CN102879734A - 智能变电站开关动作时间延迟的测试方法 - Google Patents

智能变电站开关动作时间延迟的测试方法 Download PDF

Info

Publication number
CN102879734A
CN102879734A CN2012103628494A CN201210362849A CN102879734A CN 102879734 A CN102879734 A CN 102879734A CN 2012103628494 A CN2012103628494 A CN 2012103628494A CN 201210362849 A CN201210362849 A CN 201210362849A CN 102879734 A CN102879734 A CN 102879734A
Authority
CN
China
Prior art keywords
goose
time delay
signal
smart machine
testing tool
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012103628494A
Other languages
English (en)
Other versions
CN102879734B (zh
Inventor
刘海涛
黄鸣宇
栗磊
尹亮
梁亚波
徐丽娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ELECTRIC POWER INSTITUTE OF SCIENCE NINGXIA ELECTRIC POWER Co Ltd
State Grid Corp of China SGCC
Original Assignee
ELECTRIC POWER INSTITUTE OF SCIENCE NINGXIA ELECTRIC POWER Co Ltd
State Grid Corp of China SGCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ELECTRIC POWER INSTITUTE OF SCIENCE NINGXIA ELECTRIC POWER Co Ltd, State Grid Corp of China SGCC filed Critical ELECTRIC POWER INSTITUTE OF SCIENCE NINGXIA ELECTRIC POWER Co Ltd
Priority to CN201210362849.4A priority Critical patent/CN102879734B/zh
Publication of CN102879734A publication Critical patent/CN102879734A/zh
Application granted granted Critical
Publication of CN102879734B publication Critical patent/CN102879734B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)

Abstract

本发明涉及一种智能变电站开关动作时间延迟的测试方法。其特点是,包括如下步骤:(1)将测试仪器与智能设备的空节点回路连接;(2)将测试仪器与智能设备的网络通讯回路连接;(3)由测试仪器输出空节点信号或者由外部信号源提供GOOSE信号,而智能设备接收外部动作信号并根据自身逻辑产生空节点或者GOOSE输出;(4)由测试仪器记录智能设备产生的空节点和GOOSE动作时间,然后测试仪器完成对开关动作信号时间延迟的计算。本发明方法的有益效果是:通过准确计算出开关动作时间延迟,解决了智能变电站实施后通讯层面的时间延迟分析方法,所有的测试结果数据为变电站提供有效的数据保证和依据。

Description

智能变电站开关动作时间延迟的测试方法
技术领域
本发明涉及一种智能变电站开关动作时间延迟的测试方法。
背景技术
智能变电站按照IEC61850(DL/T860)的标准设计,而GOOSE(智能变电站面向通用对象的变电站事件)是IEC61850(DL/T860)标准体系中重要的信息传输方式,智能变电站的智能终端、测控设备或者保护设备都需要通过GOOSE信息交换对方的数据信息,并利用内部的逻辑处理关系实现开关动作出口,同时利用GOOSE信息发布开关位置信息。当智能变电站在事故中需要快速切除故障时,需要考核的参数就是智能变电站的开关动作时间,开关动作时间的快慢直接影响者变电站运行的安全性,能够快速隔离故障是避免问题被扩大化的首要处理问题。因此考核开关动作时间的快慢应该是变电站安全运行的重要指标。
发明内容
本发明的目的是提供一种智能变电站开关动作时间延迟的测试方法,能够准确计算出开关动作时间延迟。
一种智能变电站开关动作时间延迟的测试方法,其特别之处在于,包括如下步骤:
(1)将测试仪器与智能设备的空节点回路连接;
(2)将测试仪器与智能设备的网络通讯回路连接;
(3)由测试仪器输出空节点信号或者由外部信号源提供GOOSE信号,而智能设备接收外部动作信号并根据自身逻辑产生空节点或者GOOSE输出;
(4)由测试仪器记录智能设备产生的空节点和GOOSE动作时间,然后测试仪器完成对开关动作信号时间延迟的计算。
具体步骤是,首先由测试仪器输出空节点信号T1给智能设备的DI端子由智能设备产生DO输出信号T2或者GOOSE输出信号T3,然后计算智能设备输入与输出之间的时间延迟为T3-T1或者T2-T1;或者测试仪器接收外部信号源发生的GOOSE信号T4,同时智能设备接收外部源GOOSE信息产生DO输出信号T2或者GOOSE输出信号T3,然后计算智能设备输入与输出之间的时间延迟为T2-T4或者T3-T4。
本发明方法的有益效果是:完全利用了智能设备的结构特点,考虑到智能变电站对GOOSE信息的普遍推广,GOOSE信息时间分析方法将来会日益增加,通过准确计算出开关动作时间延迟,解决了智能变电站实施后通讯层面的时间延迟分析方法,所有的测试结果数据为变电站提供有的数据保证和依据。
附图说明
附图1为本发明的测试流程图;
附图2为本发明的测试原理图;
附图3为本发明的测试案例图;
附图4为本发明的测试案例图;
附图5为本发明的测试案例图;
附图6为本发明的测试案例图。
具体实施方式
本发明是一种智能变电站开关动作时间延迟的测试方法,包括如下步骤:
(1)将测试仪器与智能设备的空节点回路连接;
(2)将测试仪器与智能设备的网络通讯回路连接;
(3)由测试仪器输出空节点信号或者由外部信号源提供GOOSE信号,而智能设备接收外部动作信号并根据自身逻辑产生空节点或者GOOSE输出;
(4)由测试仪器记录智能设备产生的空节点和GOOSE动作时间,然后测试仪器完成对开关动作信号时间延迟的计算。
具体步骤如下:
首先由测试仪器输出空节点信号T1给智能设备的DI端子由智能设备产生DO输出信号T2或者GOOSE输出信号T3,然后计算智能设备输入与输出之间的时间延迟为T3-T1或者T2-T1;
或者测试仪器接收外部信号源发生的GOOSE信号T4,同时智能设备接收外部源GOOSE信息产生DO输出信号T2或者GOOSE输出信号T3,然后计算智能设备输入与输出之间的时间延迟为T2-T4或者T3-T4。
智能变电站智能设备例如智能终端、测控装置及保护装置等,其内部处理器有可识别的输入输出通讯信号,包括空节点或者GOOSE信号,通过对设备输入和输出的测试就可以实现开关动作时间的延迟测量。
本发明中所指的智能设备包括智能变电站内智能终端、保护装置、测控装置等二次设备,测试仪器采用精确时间测试分析仪,利用测试仪器的网络口和空节点输入输出端口完成测试数据的交互。外部信号源为智能变电站其它智能终端、保护装置、测控装置等,从而可以实现与测试设备的GOOSE状态联动。
遵循测试原理图2进行测试应用环境的搭建,其中智能设备为被测设备,DI/DO/NET为智能设备的物理输入输出接口,外部信号源提供标准的GOOSE信号供测试仪器和智能设备使用,测试仪器为智能设备提供外部输入信号也接收智能设备的输出信号并进行计算完成时间延迟的测试。
测试环境的首要条件是测试仪器完成GPS/BD卫星的时间同步,然后利用测试仪器的时间同步输出信号,如IRIG-B/PPS等为智能设备建立与测试仪器时间同步关系,然后才能利用所有有效的测试信号进行计算得出开关动作的时间延迟数据。
测试案例1见图3,其利用外部信号源的GOOSE信号触发智能设备的DO输出,测试仪器接收外部信号源的GOOSE信息和智能设备的DO输出信息完成开关时间延迟的计算。
测试案例2见图4,其利用测试仪器的空节点输出触发智能设备的空节点输出,测试仪器接收智能设备的空节点输出信号完成开关时间延迟的计算。
测试案例3见图5,其利用测试仪器的空节点输出信号触发智能设备的GOOSE输出,测试仪器接收智能设备的GOOSE信号完成开关时间延迟的计算。
测试案例4见图6,其利用外部信号源的GOOSE信号触发智能设备的GOOSE信号输出,测试仪器接收外部信号源的GOOSE信号和智能设备的GOOSE信号完成开关时间延迟的计算。

Claims (2)

1.一种智能变电站开关动作时间延迟的测试方法,其特征在于,包括如下步骤:
(1)将测试仪器与智能设备的空节点回路连接;
(2)将测试仪器与智能设备的网络通讯回路连接;
(3)由测试仪器输出空节点信号或者由外部信号源提供GOOSE信号,而智能设备接收外部动作信号并根据自身逻辑产生空节点或者GOOSE输出;
(4)由测试仪器记录智能设备产生的空节点和GOOSE动作时间,然后测试仪器完成对开关动作信号时间延迟的计算。
2.如权利要求1所述的智能变电站开关动作时间延迟的测试方法,其特征在于:
首先由测试仪器输出空节点信号T1给智能设备的DI端子由智能设备产生DO输出信号T2或者GOOSE输出信号T3,然后计算智能设备输入与输出之间的时间延迟为T3-T1或者T2-T1;
或者测试仪器接收外部信号源发生的GOOSE信号T4,同时智能设备接收外部源GOOSE信息产生DO输出信号T2或者GOOSE输出信号T3,然后计算智能设备输入与输出之间的时间延迟为T2-T4或者T3-T4。
CN201210362849.4A 2012-09-26 2012-09-26 智能变电站开关动作时间延迟的测试方法 Active CN102879734B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210362849.4A CN102879734B (zh) 2012-09-26 2012-09-26 智能变电站开关动作时间延迟的测试方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210362849.4A CN102879734B (zh) 2012-09-26 2012-09-26 智能变电站开关动作时间延迟的测试方法

Publications (2)

Publication Number Publication Date
CN102879734A true CN102879734A (zh) 2013-01-16
CN102879734B CN102879734B (zh) 2015-06-17

Family

ID=47481130

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210362849.4A Active CN102879734B (zh) 2012-09-26 2012-09-26 智能变电站开关动作时间延迟的测试方法

Country Status (1)

Country Link
CN (1) CN102879734B (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104065524A (zh) * 2013-03-20 2014-09-24 贵州电力试验研究院 一种iec61850中goose报文的性能测试方法
CN104142471A (zh) * 2013-09-05 2014-11-12 国家电网公司 一种电子设备干接点动作延时测量装置
CN104301163A (zh) * 2013-07-18 2015-01-21 国家电网公司 一种goose时标的测试方法与***
CN105403782A (zh) * 2015-10-26 2016-03-16 山东网聪信息科技有限公司 智能终端设备干接点动作延时测试方法
CN107238768A (zh) * 2017-05-15 2017-10-10 国家电网公司 一种基于同一时钟源的直流保护时间现场校验装置与方法

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1152008A (ja) * 1997-07-28 1999-02-26 Samsung Electron Co Ltd 半導体装置の入力遅延時間の測定回路及びその測定方法
CN1348243A (zh) * 2000-10-06 2002-05-08 东芝株式会社 数字式继电保护装置
US20050015214A1 (en) * 2003-07-17 2005-01-20 Texas Instruments Incorporated, Dallas, Texas Measuring constraint parameters at different combinations of circuit parameters
CN101271139A (zh) * 2008-05-19 2008-09-24 福建亿榕信息技术有限公司 高精度开关量检测仪及检测方法
CN201708809U (zh) * 2010-06-03 2011-01-12 上海远景数字信息技术有限公司 一种ieee1588时间测试分析仪
CN202353575U (zh) * 2011-06-19 2012-07-25 上海申贝科技发展有限公司 一种时间同步实时监测装置

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1152008A (ja) * 1997-07-28 1999-02-26 Samsung Electron Co Ltd 半導体装置の入力遅延時間の測定回路及びその測定方法
CN1348243A (zh) * 2000-10-06 2002-05-08 东芝株式会社 数字式继电保护装置
US20050015214A1 (en) * 2003-07-17 2005-01-20 Texas Instruments Incorporated, Dallas, Texas Measuring constraint parameters at different combinations of circuit parameters
CN101271139A (zh) * 2008-05-19 2008-09-24 福建亿榕信息技术有限公司 高精度开关量检测仪及检测方法
CN201708809U (zh) * 2010-06-03 2011-01-12 上海远景数字信息技术有限公司 一种ieee1588时间测试分析仪
CN202353575U (zh) * 2011-06-19 2012-07-25 上海申贝科技发展有限公司 一种时间同步实时监测装置

Non-Patent Citations (5)

* Cited by examiner, † Cited by third party
Title
徐志强 等: "智能变电站中智能组件的时间测试方法", 《电网技术》 *
徐敏 等: "智能变电站中点对点传输采样值延迟及延迟校验方案", 《电力***保护与控制》 *
未知: "《"MST-082高精度开关量检测仪,http://wenku.***.com/link?url=q4YHEZ2_4vssTF1unkNYfULQ6UQIgpYYJU33WuVOg20oNIbp_XzqIU_tOI-pSXo2URnEB4JUU0Yn7wpbbCwHFIbIwnsiv6sNJ5fFK5DVk-S"》", 28 March 2011, 百度文库 *
赵旭阳: "《"智能变电站精确时间测试及测试仪技术交流",http://wenku.***.com/link?url=Rwn76-uYo0EBa-JGS63Kfi2t5-yP-QWYk2XnTxqNxYEDHrackjzWQ31502ZhoFU9mQZdxnUQzpwyEnIeAc_gxByzokuAiPXiemBIlPvDCzK》", 24 September 2012, 百度文库 *
黄灿 等: "智能变电站中采样值传输延时的处理", 《电网技术》 *

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104065524A (zh) * 2013-03-20 2014-09-24 贵州电力试验研究院 一种iec61850中goose报文的性能测试方法
CN104065524B (zh) * 2013-03-20 2017-11-10 贵州电力试验研究院 一种iec61850中goose报文的性能测试方法
CN104301163A (zh) * 2013-07-18 2015-01-21 国家电网公司 一种goose时标的测试方法与***
CN104301163B (zh) * 2013-07-18 2018-06-08 国家电网公司 一种goose时标的测试方法与***
CN104142471A (zh) * 2013-09-05 2014-11-12 国家电网公司 一种电子设备干接点动作延时测量装置
CN105403782A (zh) * 2015-10-26 2016-03-16 山东网聪信息科技有限公司 智能终端设备干接点动作延时测试方法
CN107238768A (zh) * 2017-05-15 2017-10-10 国家电网公司 一种基于同一时钟源的直流保护时间现场校验装置与方法

Also Published As

Publication number Publication date
CN102879734B (zh) 2015-06-17

Similar Documents

Publication Publication Date Title
CN102520288B (zh) 基于一次升流的电流差动保护同步性能测试***及测试方法
CN110337626A (zh) 用于检测变电站中的错误数据注入的***和方法
CN102879734B (zh) 智能变电站开关动作时间延迟的测试方法
CN104090194A (zh) 智能变电站继电保护非侵入式测试***及方法
CN204291050U (zh) 一种调度监控信息核对***
CN107741549A (zh) 基于模拟量及数字量同步发生的智能变电站同步性测试仪
CN104113142B (zh) 基于scd建模的继电保护检修安措控制***及方法
CN103323714A (zh) 智能变电站测试***中基于报告模板技术的自动测试方法
CN104104151A (zh) 配电终端设备信息的接入方法
CN104297593B (zh) 一种用于智能变电站合并单元的守时误差检测方法
CN102621512A (zh) 一种合并单元守时性能的动态模拟测试方法
CN105403751A (zh) 一种基于北斗的电网状态监测装置
CN103869187A (zh) 一种便携式合并单元时间特性测试仪
Jing et al. A novel whole-view test approach for onsite commissioning in smart substation
CN204256149U (zh) 一种合并单元测试仪的性能测试***
CN103577628A (zh) 一种智能变电站虚回路设计的优化方法
CN201765317U (zh) 多同步接口的便携式光电互感器校验***
CN204244203U (zh) 一种测试继电保护测试仪触发延时的***
CN103558474A (zh) 新型合并单元校验装置
CN203233425U (zh) 智能变电站数字量输入电能表校验报文控制装置
CN204188731U (zh) 一种基于北斗的电网状态监测装置
CN103499807B (zh) 一种消除数字电能表截断误差的校验方法
CN106451323B (zh) 一种解决智能变电站不同合并单元间延时问题的现场校验方法
CN104408665A (zh) 基于scd模型面向事件的扰动数据处理***
CN106371046A (zh) 检测合并单元测试仪角差分辨率的装置

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant