CN102840221A - Method for welding combined shaft with carriage bottom plate hinged support - Google Patents

Method for welding combined shaft with carriage bottom plate hinged support Download PDF

Info

Publication number
CN102840221A
CN102840221A CN2012103243148A CN201210324314A CN102840221A CN 102840221 A CN102840221 A CN 102840221A CN 2012103243148 A CN2012103243148 A CN 2012103243148A CN 201210324314 A CN201210324314 A CN 201210324314A CN 102840221 A CN102840221 A CN 102840221A
Authority
CN
China
Prior art keywords
setting sleeve
free bearing
cylindrical
shaft
endoporus
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012103243148A
Other languages
Chinese (zh)
Other versions
CN102840221B (en
Inventor
高文德
王双全
邢一民
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sany Heavy Equipment Co Ltd
Original Assignee
Sany Mining Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sany Mining Machinery Co Ltd filed Critical Sany Mining Machinery Co Ltd
Priority to CN201210324314.8A priority Critical patent/CN102840221B/en
Publication of CN102840221A publication Critical patent/CN102840221A/en
Application granted granted Critical
Publication of CN102840221B publication Critical patent/CN102840221B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Mounting Of Bearings Or Others (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a method for welding a combined shaft with a carriage bottom plate hinged support. The invention discloses a combined shaft which comprises an intermediate shaft, a left positioning sleeve and a right positioning sleeve, wherein the left positioning sleeve is arranged at the left end of the intermediate shaft; the right positioning sleeve is arranged at the right end of the intermediate shaft; both the left positioning sleeve and the right positioning sleeve comprise first outer circles and second outer circles; the diameters of the first outer circles are larger than those of the second outer circles; the first outer circle of the left positioning sleeve is coaxial with the first outer circle of the right positioning sleeve; and the second outer circle of the left positioning sleeve is coaxial with the second outer circle of the right positioning sleeve. The combined shaft is simple in structure, high in positioning accuracy and convenient to operate.

Description

A kind of built-up shaft and platform floor free bearing welding method
Technical field
The present invention relates to mechanical field, particularly a kind of built-up shaft and platform floor free bearing welding method.
Background technique
At present, the electric power wheel self-discharging vehicle compartment is a large welded structures spare, and the left and right free bearing above the platform floor is two big parts; Be symmetrically distributed with the platform floor center, be fixed on the vehicle floor with the mode of welding, this left and right sides free bearing is to be connected through bearing pin with vehicle frame; 2 holes are respectively arranged on it, and outer side opening is big, leans on inboard hole little; Hole depth is more shallow, is ladder, and the hole requires coaxial.
Four endoporus of left side free bearing and right free bearing require to guarantee coaxial.When welding, 4 bore dias are bigger, and axle is thicker, operating difficulties; Hole depth is more shallow, and positioning requirements can not be satisfied in a hole on the free bearing, needs 4 holes to locate simultaneously; And 4 holes are ladder, are symmetrically distributed, and apertura lateralis is big, and inboard hole is little, and a single mandrel one side can't be packed into.
Summary of the invention
In view of this, the present invention provides a kind of built-up shaft and platform floor free bearing welding method, is difficult to coaxial problem to solve the welding of platform floor free bearing.
On the one hand, the invention provides a kind of built-up shaft, comprising: jack shaft, left setting sleeve, right setting sleeve; Left side setting sleeve is installed on the left end of jack shaft; Right setting sleeve is installed on the right-hand member of jack shaft, and left setting sleeve and right setting sleeve include first cylindrical and second cylindrical, and the diameter of first cylindrical is greater than the diameter of second cylindrical; First cylindrical of left side setting sleeve is coaxial with first cylindrical of right setting sleeve, and second cylindrical of left setting sleeve is coaxial with second cylindrical of right setting sleeve.
Further, jack shaft is a steel pipe, and two ends are processed with left setting sleeve and right setting sleeve installation position.
Further, first cylindrical of left setting sleeve and right setting sleeve and second cylindrical are to be processed by two circular steel plates that vary in size, and two circular steel plates are welded through the intermediate rectangular steel.
A kind of platform floor free bearing welding method is provided on the other hand, and welding method comprises:
Step 1: left free bearing and right free bearing are put to platform floor welding position, and left free bearing and right free bearing include first endoporus and second endoporus; The diameter of first endoporus is greater than second diameter of bore;
Step 2: the jack shaft of above-mentioned built-up shaft is placed between left free bearing and the right free bearing;
Step 3: respectively left setting sleeve and right setting sleeve are mounted on the jack shaft;
Step 4: first cylindrical and second cylindrical of left setting sleeve are cooperated with left free bearing first endoporus and second endoporus; First cylindrical and second cylindrical of right setting sleeve are cooperated with right free bearing first endoporus and second endoporus;
Step 5: platform floor and left free bearing and right free bearing are welded operation.
The present invention provides a kind of built-up shaft and platform floor free bearing welding method beneficial effect to be:
One of which: adopt the built-up shaft frock to realize platform floor free bearing welding concentricity problem, simple in structure.
Its two: adopt the built-up shaft frock, left free bearing and right free bearing coaxality are high.
Its three: the built-up shaft frock, left setting sleeve and right setting sleeve are packed into and taken out, and be easy to operate.
Description of drawings
The accompanying drawing that constitutes a part of the present invention is used to provide further understanding of the present invention, and illustrative examples of the present invention and explanation thereof are used to explain the present invention, does not constitute improper qualification of the present invention.In the accompanying drawings:
Fig. 1 is platform floor free bearing welding location schematic representation;
Fig. 2 is the plan view of Fig. 1;
Fig. 3 is that the A of Fig. 1 is to view;
Fig. 4 is the built-up shaft schematic representation of Fig. 1.
Embodiment
Need to prove that under the situation of not conflicting, embodiment and the characteristic among the embodiment among the present invention can make up each other.Below with reference to accompanying drawing and combine embodiment to specify the present invention.
To shown in Figure 4, left free bearing 20 on the platform floor 3 and right free bearing 21 in order to make left free bearing 20 coaxial with right free bearing 21 endoporus, need be installed on left free bearing 20 and the right free bearing 21 through built-up shaft 1 in welding in advance like Fig. 1.
Built-up shaft 1 comprises jack shaft 10, left setting sleeve 11, right setting sleeve 12, and left setting sleeve 11 is installed on the left end of jack shaft 10, and right setting sleeve 12 is installed on the right-hand member of jack shaft 10.Jack shaft 10 is hollow steel pipe, and two ends make left setting sleeve 11 coaxial with right setting sleeve 12 installation positions through turning.Second cylindrical 110,120 and first cylindrical the 111, the 121st of left side setting sleeve 11 and right setting sleeve 12 are processed by two circular steel plates that vary in size, and two circular steel plates are formed by connecting through the intermediate rectangular steel.Built-up shaft 1 also can adopt other making method.Second cylindrical 110,120 and first cylindrical 111,121 are coaxial, and first cylindrical, 111 diameters are greater than the diameter of second cylindrical 110, first cylindrical 111 and 121 equal diameters, second cylindrical 110 and 120 equal diameters.When making built-up shaft, first cylindrical, 121 diameters equal first endoporus, 211 diameters of right free bearing 21 simultaneously, and second cylindrical, 120 diameters equal second endoporus, 210 diameters of right free bearing 21.Left side free bearing 20 is identical with right free bearing.
Left free bearing 20 on the platform floor 3 and right free bearing 21 are at first put left free bearing 20 and right free bearing 21 to platform floor 3 welding positions in welding; Jack shaft 10 with ready built-up shaft 1 inserts in left free bearing 20 and the right free bearing 21 then; Next, with left setting sleeve 11 and right setting sleeve 12 pack into from the left side and the right respectively left free bearing 20 and right free bearing 21, first endoporus 211 of right free bearing 21 and second endoporus 210 are cooperated with first cylindrical 121 and second cylindrical 120 of right setting sleeve 12.Similarly, left free bearing 20 matches with left setting sleeve 11.Its endoporus are coaxial after making left free bearing 20 and right free bearing 21 be weldingly fixed on platform floor 3 like this.Next, begin welding, left free bearing 20 is welded on the platform floor 3 with right free bearing 21.Next, pull down left setting sleeve 11 and right setting sleeve 12 and jack shaft 10 from the left side and the right.Welding process is accomplished.
Can find out that from 3 figure first endoporus, 211 diameters of right free bearing 21 are greater than second endoporus, 210 diameters, and be positioned at the outside that same left free bearing 20 is identical with right free bearing 21.Make that like this apertura lateralis is big, inboard aperture is little, is to make right free bearing 21 coaxial with left free bearing 20 four endoporus in welding process through an integral shaft.Simultaneously left free bearing 21 is very big with right free bearing 20 structures, and platform floor also is a macrostructure spare, and operation is very inconvenient, adopts method of the present invention to solve this problem.
The above is merely preferred embodiment of the present invention, and is in order to restriction the present invention, not all within spirit of the present invention and principle, any modification of being done, is equal to replacement, improvement etc., all should be included within protection scope of the present invention.

Claims (4)

1. built-up shaft; It is characterized in that; Comprise: jack shaft (10), left setting sleeve (11), right setting sleeve (12); Left side setting sleeve (11) is installed on the left end of jack shaft (10); Right setting sleeve (12) is installed on the right-hand member of jack shaft (10), and left setting sleeve (11) and right setting sleeve (12) include first cylindrical (111,121) and second cylindrical (110,120), and the diameter of first cylindrical (111,121) is greater than the diameter of second cylindrical (110,120); First cylindrical (111) of left side setting sleeve (11) is coaxial with first cylindrical (121) of right setting sleeve (12), and second cylindrical (110) of left setting sleeve (11) is coaxial with second cylindrical (120) of right setting sleeve (12).
2. according to wanting profit to require 1 described built-up shaft, it is characterized in that jack shaft (10) is a steel pipe, two ends are processed with left setting sleeve (11) and right setting sleeve (12) installation position.
3. according to wanting profit to require 1 described built-up shaft; It is characterized in that; First cylindrical (111,121) and second cylindrical (120,110) of left side setting sleeve (11) and right setting sleeve (12) are to be processed by two circular steel plates that vary in size, and two circular steel plates are formed by connecting through the intermediate rectangular steel.
4. platform floor free bearing welding method is characterized in that:
Step 1: left free bearing (20) and right free bearing (21) are put to platform floor (3) welding position, and left free bearing (20) and right free bearing (21) include first endoporus (211) and second endoporus (210); The diameter of first endoporus (211) is greater than second endoporus (210) diameter;
Step 2: the jack shaft (10) of right 1 to 3 any described built-up shaft (1) is placed between left free bearing (20) and the right free bearing (21);
Step 3: respectively left setting sleeve (11) and right setting sleeve (12) are mounted on the jack shaft (10);
Step 4: first cylindrical (111) and second cylindrical (110) of left setting sleeve (11) are cooperated with left free bearing (20) first endoporus and second endoporus; First cylindrical (121) and second cylindrical (120) of right setting sleeve (12) are cooperated with right free bearing (21) first endoporus (211) and second endoporus (210);
Step 5: platform floor (3) and left free bearing (20) and right free bearing (21) are welded operation.
CN201210324314.8A 2012-09-05 2012-09-05 Method for welding combined shaft with carriage bottom plate hinged support Expired - Fee Related CN102840221B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210324314.8A CN102840221B (en) 2012-09-05 2012-09-05 Method for welding combined shaft with carriage bottom plate hinged support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210324314.8A CN102840221B (en) 2012-09-05 2012-09-05 Method for welding combined shaft with carriage bottom plate hinged support

Publications (2)

Publication Number Publication Date
CN102840221A true CN102840221A (en) 2012-12-26
CN102840221B CN102840221B (en) 2015-01-14

Family

ID=47367870

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210324314.8A Expired - Fee Related CN102840221B (en) 2012-09-05 2012-09-05 Method for welding combined shaft with carriage bottom plate hinged support

Country Status (1)

Country Link
CN (1) CN102840221B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103801886A (en) * 2014-03-11 2014-05-21 三一矿机有限公司 Welding support structure for back tail seat of engineering vehicle
CN107877082A (en) * 2017-12-25 2018-04-06 英达热再生有限公司 A kind of hoisting frame welds special purpose device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4412699A (en) * 1980-08-13 1983-11-01 Officine Romanazzi S.P.A. Modular frame for tipping bodies of trucks adjustable in width
CN1974266A (en) * 2006-12-08 2007-06-06 青特集团有限公司 Revolving mechanism with front mounted cylinder for damper
CN201901045U (en) * 2010-11-26 2011-07-20 青特集团有限公司 Rear rotary device of dumper
CN202271896U (en) * 2011-08-18 2012-06-13 北汽福田汽车股份有限公司 Overturn support base of goods carriage
CN202360604U (en) * 2011-10-22 2012-08-01 昆明中铁大型养路机械集团有限公司 Coaxial positioner

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4412699A (en) * 1980-08-13 1983-11-01 Officine Romanazzi S.P.A. Modular frame for tipping bodies of trucks adjustable in width
CN1974266A (en) * 2006-12-08 2007-06-06 青特集团有限公司 Revolving mechanism with front mounted cylinder for damper
CN201901045U (en) * 2010-11-26 2011-07-20 青特集团有限公司 Rear rotary device of dumper
CN202271896U (en) * 2011-08-18 2012-06-13 北汽福田汽车股份有限公司 Overturn support base of goods carriage
CN202360604U (en) * 2011-10-22 2012-08-01 昆明中铁大型养路机械集团有限公司 Coaxial positioner

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103801886A (en) * 2014-03-11 2014-05-21 三一矿机有限公司 Welding support structure for back tail seat of engineering vehicle
CN103801886B (en) * 2014-03-11 2015-12-30 三一重型装备有限公司 The welding seat structure of tailstock after a kind of engineering truck
CN107877082A (en) * 2017-12-25 2018-04-06 英达热再生有限公司 A kind of hoisting frame welds special purpose device
CN107877082B (en) * 2017-12-25 2023-09-01 英达热再生有限公司 Special welding device for lifting frame

Also Published As

Publication number Publication date
CN102840221B (en) 2015-01-14

Similar Documents

Publication Publication Date Title
JP5721116B2 (en) Electrical component
CN102840221A (en) Method for welding combined shaft with carriage bottom plate hinged support
CN102500982A (en) Welding positioning fixture for fixed bolts
CN208801804U (en) Wheel
CN103551774A (en) Current collecting piece welding device, lower current collecting piece welding device and fixture of lower current collecting piece welding device
CN203796831U (en) Lightweight rubber bushing structure capable of being pressed out conveniently
CN204295627U (en) Speed changer two axle rear bearing disassembling fixture
CN204094350U (en) The movable interior circle-supporting device of a kind of pressure vessel
CN106494637B (en) A kind of ancillary equipment for helicopter ground moving
CN202367414U (en) Locomotive axle-hung box bearing removal load-bearing plate
CN203484827U (en) Tank assembly-welding tooling of concrete mixing truck
CN104690502A (en) Vehicle wheel cage processing method
CN217475198U (en) Positioning and assembling auxiliary device
CN202317524U (en) Tooling for welding and locating fixed bolts
CN207823846U (en) Output shaft processes head of swaging
CN202356821U (en) Impeller welding tool
CN203780319U (en) Car control mechanism
CN103433534B (en) The boring combination drill jig of door lock lock tube
CN103240553B (en) Impeller welding tool
CN108248683B (en) Knuckle and vehicle
CN110758342A (en) Automobile rear axle half shaft and half shaft bearing maintenance device and method
CN217914038U (en) Outer circular arc turning clamp for axle bush cover
CN103697848A (en) Detection tool for half housing of axle housing of axle for passenger car
CN211543740U (en) Assembly fixture of heavy truck wide body frame
CN203948413U (en) Two-way positioning clamping device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20151202

Address after: 110027, No. 25, development road, Shenyang economic and Technological Development Zone, Liaoning

Patentee after: Sany Heavy Equipment Co.,Ltd.

Address before: 215334, No. 18, No. 9999, Cheng Cheng lake road, Kunshan Development Zone, Jiangsu, Suzhou

Patentee before: Sany Mining Machinery Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150114

Termination date: 20150905

EXPY Termination of patent right or utility model