CN102864795B - Light steel factory post foundation suitable for sedimentation of filled-in ground and construction method - Google Patents

Light steel factory post foundation suitable for sedimentation of filled-in ground and construction method Download PDF

Info

Publication number
CN102864795B
CN102864795B CN201210399823.7A CN201210399823A CN102864795B CN 102864795 B CN102864795 B CN 102864795B CN 201210399823 A CN201210399823 A CN 201210399823A CN 102864795 B CN102864795 B CN 102864795B
Authority
CN
China
Prior art keywords
reinforcing bar
screw rod
base plate
steel
billet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201210399823.7A
Other languages
Chinese (zh)
Other versions
CN102864795A (en
Inventor
曾祥勇
邓安福
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing University
Original Assignee
Chongqing University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing University filed Critical Chongqing University
Priority to CN201210399823.7A priority Critical patent/CN102864795B/en
Publication of CN102864795A publication Critical patent/CN102864795A/en
Application granted granted Critical
Publication of CN102864795B publication Critical patent/CN102864795B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Foundations (AREA)

Abstract

The invention discloses a light steel factory post foundation suitable for sedimentation of filled-in ground and a construction method. The post foundation comprises a connecting rebar, a post bottom plate, a steel base plate, a precast cushion block and an independent under-post foundation; wherein the post bottom plate, the steel base plate, the precast cushion block and the independent under-post foundation are arranged from top to bottom in sequence; the connecting rebar comprises a top screw rod rebar, a middle screw rod rebar and a bottom drift bolt screw rod rebar; when the filled-in ground sediments, the top screw rod rebar and the middle screw rod rebar can be dismantled; the post bottom plate is jacked and restored to an original design elevation by a jack through the steel base plate, and a gap between the post bottom plate and the independent under-post foundation is filled by the precast cushion block. The light steel factory post foundation is reasonable in structure, convenient to construct, safe and reliable; height of a post bottom can be freely adjusted according to the requirement; adverse effects on construction of the conventional light steel factory post foundation and normal use of a structure caused by foundation sedimentation can be effectively solved, and the light steel factory post foundation has a good economic benefit and a time benefit in engineering construction.

Description

A kind of light Steel-Structure Factory with Steel patten and construction method that adapts to filled ground sedimentation
Technical field
The present invention relates to the foundation structure of a kind of light steel mill pillars of a house, relate in particular to padded construction method after a kind of light Steel-Structure Factory with Steel patten that adapts to filled ground sedimentation and sedimentation thereof.
Background technology
In the Mountain Urban Area of hypsography injustice, carry out industrial district construction, during smooth location, often dig greatly and fill out greatly, and be limited to construction costs and construction period, often be difficult to accomplish to ram packing in fact, if steel-structure factory building is built in the embankment district that does not meet compaction quality requirement, while building before filled ground sedimentation is unstable, its sedimentation will directly cause basis to produce corresponding sedimentation, thereby in superstructure, produce harmful secondary stress, and superstructure and building are deformed, cracking or unstability etc., thereby have a strong impact on structural safety work, therefore often need this filled ground to carry out ground processing or adopt the relatively high pile foundation of cost that load is passed among stratum stable under fill stratum, so all need to pay more economic cost.If wait for that uncompacted filled ground settlement stability carries out steel-structure factory building construction again, required wait is banketed the fixed time, from just starting to banket, count generally at least about more than 5 years, as after waiting for that recent fill is fixed and completing, build again, the time cost of paying is more expensive.
Therefore, need to transform the design and construction scheme of the light Steel-Structure Factory with Steel patten on existing filled ground, at the bottom of the sedimentation that can guarantee filled ground does not cause post, absolute altitude does not reduce, and can also be reliably connected with superstructure post after increasing, guarantee the top-down reliable delivery of load and superstructure safety, avoid thus the relatively high ground processing of cost and pile foundation or strip foundation construction scheme even to wait for banketing fixed completing the more expensive loss of time that construction causes again.
Summary of the invention
For prior art above shortcomings, at the bottom of the present invention solves light Steel-Structure Factory with Steel patten on existing filled ground and causes post with the sedimentation meeting of filled ground, absolute altitude reduces, cause light Steel-Structure Factory with Steel superstructure and building deforms, cracking or unstability, have a strong impact on structural safety work, and adopt the construction that prior art produces to cause the high problem of maintenance cost, and a kind of light Steel-Structure Factory with Steel patten that adapts to filled ground sedimentation is provided.
Another object of the present invention is carried out padded construction method after being to provide a kind of light Steel-Structure Factory with Steel patten sedimentation that adopts the sedimentation of described adaptation filled ground.
Solve described problem, the technical solution used in the present invention is: a kind of light Steel-Structure Factory with Steel patten that adapts to filled ground sedimentation, it is characterized in that, comprise connecting reinforcement and the column base plate setting gradually from top to bottom, billet, precast lining and independent foundation under column, described connecting reinforcement comprises top screws reinforcing bar and bottom crab-bolt screw rod reinforcing bar, and described top screws reinforcing bar and bottom crab-bolt screw rod reinforcing bar removably connect by branch sleeve; Described column base plate is for the i iron steel column of fixing light Steel-Structure Factory with Steel;
The array that is provided with described column base plate, billet and precast lining runs through the via hole of column base plate, billet and precast lining, by connecting reinforcement, through after described via hole, column base plate, billet, precast lining and independent foundation under column is connected as a single entity; The upper end of described top screws reinforcing bar is fixed by double nut and nut backing plate and column base plate, and the lower end of top screws reinforcing bar is threaded by branch sleeve with the upper end of bottom crab-bolt screw rod reinforcing bar; Lower end and the concrete foundation anchor connection of bottom crab-bolt screw rod reinforcing bar;
Described billet has the position of growing above the relative both sides of precast lining.
Further, described precast lining is steel plate, cement mortar bedding block or concrete pad.
Further, described via hole is 4 groups.
Further, the bottom of described bottom crab-bolt screw rod reinforcing bar has kink.
Further, described precast lining is a plurality of, described connecting reinforcement comprises top screws reinforcing bar, middle part screw rod reinforcing bar, bottom crab-bolt screw rod reinforcing bar, and described top screws reinforcing bar, middle part screw rod reinforcing bar and bottom crab-bolt screw rod reinforcing bar are threaded by branch sleeve.
A padded construction method after the sedimentation of above-mentioned light Steel-Structure Factory with Steel patten, comprises the steps:
1), after the sedimentation of banketing, first dismantle top screws reinforcing bar upper end double nut and nut backing plate, and take out top screws reinforcing bar;
2), by the position of growing of the billet of top, the relative both sides of precast lining is applied to active force, column base plate is increased to design elevation at the bottom of the former post before foundation settlement;
3) between billet and independent foundation under column, be packed to again the precast lining with via hole that quantity, thickness and intensity are suitable;
4) remove active force, column base plate is padded to design elevation at the bottom of former post by precast lining;
5) the top screws reinforcing bar after adopting length adjustment suitable is connected fastening by branch sleeve with bottom crab-bolt screw rod screw thread steel after through column base plate, billet, precast lining; Finally in the end of top screws reinforcing bar, insert nut backing plate fastening by double nut and column base plate, complete thus the padded adjustment process after filled ground sedimentation occurs.
Further, when the position of growing of the billet of top, the relative both sides of precast lining is applied to active force, jack is placed in to the billet below, position of growing, by jack, directly billet is carried out to jacking.
A padded construction method after the sedimentation of above-mentioned light Steel-Structure Factory with Steel patten, comprises the steps:
1), after the sedimentation of banketing, first dismantle double nut and the nut backing plate of top screws reinforcing bar upper end, and take out top screws reinforcing bar;
2), by the position of growing of the billet of top, the relative both sides of precast lining is applied to active force, column base plate is increased to design elevation at the bottom of the former post before foundation settlement;
3) again the middle part screw rod reinforcing bar of the suitable TBE (threaded both ends) of length adjustment is coupled together by branch sleeve and bottom crab-bolt screw rod reinforcing bar, and at the branch sleeve between fastening good itself and top shank of bolt reinforcing bar above the screw rod reinforcing bar of middle part; The reinforcing bar top connecting from these penetrates the precast lining with via hole that quantity, thickness and intensity are suitable;
4) remove active force, column base plate is padded to design elevation at the bottom of former post by precast lining;
5) top screws reinforcing bar is connected fastening by branch sleeve with middle part screw rod screw thread steel through after column base plate, billet; Finally in the end of top screws reinforcing bar, insert nut backing plate fastening by double nut and column base plate, complete thus the padded adjustment process after filled ground sedimentation occurs.
Further, make quadrilateral frame, when the position of growing of the billet of top, the relative both sides of precast lining is applied to active force, by two frameworks, be inserted in respectively the position of growing of billet both sides, then adopt two steel poles through two corners of two framework top margins, and jack pair steel pole is set on the ground carries out jacking, thereby framework is carried out to jacking, and then billet and column base plate are carried out to jacking.
Compared to existing technology, the present invention has following beneficial effect:
1, the present invention is rational in infrastructure, easy construction, can be as required height at the bottom of adjustable column at any time.
2, adopt the inventive method, can carry out at any time engineering construction banketing not yet to complete in fixed, simultaneously under the Qing steel mill pillars of a house without adopting cost high pile foundation, strip foundation or carrying out ground processing, only need to adopt conventional shallow foundation, reach economy, safe and reliable, easy construction is object efficiently.
3, when filled ground and column footing generation sedimentation, because light Steel-Structure Factory with Steel superstructure is lighter, by this structure, can adopt jack pair factory building columns to carry out jacking, clog in the billet producing after simultaneously adopting precast lining to jacking and the gap between independent foundation under column, and change the top screws reinforcing bar being of convenient length or increase middle part screw rod reinforcing bar, again by column base plate and under billet, precast lining and independent foundation under column couple together by connecting reinforcement, adopt in this way, generation along with the sedimentation of banketing, at any time can be by jacking at the bottom of post to former absolute altitude, until banket afterwards for many years, Settlement Consolidation is stable, avoid thus the adverse effect that the superstructure of absolute altitude and light Steel-Structure Factory with Steel causes at the bottom of the sedimentation coupled columns of filled ground.
4, this invention can effectively solve all difficulties that cause because of foundation settlement in light Steel-Structure Factory with Steel patten construction on conventional filled ground, has good economic benefit and time benefit, and easy construction is safe and reliable.
5, the present invention is applied widely, is not only applicable to filled ground, is also applicable to the project situation such as the light Steel-Structure Factory with Steel malformation in top, cracking or unstability that the uneven settlement of foundation in soft foundation and various situation causes.
Accompanying drawing explanation
Fig. 1 is the structural representation on basis of the present invention;
Fig. 2 is the structural representation after increase on basis of the present invention.
The specific embodiment
Below in conjunction with drawings and Examples, the invention will be further described.
Embodiment 1: as shown in Figure 1, a kind of light Steel-Structure Factory with Steel patten that adapts to filled ground sedimentation, comprises the column base plate 1, the billet 2 that set gradually from top to bottom ,precast lining 3 ,independent foundation under column 4 (described independent foundation under column 4 is generally made by concrete or Reinforced Concrete Materials) and connecting reinforcement, described connecting reinforcement comprises top screws reinforcing bar 5 and bottom crab-bolt screw rod reinforcing bar 6, described top screws reinforcing bar 5 removably connects by branch sleeve 7 with bottom crab-bolt screw rod reinforcing bar 6, during concrete enforcement, adopt mechanical sleeve to be connected, more firm; The i iron steel column 8 of light Steel-Structure Factory with Steel is fixedly connected with column base plate 1.Described precast lining 3 is steel plate, cement mortar bedding block or concrete pad, make the intensity of precast lining 3 can meet structure stress needs, the material of this precast lining 3, thickness are selected (to be generally less than employing steel plate or the steel disc of 2cm according to actual conditions, 2-6cm adopts cement mortar bedding block, surpasses 6cm and adopts pea gravel concreten cushion block).During Specific construction, can make precast lining globality better according to stressing conditions at cement mortar bedding block or concrete pad internal configurations gauze wire cloth or steel mesh reinforcement, supporting capacity be stronger.
The array that is provided with described column base plate 1, billet 2 and precast lining 3 runs through the via hole of column base plate 1, billet 2 and precast lining 3, by connecting reinforcement through column base plate 1, billet 2, precast lining 3 being connected as a single entity with independent foundation under column 4 after described via hole; Described via hole is generally 4 groups (size of visual column base plate 1 and steel columns bear load increase and decrease), also can be 6 groups, 8 groups etc., with concrete condition, selects; Be distributed in the reasonable force part of column base plate 1, billet 2 and precast lining 3, better effects if.
The upper end of described top screws reinforcing bar 5 is fixing by double nut and nut backing plate and column base plate 1, and the lower end of top screws reinforcing bar 5 is threaded by branch sleeve 7 with the upper end of bottom crab-bolt screw rod reinforcing bar 6; Lower end and independent foundation under column 4 anchor connections of bottom crab-bolt screw rod reinforcing bar 6; The bottom of described bottom crab-bolt screw rod reinforcing bar 6 has kink, can effectively improve anchoring effect.Described billet 2 has the position of growing above precast lining 3 relative both sides.
Described billet 2 also can adopt the steel filler strip of avoiding connecting reinforcement to replace, and in guaranteed strength and stable in the situation that, more saves material.The thickness of this billet 2 or steel filler strip need meet force request, and its thickness is generally not less than 20mm.
In the situation that settlement of foundation is little, only needs to change the top screws reinforcing bar being of convenient length and then by branch sleeve 7, be again threaded with bottom crab-bolt screw rod reinforcing bar 6.When ground produces after sedimentation, first the column base plate 1 of the i iron steel column 8 by 2 pairs of light Steel-Structure Factory with Steel of billet carries out jacking, adopt again precast lining with holes to clog the gap between consequent independent foundation under column 4 and column base plate 1, thereby make column base plate 1 be returned to home position.
Adopt the light Steel-Structure Factory with Steel patten of this adaptation filled ground sedimentation, padded construction method after its sedimentation, comprises the steps:
1), after the sedimentation of banketing, first dismantle top screws reinforcing bar upper end double nut and nut backing plate, and take out top screws reinforcing bar; Carry out excavation of foundation pit simultaneously, the position of growing of independent foundation under column top and top billet thereof is exposed;
2), by the position of growing of the billet of top, the relative both sides of precast lining is applied to active force, column base plate is increased to design elevation at the bottom of the former post before foundation settlement; When the position of growing of the billet of top, the relative both sides of precast lining is applied to active force, jack is placed in to grow position below of billet, by jack, directly billet is carried out to jacking, easy to operate, be applicable to the factory building that less jack or weight are lighter.
3) between billet and independent foundation under column, be packed to again the precast lining with via hole that quantity, thickness and intensity are suitable; Described precast lining quantity and thickness are highly as the criterion before column base plate can being increased to sedimentation, and precast lining intensity is as the criterion can meet stressed needs, and is not less than the concrete strength of independent foundation under column 4, before filling, by required number and thickness, are undertaken prefabricated; During filling, insert between billet 2 and independent foundation under column 4;
4) remove active force, column base plate is padded to design elevation at the bottom of former post by precast lining;
5) the top screws reinforcing bar after adopting length adjustment suitable is connected fastening (can change another root top screws reinforcing bar) after through column base plate, billet, precast lining with bottom crab-bolt screw rod screw thread steel by branch sleeve; Finally in the end of top screws reinforcing bar, insert nut backing plate fastening by double nut and column base plate, complete thus the padded adjustment process after filled ground sedimentation occurs.Adopt double nut and column base plate fastening, can further ensure integrally-built stability, avoid nut to come off.
Embodiment 2, as shown in Figure 2, described precast lining is a plurality of, described connecting reinforcement comprises top screws reinforcing bar, middle part screw rod reinforcing bar 9, bottom crab-bolt screw rod reinforcing bar, described top screws reinforcing bar, middle part screw rod reinforcing bar 9 and bottom crab-bolt screw rod reinforcing bar are threaded by branch sleeve, during concrete enforcement, adopt mechanical sleeve to be connected, more firm.
In the situation that settlement of foundation is larger, increase as required or change the middle part screw rod reinforcing bar being of convenient length, when filling precast lining (filler strip), can connect middle part screw rod reinforcing bar in limit like this, limit filling precast lining (filler strip), convenient.When ground produces after sedimentation, first the column base plate of the i iron steel column of light Steel-Structure Factory with Steel is carried out to jacking, adopt again perforate precast concrete cushion block (or filler strip) to clog the gap between consequent independent foundation under column and column base plate, thereby make column base plate be returned to home position.
Light Steel-Structure Factory with Steel patten to the sedimentation of above-mentioned adaptation filled ground, padded construction method after its sedimentation, comprises the steps:
1), after the sedimentation of banketing, first dismantle double nut and the nut backing plate of top screws reinforcing bar upper end, and take out top screws reinforcing bar; To carrying out excavation of foundation pit, the position of growing of the billet of independent foundation under column top and top thereof is exposed simultaneously;
2), by the position of growing of the billet of top, the relative both sides of precast lining is applied to active force, column base plate is increased to design elevation at the bottom of the former post before foundation settlement; During jacking, make quadrilateral frame, when the position of growing of the billet of top, the relative both sides of precast lining is applied to active force, by two frameworks, be inserted in respectively the position of growing of billet both sides, then adopt two steel poles through two corners of two framework top margins, and jack pair steel pole is set on the ground carries out jacking, thereby framework is carried out to jacking, and then billet and column base plate are carried out to jacking.During Specific construction, described quadrilateral frame can be made into trapezoidal, and adopts steel work, so not only easy construction, and supporting capacity is stronger.This quadrangle steelframe can be according to the load of the light steel mill pillars of a house, and the size of required top lift adopts the conventional steel such as hot-rolled reinforced bar or shaped steel to make.So can jacking process be subject to the impact of light Steel-Structure Factory with Steel, more convenient to operate, and better effects if, make the stressed balance more of billet, be more prone to operation.
3) again the middle part screw rod reinforcing bar of the suitable TBE (threaded both ends) of length adjustment is coupled together by branch sleeve and bottom crab-bolt screw rod reinforcing bar, and at the branch sleeve between fastening good itself and top shank of bolt reinforcing bar above the screw rod reinforcing bar of middle part; The reinforcing bar top connecting from these penetrates the precast lining with via hole that quantity, thickness and intensity are suitable;
4) remove active force, column base plate is padded to design elevation at the bottom of former post by precast lining;
5) top screws reinforcing bar is connected fastening by branch sleeve with middle part screw rod screw thread steel through after column base plate, billet; Finally in the end of top screws reinforcing bar, insert nut backing plate fastening by double nut and column base plate, complete thus the padded adjustment process after filled ground sedimentation occurs.Adopt double nut and column base plate fastening, can further ensure integrally-built stability, avoid nut to come off.
The present invention, except applicable filled ground, also can be extended to the light Steel-Structure Factory with Steel building that may produce foundation settlement of other occasion, as soft foundation, and other unfavorable foundation etc.
In addition, precast lining is made the form of upper level, lower tilt, for basic end face in the sedimentation of banketing, may produce inclination situation slightly, can guarantee to maintain former level at the bottom of upper post, and general this inclined degree is not very large.
Finally it should be noted that, above embodiment is only in order to illustrate technical scheme of the present invention but not restriction technologies scheme, although applicant has been described in detail the present invention with reference to preferred embodiment, those of ordinary skill in the art is to be understood that, those are modified or are equal to replacement technical scheme of the present invention, and do not depart from aim and the scope of the technical program, all should be encompassed in the middle of claim scope of the present invention.

Claims (3)

1. a light Steel-Structure Factory with Steel patten that adapts to filled ground sedimentation, it is characterized in that, comprise connecting reinforcement and the column base plate setting gradually from top to bottom, billet, precast lining and independent foundation under column, described connecting reinforcement comprises top screws reinforcing bar and bottom crab-bolt screw rod reinforcing bar, and described top screws reinforcing bar and bottom crab-bolt screw rod reinforcing bar removably connect by branch sleeve; Described column base plate is for the i iron steel column of fixing light Steel-Structure Factory with Steel;
The array that is provided with described column base plate, billet and precast lining runs through the via hole of column base plate, billet and precast lining, and described precast lining is steel plate, cement mortar bedding block or concrete pad; Described via hole is 4 groups; By connecting reinforcement, through after described via hole, column base plate, billet, precast lining and independent foundation under column are connected as a single entity; Described precast lining is a plurality of, and described connecting reinforcement comprises top screws reinforcing bar, middle part screw rod reinforcing bar, bottom crab-bolt screw rod reinforcing bar, and described top screws reinforcing bar, middle part screw rod reinforcing bar and bottom crab-bolt screw rod reinforcing bar are threaded by branch sleeve; The upper end of described top screws reinforcing bar is fixed by double nut and nut backing plate and column base plate, lower end and the concrete foundation anchor connection of bottom crab-bolt screw rod reinforcing bar; The bottom of described bottom crab-bolt screw rod reinforcing bar has kink;
Described billet has the position of growing above the relative both sides of precast lining.
2. adapt to as claimed in claim 1 padded construction method after the light Steel-Structure Factory with Steel patten sedimentation of filled ground sedimentation, it is characterized in that, comprise the steps:
1), after the sedimentation of banketing, first dismantle double nut and the nut backing plate of top screws reinforcing bar upper end, and take out top screws reinforcing bar;
2), by the position of growing of the billet of top, the relative both sides of precast lining is applied to active force, column base plate is increased to design elevation at the bottom of the former post before foundation settlement;
3) again the middle part screw rod reinforcing bar of the suitable TBE (threaded both ends) of length adjustment is coupled together by branch sleeve and bottom crab-bolt screw rod reinforcing bar, and at the branch sleeve between fastening good itself and top shank of bolt reinforcing bar above the screw rod reinforcing bar of middle part; The reinforcing bar top connecting from these penetrates the precast lining with via hole that quantity, thickness and intensity are suitable;
4) remove active force, column base plate is padded to design elevation at the bottom of former post by precast lining;
5) top screws reinforcing bar is connected fastening by branch sleeve with middle part screw rod screw thread steel through after column base plate, billet; Finally in the end of top screws reinforcing bar, insert nut backing plate fastening by double nut and column base plate, complete thus the padded adjustment process after filled ground sedimentation occurs.
3. construction method according to claim 2, it is characterized in that, make quadrilateral frame, when the position of growing of the billet of top, the relative both sides of precast lining is applied to active force, by two frameworks, be inserted in respectively the position of growing of billet both sides, then adopt two steel poles through two corners of two framework top margins, and jack pair steel pole is set on the ground carries out jacking, thereby framework is carried out to jacking, and then billet and column base plate are carried out to jacking.
CN201210399823.7A 2012-10-19 2012-10-19 Light steel factory post foundation suitable for sedimentation of filled-in ground and construction method Expired - Fee Related CN102864795B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210399823.7A CN102864795B (en) 2012-10-19 2012-10-19 Light steel factory post foundation suitable for sedimentation of filled-in ground and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210399823.7A CN102864795B (en) 2012-10-19 2012-10-19 Light steel factory post foundation suitable for sedimentation of filled-in ground and construction method

Publications (2)

Publication Number Publication Date
CN102864795A CN102864795A (en) 2013-01-09
CN102864795B true CN102864795B (en) 2014-11-26

Family

ID=47443906

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210399823.7A Expired - Fee Related CN102864795B (en) 2012-10-19 2012-10-19 Light steel factory post foundation suitable for sedimentation of filled-in ground and construction method

Country Status (1)

Country Link
CN (1) CN102864795B (en)

Families Citing this family (20)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103343547B (en) * 2013-07-19 2015-08-05 中国建筑股份有限公司 Container type prefabricated house assembling steel reinforced concrete four patten and construction method
CN103352471B (en) * 2013-07-19 2015-07-15 中国建筑股份有限公司 Container prefabricated house assembling type steel reinforced concrete single-double-column foundation and construction method thereof
FR3009725B1 (en) * 2013-08-13 2015-09-18 Pomagalski Sa ANCHORING DEVICE FOR MECHANICAL UPPERWORKING FOUNDATIONS, AND METHOD FOR MANUFACTURING SUCH A DEVICE
CN103669431B (en) * 2013-11-18 2016-06-01 国家电网公司 A kind of colliery minery electric power pylon inclination adjusting device
CN103669432B (en) * 2013-11-18 2016-11-02 国家电网公司 A kind of jacking device for deviation rectification of steel pylon in mining area of coal mine
CN104234070B (en) * 2014-07-23 2016-08-17 杭州江润科技有限公司 A kind of steel construction and the pre-buried attachment structure in basis and construction method
CN104563172B (en) * 2015-01-13 2016-10-05 浙江湖州市建工集团有限公司 A kind of steel construction room sinking resetting structure and repositioning method thereof
CN106869196B (en) * 2015-12-14 2019-04-23 中勘冶金勘察设计研究院有限责任公司 Screw rod for anchor slab basis jacks rectification and reinforcement of building method
CN105926857A (en) * 2016-05-10 2016-09-07 江苏东晟新诚建设集团有限公司 Prefabricated pier and application of prefabricated pier to high-rise reversed beam overhanging scaffold construction
CN106639018B (en) * 2016-11-15 2022-03-08 姚献忠 Unloading building
CN106522294B (en) * 2016-12-16 2018-09-28 四川省建筑科学研究院 A kind of secondary accurate levelling device of underground space prefabricated components and method
CN106760903A (en) * 2017-01-22 2017-05-31 国网山西省电力公司阳泉供电公司 A kind of electric power pylon differential settlement adjusting means
CN107044142B (en) * 2017-04-20 2023-07-21 南京工业大学 Adjustable reinforcement deviation correcting method and structure for reducing uneven settlement of house
CN107327025A (en) * 2017-08-18 2017-11-07 精工工业建筑***有限公司 A kind of device of freely adjustable crab-bolt length
CN109058597A (en) * 2018-07-25 2018-12-21 南京奥达升智能科技有限公司 A kind of rapid rescue device
CN109138485B (en) * 2018-09-14 2023-01-17 武大巨成结构股份有限公司 Concrete column core cushion block for jacking and storey-adding of building and using method thereof
CN111173025A (en) * 2019-12-11 2020-05-19 华中科技大学 Assembled transformer substation GIS equipment foundation and construction method thereof
CN111608175B (en) * 2020-06-12 2021-07-16 湖南城市学院 Reinforcing pile for building bridge
CN112166888A (en) * 2020-09-28 2021-01-05 嘉兴易久农业科技有限责任公司 Big-arch shelter structure for orchard is planted
CN116290078B (en) * 2023-02-07 2024-05-28 重庆大学 Prefabricated assembled barricade

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102444209A (en) * 2011-09-30 2012-05-09 中国二十二冶集团有限公司 Building steel-column foundation lengthening bolt and lengthening method thereof
CN202809636U (en) * 2012-10-19 2013-03-20 重庆大学 Light steel plant column foundation adapted to filling subgrade settlement

Also Published As

Publication number Publication date
CN102864795A (en) 2013-01-09

Similar Documents

Publication Publication Date Title
CN102864795B (en) Light steel factory post foundation suitable for sedimentation of filled-in ground and construction method
CN201915422U (en) Counterfort retaining wall on high slope
CN106245670B (en) Exposed steel column base construction method
CN102864796B (en) Construction spreading foundation adaptive to filled ground settlement and construction method
CN203021923U (en) Big cantilever bent cap steel truss construction platform
CN204060020U (en) A kind of Reinforced Concrete Reinforcement structure
CN201770942U (en) Support for soft soil foundation cast-in-place concrete continuous beam bridge
CN101876160A (en) Method for installing bracket used for in-situ casting concrete continuous girder bridge on soft soil foundation
CN108930224A (en) Punching stick method bent cap supports regulating system construction method
CN210288410U (en) Ultra-large deep foundation pit support-replacing backfill structure
CN202809636U (en) Light steel plant column foundation adapted to filling subgrade settlement
CN107100322B (en) Post stretching vertical prestressing cast-in-place concrete rod structure and construction method
CN104762967A (en) Improved anchor rod static pressure pile sealing device and construction method
CN112681160B (en) Reinforced concrete arch culvert reinforcing structure with enlarged section and construction method
CN201942994U (en) Bridge bearing pad
CN206769200U (en) First wear formula post stretching vertical prestressing cast-in-place concrete rod structure
CN206769199U (en) After wear formula post stretching vertical prestressing cast-in-place concrete rod structure
CN104863124A (en) Device and method for utilizing bearing force of soil between cast-in-place piles
CN203271106U (en) Profile steel anchoring device of cantilever scaffold
CN205024719U (en) Pile foundation and integrated reverse construction vertical braces system of underground continuous wall
CN204780635U (en) Super wide nonprismatic continuous beam 0# piece concreties and relieves construction structures
CN102425188A (en) Height-adjustable tower foundation and adjustment method thereof
CN110607801A (en) Improve fan cushion cap subassembly of stake resistance to plucking bearing capacity
CN106426542B (en) The U-shaped beam of rail traffic large-tonnage pretensioning prestressed concrete and its stretching bed seat
CN106917396B (en) A kind of taper foundation reinforcement method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141126

Termination date: 20151019

EXPY Termination of patent right or utility model