CN102842868A - Method for fastening lead damper bolt in electrified way - Google Patents

Method for fastening lead damper bolt in electrified way Download PDF

Info

Publication number
CN102842868A
CN102842868A CN2012103275257A CN201210327525A CN102842868A CN 102842868 A CN102842868 A CN 102842868A CN 2012103275257 A CN2012103275257 A CN 2012103275257A CN 201210327525 A CN201210327525 A CN 201210327525A CN 102842868 A CN102842868 A CN 102842868A
Authority
CN
China
Prior art keywords
bolt
slide block
handle
stockbridge damper
ratchet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012103275257A
Other languages
Chinese (zh)
Other versions
CN102842868B (en
Inventor
屈以军
后承康
陈自立
牛永志
王龙全
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Chuzhou Power Supply Co of State Grid Anhui Electric Power Co Ltd
Original Assignee
Chuzhou Power Supply Co of State Grid Anhui Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chuzhou Power Supply Co of State Grid Anhui Electric Power Co Ltd filed Critical Chuzhou Power Supply Co of State Grid Anhui Electric Power Co Ltd
Priority to CN201210327525.7A priority Critical patent/CN102842868B/en
Publication of CN102842868A publication Critical patent/CN102842868A/en
Application granted granted Critical
Publication of CN102842868B publication Critical patent/CN102842868B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The invention discloses a method for fastening a lead damper bolt in an electrified way. The lead damper bolt is fastened by adopting a bolt fastener. The fastener comprises a ratchet spanner and a slide block, wherein the front end of the ratchet spanner is provided with a racket sleeve; a handle of the ratchet spanner is provided with a strip-shaped through groove along a length direction; the slide block can slide along the through groove in the handle, and is provided with a locking piece which can be used for locking the slide block on the handle tightly; and the end part of the locking piece is connected with an operating rod. Operating personnel on the rod rotates the racket spanner through the operating rod for fastening the damper bolt. Due to the adoption of the method, the operating safety can be enhanced, the working efficiency is increased, and the operating personnel can fasten a damper fixing bolt by using an insulated operating rod type fastener on a tower with an indirect live working method (ground potential working).

Description

The method of charged secure wires stockbridge damper bolt
Technical field:
The present invention relates to a kind of method of charged secure wires stockbridge damper bolt.
Background technology:
The lead stockbridge damper is one of important protection gold utensil of transmission line, and significant feature is to avoid lead in running, not receive the damage that is caused by the wind vibration.The installation of lead stockbridge damper all requires to install according to defined through calculating the back; In case stockbridge damper generation slip positioning does not just have its antihunt action; Make hitch point that the vibration of lead constantly has been sent to lead suspension clamp place just; Finally cause lead to produce metal fatigue, and disconnected burst of broken string accident of lead takes place.
In order to prevent that the lead stockbridge damper from continuing to take place the slip positioning; In maintenance process, at first to the stockbridge damper of positioning be resetted; Will the stockbridge damper of not positioning being tightened up then, all is that combined circuit power failure chance establishment officer carries out surprise and tightens up generally speaking.It is the low-down work of a big operating efficiency of labour intensity that but stockbridge damper tightens up in the circuit service work; To hang on and hang up properly rope ladder or vertical ladder behind operating personnel's rod-rising tower; Then down to lead; On lead, hang up properly coaster again, slide into a side stockbridge damper place under the personnel to the coaster and carry out fasteningly, return then under the upper conductor and carry out fastening to opposite side.Four-player group of the many inefficiencys of the Work tool of being with a day accomplish the fastening work of 3-4 base at most.
Summary of the invention:
For overcoming the defective of prior art; The object of the present invention is to provide a kind of method of charged secure wires stockbridge damper bolt; With improve processing safety, increase work efficiency, through indirect live line working method (earth potential working), on shaft tower, carry out fastening to the stockbridge damper set bolt by the operating personnel with insulating bar, fastener.
Technical solution problem of the present invention adopts following technical scheme:
The method of charged secure wires stockbridge damper bolt, it is fastening to adopt bolt tightener that said lead stockbridge damper bolt is carried out, and said fastener comprises:
Front end is provided with the ratchet spanner of ratchet carriage, is provided with the strip groove on the handle of said ratchet spanner along its length;
Can be along the slide block of the slip of the groove on the said handle, said slide block is provided with locking member and can said slide block be lock onto on the handle, and the end of said locking member connects with action bars; Said locking member comprises: the boring nut that is fixed on said slide block lower end; The fastening bolt that cooperates with said snail box thread; The inner chamber that the upper end of said fastening bolt extends into said slide block can contact with the outer wall of said handle, and the lower end of fastening bolt is provided with the cross draw-in groove and connects with action bars;
Said slide block is socketed on the handle of said ratchet spanner with the inner chamber of its hollow, and slide block is provided with the caging bolt that in said groove, passes;
The fastening of lead stockbridge damper bolt carried out according to the following steps:
1) operating personnel carries bolt tightener and gets into the cross-arm position on the bar; Transmit rope by the Ground Operation personnel with insulation action bars is passed to operating personnel on the bar that is in the cross-arm position; The operating personnel carries out positive connection with fastener and action bars on the bar, confirms that the direction adjusting knob on the ratchet carriage is in the tram;
2) operating personnel draws the position near ratchet carriage with square slider on the bar, tightens fixedly square slider by fastening bolt, delivers to the stockbridge damper bolt position by action bars, and ratchet carriage is inserted in the stockbridge damper nut;
3) the rotating operation bar is unscrewed fastening bolt slide block is moved to the groove afterbody of ratchet spanner, promotes action bars back and forth along line direction then and makes the ratchet spanner swing, and ratchet carriage rotates with the interlock of stockbridge damper bolt, the purpose of realization stockbridge damper bolted.
Compared with present technology, beneficial effect of the present invention is embodied in:
1, whether fastening work does not receive the time and has a power failure to influence.
2, be applicable to the single, double loop line road operation of 110 kilovolts of-220 kilovolts of transmission lines.
3, reduce operating personnel's labour intensity, reduce the personnel operation fault rate, the fail safe that has improved operating personnel and equipment.After operating personnel's rod-rising tower is in place, carry out fastening work with regard to ratchet fastener on the available action bar.
4, Work tool reduces, without the lower wire operation, and the several times of can increasing work efficiency.
Description of drawings:
Fig. 1,2 is for the front view of ratchet spanner of the present invention, vertical view; Fig. 3 is socketed on the front view on the pinch bar for slide block among the present invention and locking member thereof, and Fig. 4 is the right view of slide block and locking member thereof among Fig. 3; Fig. 5 is the process chart that action bars cooperates with fastener.
Label among the figure: 1 ratchet carriage, 2 grooves, 3 slide blocks, 4 fastening bolts, 5 caging bolts, 6 boring nuts, 7 action bars.
Below pass through embodiment, and combine accompanying drawing that the present invention is described further.
Embodiment:
Embodiment: combine Fig. 1-5, the stockbridge damper bolt tightener, it comprises:
Ratchet spanner; Its front end is provided with ratchet carriage 1; On the handle of ratchet spanner, be provided with strip groove 2 along its length, the inner chamber of slide block 3 through its hollow is socketed on the handle of ratchet spanner and can on handle, slides, for the sliding stroke to slide block carries out spacing; Anti-limited slip block comes off from handle, is being provided with the caging bolt 5 that in groove 2, passes on the slide block 3.
In order slide block to be locked on the handle of ratchet spanner; Be fixedly connected with boring nut 6 in the lower end of slide block 3; Fastening bolt 4 cooperates with the snail box thread; The inner chamber that the upper end of fastening bolt extends into slide block 3 can contact with the outer wall of handle, and the lower end of fastening bolt is provided with the cross draw-in groove and connects with action bars 7.
The purpose that slide block can slide on the handle of ratchet spanner is; The handle of ratchet spanner is long more laborsaving more in fastening process, but the ratchet spanner handle rear end is fixed on action bars instability again after reaching certain-length, and the operating personnel is difficult to the ratchet carriage of front end the stockbridge damper nut entangled; Therefore on the handle of ratchet spanner, leave a strip groove; Before ratchet carriage was inserted in the stockbridge damper nut, the position of slide block was comparatively near ratchet carriage one end, after being inserted in; Can slide block be slid into the end of ratchet spanner handle, the moment when rotating to increase.
The fastening of lead stockbridge damper bolt carried out according to the following steps:
Preparation under the shaft tower: the inspection waistband, to step on bar instrument, personal protection apparatus complete good, correctly wears; Inspection shaft tower root is firm.
1) operating personnel carries bolt tightener on the bar, transmission rope (be made up of becket bridle, single-sheaved block, buckle insulation ropes, insulation ropes penetrates single-sheaved block) is stepped on bar, gets into the cross-arm position; Get into the cross-arm position; Transmit rope by the Ground Operation personnel with insulation action bars is passed to operating personnel on the bar that is in the cross-arm position; The operating personnel carries out positive connection with fastener and action bars on the bar, confirms that the direction adjusting knob on the ratchet carriage 1 is in the tram;
2) operating personnel tightens fixedly square slider 3 with 3 strokes of positions of arriving near ratchet carriage 1 of square slider by fastening bolt 4 on the bar, delivers to the stockbridge damper bolt position by action bars 7, and ratchet carriage 1 is inserted in the stockbridge damper nut;
3) the rotating operation bar is unscrewed fastening bolt 4 slide block 3 is moved to the groove afterbody of ratchet spanner, promotes action bars back and forth along line direction then and makes the ratchet spanner swing, and ratchet carriage 1 rotates with the interlock of stockbridge damper bolt, realizes the purpose of stockbridge damper bolted.
To be tightened fully after, ratchet carriage 1 is withdrawn from the stockbridge damper nut, personnel's lower beam; Under work director's commander and monitoring, operating personnel's finishing tool material, cleaning work is on-the-spot, safe escape working site, end-of-job.

Claims (1)

1. the method for charged secure wires stockbridge damper bolt is characterized in that, it is fastening to adopt bolt tightener that said lead stockbridge damper bolt is carried out, and said fastener comprises:
Front end is provided with the ratchet spanner of ratchet carriage (1), is provided with strip groove (2) on the handle of said ratchet spanner along its length;
Can be along the slide block (3) of the slip of the groove (2) on the said handle, said slide block (3) is provided with locking member and can said slide block be lock onto on the handle, and the end of said locking member connects with action bars; Said locking member comprises: the boring nut (6) that is fixed on said slide block (3) lower end; The fastening bolt (4) that cooperates with said snail box thread; The inner chamber that the upper end of said fastening bolt extends into said slide block can contact with the outer wall of said handle, and the lower end of fastening bolt is provided with the cross draw-in groove and connects with action bars;
Said slide block (3) is socketed on the handle of said ratchet spanner with the inner chamber of its hollow, and slide block (3) is provided with the caging bolt (5) that in said groove (2), passes;
The fastening of lead stockbridge damper bolt carried out according to the following steps:
1) operating personnel carries bolt tightener and gets into the cross-arm position on the bar; Transmit rope by the Ground Operation personnel with insulation action bars is passed to operating personnel on the bar that is in the cross-arm position; The operating personnel carries out positive connection with fastener and action bars on the bar, confirms that the direction adjusting knob on the ratchet carriage (1) is in the tram;
2) operating personnel draws the position near ratchet carriage (1) with square slider (3) on the bar, tightens fixedly square slider (3) by fastening bolt (4), delivers to the stockbridge damper bolt position by action bars, and ratchet carriage (1) is inserted in the stockbridge damper nut;
3) the rotating operation bar is unscrewed the groove afterbody that fastening bolt (4) moves to slide block (3) ratchet spanner; Promote action bars back and forth along line direction then and make the ratchet spanner swing; Ratchet carriage (1) rotates with the interlock of stockbridge damper bolt, realizes the purpose of stockbridge damper bolted.
CN201210327525.7A 2012-09-06 2012-09-06 The method of Electrified fastening hammer for preventing conductor from vibration bolt Expired - Fee Related CN102842868B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210327525.7A CN102842868B (en) 2012-09-06 2012-09-06 The method of Electrified fastening hammer for preventing conductor from vibration bolt

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210327525.7A CN102842868B (en) 2012-09-06 2012-09-06 The method of Electrified fastening hammer for preventing conductor from vibration bolt

Publications (2)

Publication Number Publication Date
CN102842868A true CN102842868A (en) 2012-12-26
CN102842868B CN102842868B (en) 2016-01-27

Family

ID=47370012

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210327525.7A Expired - Fee Related CN102842868B (en) 2012-09-06 2012-09-06 The method of Electrified fastening hammer for preventing conductor from vibration bolt

Country Status (1)

Country Link
CN (1) CN102842868B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103683104A (en) * 2013-12-11 2014-03-26 云南电网公司昆明供电局 Ratchet wheel type combined tool for fastening jumper conductor clamp in charged mode
CN104552175A (en) * 2013-10-12 2015-04-29 国家电网公司 Multifunctional overhaul tool
CN106451230A (en) * 2016-09-05 2017-02-22 国家电网公司 Vibration-proofing hammer electric installation tool
CN108988208A (en) * 2018-08-02 2018-12-11 刘少广 A kind of earth potential live benefit dress power line conductive line side bolt and nut operational instrument
CN113852015A (en) * 2021-09-24 2021-12-28 广东电网有限责任公司 Wire stripper
CN113889918A (en) * 2021-10-21 2022-01-04 国家电网有限公司 Electrified repacking system of transmission line bolt cotter pin
CN114799846A (en) * 2022-05-13 2022-07-29 安徽博晟亿电力科技有限公司 High-strength bolt fastening device and method for damper

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08196010A (en) * 1995-01-11 1996-07-30 Nishi Nippon Densen Kk Connecting clamp
CN201256263Y (en) * 2008-10-06 2009-06-10 江西景德镇供电公司 Live fastener for manufacturing metal bolt
CN201300393Y (en) * 2008-11-20 2009-09-02 许延龙 Spanner

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08196010A (en) * 1995-01-11 1996-07-30 Nishi Nippon Densen Kk Connecting clamp
CN201256263Y (en) * 2008-10-06 2009-06-10 江西景德镇供电公司 Live fastener for manufacturing metal bolt
CN201300393Y (en) * 2008-11-20 2009-09-02 许延龙 Spanner

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104552175A (en) * 2013-10-12 2015-04-29 国家电网公司 Multifunctional overhaul tool
CN103683104A (en) * 2013-12-11 2014-03-26 云南电网公司昆明供电局 Ratchet wheel type combined tool for fastening jumper conductor clamp in charged mode
CN106451230A (en) * 2016-09-05 2017-02-22 国家电网公司 Vibration-proofing hammer electric installation tool
CN108988208A (en) * 2018-08-02 2018-12-11 刘少广 A kind of earth potential live benefit dress power line conductive line side bolt and nut operational instrument
CN113852015A (en) * 2021-09-24 2021-12-28 广东电网有限责任公司 Wire stripper
CN113852015B (en) * 2021-09-24 2023-04-07 广东电网有限责任公司 Wire stripper
CN113889918A (en) * 2021-10-21 2022-01-04 国家电网有限公司 Electrified repacking system of transmission line bolt cotter pin
CN114799846A (en) * 2022-05-13 2022-07-29 安徽博晟亿电力科技有限公司 High-strength bolt fastening device and method for damper

Also Published As

Publication number Publication date
CN102842868B (en) 2016-01-27

Similar Documents

Publication Publication Date Title
CN102842868A (en) Method for fastening lead damper bolt in electrified way
CN102623926B (en) Distant equipotential tackle and method for realizing charged equipotential access by using same
CN106129666A (en) A kind of earthing clamp device
CN102185265B (en) Construction method for replacing cross arm of 35kV line linear rod
CN103683104A (en) Ratchet wheel type combined tool for fastening jumper conductor clamp in charged mode
CN203674624U (en) Sleeve-type combination tool for live-line jumper clamp fastening
CN202023497U (en) Special rope ladder between tower and lead
CN202602223U (en) Operating rod type antivibration hammer bolt fastener
CN104158112A (en) Multi-purpose pedaled flying vehicle
CN204258155U (en) Electric transmission line hot-line adds split pin, closed pin specific purpose tool
CN204144784U (en) A kind of adjustable strain insulator wire load replacing insulator protective device
CN102801116B (en) Operating rod type stockbridge damper bolt tightener
CN104836149A (en) Tool for removing foreign matter from bundled conductor of high-voltage line in live working manner and method for removing foreign matter
CN204809753U (en) Turn -buckle is salvageed to electric power
CN203690799U (en) Device for replacing suspension angle tower insulator string in live state
CN110707599A (en) Special tool for electrified adjustment of 220kv vertically-arranged double-bundle conductor sag
CN103124054A (en) One-way running routing pulley
CN203859438U (en) Multipurpose pedaling type overhead carriage
CN206022675U (en) Universal shaped cable clamp earth lead
CN204835355U (en) Electrified foreign matter instrument of demolising of high voltage transmission lines split conductor
CN206471748U (en) Universal 500kV straight lines wineglass tower line maintenance cross-arm hanging point device
CN204068045U (en) Transmission line wire conductor spacer maintenance aid
CN104348122B (en) Ground potential mounting type shunt wire clamp device and mounting method thereof
CN102420402A (en) New technology for electrified fastening drainage wire clamp
CN202424088U (en) Socket spanner special for charged installation of arrester in ground potential

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA

Effective date: 20121204

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20121204

Address after: 239000 No. 510 Fenghuang Road, Anhui, Chuzhou

Applicant after: Chuzhou Power Supply Company of Anhui Electric Power Co.,Ltd.

Applicant after: State Grid Corporation of China

Address before: 239000 No. 510 Fenghuang Road, Anhui, Chuzhou

Applicant before: Chuzhou Power Supply Company of Anhui Electric Power Co.,Ltd.

C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160127