CN102852533A - High-strength three-dimensional support system of yielding type restriction concrete lagging jack - Google Patents

High-strength three-dimensional support system of yielding type restriction concrete lagging jack Download PDF

Info

Publication number
CN102852533A
CN102852533A CN2012103977955A CN201210397795A CN102852533A CN 102852533 A CN102852533 A CN 102852533A CN 2012103977955 A CN2012103977955 A CN 2012103977955A CN 201210397795 A CN201210397795 A CN 201210397795A CN 102852533 A CN102852533 A CN 102852533A
Authority
CN
China
Prior art keywords
concrete
strength
bow member
support system
anchor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012103977955A
Other languages
Chinese (zh)
Inventor
王�琦
李术才
李智
李海燕
王德超
王洪涛
李为腾
张红军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University
Original Assignee
Shandong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University filed Critical Shandong University
Priority to CN2012103977955A priority Critical patent/CN102852533A/en
Publication of CN102852533A publication Critical patent/CN102852533A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses a high-strength three-dimensional support system of a yielding type restriction concrete lagging jack, which is mainly formed by a restriction concrete lagging jack, a yielding node, a vertical beam, an anchor rod or an anchor cable, wherein the restriction concrete lagging jack is in a closed structure which is the same as the shape of a roadway and is formed by connecting and combining restriction concrete through a sleeve and the yielding node; the restriction concrete is distributed at an interval and is connected through the vertical beam; the anchor rod or the anchor cable passes through the vertical beam to be anchored into a rock layer; pre-stress is applied so as to form extrusion effect on a surrounding rock; and the lagging jack forms an integral structure with the anchor rod or the anchor cable through the vertical beam, and a space three-dimensional support system is formed by combined action. The high-strength three-dimensional support system is applicable to an underground engineering support including a deep soft rock underground roadway and the like, and has the advantages of high supporting strength, good stability, reasonable stress and the like; and the high-strength three-dimensional support system has a yielding function and can effectively control the stability of a roadway surrounding rock.

Description

Allow die mould retrain concrete bow member high-strength three-dimensional support system
Technical field
The invention belongs to the underground engineering support field, particularly the underground cave in a kind of deep lane support system.
Background technology
Along with socioeconomic development, building of underground rock engineering such as coal mine roadway, road and rail tunnel and large hydropower station is more and more, the situation of the deep tunnel that faces and the large buried depth of chamber group, large section also increases gradually, and corresponding supporting problem is also more and more outstanding with it., supporting difficult characteristics large for the distortion of deep soft rock cavern, the support pattern of the large section of deep high stressed soft rock cavern carried out particular study both at home and abroad, experienced from common bolt-spary supports, sprayed steel fibre supporting, flexible steel bracket support to forms such as the spray of anchor net and flexible steel support combined supportings, but the effect of these support forms is not very desirable, Support Resistance is not enough mostly, and supporting intensity is not high.In general, the large deformation that tunnel and chamber group show under deep high stressed soft rock and fragmented rock body condition, difficult supporting problem, existing support technology is difficult to satisfy fully deep high stress tunnel and chamber group's supporting needs, has had a strong impact on production and the safety of deep rock mass engineering project.
Summary of the invention
The object of the invention is to overcome the deficiency of above-mentioned supporting aspect, provide a kind of supporting intensity high, the die mould that allows that is applicable to the underground engineering supports such as the underground cave of deep soft rock lane (tunnel, tunnel etc.) of good stability and reasonable stress retrains concrete bow member high-strength three-dimensional support system.
For achieving the above object, the present invention adopts following technical proposals: allow die mould retrain concrete bow member high-strength three-dimensional support system, mainly by retraining the concrete bow member, allowing and press node, longitudinal beam, anchor pole or anchor cable to form, constraint concrete bow member is the enclosed construction consistent with roadway shape, and the interval is arranged, connected with longitudinal beam between the adjacent constraint concrete bow member, be provided with anchor pole or anchor cable hole on the longitudinal beam, anchor pole or anchor cable pass longitudinal beam and anchor in the rock stratum, and apply prestressing force, and country rock is formed squeezing action; Anchor pole or anchor cable form a three-dimensional support system by longitudinal beam and the acting in conjunction of constraint concrete bow member.And, be provided with leveling between constraint concrete bow member and the country rock and release ergosphere, so that bow member and country rock close contact and make bow member bear uniform pressure.
Described constraint concrete bow member is retrained concrete by sleeve or allowed by multistage presses the node connection to combine, and is shaped as stalk arch, circle or the shape of a hoof.
Described constraint concrete is to fill the member that the core concrete forms in the steel tube confinement material, and wherein, the core concrete is the steel fibrous concrete material, and constraint concrete cross sectional shape is rectangle, round-shaped according to the practical application needs.
Described allowing presses node to press material and sleeve to consist of by allowing, and wherein, sleeve set is on constraint concrete bow member, and the play movements of two constraint concretes are filled with and allow the pressure material in sleeve, allow press material be have quantitative yielding property can allow pressure ring or macromolecular material.
Described longitudinal beam is mining girder steel channel-section steel, i iron or the constraint concrete with regular shape.
Described anchor pole is high strength anchor bar or grouted anchor bar, and described anchor cable is high-strength anchor cable or grouting cable anchor.
Described leveling is released ergosphere and is formed by the woven bag filling that the comminuted coal spoil is housed.
The present invention has the following advantages:
1. constraint concrete bow member has high-strength supporting capacity, and it is large to protect surface area, and plasticity and toughness properties are better, and non-deformability is strong, and the deep soft rock cave lane of large deformation, high confining pressure is had remarkable supporting effect.
2. the connection by longitudinal beam, make constraint concrete bow member and anchor pole or anchor cable acting in conjunction, form the three-dimensional support system in space, in the high-strength enabling capabilities of performance constraint concrete bow member, can more effective anchor pole or anchor cable prestressing force be diffused in the surrounding rock of chamber by bow member, can provide three-dimensional supporting power for country rock, surrouding rock deformation is controlled in the allowed band, avoid causing because of excessive deformation the bearing capacity forfeiture of country rock itself, thereby guarantee the stability of cave lane country rock.
3. the support system supporting intensity is high, integer support property regulation space is large, constraint concrete and longitudinal beam, anchor pole or anchor cable are used in conjunction with, can adjust bow member spacing, longitudinal beam array pitch in conjunction with on-the-spot geological condition, retrain concrete size and anchor pole or the parameters such as anchor cable model and an array pitch to carry out the coupling of mechanical property, country rock is carried out effective supporting.
4. allow and press node can play the pressure effect that effectively allows, after the support system bearing capacity reaches certain limit, allow country rock to produce certain distortion with release pressure, guaranteed monolithic stability and the safety of support system.
Description of drawings
Fig. 1 is the structural representation of the embodiment of the invention one;
Fig. 2 retrains longitudinal beam connection diagram between concrete bow member frame among the present invention;
Fig. 3 is A-A sectional view among Fig. 1.
Fig. 4 is A structure enlarged diagram among Fig. 1;
Fig. 5 is the structural representation of the embodiment of the invention two.
Wherein: 1-constraint concrete bow member; 2-allow the pressure node; 3-sleeve; 4-longitudinal beam; Ergosphere is released in 5-leveling; 6-anchor pole; 7-constraint concrete; 8-constraint steel pipe; 9-concrete; 10-allow pressure ring; 11-tunnel terrace; 12-country rock.
The specific embodiment
The present invention will be further described below in conjunction with accompanying drawing and embodiment.
With reference to Fig. 1 ~ 2, the specific embodiment of the present invention is, allow die mould retrain concrete bow member high-strength three-dimensional support system, mainly by constraint concrete bow member 1, allow and press node 2, longitudinal beam 4, anchor pole 6 forms, constraint concrete bow member 1 adds domes of the anti-end for the closed stalk arch consistent with roadway shape, its layout that keeps at a certain distance away, connect with longitudinal beam 4 between the adjacent constraint concrete bow member 1, be provided with bolthole on the longitudinal beam 4, anchor pole 6 passes longitudinal beam 4 and anchors in the country rock 12 again, and apply prestressing force, and country rock 12 is formed squeezing action, anchor pole 6 forms a three-dimensional support system by longitudinal beam 4 and constraint concrete bow member 1.Be provided with leveling between constraint concrete bow member 1 and the country rock 12 and release ergosphere 5, so that bow member 1 and country rock 12 close contacts and make bow member 1 bear uniform pressure.Wherein, the member that constraint concrete 7 forms for constraint steel pipe 8 inner filling steel fiber concretes 9, cross sectional shape is square (Fig. 3); Single constraint concrete bow member 1 is combined by 4 sections constraint concretes 7 connections, and the arch section presses node 2 to be connected with stalk section constraint concrete 7 by allowing, and encircle section and is connected by sleeve 3 with stalk section constraint concrete 7 at the anti-end; Allow and press node 2 by allowing pressure ring 10 and square sleeve 3 consist of, allow pressure ring 10 be arranged on the position, play movement (Fig. 4) of two constraint concretes 7 in the sleeve 3; Longitudinal beam 4 is mining channel-section steel, and length is consistent with adjacent bow member spacing; Anchor pole 6 can be selected high strength anchor bar or grouted anchor bar according to actual conditions and needs; Leveling is released ergosphere 5 and is formed by the woven bag filling that the comminuted coal spoil is housed.
In the present invention, bow member spacing, longitudinal beam arrange between density and anchor pole or anchor cable that the parameter such as array pitch can be according to the actual conditions adjustment, embodiment two as shown in Figure 5, for the Deep Soft Rock Tunnel that presents obvious asymmetrical deformation feature, longitudinal beam 4, anchor pole 6 can be arranged to unsymmetric form, and use grouted anchor bar to carry out wall rock grouting and reinforce, add strong supporting at key position.
As known by the technical knowledge, the present invention can realize by other the embodiment that does not break away from its Spirit Essence or essential feature.Therefore, with regard to each side, all just illustrating, is not only.All within the scope of the present invention or the change within being equal to scope of the present invention all be included in the invention.

Claims (7)

1. allow die mould retrain concrete bow member high-strength three-dimensional support system, it is characterized in that: mainly by retraining the concrete bow member, allowing and press node, longitudinal beam, anchor pole or anchor cable to form, wherein, constraint concrete bow member is the enclosed construction consistent with roadway shape, the interval is arranged, connects with longitudinal beam between the adjacent constraint concrete bow member, is provided with anchor pole or anchor cable hole on the longitudinal beam, anchor pole or anchor cable pass longitudinal beam and anchor in the rock stratum again, and anchor pole or anchor cable become a three-dimensional support system by longitudinal beam with constraint concrete arch; Be provided with leveling between constraint concrete bow member and the country rock and release ergosphere.
2. the die mould that allows according to claim 1 retrains concrete bow member high-strength three-dimensional support system, it is characterized in that: described constraint concrete bow member is retrained concrete by sleeve or allowed by multistage presses the node connection to combine, and is shaped as stalk arch, circle or the shape of a hoof.
3. the die mould that allows according to claim 1 and 2 retrains concrete bow member high-strength three-dimensional support system, it is characterized in that: described constraint concrete is to fill the member that the core concrete forms in the steel pipe, wherein, the core concrete is the steel fibrous concrete material, and constraint concrete cross sectional shape is rectangle, circle.
4. the die mould that allows according to claim 1 and 2 retrains concrete bow member high-strength three-dimensional support system, it is characterized in that: described allowing presses node to press material and sleeve to consist of by allowing, wherein, sleeve set is on constraint concrete bow member, the play movements of two constraint concretes are filled with and allow the pressure material in sleeve, allow press material be have quantitative yielding property can allow pressure ring or macromolecular material.
5. the die mould that allows according to claim 1 retrains concrete bow member high-strength three-dimensional support system, and it is characterized in that: described longitudinal beam is mining girder steel channel-section steel, i iron or the constraint concrete with regular shape.
6. the die mould that allows according to claim 1 retrains concrete bow member high-strength three-dimensional support system, and it is characterized in that: described anchor pole is high strength anchor bar or grouted anchor bar, and described anchor cable is high-strength anchor cable or grouting cable anchor.
7. the die mould that allows according to claim 1 retrains concrete bow member high-strength three-dimensional support system, and it is characterized in that: described leveling is released ergosphere and formed by the woven bag filling that the comminuted coal spoil is housed.
CN2012103977955A 2012-10-18 2012-10-18 High-strength three-dimensional support system of yielding type restriction concrete lagging jack Pending CN102852533A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012103977955A CN102852533A (en) 2012-10-18 2012-10-18 High-strength three-dimensional support system of yielding type restriction concrete lagging jack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012103977955A CN102852533A (en) 2012-10-18 2012-10-18 High-strength three-dimensional support system of yielding type restriction concrete lagging jack

Publications (1)

Publication Number Publication Date
CN102852533A true CN102852533A (en) 2013-01-02

Family

ID=47399465

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012103977955A Pending CN102852533A (en) 2012-10-18 2012-10-18 High-strength three-dimensional support system of yielding type restriction concrete lagging jack

Country Status (1)

Country Link
CN (1) CN102852533A (en)

Cited By (27)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103615273A (en) * 2013-12-04 2014-03-05 山东大学 Square steel confined concrete arch center wall back filling bolting-grouting support system and construction method
CN104153792A (en) * 2014-07-24 2014-11-19 山东大学 Energy-absorption yield tunnel support system and method suitable for weak broken wall rock
CN104343458A (en) * 2014-09-29 2015-02-11 湖南科技大学 Full-section wide-width one-piece type steel bracket and supporting method thereof
CN104763442A (en) * 2015-03-12 2015-07-08 中国矿业大学(北京) High-intensity large-shrinkage sealed cambered-plate support structural element
CN105298514A (en) * 2015-11-26 2016-02-03 山东科技大学 Cast-in-place continuous concrete support and installation method thereof
CN105569673A (en) * 2015-12-31 2016-05-11 中国石油天然气集团公司 Concrete filled steel tube bracket system and construction method
CN105822329A (en) * 2016-05-11 2016-08-03 长沙理工大学 Support frame, support structure and construction method of support structure
CN105952474A (en) * 2016-07-08 2016-09-21 山东大学 Rapid construction method for primary support of confined concrete of large-section tunnel
CN107905806A (en) * 2017-11-15 2018-04-13 长安大学 A kind of device and its installation method for being used to lift the livable performance of cave dwelling
CN107905821A (en) * 2017-12-20 2018-04-13 贵州大学 The roadway support structure that truss coordinates with metallic support
CN107956491A (en) * 2017-10-11 2018-04-24 中国矿业大学(北京) One kind is based on the soft rock roadway support method of " steel grating-concrete filled steel tube "
CN108397216A (en) * 2018-05-14 2018-08-14 山东建筑大学 A kind of concrete filled steel tube arch can contracting formula connector and arch
CN108412549A (en) * 2018-03-21 2018-08-17 中煤科工集团重庆研究院有限公司 One kind being adapted to gas bearing rock section tunnel support structure
CN108915735A (en) * 2018-06-21 2018-11-30 安徽理工大学 Slopes wall construction method for supporting and slopes wall support system
CN109184737A (en) * 2018-09-30 2019-01-11 山东建筑大学 The tunnel prestressing force constraint of pressure energy-absorbing can be allowed to fill liner supporting system and technique
CN109372556A (en) * 2018-09-30 2019-02-22 淮阴工学院 A kind of sandwich arch and construction method suitable for high stressed soft rock tunnel supporting roadway surrounding rock
CN109458197A (en) * 2018-12-30 2019-03-12 中国电建集团华东勘测设计研究院有限公司 A kind of classification yield supporting system
CN109695454A (en) * 2019-01-25 2019-04-30 河北工程大学 The construction method of preliminary bracing is carried out in the constructing tunnel of high earthquake zone fracture area
CN110094215A (en) * 2019-05-30 2019-08-06 三峡大学 Non-newtonian fluid liner supporting structure and construction method
CN110307013A (en) * 2019-08-09 2019-10-08 长沙理工大学 A kind of unsymmetrial loading tunnel arch and unsymmetrial loading tunnel arch caunch structure
CN110424989A (en) * 2019-08-09 2019-11-08 中铁第六勘察设计院集团有限公司 The first branch supporting construction of hard rock area super-span underground engineering and its construction method
CN110566242A (en) * 2019-08-21 2019-12-13 义煤集团宜阳义络煤业有限责任公司 control method for surrounding rock of top coal roadway of large-inclination soft thick coal seam
CN111005742A (en) * 2019-12-04 2020-04-14 中铁第四勘察设计院集团有限公司 Yielding node and arch frame
CN111911188A (en) * 2020-09-04 2020-11-10 湖南科技大学 Installation method of high-pressure tunnel pressure relief device
CN112879049A (en) * 2021-01-19 2021-06-01 华北理工大学 Arch yielding energy dissipation node connecting structure, arch and construction method
CN114151108A (en) * 2021-11-18 2022-03-08 山东济矿鲁能煤电股份有限公司阳城煤矿 Support method for soft rock chamber bottom heave treatment
CN114483085A (en) * 2022-04-01 2022-05-13 中国矿业大学(北京) Construction method of double-partition double-control system of soft rock tunnel

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004285711A (en) * 2003-03-24 2004-10-14 Public Works Research Institute Construction method for enlarged tunnel
CN1959063A (en) * 2006-10-17 2007-05-09 中国矿业大学(北京) Supporting device
CN201254993Y (en) * 2008-07-24 2009-06-10 义马煤业(集团)有限责任公司 O-shaped composite supporting construction for tunnel
CN101725362A (en) * 2009-12-09 2010-06-09 中国矿业大学(北京) Composite support device of dynamic pressure softrock tunnel based on steel pipe concrete bracket
CN101906977A (en) * 2010-07-21 2010-12-08 中国矿业大学(北京) Method for preventing and treating large deformation and collapse of softrock tunnel
CN102418539A (en) * 2011-10-31 2012-04-18 山西晋城无烟煤矿业集团有限责任公司 Supporting process in soft rock mine roadway rush through construction tunneling
CN202325548U (en) * 2011-11-30 2012-07-11 西安科技大学 Secondary yielding uniform pressure supporting structure of roadway surrounding rock under high ground stress
CN102562097A (en) * 2012-01-30 2012-07-11 山东大学 Three-dimensional asymmetrical supporting system
CN202882943U (en) * 2012-10-18 2013-04-17 山东大学 Yielding type restrained concrete arc frame high-strength three-dimensional supporting and protecting system

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004285711A (en) * 2003-03-24 2004-10-14 Public Works Research Institute Construction method for enlarged tunnel
CN1959063A (en) * 2006-10-17 2007-05-09 中国矿业大学(北京) Supporting device
CN201254993Y (en) * 2008-07-24 2009-06-10 义马煤业(集团)有限责任公司 O-shaped composite supporting construction for tunnel
CN101725362A (en) * 2009-12-09 2010-06-09 中国矿业大学(北京) Composite support device of dynamic pressure softrock tunnel based on steel pipe concrete bracket
CN101906977A (en) * 2010-07-21 2010-12-08 中国矿业大学(北京) Method for preventing and treating large deformation and collapse of softrock tunnel
CN102418539A (en) * 2011-10-31 2012-04-18 山西晋城无烟煤矿业集团有限责任公司 Supporting process in soft rock mine roadway rush through construction tunneling
CN202325548U (en) * 2011-11-30 2012-07-11 西安科技大学 Secondary yielding uniform pressure supporting structure of roadway surrounding rock under high ground stress
CN102562097A (en) * 2012-01-30 2012-07-11 山东大学 Three-dimensional asymmetrical supporting system
CN202882943U (en) * 2012-10-18 2013-04-17 山东大学 Yielding type restrained concrete arc frame high-strength three-dimensional supporting and protecting system

Cited By (40)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103615273A (en) * 2013-12-04 2014-03-05 山东大学 Square steel confined concrete arch center wall back filling bolting-grouting support system and construction method
CN104153792A (en) * 2014-07-24 2014-11-19 山东大学 Energy-absorption yield tunnel support system and method suitable for weak broken wall rock
CN104343458B (en) * 2014-09-29 2017-05-17 湖南科技大学 Full-section wide-width one-piece type steel bracket and supporting method thereof
CN104343458A (en) * 2014-09-29 2015-02-11 湖南科技大学 Full-section wide-width one-piece type steel bracket and supporting method thereof
CN104763442A (en) * 2015-03-12 2015-07-08 中国矿业大学(北京) High-intensity large-shrinkage sealed cambered-plate support structural element
CN104763442B (en) * 2015-03-12 2017-06-06 中国矿业大学(北京) The big contracting amount enclosed type Arc plate support structure of high intensity
CN105298514A (en) * 2015-11-26 2016-02-03 山东科技大学 Cast-in-place continuous concrete support and installation method thereof
CN105569673A (en) * 2015-12-31 2016-05-11 中国石油天然气集团公司 Concrete filled steel tube bracket system and construction method
CN105569673B (en) * 2015-12-31 2018-02-02 中国石油天然气集团公司 A kind of steel pipe concrete bracket system and construction method
CN105822329A (en) * 2016-05-11 2016-08-03 长沙理工大学 Support frame, support structure and construction method of support structure
CN105952474A (en) * 2016-07-08 2016-09-21 山东大学 Rapid construction method for primary support of confined concrete of large-section tunnel
CN105952474B (en) * 2016-07-08 2018-10-12 山东大学 A kind of large cross-section tunnel confined concrete preliminary bracing rapid constructing method
CN107956491B (en) * 2017-10-11 2020-05-12 中国矿业大学(北京) Soft rock roadway supporting method based on steel grating-steel pipe concrete
CN107956491A (en) * 2017-10-11 2018-04-24 中国矿业大学(北京) One kind is based on the soft rock roadway support method of " steel grating-concrete filled steel tube "
CN107905806A (en) * 2017-11-15 2018-04-13 长安大学 A kind of device and its installation method for being used to lift the livable performance of cave dwelling
CN107905806B (en) * 2017-11-15 2023-08-29 长安大学 Device for improving cave dwelling performance and installation method thereof
CN107905821A (en) * 2017-12-20 2018-04-13 贵州大学 The roadway support structure that truss coordinates with metallic support
CN108412549A (en) * 2018-03-21 2018-08-17 中煤科工集团重庆研究院有限公司 One kind being adapted to gas bearing rock section tunnel support structure
CN108412549B (en) * 2018-03-21 2023-07-18 中煤科工集团重庆研究院有限公司 Tunnel supporting structure suitable for gas occurrence rock section
CN108397216B (en) * 2018-05-14 2023-11-17 山东建筑大学 Retractable joint of steel tube concrete arch frame and arch frame
CN108397216A (en) * 2018-05-14 2018-08-14 山东建筑大学 A kind of concrete filled steel tube arch can contracting formula connector and arch
CN108915735A (en) * 2018-06-21 2018-11-30 安徽理工大学 Slopes wall construction method for supporting and slopes wall support system
CN109184737A (en) * 2018-09-30 2019-01-11 山东建筑大学 The tunnel prestressing force constraint of pressure energy-absorbing can be allowed to fill liner supporting system and technique
CN109372556A (en) * 2018-09-30 2019-02-22 淮阴工学院 A kind of sandwich arch and construction method suitable for high stressed soft rock tunnel supporting roadway surrounding rock
CN109184737B (en) * 2018-09-30 2023-11-03 山东建筑大学 Tunnel prestress constraint filling lining support system capable of yielding and absorbing energy and process
CN109458197A (en) * 2018-12-30 2019-03-12 中国电建集团华东勘测设计研究院有限公司 A kind of classification yield supporting system
CN109695454A (en) * 2019-01-25 2019-04-30 河北工程大学 The construction method of preliminary bracing is carried out in the constructing tunnel of high earthquake zone fracture area
CN110094215A (en) * 2019-05-30 2019-08-06 三峡大学 Non-newtonian fluid liner supporting structure and construction method
CN110424989A (en) * 2019-08-09 2019-11-08 中铁第六勘察设计院集团有限公司 The first branch supporting construction of hard rock area super-span underground engineering and its construction method
CN110424989B (en) * 2019-08-09 2024-02-09 中铁第六勘察设计院集团有限公司 Primary support structure of ultra-large span underground engineering in hard rock area and construction method thereof
CN110307013A (en) * 2019-08-09 2019-10-08 长沙理工大学 A kind of unsymmetrial loading tunnel arch and unsymmetrial loading tunnel arch caunch structure
CN110566242A (en) * 2019-08-21 2019-12-13 义煤集团宜阳义络煤业有限责任公司 control method for surrounding rock of top coal roadway of large-inclination soft thick coal seam
CN111005742A (en) * 2019-12-04 2020-04-14 中铁第四勘察设计院集团有限公司 Yielding node and arch frame
CN111911188A (en) * 2020-09-04 2020-11-10 湖南科技大学 Installation method of high-pressure tunnel pressure relief device
CN112879049A (en) * 2021-01-19 2021-06-01 华北理工大学 Arch yielding energy dissipation node connecting structure, arch and construction method
CN112879049B (en) * 2021-01-19 2022-08-30 华北理工大学 Arch yielding energy dissipation node connecting structure, arch and construction method
CN114151108A (en) * 2021-11-18 2022-03-08 山东济矿鲁能煤电股份有限公司阳城煤矿 Support method for soft rock chamber bottom heave treatment
CN114151108B (en) * 2021-11-18 2024-03-22 山东济矿鲁能煤电股份有限公司阳城煤矿 Soft rock chamber bottom drum treatment supporting method
CN114483085B (en) * 2022-04-01 2022-07-01 中国矿业大学(北京) Construction method of double-partition double-control system of soft rock tunnel
CN114483085A (en) * 2022-04-01 2022-05-13 中国矿业大学(北京) Construction method of double-partition double-control system of soft rock tunnel

Similar Documents

Publication Publication Date Title
CN102852533A (en) High-strength three-dimensional support system of yielding type restriction concrete lagging jack
CN202882943U (en) Yielding type restrained concrete arc frame high-strength three-dimensional supporting and protecting system
CN101725362B (en) Composite support device of dynamic pressure softrock tunnel based on steel pipe concrete bracket
CN102839981B (en) Backfilling stand shoring system of three-dimensional prestress wire of deep soft rock roadway
CN102493821B (en) Support method for high stress roadway coal-rock mass
CN202152463U (en) Foundation pressure-bearing beam plate type wind power generation tower foundation
CN104533453A (en) Substep dynamic coupling support method for roadway fault fracture zone
CN102562097A (en) Three-dimensional asymmetrical supporting system
CN104389628A (en) Landslide section tunnel reinforcing device and reinforcing construction method
CN108661664A (en) A kind of tunnel crushed zone construction method and combination supporting device
CN202882939U (en) Deep soft rock roadway three-dimensional prestress wire backfilling support retaining and protecting system
CN203238642U (en) Supporting retaining wall of foundation pit
CN201665875U (en) Light gravity-type anti-earthquake concrete retaining wall
CN206070724U (en) The structure at design large span deep buried metro station is combined using Y shape pillar with uplift pile
CN202187288U (en) Compound tunnel anchorage
CN112482409A (en) Combined supporting device and construction method thereof
CN201502065U (en) Anchor rod joint excavation compound basis
CN111101526A (en) Vertical excavation supporting system based on miniature steel pipe piles for red clay foundation pit
CN216893755U (en) Mountain area combination formula transmission tower encloses anchor pier foundation structure
CN202787275U (en) Tubular soil nailing wall of novel pneumatic impact anchor
CN107119677B (en) A kind of tubular pole stake top friction-shearing-type energy-consumption attachment device and its construction method
CN202969405U (en) Cup-shaped concrete foundation of wind power generation tower
CN102936901A (en) Wind power tower foundation with inverted frustum and independent column combined
CN202969406U (en) Wind power generation tower foundation combining reverse frustum with free-standing column
CN106368717A (en) Tunnel collapse-prevention supporting structure

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20130102