CN102869106B - PDCCH self-adapting regulation methods and device - Google Patents

PDCCH self-adapting regulation methods and device Download PDF

Info

Publication number
CN102869106B
CN102869106B CN201110189888.4A CN201110189888A CN102869106B CN 102869106 B CN102869106 B CN 102869106B CN 201110189888 A CN201110189888 A CN 201110189888A CN 102869106 B CN102869106 B CN 102869106B
Authority
CN
China
Prior art keywords
cce
current
user
polymerization
degree
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201110189888.4A
Other languages
Chinese (zh)
Other versions
CN102869106A (en
Inventor
陈继勋
王新台
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZTE Corp
Original Assignee
ZTE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZTE Corp filed Critical ZTE Corp
Priority to CN201110189888.4A priority Critical patent/CN102869106B/en
Priority to PCT/CN2012/071633 priority patent/WO2012155590A1/en
Publication of CN102869106A publication Critical patent/CN102869106A/en
Application granted granted Critical
Publication of CN102869106B publication Critical patent/CN102869106B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W52/00Power management, e.g. TPC [Transmission Power Control], power saving or power classes
    • H04W52/04TPC
    • H04W52/06TPC algorithms
    • H04W52/16Deriving transmission power values from another channel
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04LTRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
    • H04L5/00Arrangements affording multiple use of the transmission path
    • H04L5/003Arrangements for allocating sub-channels of the transmission path
    • H04L5/0053Allocation of signaling, i.e. of overhead other than pilot signals
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W52/00Power management, e.g. TPC [Transmission Power Control], power saving or power classes
    • H04W52/04TPC
    • H04W52/06TPC algorithms
    • H04W52/14Separate analysis of uplink or downlink
    • H04W52/143Downlink power control
    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W72/00Local resource management
    • H04W72/12Wireless traffic scheduling

Landscapes

  • Engineering & Computer Science (AREA)
  • Signal Processing (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

The present invention relates to a kind of PDCCH self-adapting regulation methods and device, the above method to be:The number of users UE of scheduling is currently needed for according to systemnumAnd default CFI threshold values, adjust automatically PDCCH CFI;The user of above-mentioned needs scheduling is dispatched in respective scheduling window;According to the PDCCH of the user of current scheduling BLER and default power excursion and CCE degree of polymerization adjustable strategies, the current PDCCH transmission powers Po of the above-mentioned user of adjust automatically and the current CCE degree of polymerization;Said apparatus includes CFI adjusting modules, initialization module, scheduler module and adaptive adjusting module.Present invention optimizes the overall performance of LTE system.

Description

PDCCH self-adapting regulation methods and device
Technical field
The present invention relates to wireless communication field, more particularly to a kind of PDCCH (Physical Downlink Control Channel, Physical Downlink Control Channel) self-adapting regulation method and device.
Background technology
LTE (Long-Term Evolution, Long Term Evolution) is used as 3G (3rd Generation, 3G (Third Generation) Moblie Technology) technology evolution, improve and enhance 3G aerial access technology, using OFDM (Orthogonal Frequency Division Multiplexing, OFDM) and MIMO (Multiple Input Multiple Output, it is how defeated Enter multi output) etc. basic technology standard of the new technology as its wireless network evolution.LTE system can provide higher user peak Family QoS (Quality of Service, the clothes of Value Data rate, bigger system ovelay range and more preferable cell edge Business quality) etc..
LTE system carries the upper of user in up-downgoing using SCH (Shared Channel, shared channel) mode Downlink data transmission, limited running time-frequency resource can be sufficiently utilized using this bearing mode.SCH resource is to pass through PDCCH is allocated.DCI (Downlink Control Information, descending control letter are carry on PDCCH Breath), include the resource allocation on one or more UE (User Equipment, user equipment) and other control information. In LTE, the resource scheduling information of up-downgoing is all carried by PDCCH.In general, in a subframe, can have more Individual PDCCH.UE needs to demodulate the DCI information in PDCCH first, then descending that category can be demodulated on corresponding resource location PDSCH (Physical Downlink Shared Channel, Physical Downlink Shared Channel) in oneself, it is up can be Transmitting uplink data is carried out on corresponding resource location.
Due to multiple PDCCH can be included in PDCCH transmission bandwidth simultaneously, in order to more effectively configure PDCCH and its The running time-frequency resource of its down control channel, LTE define two special PDCCH resource units:REG(Resource Element Group, resource grains subgroup) and CCE (Control Channel Element, control channel unit).1 REG by The 4 or 6 adjacent RE (Resource Element, resource particle) in same OFDM symbol are adjacent by 6 In the REG of RE compositions, there are 4 available RE, for two other RE to be referenced signal occupancy, the RE shared by reference signal is not It can be used by PDCCH REG.One CCE is made up of 9 REG, and DCI is transmitted on one or more continuous CCE, DCI institutes The CCE numbers of occupancy depend on the down channel environment residing for UE, for the good UE of down channel environment, eNodeB (evolved Node B, evolved base station) CCE only may need to be distributed, for the UE that down channel environment is poor, eNodeB may need The CCE of up to 8 is distributed for it.
In LTE, what PDCCH took in a TTI (Transmission Time Interval, Transmission Time Interval) Symbolic number, it is by PCFICH (Physical Control Format Indicatior Channel, physical control format instruction Channel) defined in CFI (Control Format Indicatior, control format instruction) determined by.PCFICH always positions In in first OFDM symbol of subframe.Its specific location-dependent query is in the bandwidth of system and the physical label PCI of cell (Physical Cell Identity, Physical Cell Identifier).PCFICH sizes are 2bit, and its CFI carried is used to refer to bright Symbol numbers shared in subframe PDCCH, for the system that bandwidth is larger, the symbolic number that PDCCH takes is 1 to 3, right In the less system of bandwidth, the symbolic number that PDCCH takes is 2 to 4, this be due to subcarrier on each symbol number compared with It is few, it is therefore desirable to which that more symbols carry the control information in PDCCH.Done to reduce the mutual of PCFICH between cell Disturb, PCFICH resource block employs the position skew related to cell physics ID on frequency domain, and is carried out for CFI code words The scrambler related to cell physics ID.
In order to more reasonably distribute PDCCH resource and PDSCH resources, it is necessary to first determine the PDCCH occupancy in a TTI Symbolic number, when the number of users for needing to dispatch is few, the symbolic number that PDCCH takes is small, to reserve more PDSCH resources, improves The overall handling capacity of system;When the number of users for needing to dispatch is more, the symbolic number that PDCCH takes is more, so that system call is more User, the overall performance of lifting system.
When carrying out PDCCH resource distribution, in order to meet the reliability of subscriber control information transmission, it is necessary to ensure to distribute to The CCE sizes of user are sufficiently large.In addition, in order that PDCCH carries more users gives unique user distribution, it is necessary to reduce as far as possible Control resource.Need to consider the transmission power and the CCE degree of polymerization for changing PDCCH under some scenes, such as:Cell side During edge user PDCCH degradation.
The content of the invention
It is an object of the present invention to provide a kind of PDCCH self-adapting regulation methods and device, to optimize the entirety of LTE system Performance.
The invention provides a kind of PDCCH self-adapting regulation methods, the above method is:
The number of users UE of scheduling is currently needed for according to systemnumAnd default CFI threshold values, the above-mentioned PDCCH's of adjust automatically CFI;
The user of above-mentioned needs scheduling is dispatched in respective scheduling window;
According to the PDCCH of the user of current scheduling BLER (Block Error Rate, Block Error Rate) and default power Skew and CCE degree of polymerization adjustable strategies, the current PDCCH transmission powers Po of the above-mentioned user of adjust automatically and the current CCE degree of polymerization.
Preferably, the above method also comprises the following steps before all steps:
Initialize the CCE degree of polymerization and PDCCH transmission powers of said system.
Preferably, the CCE degree of polymerization of above-mentioned initialization system and PDCCH transmission power steps specifically include:
Obtain user type and CQI (Channel Quality Indicator, letter that said system is currently needed for scheduling Road quality instruction) information;
According to the user type got, the user for judging to be currently needed for scheduling is edge customer or central user;
If the user for being currently needed for scheduling is edge customer, the initial CCE degree of polymerization for making said system is the first reference The CCE degree of polymerization, initial p DCCH power excursions PowerOffset0Offset for the first reference power;
If being currently needed for the user-center user of scheduling, judge whether above-mentioned CQI is more than or equal to default CQI thresholdings Value CQIth, if so, then making the initial CCE initial polymerizations degree of said system refer to the CCE degree of polymerization, initial p DCCH power for second Offset PowerOffset0Offset for the second reference power;Otherwise, the initial CCE degree of polymerization of said system is made to refer to work(for the 3rd Rate is offset, initial p DCCH power excursions PowerOffset0Offset for the 3rd reference power;
Calculate the reference emission power P of said system and above-mentioned initial p DCCH power excursions PowerOffset0Sum, obtain To the initial p DCCH transmission powers of said system.
Preferably, the above-mentioned number of users UE that scheduling is currently needed for according to systemnumAnd default CFI threshold values, adjust automatically Control format indicates that CFI steps are specially:
Acquisition system is currently needed for the number of users UE of schedulingnum
According to the above-mentioned number of users UE for being currently needed for schedulingnum, calculate the CCE sums CCE needed for current schedulingall
Judge above-mentioned CCE sums CCEallWhether default first CFI threshold values CFI1 is less thanth, if so, then making current CFI For the first CFI values;Otherwise,
Judge above-mentioned CCE sums CCEallWhether default 2nd CFI threshold values CFI2 is less thanth, if so, then making current CFI For the 2nd CFI values;Otherwise, it is the 3rd CFI values to make current CFI.
Preferably, the above-mentioned user steps that above-mentioned needs scheduling is dispatched in respective scheduling window further comprise:
The user for counting current scheduling dispatches number Schd scheduled in window at itcnt
Calculate BLERs of the PDCCH of above-mentioned user in above-mentioned scheduling window;
Judge above-mentioned BLER size.
Preferably, if above-mentioned BLER is less than or equal to first threshold, the PDCCH's of the above-mentioned user according to current scheduling BLER and default power excursion and CCE degree of polymerization adjustable strategies, the current PDCCH of the above-mentioned user of adjust automatically penetrate power P o and Currently CCE degree of polymerization steps are specially:
If the number Schd that above-mentioned user is scheduledcntMore than or equal to above-mentioned scheduling times threshold value Cntth, then by above-mentioned use The current PDCCH transmission powers Po at family reduces a default first power excursion PowerOffset1, obtain above-mentioned user's The quasi- transmission powers of PDCCH;
If total power excursion PowerOffset of the above-mentioned user under current scheduling window absolute value is more than or equal to default Power drift threshold value PowerOffsetthAnd the current CCE degree of polymerization of above-mentioned user is more than 1, then above-mentioned current CCE is gathered Right reduction one-level, the quasi- degree of polymerization of CCE of above-mentioned user is obtained, while the quasi- transmission powers of the PDCCH of above-mentioned user are increased by one Default second power excursion PowerOffset2
Update above-mentioned current PDCCH transmission powers Po and the above-mentioned current CCE degree of polymerization.
Preferably, if above-mentioned BLER is more than Second Threshold, the PDCCH of the above-mentioned user according to current scheduling BLER and Default power excursion and CCE degree of polymerization adjustable strategies, the current PDCCH transmission powers Po of the above-mentioned user of adjust automatically and current CCE degree of polymerization steps are specially:
If the current CCE degree of polymerization of above-mentioned user is less than 8, increases the above-mentioned current CCE degree of polymerization step by step, obtain above-mentioned use The quasi- degree of polymerization of CCE at family;If there are available CCE positions in the reserved area of system and the above-mentioned current CCE degree of polymerization increases two More than level, then the current PDCCH transmission powers Po of above-mentioned user is reduced into a default 3rd power excursion PowerOffset3, The quasi- transmission powers of PDCCH of above-mentioned user are obtained, and distribute a CCE positions, update the current PDCCH transmission powers of above-mentioned user Po, the current CCE degree of polymerization and current CCE positions;
If the current CCE degree of polymerization of above-mentioned user is increased in 8 and the reserved area of system without available CCE positions, Judge whether there are available CCE positions in the reserved area of system using the current CCE degree of polymerization, if being in the reserved area of system It is no to have available CCE positions and have transmission power, then by above-mentioned current PDCCH transmission powers Po increases by one the default 4th Power excursion PowerOffset4, so as to get above-mentioned user the quasi- degree of polymerization of PDCCH be less than or equal to system emission maximum work( Rate, and a CCE positions are distributed, update current PDCCH transmission powers Po, the current CCE degree of polymerization and current CCE positions;
If during using the above-mentioned current CCE degree of polymerization, without available CCE positions in the reserved area of system, but above-mentioned PDCCH The Downlink Control Information DCI of carrying can be distributed in CCE resources and above-mentioned public domain in public domain available CCE positions, Then distribute a CCE positions;If the DCI of above-mentioned PDCCH carryings can not be distributed in CCE resources or above-mentioned public domain in public domain Without available CCE positions, then this adjustment is abandoned.
Preferably, in the above method,
The above-mentioned current PDCCH transmission power Po of above-mentioned renewal, refer to above-mentioned current with the quasi- transmission power renewals of above-mentioned PDCCH PDCCH transmission powers Po;
The above-mentioned current CCE degree of polymerization of renewal, refer to the above-mentioned current CCE degree of polymerization of the quasi- degree of polymerization renewals of above-mentioned CCE;
The above-mentioned current CCE positions of renewal, refer to the current CCE positions of CCE location updatings with above-mentioned distribution.
Preferably, if above-mentioned BLER, which is more than, first threshold and is less than or equal to Second Threshold, keep that above-mentioned user's is current PDCCH transmission powers Po and the current CCE degree of polymerization are constant.
Preferably, the above method further comprises:
After above-mentioned adjustment terminates, according to the current PDCCH transmission powers Po of the above-mentioned user after renewal and/or currently The CCE degree of polymerization, scheduling window is reset for above-mentioned user.
Invention further provides a kind of PDCCH self-adapting adjusting apparatus, said apparatus includes CFI adjusting modules, just Beginningization module, scheduler module and adaptive adjusting module,
Above-mentioned CFI adjusting modules, for being currently needed for the number of users UE of scheduling according to systemnumWith default CFI thresholdings Value, the above-mentioned PDCCH of adjust automatically CFI;
Above-mentioned scheduler module, for according to respective current PDCCH transmission powers Po and the current CCE degree of polymerization, respective Scheduling window in scheduling above-mentioned needs scheduling user;
Above-mentioned adaptive adjusting module, for the PDCCH of the user according to above-mentioned scheduler module current scheduling BLER and Default power excursion and CCE degree of polymerization adjustable strategies, the user's of the above-mentioned scheduler module current scheduling of adjust automatically is current PDCCH transmission powers Po and the current CCE degree of polymerization.
Preferably, above-mentioned initialization module, it is additionally operable to the number of users UE that acquisition system is currently needed for schedulingnum, calculate current CCE sums CCE needed for schedulingall, judge above-mentioned CCE sums CCEallWhether default first CFI threshold values CFI1 is less thanth, And in above-mentioned CCE sums CCEallLess than above-mentioned first CFI threshold values CFI1thWhen, it is the first CFI values to make current CFI;Above-mentioned CCE sums CCEallMore than or equal to above-mentioned first CFI threshold values CFI1thWhen, judge above-mentioned CCE sums CCEallWhether it is less than default The 2nd CFI threshold values CFI2th, and in above-mentioned CCE sums CCEallLess than above-mentioned 2nd CFI threshold values CFI2thWhen, order is current CFI is the 2nd CFI values;In above-mentioned CCE sums CCEallMore than or equal to above-mentioned 2nd CFI threshold values CFI2thWhen, make the current CFI be 3rd CFI values;
Above-mentioned initialization module, the user type and CQI information of scheduling are currently needed for for obtaining said system, according to obtaining The user type got, the user for judging to be currently needed for scheduling is edge customer or central user, and is being currently needed for dispatching User when being edge customer, make the initial CCE degree of polymerization of said system refer to the CCE degree of polymerization, initial p DCCH power for first Offset PowerOffset0Offset for the first reference power, when being currently needed for the user-center user of scheduling, judge above-mentioned Whether CQI is more than or equal to default CQI threshold values CQIth, and it is more than or equal to default CQI threshold values CQI in above-mentioned CQIthWhen, The initial CCE initial polymerizations degree of said system is made to refer to the CCE degree of polymerization, initial p DCCH power excursions for second PowerOffset0Offset for the second reference power, be less than default CQI threshold values CQI in above-mentioned CQIthWhen, make said system The initial CCE degree of polymerization for the 3rd refer to the CCE degree of polymerization, initial p DCCH power excursions PowerOffset0Work(is referred to for the 3rd Rate is offset;And calculate the reference emission power P of said system and above-mentioned initial p DCCH power excursions PowerOffset0Sum, Obtain the initial p DCCH transmission powers of said system;
Above-mentioned scheduler module, the user for counting current scheduling dispatch the number Schd being scheduled in window at itcnt, meter Count stating BLERs of the PDCCH of user in above-mentioned scheduling window in, and judge above-mentioned BLER size, and will determine that result is sent To above-mentioned adaptive scheduling module.
Preferably, above-mentioned adaptive adjusting module, for being above-mentioned user's in the judged result of above-mentioned scheduler module When PDCCH BLER is less than or equal to first threshold, the number Schd that above-mentioned user is scheduled is judgedcntWhether it is more than or equal to default Scheduling times threshold value Cntth, in the number Schd that above-mentioned user is scheduledcntMore than or equal to above-mentioned scheduling times threshold value CntthWhen, the current PDCCH transmission powers Po of above-mentioned user is reduced into a default first power excursion PowerOffset1, obtain To the quasi- transmission powers of PDCCH of above-mentioned user, and total power excursion in above-mentioned user under current scheduling window PowerOffset absolute value is more than or equal to default power drift threshold value PowerOffsetthAnd above-mentioned user's is current When the CCE degree of polymerization is more than 1, the above-mentioned current CCE degree of polymerization is reduced into one-level, the quasi- degree of polymerization of CCE of above-mentioned user is obtained, simultaneously will The quasi- transmission powers of PDCCH of above-mentioned user increase by a default second power excursion PowerOffset2, and update above-mentioned work as Preceding PDCCH transmission powers Po and the above-mentioned current CCE degree of polymerization.
Preferably, above-mentioned adaptive adjusting module, for being above-mentioned user's in the judged result of above-mentioned scheduler module When PDCCH BLER is more than the current CCE degree of polymerization of Second Threshold and above-mentioned user less than 8, increases above-mentioned current CCE step by step and gather It is right, obtain the quasi- degree of polymerization of CCE of above-mentioned user;And have in the degree of polymerization quasi- using above-mentioned CCE in the reserved area of system can CCE positions and when the above-mentioned current CCE degree of polymerization is increased more than two-stage, by the current PDCCH transmission powers of above-mentioned user Po reduces a default 3rd power excursion PowerOffset3, a CCE positions are distributed, update the current PDCCH of above-mentioned user Transmission power Po, the current CCE degree of polymerization and current CCE positions;
Above-mentioned user the current CCE degree of polymerization increase to 8 and system reserved area in without available CCE positions when, Judge whether there are available CCE positions in the reserved area of system using the current CCE degree of polymerization, and in the reserved area of system When whether having available CCE positions and having transmission power, by above-mentioned current PDCCH transmission powers Po increases by one default the Four power excursion PowerOffset4, so as to get above-mentioned user the quasi- degree of polymerization of PDCCH be less than or equal to system emission maximum Power, and a CCE positions are distributed, update current PDCCH transmission powers Po, the current CCE degree of polymerization and current CCE positions;And Without available CCE positions in the reserved area of system when using the above-mentioned current CCE degree of polymerization, but the DCI of above-mentioned PDCCH carryings When there can be available CCE positions in public domain distribution CCE resources and above-mentioned public domain, a CCE positions are distributed.
The number of users that the present invention dispatches as needed, it is determined that the CCE number of resources needed, and determined according to CCE number of resources CFI, guarantee system obtain optimum performance between maximum number of user and maximum throughput;And according to the PDCCH situations of user, it is The control information of user chooses the suitable CCE degree of polymerization, ensure that the reliability of PDCCH transmission.
Brief description of the drawings
Accompanying drawing described herein is used for providing a further understanding of the present invention, forms the part of the present invention, this hair Bright schematic description and description is used to explain the present invention, does not form inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 is the preferred embodiment flow chart of PDCCH self-adapting regulation methods of the present invention;
Fig. 2 is the particular flow sheet of step S100 in Fig. 1;
Fig. 3 is the particular flow sheet of step S200 in Fig. 1;
Fig. 4 is particular flow sheets of the step S700 when BLER is less than or equal to 0.5% in Fig. 1;
Fig. 5 is particular flow sheets of the step S700 when BLER is more than 1% in Fig. 1;
Fig. 6 is the preferred embodiment theory diagram of PDCCH self-adapting adjusting apparatus of the present invention.
Embodiment
In order that technical problems, technical solutions and advantages to be solved are clearer, clear, tie below Drawings and examples are closed, the present invention will be described in further detail.It should be appreciated that specific embodiment described herein is only used To explain the present invention, it is not intended to limit the present invention.
As shown in figure 1, being the preferred embodiment flow chart of PDCCH self-adapting regulation methods of the present invention, the present embodiment includes Following steps:
Step S100:The initialization system CCE degree of polymerization and PDCCH transmission powers;
This step implements flow referring to Fig. 2.
Step S200:The number of users UE of scheduling is currently needed for according to systemnum, adjust automatically PDCCH CFI;
This step is to adjust the OFDM symbol number that PDCCH takes.
This step implements flow referring to Fig. 3.
Step S300:The user of above-mentioned needs scheduling is dispatched in respective scheduling window;
The scheduling window of user is set according to respective current PDCCH transmission powers Po and the current CCE degree of polymerization;Scheduling The length of window is set according to 2 power, for example the length for dispatching window can be arranged to 1024 subframes, and user scheduled one Secondary, then it dispatches window forward slip once, scheduling times SchdcntIncrease is once;
After the current PDCCH transmission powers Po of user and/or the current CCE degree of polymerization update, then dispatch window and can also be weighed Put.
Step S400:The user for counting current scheduling dispatches number Schd scheduled in window at itcnt
After window replacement is dispatched, above-mentioned scheduled number SchdcntAgain count;
Step S500:The PDCCH for calculating above-mentioned user dispatches the BLER in window at it;
BLER shows the performance of the PDCCH within a period of time, and this step can be by counting DTX (Discontinuous It is Transmission, discontinuous to send) number obtain PDCCH BLER.
Step S600:Judge above-mentioned BLER size;
In this step, the size of BLER more above-mentioned first and first threshold, when above-mentioned BLER is more than first threshold, then More above-mentioned BLER and Second Threshold size.
Step S700:It is above-mentioned according to above-mentioned BLER and default power excursion and CCE degree of polymerization adjustable strategies, adjust automatically The current PDCCH transmission powers Po of the user of current scheduling and the current CCE degree of polymerization.
In the present embodiment, first threshold=0.5%, Second Threshold=1% are taken;Therefore in this step, BLER is less than or equal to Specific implementation flow when 0.5% is referring to Fig. 4;Specific implementation flow when BLER is more than 1% is referring to Fig. 5;BLER is more than 0.5% And during less than or equal to 1%, keep the current PDCCH transmission powers Po of above-mentioned user and the current CCE degree of polymerization constant.Above-mentioned first Threshold value, the value of Second Threshold can determine according to specific application scenarios, that is to say, that in other embodiments, above-mentioned first Threshold value, Second Threshold can be other values.
As shown in Fig. 2 it is the particular flow sheet of step S100 in Fig. 1;The present embodiment takes the first reference CCE degree of polymerization=4, First reference power skew=0db, second refers to CCE degree of polymerization=2, the second reference powers skew=- 1db, and the 3rd refers to CCE The reference power skew of degree of polymerization=2, the three=0db, comprises the following steps:
Step S101:Obtain user type and CQI that said system is currently needed for scheduling;
Step S102:According to the user type got, judge the user for being currently needed for scheduling be edge customer or in Heart user, if the user for being currently needed for scheduling is edge customer, perform step S103;During if the user for being currently needed for scheduling is Heart user, then perform step S104;
Step S103:The initial CCE degree of polymerization for making said system is 4, initial p DCCH power excursions PowerOffset0For 0db, perform step S107;
Step S104:Judge whether above-mentioned CQI is more than or equal to default CQI threshold values CQIth, if so, then performing step S105;Otherwise, step S106 is performed;
Step S105:The initial CCE initial polymerizations degree for making said system is 2, initial p DCCH power excursions PowerOffset0For -1db, step S107 is performed;
Step S106:The initial CCE degree of polymerization of said system is 2, initial p DCCH power excursions PowerOffset0For 0db;
Step S107:Calculate the reference emission power P of said system and above-mentioned initial p DCCH power excursions PowerOffset0Sum, obtain the initial p DCCH transmission powers of said system.
This step calculates:P+PowerOffset0
As shown in figure 3, it is the particular flow sheet of step S200 in Fig. 1;The present embodiment takes the CFI of the first CFI values=1, the two Value=2, the 3rd CFI value=3;This implementation comprises the following steps:
Step S201:Acquisition system is currently needed for the number of users UE of schedulingnum
Step S202:The CCE degree of polymerization that number of users and each user according to being dispatched in default statistic window use, calculate The average CCE degree of polymerization CCE that the user of scheduling uses in above-mentioned statistic windowave
Step S203:Calculate the above-mentioned number of users UE for being currently needed for schedulingnumWith above-mentioned average CCE degree of polymerization CCEaveMultiply Product, obtains the CCE sums CCE needed for current schedulingall
This step calculates:CCEall=UEnum×CCEave
Step S204:Judge above-mentioned CCE sums CCEallWhether default first CFI threshold values CFI1 is less thanth, if so, then Perform step S205;Otherwise, step S206 is performed;
Step S205:It is 1 to make current CFI, is terminated;
Step S206:Judge above-mentioned CCE sums CCEallWhether default 2nd CFI threshold values CFI2 is less thanth, if so, then Perform step S207;Otherwise, step S208 is performed;
Step S207:It is 2 to make current CFI, is terminated
Step S208:It is 3 to make current CFI, is terminated.
As shown in figure 4, it is particular flow sheets of the step S700 when BLER is less than or equal to 0.5%, including following step in Fig. 1 Suddenly:
Step S701:Judge the number Schd that above-mentioned user is scheduledcntWhether default scheduling times thresholding is more than or equal to Value Cntth, if so, then performing step S702, otherwise, continue executing with this step;
Step S702:The current PDCCH transmission powers Po of above-mentioned user is reduced into by default first power excursion PowerOffset1, that is, calculate Po-PowerOffset1Value, obtain the quasi- transmission powers of PDCCH of above-mentioned user;
Step S703:Calculate total power excursion PowerOffset of the above-mentioned user under current scheduling window;
In this step, if current scheduling window is first scheduling window of above-mentioned user, above-mentioned total power excursion PowerOffset is calculated by equation below:
PowerOffset=PowerOffset0-PowerOffset1
If current scheduling window is non-first scheduling window of above-mentioned user, above-mentioned total power excursion PowerOffset Calculated by equation below:
PowerOffset=PowerOffset1
Step S704:Judge whether above-mentioned total power excursion PowerOffset absolute value is more than or equal to default work( Rate skew threshold value PowerOffsetth, if so, then performing step S705, otherwise, perform step S710;
Step S705:Judge whether the current CCE degree of polymerization of above-mentioned user is more than 1, if so, then performing step S706;It is no Then, step S710 is performed;
Step S706:The current CCE degree of polymerization of above-mentioned user is reduced into one-level, obtains the quasi- degree of polymerization of above-mentioned CCE;
Step S707:The quasi- transmission powers of above-mentioned PDCCH are increased into by a default second power excursion PowerOffset2
Step S708:Empty total power excursion PowerOffset;
Step S709:It is accurate with above-mentioned CCE with the above-mentioned current PDCCH transmission power Po of the quasi- transmission power renewals of above-mentioned PDCCH The above-mentioned current CCE degree of polymerization of degree of polymerization renewal, this adjustment terminate;
Step S710:With the above-mentioned PDCCH above-mentioned current PDCCH transmission power Po of quasi- transmission power renewal, this adjustment knot Beam.
As shown in figure 5, being particular flow sheets of the step S700 when BLER is more than 1% in Fig. 1, comprise the following steps:
Step S701 ':Make the quasi- degree of polymerization of CCE of above-mentioned user be equal to the current CCE degree of polymerization, make CCE adjustment numbers I=0;
Step S702 ':Judge whether the quasi- degree of polymerization of above-mentioned CCE is less than 8, if so, then performing step S703 ', otherwise, also It is that the quasi- degree of polymerization of above-mentioned CCE is equal to 8, performs step S707 ';
Step S703 ':By the quasi- degree of polymerization increase one-levels of above-mentioned CCE, and make I=I+1;
Step S704 ':According to the quasi- degree of polymerization of above-mentioned CCE, judge whether there are available CCE positions in the reserved area of system Put, if so, then performing step S705 ';Otherwise, step S712 ' is performed;
Step S705 ':Judge whether above-mentioned CCE adjustment numbers I is more than or equal to 2, if so, then execution step S706 ', no Then, step S710 ' is performed;
In this step, if the quasi- degree of polymerization of CCE increases to 2 from 1, either increase to 4 from 2 or increase to 8 from 4, then I= 1, if the quasi- degree of polymerization of CCE increases to 2 from 1, then increases to 4 from 2, or 4 are increased to from 2, then 8 are increased to from 4, then I=2, if The quasi- degree of polymerization of CCE increases to 2 from 1, then increases to 4 from 2, and increases to 8 from 4, then I=3.
Step S706 ':The current PDCCH transmission powers Po of above-mentioned user is reduced into default 3rd power excursion PowerOffset3, obtain the quasi- transmission powers of PDCCH of above-mentioned user;
Step S707 ':According to the above-mentioned current CCE degree of polymerization, judge whether there are available CCE positions in the reserved area of system Put, if so, then performing step S708 ';Otherwise, step S712 ' is performed;
Step S708 ':Judge whether system has transmission power, that is, judge whether current PDCCH transmission powers Po is small In the maximum transmission power Power of systemmax, if so, then performing step S709 ', otherwise, perform step S710 ';
Step S709 ':Above-mentioned current PDCCH transmission powers Po is increased into by default 4th power excursion PowerOffset4, obtain the quasi- tranmitting frequencies of PDCCH of above-mentioned user;
This step performs:Quasi- transmission power=the Po+ of PDCCH | PowerOffset4|;
It is worth noting that, the quasi- transmission powers of PDCCH that this step calculates should be less than the emission maximum work(equal to system Rate PowermaxIf, that is to say, that Po+ | PowerOffset4|>Powermax, then in this step, the quasi- transmission powers of PDCCH= Powermax
Step S710 ':Distribute a CCE positions;
Step S711 ':Above-mentioned current PDCCH transmission powers Po, the current CCE degree of polymerization and current CCE positions are updated, this Secondary adjustment terminates;
Step S712 ':The DCI information carried according to PDCCH, judge whether that CCE resources can be distributed in public domain, if It is then to perform step S713 ', otherwise, performs step S715 ';
Step S713 ':Judge whether there are available CCE positions in the public domain of system, if so, then performing step S714 ', otherwise, perform step S715 ';
Step S714 ':Distribute a CCE positions;
Step S715 ':Abandon this adjustment.
As shown in fig. 6, be the theory diagram of the preferred embodiment of PDCCH self-adapting adjusting apparatus of the present invention, the present embodiment Including CFI adjusting modules 10, initialization module 20, scheduler module 30 and adaptive adjusting module 40,
CFI adjusting modules 10, for being currently needed for the number of users UE of scheduling according to systemnumAnd default CFI threshold values, Adjust automatically PDCCH CFI;Specially:Acquisition system is currently needed for the number of users UE of schedulingnum;According in default statistic window The CCE degree of polymerization that the number of users of scheduling and each user use, calculate the average CCE that the user of scheduling in above-mentioned statistic window uses Degree of polymerization CCEave;Calculate the above-mentioned number of users UE for being currently needed for schedulingnumWith above-mentioned average CCE degree of polymerization CCEaveProduct, obtain To the CCE sums CCE needed for current schedulingall, judge CCE sums CCEallWhether default first CFI threshold values are less than CFI1th, and in CCE sums CCEallLess than above-mentioned first CFI threshold values CFI1thWhen, current CFI value is adjusted to first CFI values;In CCE sums CCEallMore than or equal to above-mentioned first CFI threshold values CFI1thWhen, judge CCE sums CCEallWhether it is less than Default 2nd CFI threshold values CFI2th, and in CCE sums CCEallLess than above-mentioned 2nd CFI threshold values CFI2thWhen, will be current CFI value is adjusted to the 2nd CFI values;In CCE sums CCEallMore than or equal to above-mentioned 2nd CFI threshold values CFI2thWhen, will be current CFI value is adjusted to the 3rd CFI values;
Initialization module 20, for initializing the CCE degree of polymerization and PDCCH transmission powers of said system;Specially:Obtain Said system is currently needed for the user type and CQI information of scheduling, and according to the user type got, judgement is currently needed for dispatching User be edge customer or central user, and when being currently needed for the user of scheduling and being edge customer, make said system The initial CCE degree of polymerization is first with reference to the CCE degree of polymerization, initial p DCCH power excursions PowerOffset0For the first reference power Skew, when being currently needed for the user-center user of scheduling, judge whether above-mentioned CQI is more than or equal to default CQI threshold values CQIth, and it is more than or equal to above-mentioned CQI threshold values CQI in above-mentioned CQIthWhen, the initial CCE initial polymerizations degree for making said system is Second refers to the CCE degree of polymerization, initial p DCCH power excursions PowerOffset0Offset for the second reference power, it is small in above-mentioned CQI In above-mentioned CQI threshold values CQIthWhen, make the initial CCE degree of polymerization of said system refer to the CCE degree of polymerization, initial p DCCH for the 3rd Power excursion PowerOffset0Offset for the 3rd reference power;And calculate the reference emission power P of said system with it is above-mentioned just Beginning PDCCH power excursion PowerOffset0Sum, obtain the initial p DCCH transmission powers of said system;
Above-mentioned scheduler module 30, for dispatching the user of above-mentioned needs scheduling in respective scheduling window, and statistics is worked as The user of preceding scheduling dispatches number Schd scheduled in window at itcnt, the PDCCH of above-mentioned user is calculated in above-mentioned scheduling window BLER, and judge above-mentioned BLER size, will determine that result is sent to adaptive adjusting module 40;
Adaptive adjusting module 40, BLER and default power excursion and CCE for the PDCCH according to the user received Degree of polymerization adjustable strategies, the automatic user for the current scheduling of scheduler module 30 adjust current PDCCH transmission powers Po and current CCE The degree of polymerization;Specially:
When the judged result of scheduler module 30 is less than or equal to first threshold for the PDCCH of above-mentioned user BLER, judge The number Schd that above-mentioned user is scheduledcntWhether default scheduling times threshold value Cnt is more than or equal toth, and in above-mentioned user's quilt The number Schd of schedulingcntMore than or equal to above-mentioned scheduling times threshold value CntthWhen, the current PDCCH of above-mentioned user is launched into work( Rate Po reduces by a default first power excursion PowerOffset1, obtain the quasi- transmission powers of PDCCH of above-mentioned user;In calculating State total power excursion PowerOffset of the user under current scheduling window;Judge above-mentioned total power excursion PowerOffset Absolute value whether be more than or equal to default power drift threshold value PowerOffsetth;And in above-mentioned total power excursion PowerOffset absolute value is more than or equal to above-mentioned power drift threshold PowerOffsetthWhen, judge that above-mentioned user's is current Whether the CCE degree of polymerization is 1, above-mentioned current with the quasi- transmission power renewals of above-mentioned PDCCH when the above-mentioned current CCE degree of polymerization is 1 PDCCH transmission powers Po;When the above-mentioned current CCE degree of polymerization is not 1, the current CCE degree of polymerization of above-mentioned user is reduced into one-level, The quasi- degree of polymerization of above-mentioned CCE is obtained, and the quasi- transmission powers of above-mentioned PDCCH are increased into by default second power excursion PowerOffset2, with the above-mentioned PDCCH above-mentioned current PDCCH transmission power Po of quasi- transmission power renewal, it is polymerize with above-mentioned CCE is accurate The above-mentioned current CCE degree of polymerization of degree renewal;It is less than above-mentioned power excursion in above-mentioned total power excursion PowerOffset absolute value Thresholding PowerOffsetthWhen, with the above-mentioned current PDCCH transmission powers Po of the quasi- transmission power renewals of above-mentioned PDCCH;
When the judged result of scheduler module 30 is more than Second Threshold for the PDCCH of above-mentioned user BLER, above-mentioned use is made The quasi- degree of polymerization of CCE at family is equal to the current CCE degree of polymerization, and makes CCE adjustment numbers I=0;Whether judge the quasi- degree of polymerization of above-mentioned CCE Less than 8;When the quasi- degree of polymerization of above-mentioned CCE is less than 8, the quasi- degree of polymerization of above-mentioned CCE is increased into one-level, makes I=I+1, and according to above-mentioned The quasi- degree of polymerization of CCE, judge whether there are available CCE positions in the reserved area of system, the quasi- degree of polymerization of above-mentioned CCE be less than 8 and When in the reserved area of system without available CCE positions, continue to increase the quasi- degree of polymerization of above-mentioned CCE;In the reserved area of system When there are available CCE positions, judge whether above-mentioned CCE adjustment numbers I is more than or equal to 2, be more than in above-mentioned CCE adjustment numbers I etc. When 2, the current PDCCH transmission powers Po of above-mentioned user is reduced into a default 3rd power excursion PowerOffset3, obtain To the quasi- transmission powers of PDCCH of above-mentioned user, and a CCE positions are distributed, it is above-mentioned current with the quasi- transmission power renewals of above-mentioned PDCCH PDCCH transmission power Po, with the above-mentioned current CCE degree of polymerization of above-mentioned CCE quasi- degree of polymerization renewal, with the CCE positions of above-mentioned distribution more New current CCE positions;
When the quasi- degree of polymerization of above-mentioned CCE is equal to 8, judged using the above-mentioned current CCE degree of polymerization be in the reserved area of system It is no to have available CCE positions, judge whether system has transmission power, there are available CCE positions in the reserved area of system When putting and when having transmission power, above-mentioned current PDCCH transmission powers Po is increased into by default 4th power excursion PowerOffset4, so as to get the quasi- transmission powers of PDCCH be less than or equal to system maximum transmission power Powermax, and distribute One CCE positions, above-mentioned current PDCCH transmission power Po are updated with the quasi- transmission powers of above-mentioned PDCCH, with the quasi- degree of polymerization of above-mentioned CCE The above-mentioned current CCE degree of polymerization is updated, with the current CCE positions of the CCE location updatings of above-mentioned distribution;Have in the reserved area of system During during available CCE positions but without transmission power, a CCE positions are only distributed, and it is above-mentioned with the quasi- degree of polymerization renewals of above-mentioned CCE The current CCE degree of polymerization, with the current CCE positions of the CCE location updatings of above-mentioned distribution;Without available in the reserved area of system During CCE positions, whether can in public domain distribute CCE resource, in above-mentioned PDCCH carryings if judging the DCI of above-mentioned PDCCH carryings DCI can be distributed in public domain when having available CCE positions in CCE resources and the public domain, distribute a CCE positions, When the DCI of above-mentioned PDCCH carryings can not be distributed in CCE resources or the public domain in public domain without available CCE positions, Abandon this adjustment, that is to say, that keep the current PDCCH transmission powers Po of the user and the current CCE degree of polymerization constant.
The preferred embodiments of the present invention have shown and described in described above, but as previously described, it should be understood that the present invention is not Form disclosed herein is confined to, is not to be taken as the exclusion to other embodiment, and available for various other combinations, modification And environment, and can be carried out in the scope of the invention is set forth herein by the technology or knowledge of above-mentioned teaching or association area Change., then all should be in institute of the present invention and the change and change that those skilled in the art are carried out do not depart from the spirit and scope of the present invention In attached scope of the claims.

Claims (13)

1. a kind of physical downlink control channel PDCCH self-adapting regulation method, it is characterised in that methods described is:
The number of users UE of scheduling is currently needed for according to systemnumAnd default control format instruction CFI threshold values, adjust automatically institute State PDCCH CFI;
The user for needing to dispatch is dispatched in the respective scheduling window of user;
Gathered according to the PDCCH of the user of current scheduling block error rate BLER and default power excursion with control channel unit CCE Right adjustable strategies, the current PDCCH transmission powers Po of user described in adjust automatically and the current CCE degree of polymerization;
Wherein, the number of users UE that scheduling is currently needed for according to systemnumAnd default CFI threshold values, adjust automatically control lattice Formula indicates that CFI steps are specially:
Acquisition system is currently needed for the number of users UE of schedulingnum
According to the number of users UE for being currently needed for schedulingnum, calculate the CCE sums CCE needed for current schedulingall
Judge the CCE sums CCEallWhether default first CFI threshold values CFI1 is less thanth, if so, then making current CFI as the One CFI values;Otherwise,
Judge the CCE sums CCEallWhether default 2nd CFI threshold values CFI2 is less thanth, if so, then making current CFI as the Two CFI values;Otherwise, it is the 3rd CFI values to make current CFI;
Wherein, the first CFI values<The 2nd CFI values<The 3rd CFI values.
2. according to the method for claim 1, it is characterised in that methods described is before all steps, in addition to following step Suddenly:
Initialize the CCE degree of polymerization and PDCCH transmission powers of the system.
3. according to the method for claim 2, it is characterised in that the CCE degree of polymerization and the PDCCH transmitting of the initialization system Power step specifically includes:
Obtain user type and channel quality indicator CQI information that the system is currently needed for scheduling;
According to the user type got, the user for judging to be currently needed for scheduling is edge customer or central user;
If the user for being currently needed for scheduling is edge customer, the initial CCE degree of polymerization of the system is made to gather for first with reference to CCE It is right, initial p DCCH power excursions PowerOffset0Offset for the first reference power;
If being currently needed for the user-center user of scheduling, judge whether the CQI is more than or equal to default CQI threshold values CQIth, if so, then making the initial CCE initial polymerizations degree of the system refer to the CCE degree of polymerization for second, initial p DCCH power is inclined Move PowerOffset0Offset for the second reference power;Otherwise, the initial CCE degree of polymerization of the system is made to refer to CCE for the 3rd The degree of polymerization, initial p DCCH power excursions PowerOffset0Offset for the 3rd reference power;
Calculate the reference emission power P of the system and the initial p DCCH power excursions PowerOffset0Sum, obtain institute State the initial p DCCH transmission powers of system;
Wherein, described second the CCE degree of polymerization is referred to reference to the CCE degree of polymerization≤described first with reference to the CCE degree of polymerization≤described 3rd; The second reference power skew≤the 3rd reference power skew≤first reference power skew.
4. according to the method for claim 1, it is characterised in that described dispatched in respective scheduling window described needs to dispatch User steps further comprise:
The user for counting current scheduling dispatches number Schd scheduled in window at itcnt
Calculate BLERs of the PDCCH of the user in the scheduling window;
Judge the size of the BLER.
5. the method according to claim 1 or 4, it is characterised in that described if the BLER is less than or equal to first threshold According to the PDCCH of the user of current scheduling BLER and default power excursion and CCE degree of polymerization adjustable strategies, adjust automatically institute The current PDCCH transmission powers Po and current CCE degree of polymerization step for stating user be specially:
If the number Schd that the user is scheduledcntMore than or equal to scheduling times threshold value Cntth, then by the current of the user PDCCH transmission powers Po reduces a default first power excursion PowerOffset1, obtain the quasi- transmittings of PDCCH of the user Power;
If total power excursion PowerOffset of the user under current scheduling window absolute value is more than or equal to default work( Rate skew threshold value PowerOffsetthAnd the current CCE degree of polymerization of the user is more than 1, then by the current CCE degree of polymerization One-level is reduced, obtains the quasi- degree of polymerization of CCE of the user, while the quasi- transmission power increases by one of the PDCCH of the user are preset The second power excursion PowerOffset2
Update the current PDCCH transmission powers Po and the current CCE degree of polymerization.
6. the method according to claim 1 or 4, it is characterised in that if the BLER is more than Second Threshold, the basis The PDCCH of the user of current scheduling BLER and default power excursion and CCE degree of polymerization adjustable strategies, use described in adjust automatically The current PDCCH transmission powers Po at family and current CCE degree of polymerization step are specially:
If the current CCE degree of polymerization of the user is less than 8, increases the current CCE degree of polymerization step by step, obtain the user's The quasi- degree of polymerization of CCE;If have available CCE positions in the reserved area of system and the current CCE degree of polymerization increase two-stage with On, then the current PDCCH transmission powers Po of the user is reduced into a default 3rd power excursion PowerOffset3, obtain The quasi- transmission powers of PDCCH of the user, and distribute a CCE positions, update the user current PDCCH transmission powers Po, The current CCE degree of polymerization and current CCE positions;
If the current CCE degree of polymerization of the user increases to 8, judged using the current CCE degree of polymerization in the reserved area of system Whether available CCE position is had, if there are available CCE positions in the reserved area of system and having transmission power, by institute Stating current PDCCH transmission powers Po increases by a default 4th power excursion PowerOffset4, so as to get the user The quasi- transmission powers of PDCCH are less than or equal to the maximum transmission power Power of systemmax, and a CCE positions are distributed, renewal is current PDCCH transmission powers Po, the current CCE degree of polymerization and current CCE positions;
If the current CCE degree of polymerization increases to 8, without available CCE positions in the reserved area of system, but the PDCCH The Downlink Control Information DCI of carrying can be distributed in CCE resources and the public domain in public domain available CCE positions, A CCE positions are then distributed, if the DCI of PDCCH carryings can not be distributed in CCE resources or the public domain in public domain Without available CCE positions, then this adjustment is abandoned.
7. according to the method for claim 6, it is characterised in that in methods described,
The renewal current PDCCH transmission power Po, refer to described current with the quasi- transmission power renewals of the PDCCH PDCCH transmission powers Po;
The current CCE degree of polymerization of renewal, refer to the quasi- degree of polymerization renewals of the CCE current CCE degree of polymerization;
The current CCE positions of renewal, refer to the current CCE positions of CCE location updatings with the distribution.
8. the method according to claim 1 or 4, it is characterised in that if the BLER is more than first threshold and is less than or equal to Second Threshold, then keep the current PDCCH transmission powers Po of the user and the current CCE degree of polymerization constant.
9. according to the method for claim 1, it is characterised in that methods described further comprises:
After the adjustment terminates, gathered according to the current PDCCH transmission powers Po of the user after renewal and/or current CCE It is right, reset scheduling window for the user.
10. a kind of physical downlink control channel PDCCH self-adapting adjusting apparatus, it is characterised in that described device includes control lattice Formula instruction CFI adjusting modules, initialization module, scheduler module and adaptive adjusting module,
The CFI adjusting modules, for being currently needed for the number of users UE of scheduling according to systemnumWith default CFI threshold values, from Dynamic adjustment PDCCH CFI;
The scheduler module, for being polymerize according to respective current PDCCH transmission powers Po and current control channel unit CCE Degree, the user for needing to dispatch is dispatched in respective scheduling window;
The adaptive adjusting module, the block error rate BLER for the PDCCH of the user according to the scheduler module current scheduling And default power excursion and CCE degree of polymerization adjustable strategies, the user's of scheduler module current scheduling is current described in adjust automatically PDCCH transmission powers Po and the current CCE degree of polymerization;
The CFI adjusting modules, it is additionally operable to the number of users UE that acquisition system is currently needed for schedulingnum, calculate needed for current scheduling CCE sums CCEall, judge the CCE sums CCEallWhether default first CFI threshold values CFI1 is less thanth, and in the CCE Total CCEallLess than the first CFI threshold values CFI1thWhen, it is the first CFI values to make current CFI;In the CCE sums CCEall More than or equal to the first CFI threshold values CFI1thWhen, judge the CCE sums CCEallWhether default 2nd CFI doors are less than Limit value CFI2th, and in the CCE sums CCEallLess than the 2nd CFI threshold values CFI2thWhen, it is second to make current CFI CFI values;In the CCE sums CCEallMore than or equal to the 2nd CFI threshold values CFI2thWhen, it is the 3rd CFI to make current CFI Value;
Wherein, the first CFI values<The 2nd CFI values<The 3rd CFI values.
11. device according to claim 10, it is characterised in that
The initialization module, the user type and CQI information of scheduling are currently needed for for obtaining the system, according to getting User type, the user for judging to be currently needed for scheduling is edge customer or central user, and in the use for being currently needed for scheduling When family is edge customer, the initial CCE degree of polymerization of the system is made to refer to the CCE degree of polymerization, initial p DCCH power excursions for first PowerOffset0Offset for the first reference power, when being currently needed for the user-center user of scheduling, judge that the CQI is It is no to be more than or equal to default CQI threshold values CQIth, and it is more than or equal to default CQI threshold values CQI in the CQIthWhen, make institute The initial CCE initial polymerizations degree for stating system refers to the CCE degree of polymerization, initial p DCCH power excursions PowerOffset for second0For Second reference power is offset, and is less than default CQI threshold values CQI in the CQIthWhen, make the initial CCE degree of polymerization of the system The CCE degree of polymerization, initial p DCCH power excursions PowerOffset are referred to for the 3rd0Offset for the 3rd reference power;And calculate institute State the reference emission power P of system and the initial p DCCH power excursions PowerOffset0Sum, obtain the system just Beginning PDCCH transmission power;
The scheduler module, the user for counting current scheduling dispatch the number Schd being scheduled in window at itcnt, calculate institute BLERs of the PDCCH of user in the scheduling window is stated, and judges the size of the BLER, and will determine that result is sent to institute State adaptive adjusting module;
Wherein, described second the CCE degree of polymerization is referred to reference to the CCE degree of polymerization≤described first with reference to the CCE degree of polymerization≤described 3rd; The second reference power skew≤the 3rd reference power skew≤first reference power skew.
12. the device according to claim 10 or 11, it is characterised in that the adaptive adjusting module, for described When the judged result of scheduler module is less than or equal to first threshold for the PDCCH of user BLER, judge that the user is adjusted The number Schd of degreecntWhether default scheduling times threshold value Cnt is more than or equal toth, in the number that the user is scheduled SchdcntMore than or equal to the scheduling times threshold value CntthWhen, the current PDCCH transmission powers Po of the user is reduced by one Default first power excursion PowerOffset1, the quasi- transmission powers of PDCCH of the user are obtained, and working as in the user The absolute value of total power excursion PowerOffset under preceding scheduling window is more than or equal to default power drift threshold value PowerOffsetthAnd the current CCE degree of polymerization of the user is when being more than 1, will the current CCE degree of polymerization reduction one-level, obtain The quasi- degree of polymerization of CCE of the user, while the quasi- transmission powers of the PDCCH of the user are increased into by default second power excursion PowerOffset2, and the renewal current PDCCH transmission powers Po and the current CCE degree of polymerization.
13. the device according to claim 10 or 11, it is characterised in that the adaptive adjusting module, for described The judged result of scheduler module is more than Second Threshold and the current CCE polymerizations of the user for the PDCCH of user BLER When degree is less than 8, increases the current CCE degree of polymerization step by step, obtain the quasi- degree of polymerization of CCE of the user;And using the CCE There are available CCE positions during the quasi- degree of polymerization in the reserved area of system and when the current CCE degree of polymerization is increased more than two-stage, The current PDCCH transmission powers Po of the user is reduced into a default 3rd power excursion PowerOffset3, distribute a CCE Position, update current PDCCH transmission powers Po, the current CCE degree of polymerization and the current CCE positions of the user;
When the current CCE degree of polymerization of the user increases to 8, judged using the current CCE degree of polymerization in the reserved area of system , will when whether having available CCE positions, and having available CCE positions in the reserved area of system and have transmission power The current PDCCH transmission powers Po increases by a default 4th power excursion PowerOffset4, so as to get the user The quasi- transmission powers of PDCCH be less than or equal to system maximum transmission power Powermax, and a CCE positions are distributed, renewal is current PDCCH transmission powers Po, the current CCE degree of polymerization and current CCE positions, and system when using the current CCE degree of polymerization Reserved area in without available CCE positions, but the DCI of PDCCH carryings can distribute CCE resources and described in public domain When there are available CCE positions in public domain, a CCE positions are distributed.
CN201110189888.4A 2011-07-07 2011-07-07 PDCCH self-adapting regulation methods and device Active CN102869106B (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201110189888.4A CN102869106B (en) 2011-07-07 2011-07-07 PDCCH self-adapting regulation methods and device
PCT/CN2012/071633 WO2012155590A1 (en) 2011-07-07 2012-02-24 Method and apparatus for adaptively adjusting pdcch

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201110189888.4A CN102869106B (en) 2011-07-07 2011-07-07 PDCCH self-adapting regulation methods and device

Publications (2)

Publication Number Publication Date
CN102869106A CN102869106A (en) 2013-01-09
CN102869106B true CN102869106B (en) 2018-04-10

Family

ID=47176215

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201110189888.4A Active CN102869106B (en) 2011-07-07 2011-07-07 PDCCH self-adapting regulation methods and device

Country Status (2)

Country Link
CN (1) CN102869106B (en)
WO (1) WO2012155590A1 (en)

Families Citing this family (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9031033B2 (en) * 2011-09-27 2015-05-12 Apple Inc. Wireless radio access network control channel capacity management
CN103973425B (en) * 2013-02-04 2017-08-25 普天信息技术研究院有限公司 A kind of method of down control channel resources distribution
CN104244393B (en) * 2013-06-24 2018-01-05 普天信息技术研究院有限公司 A kind of method and apparatus for adjusting Physical Downlink Control Channel
CN104348572B (en) * 2013-07-24 2017-08-25 成都鼎桥通信技术有限公司 Physical Downlink Control Channel symbolic number adaptive approach and base station
CN105188141A (en) * 2014-06-20 2015-12-23 中兴通讯股份有限公司 Channel demodulation method and device
CN106454885A (en) * 2015-08-10 2017-02-22 北京大学 Method and apparatus for determining aggregation grade of physical downlink control channel
CN106550471B (en) * 2015-09-22 2020-10-30 大唐移动通信设备有限公司 Parameter adjusting method and device
CN108337731B (en) * 2017-01-19 2020-06-16 大唐移动通信设备有限公司 Method and device for controlling format indication adjustment
CN108633002A (en) * 2017-03-15 2018-10-09 深圳市金立通信设备有限公司 A kind of resource indicating method, relevant device and system
CN107124772B (en) * 2017-04-11 2020-02-18 京信通信***(中国)有限公司 Resource scheduling method and device
CN109217997B (en) * 2017-07-07 2021-05-25 普天信息技术有限公司 Method and device for dynamically adjusting CFI in subframe
CN109922500A (en) * 2017-12-12 2019-06-21 成都鼎桥通信技术有限公司 Channel capacity control method and device
CN111385899B (en) * 2018-12-28 2023-03-14 中兴通讯股份有限公司 Resource scheduling method and device, network equipment and readable storage medium
CN111628852B (en) * 2019-02-27 2021-11-19 大唐移动通信设备有限公司 Resource allocation method and device
CN113824543A (en) * 2021-09-07 2021-12-21 深圳金信诺高新技术股份有限公司 Method, base station and storage medium for adaptively adjusting PDCCH polymerization degree

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101895936A (en) * 2009-05-18 2010-11-24 中兴通讯股份有限公司 Method and device for distributing control channel resources
CN102065543A (en) * 2009-11-16 2011-05-18 中兴通讯股份有限公司 Control channel unit allocation method and device

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES2595040T3 (en) * 2007-10-29 2016-12-27 Optis Wireless Technology, Llc Terminal device and corresponding procedure
KR101523985B1 (en) * 2008-12-12 2015-05-29 삼성전자주식회사 Method and Apparatus for detecting control channel element using channel quality indicator
CN101841825B (en) * 2009-03-20 2013-01-23 电信科学技术研究院 Channel detecting method and equipment in long-term evolution system
CN101931600B (en) * 2009-06-25 2013-08-07 中兴通讯股份有限公司 Device and method for dynamically confirming CFI (Control Format Indication)

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101895936A (en) * 2009-05-18 2010-11-24 中兴通讯股份有限公司 Method and device for distributing control channel resources
CN102065543A (en) * 2009-11-16 2011-05-18 中兴通讯股份有限公司 Control channel unit allocation method and device

Also Published As

Publication number Publication date
CN102869106A (en) 2013-01-09
WO2012155590A1 (en) 2012-11-22

Similar Documents

Publication Publication Date Title
CN102869106B (en) PDCCH self-adapting regulation methods and device
US8797983B2 (en) Apparatuses and methods for allocating spectrum resources in a wireless communication network
US8072918B2 (en) Network-based inter-cell power control for multi-channel wireless networks
DK2567578T3 (en) REPORTING OF THE SUSTAINABILITY EFFECT MARGET
US8812040B2 (en) Communication system, user equipment, base station, transmit power deciding method, and program
WO2011119249A1 (en) Uplink power control for channel aggregation in a communication network
Triantafyllopoulou et al. QoS and energy efficient resource allocation in uplink SC-FDMA systems
EP2892284B1 (en) Method and device for reducing transmitting power
US9814062B2 (en) Method and device for transmission scheduling
JP2010521827A (en) Method and apparatus for reporting channel quality to a communication system
EP2011249B1 (en) Method and system of communication
EP2232724B1 (en) A method and a device for improved scheduling
EP2489231A1 (en) Wireless scheduling considering overhead cost estimate
Yildiz et al. A novel mobility aware downlink scheduling algorithm for LTE-A networks
CN103621171B (en) Dispatching method and dispatching device and base station
Merlhe et al. Dynamic cell-less radio access network meta-scheduler for high system capacity increase
Van Do et al. An integrated analytical model for computation and comparison of the throughputs of the UMTS/HSDPA user equipment categories
Sulthana et al. Development and analysis of downlink scheduling algorithm in LTE system with imperfect channel quality indicator
Alotaibi et al. Radio resource management in LTE femtocell networks
Rebekka et al. Priority-based quality of service guaranteed radio resource allocation in long term evolution network
Assaad Reduction of the feedback delay impact on the performance of scheduling in OFDMA systems
KR101013491B1 (en) apparatus for power allocation in wireless communication system and method thereof
Liu et al. Uplink channel-aware scheduling algorithm for LTE-Advanced system
Burchardt et al. Uplink interference protection and fair scheduling for power efficient OFDMA networks
Hsu et al. Window-based frequency-domain packet scheduling with QoS support in LTE uplink

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant