000000034 method Methods 0.000 title claims abstract description 24
- 238000009434 installation Methods 0.000 title claims abstract description 19
- 239000000725 suspension Substances 0.000 claims abstract description 5
- 238000003466 welding Methods 0.000 claims description 13
- 229910000831 Steel Inorganic materials 0.000 claims description 9
- 239000010959 steel Substances 0.000 claims description 9
- 241000282326 Felis catus Species 0.000 claims description 3
- 229910000746 Structural steel Inorganic materials 0.000 claims description 3
- 230000002787 reinforcement Effects 0.000 claims description 3
- 238000010276 construction Methods 0.000 description 2
- 230000009466 transformation Effects 0.000 description 2
- 238000005266 casting Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
Landscapes
- Jib Cranes (AREA)
- Leg Units, Guards, And Driving Tracks Of Cranes (AREA)
Abstract
The present invention relates to pipe installation method, particularly relate to the installation method of high vacant duct vertical section.A kind of high-altitude big-diameter pipeline vertical section pipe installation method, it comprises: step one, and support platform is built; Step 2, lifts the pipeline of described vertical section with truck crane, unclamp truck crane suspension hook after Pipe installing.The present invention can accelerate the duration of high-altitude Pipe installing, meets the requirement of owner to the duration.
Description
Technical field
The present invention relates to pipe installation method, particularly relate to the installation method of high vacant duct vertical section.
Background technology
Along with the high speed development of steel industry, the traditional industrial structure of each steel plant can not be met the need of market, the project reconstruction such as increasing steel industry is recombinated to self structure, technological transformation, enlarging.The interface method of the new and old pipeline of its high and medium Large Diameter Pipeline becomes the heavy difficult point of transformation project.In extra-thick slab casting machine project, the new and old pipeline of one-time dedusting pipeline carries out interface when installing: vertical pipe (φ 2620) the tube hub absolute altitude of one-time dedusting pipeline modification is from from+7.5m--+49.8m, and single pipe weighs 32.7t.Should install from bottom to top according to normal working procedure, and owner gives the time very section with construction party at present, the duration is very nervous, and existing installation method cannot meet nowadays urgent construction period.
Summary of the invention
The present invention is intended to address the aforementioned drawbacks, and provides a kind of high-altitude big-diameter pipeline vertical section pipe installation method.The present invention can accelerate the duration of high-altitude Pipe installing, meets the requirement of owner to the duration.
For solving the problem, must formulate a kind of rationally, effective method to lift this section of vertical pipe, the emphasis will considered before lifting is that pipeline will carry out support platform in a pre-installation, is drawn by girder and collapse after preventing from installing; Prevent pipeline hoisting point position unbalance stress from causing tube wall drawing crack when also will consider lifting pipeline simultaneously, must on the duct wall of welding hanger position, weld reinforcing sleeve and adopt T-shaped hanger.
A kind of high-altitude big-diameter pipeline vertical section pipe installation method, it comprises:
Step one, support platform is built;
Step 2, lifts the pipeline of described vertical section with truck crane, unclamp truck crane suspension hook after Pipe installing.
Described high-altitude big-diameter pipeline vertical section pipe installation method, described step one comprises: the structural steel beam of pipe support platform is welded stay pipe bearing, and bearing adopts channel-section steel to make diagonal brace, and platform adopts steel plate; On pipeline, weld stay pipe base support platform as pipeline support point, pipeline support platform adopts tube wall reinforcement form as support platform simultaneously; Often organize pipeline welding and be no less than three group platforms;
Described high-altitude big-diameter pipeline vertical section pipe installation method, described step 2 comprises: after Standing position of a crane is good, lifting vertical section pipeline, and pipeline butt is rear welded pipe line well, after counterpart, simultaneously crane can not loose hook for welded pipe line, etc. upper interface positioning welding complete after pipeline bottom is supported.The spiral welded pipe that supporting pipeline adopts.Prevent pipe walls support place unbalance stress from tube wall drawing crack being adopted in support platform position, pipe portion tube wall to thicken and strengthen intensity measure.Install supporting pipeline and adopt crane lifting supporting pipeline, pipeline should be welded on relevant position by welding cat ladder in advance with welding of support platform.
Described high-altitude big-diameter pipeline vertical section pipe installation method, in described step 2, stay pipe has welded the not loose hook of front whole process crane, and after strutting means completes, loose hook completes vertical section Pipe installing task.
Support platform has been welded by the present invention before lifting straight length, is first installed by stay pipe in hoisting process, and then loose truck crane suspension hook, otherwise the gravity of vertical tube will can not get supporting and the roof girder that crushes.So greatly accelerate the installation of pipeline, meet the requirement of owner to the duration.
Detailed description of the invention
A kind of high-altitude of the present invention big-diameter pipeline vertical section pipe installation method, it comprises:
Step one, support platform is built; The structural steel beam of pipe support platform is welded stay pipe bearing, and bearing adopts channel-section steel, and [16 make diagonal brace, and platform adopts the steel plate of 500mm*500mm*10mm; On pipeline, weld stay pipe base support platform as pipeline support point, pipeline support platform adopts tube wall reinforcement form as support platform simultaneously; Often organize pipeline welding and be no less than three group platforms.
Step 2, lifts the pipeline of described vertical section with truck crane, unclamp truck crane suspension hook after Pipe installing.After 200t Standing position of a crane is good, lifting vertical section pipeline ,+49.8m locate pipeline butt well after welded pipe line, after counterpart, crane can not loose hook simultaneously for welded pipe line, etc. upper interface positioning welding complete after pipeline bottom is supported.Supporting pipeline adopts the spiral welded pipe of φ 273*8.Prevent pipe walls support place unbalance stress from tube wall drawing crack being adopted in support platform position, pipe portion tube wall to thicken and strengthen intensity measure.Supporting pipeline being installed and adopting 25t crane lifting supporting pipeline, relevant position should be welded on by welding cat ladder in advance for convenience of supporting pipeline with welding of support platform.Stay pipe has welded the not loose hook of front whole process 200t crane.After strutting means completes, loose hook completes vertical section Pipe installing task.For further interface work provides fast interface to create good condition.
Claims (3)
1. a high-altitude big-diameter pipeline vertical section pipe installation method, it is characterized in that, it comprises:
Step one, pipe portion support platform is built;
Step 2, the pipeline of described vertical section is lifted with truck crane, truck crane suspension hook is unclamped after vertical section Pipe installing, comprise Standing position of a crane good after, lifting vertical section pipeline, vertical section pipeline butt well welds afterwards, and simultaneously crane can not loose hook to weld vertical section pipeline after counterpart, etc. upper interface positioning welding complete after vertical section pipeline bottom is supported; The spiral welded pipe that supporting pipeline adopts; Prevent pipe walls support place unbalance stress from tube wall drawing crack being adopted in support platform position, pipe portion tube wall to thicken and strengthen intensity measure; Install supporting pipeline and adopt crane lifting supporting pipeline, supporting pipeline should be welded on relevant position by welding cat ladder in advance with welding of pipe portion support platform.
2. high-altitude according to claim 1 big-diameter pipeline vertical section pipe installation method, it is characterized in that, described step one comprises: the structural steel beam of pipe portion support platform welds stay pipe bearing, and stay pipe bearing adopts channel-section steel to make diagonal brace, and pipe portion support platform adopts steel plate; On pipeline, weld stay pipe base as the supporting pipeline strong point, pipe portion support platform adopts tube wall reinforcement form as support simultaneously; Often organize vertical section pipeline welding and be no less than three groups of pipe portion support platforms.
3. high-altitude according to claim 1 big-diameter pipeline vertical section pipe installation method, in described step 2, stay pipe has welded the not loose hook of front whole process crane, and after strutting means completes, loose hook completes vertical section Pipe installing task.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110211488.9A CN102896432B (en) | 2011-07-27 | 2011-07-27 | High-altitude big-diameter pipeline vertical section pipe installation method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110211488.9A CN102896432B (en) | 2011-07-27 | 2011-07-27 | High-altitude big-diameter pipeline vertical section pipe installation method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102896432A CN102896432A (en) | 2013-01-30 |
CN102896432B true CN102896432B (en) | 2016-03-30 |
Family
ID=47569075
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110211488.9A Expired - Fee Related CN102896432B (en) | 2011-07-27 | 2011-07-27 | High-altitude big-diameter pipeline vertical section pipe installation method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102896432B (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103692195A (en) * | 2013-12-20 | 2014-04-02 | 中国五冶集团有限公司 | Pipe installation method |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101323418A (en) * | 2008-07-25 | 2008-12-17 | 北京城建集团有限责任公司 | Huge deformed steel member single machine turnover hoisting method |
CN101818575A (en) * | 2010-02-10 | 2010-09-01 | 中国建筑第七工程局有限公司 | Construction technology of cross-shaped profile steel column |
CN102029473A (en) * | 2009-09-25 | 2011-04-27 | 上海宝钢工业检测公司 | Aerological welding method of steel sleeve |
CN201863992U (en) * | 2010-11-09 | 2011-06-15 | 沪东中华造船(集团)有限公司 | Block supporting device for dock carrying |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP4369025B2 (en) * | 2000-08-04 | 2009-11-18 | 高砂熱学工業株式会社 | Method for constructing a steel pipe and a lifting device used in the method |
-
2011
- 2011-07-27 CN CN201110211488.9A patent/CN102896432B/en not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101323418A (en) * | 2008-07-25 | 2008-12-17 | 北京城建集团有限责任公司 | Huge deformed steel member single machine turnover hoisting method |
CN102029473A (en) * | 2009-09-25 | 2011-04-27 | 上海宝钢工业检测公司 | Aerological welding method of steel sleeve |
CN101818575A (en) * | 2010-02-10 | 2010-09-01 | 中国建筑第七工程局有限公司 | Construction technology of cross-shaped profile steel column |
CN201863992U (en) * | 2010-11-09 | 2011-06-15 | 沪东中华造船(集团)有限公司 | Block supporting device for dock carrying |
Also Published As
Publication number | Publication date |
---|---|
CN102896432A (en) | 2013-01-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104018514B (en) | Large Towers kind equipment basis pre-embedded anchoring bolts inversion construction method | |
CN103061506B (en) | Construction method of steel structure dome | |
CN204899180U (en) | Steel construction jar body aerial working platform simply sets up device | |
CN104195948B (en) | Bridge suspension pipe pushing installation construction method | |
CN103243961A (en) | Titanium plate steel inner tank reversed construction device for chimney of thermal power station | |
CN105201198A (en) | Tool-type cantilever beam and construction method thereof | |
CN103437563B (en) | Mounting method for steel skeleton of large steel structure factory building | |
CN204644884U (en) | High pier over-form construction reinforced bar installs mobile stock | |
CN105804400A (en) | Curved surface net frame lifting construction method | |
CN102518300A (en) | Embedded conical bearing joint type steel structure support and construction method thereof | |
CN202591864U (en) | Lifting type welding service trolley | |
CN102494536B (en) | Construction method for dust-fall pipe of sintering chamber | |
CN102896432B (en) | High-altitude big-diameter pipeline vertical section pipe installation method | |
CN202963332U (en) | Device for manufacturing pile foundation reinforcement cage by using simple portal frame | |
CN203380228U (en) | Inner support device for production of pressure steel pipe | |
CN102635070A (en) | Mutual-pulling type vertical turning construction method for steel towers of cable-stayed bridge | |
JP6534938B2 (en) | Lining plate installation and rain curing jig and lining plate installation method using the jig | |
JP6611129B2 (en) | How to replace the converter furnace body | |
CN204080636U (en) | Steel pipe arch bridge arch rib installs flat turn supporting and location platform | |
CN203806943U (en) | Lifting device | |
CN205099290U (en) | Saddle arm jacking device is changed to continuous casting revolving platform floating bearing | |
CN204225503U (en) | Large span steel truss high altitude bulk conversion beam moulding bed | |
CN209509453U (en) | A kind of skyscraper cast-in-place concrete structure tool-type builder's jack | |
CN203924652U (en) | The operation platform of periphery shear wall between a kind of precast stair | |
CN202644407U (en) | Demoulding device for bottom plate bracket of capping beam constructed by hoop method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160330 |
|
CF01 | Termination of patent right due to non-payment of annual fee |