CN102837862A - Brick and plate separating mechanism for conveying machine-made baking-free brick - Google Patents

Brick and plate separating mechanism for conveying machine-made baking-free brick Download PDF

Info

Publication number
CN102837862A
CN102837862A CN2012103452251A CN201210345225A CN102837862A CN 102837862 A CN102837862 A CN 102837862A CN 2012103452251 A CN2012103452251 A CN 2012103452251A CN 201210345225 A CN201210345225 A CN 201210345225A CN 102837862 A CN102837862 A CN 102837862A
Authority
CN
China
Prior art keywords
brick
fixed
section
type channel
supporting plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012103452251A
Other languages
Chinese (zh)
Other versions
CN102837862B (en
Inventor
包训权
金飞
何家雁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HEFEI HANDBARAOW ACCESSORY TECHNOLOGY Co Ltd
Original Assignee
HEFEI HANDBARAOW ACCESSORY TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HEFEI HANDBARAOW ACCESSORY TECHNOLOGY Co Ltd filed Critical HEFEI HANDBARAOW ACCESSORY TECHNOLOGY Co Ltd
Priority to CN201210345225.1A priority Critical patent/CN102837862B/en
Publication of CN102837862A publication Critical patent/CN102837862A/en
Application granted granted Critical
Publication of CN102837862B publication Critical patent/CN102837862B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a brick and plate separating mechanism for conveying a machine-made baking-free brick. The brick and plate separating mechanism consists of a base frame, a brick lifting device, a carrying plate lifting device, a translation device and an automatic control system, wherein the automatic control system consists of a programmable controller; lifting fixed frames in the brick lifting device (2) and the carrying plate lifting device (3) are connected into a whole through a connecting rod (5) between the frames, are movably arranged on a first guide rail and are driven by the translation device (7); the first guide rail is formed by two pieces of C-shaped parallel channel steel (12) with opposite notches in the base frame (1); lifting connecting frames in the brick lifting device and the carrying plate lifting device are movably arranged in the lifting fixed frames respectively and are connected by a hydraulic oil cylinder respectively; and the lower ends of the lifting connecting frames are connected with a brick clamp (27) and a carrying plate clamp (38) consisting of supporting frames, clamping arms and hydraulic oil cylinders respectively. The aims of brick and plate separation and stacking in a conveying process of the baking-free bricks are fulfilled; and the brick and plate separating mechanism has the advantages of working hour saving, labor saving, high working efficiency, simple structure and reliability in operation.

Description

The brick plate separation device that is used for machine-processed non-burning brick carrying
Technical field
The present invention relates to a kind of brick plate separation device that is used for machine-processed non-burning brick carrying, belong to non-baking brick machine corollary equipment technical field.
Background technology
Non-burning brick is to be primary raw material with fly ash, river sand, sea sand, mountain sand, breeze, slag, stone flour, cinder, gangue, mine tailings, residue of chemical industry etc.; After puddle mixer stirs, delivering to a kind of novel wall material of brick press compression moulding, is the environmental protection building material that country vigorously advocates.
At present, unburned brick field is in producing non-burning brick process, and particularly after the finished product fragment of brick through the non-baking brick machine mechanical compression molding went out machine, the artificial carrying of carrying out the branch brick, stacking bricks of main dependence was both taken a lot of work, required great effort, and influenced work efficiency again.
Summary of the invention
The object of the present invention is to provide and a kind ofly can substitute a dead lift, saving of labor, laborsaving, the brick plate separation device that is used for machine-processed non-burning brick carrying that work efficiency is higher.
Its technical scheme is: a kind of brick plate separation device that is used for machine-processed non-burning brick carrying is characterized in that: comprise pedestal, fragment of brick bont, supporting plate bont, translating device and the autonomous cruise speed system that is made up of Programmable Logic Controller; Said pedestal is made up of the C type channel-section steel that left and right two bracing frames and two parallel interval are fixed on the pair of supporting back timber, and two C type channel-section steel notches that are parallel to each other are relative, form first guide rail;
The fragment of brick bont is formed by promoting fixed mount, lifting link span and hydraulic ram and brick clamp; Promote link span and pass through the compound roller of bonded assembly on the fixing compound roller shaft in both sides, the C type channel-section steel outside, its upper end; Be movably arranged on and promote in second guide rail that forms by two C type channel-section steels vertical, that notch is relative in the fixed mount; Promote fixed mount and promote between the link span and connected by first hydraulic ram: the cylinder tail of first hydraulic ram is fixed on and promotes on the fixed mount top cross beam; Cylinder head is fixed by being arranged on the supporting plate that promotes the link span upper end, and rod end is connected with rod end seat on being fixed on lifting link span middle beam; Promote link span cross sill position placed in the middle and be welded with revolving bed, the parallel affixed oil cylinder installation seat plate of a side of this cross sill, an end of oil cylinder installation seat plate are welded with changes oil cylinder installation axle bed;
Brick clamp is made up of bracing frame, jig arm and second, third hydraulic jack; Bracing frame is won in succession by two C type channel-section steels that are parallel to each other and two and is constituted, and two C type channel-section steel notches that are parallel to each other are relative, form the 3rd guide rail; The two ends of the C type channel-section steel that two notches are relative are connected and fixed by winning in succession respectively;
The brick clamp jig arm by two respectively bending be first and second sections and be " L " type batten, be connected two and be the clamping plate of first section bottom of " L " type batten and be installed in two gussets and tooth bar fixed base plate formation that are between second section of " L " type batten; Two second section outsides that is " L " type batten, the installation of interval and symmetry is by the compound roller bearing of compound roller shaft bonded assembly respectively;
The brick clamp jig arm is left and right two, and left and right two jig arm are the compound roller bearing of bonded assembly on second section outside of " L " type batten through its separately two respectively, being installed in the 3rd guide rail that the relative C type channel-section steel of two notches of bracing frame forms of symmetry; The cylinder tail of second hydraulic ram is fixed on the oil cylinder seat on the cross sill that is provided with between the relative C type channel-section steel center bottom of two notches of bracing frame, the rod end of second hydraulic ram be arranged on the rod end seat that two of right jig arm are on the gusset between second section batten of " L " type batten and be connected; Be provided with entablatrance between the C type channel-section steel top relative with corresponding two notches of bracing frame cross sill; Be fixed with synchronizer gear on the bottom face of entablatrance; Being installed in two of left and right jig arm is on the tooth bar fixed base plate between second section of " L " type batten; Fixing respectively synchronous tooth bar, the other end of tooth bar meshes with the synchronizer gear that is fixed on the entablatrance bottom face respectively synchronously;
Brick clamp is essentially identical upper and lower two an of structure, is the welding of " ten " font overlapping between upper and lower two brick clamps and forms whole;
Be fixed with and promote the revolving bed bonded assembly gripping sleeve of link span cross sill place welding in the last brick clamp on the upper surface of entablatrance; One face down bonding of this gripping sleeve is connected to and the 3rd hydraulic cylinder piston rod end bonded assembly oil cylinder mount pad; The cylinder tail of the 3rd hydraulic ram is installed axle bed with the oil cylinder that parallel affixed oil cylinder installation seat plate one end of lifting link span cross sill one side welds and is connected;
The supporting plate bont is made up of lifting fixed mount, lifting link span and hydraulic ram and supporting plate folder; Promote link span and pass through the compound roller of bonded assembly on the fixing compound roller shaft in both sides, the C type channel-section steel outside, its upper end; Be movably arranged on and promote in the 4th guide rail that forms by two C type channel-section steels vertical, that notch is relative in the fixed mount; Promote fixed mount and promote between the link span and is connected by the 4th hydraulic ram: the cylinder tail of the 4th hydraulic ram is fixed on and promotes on the fixed mount top cross beam, and rod end is connected with rod end seat on being fixed on lifting link span middle beam;
The supporting plate folder is made up of bracing frame, jig arm and hydraulic ram; Bracing frame is won in succession by two C type channel-section steels that are parallel to each other and two and is constituted, and two C type channel-section steel notches that are parallel to each other are relative, form the 5th guide rail, and the two ends of the C type channel-section steel that two notches are relative connect fixing respectively by winning in succession;
Supporting plate folder jig arm by two respectively bending be first and second sections and be " L " type batten, be connected two and be the clamping plate of first section one end of " L " type batten and be installed in two gusset and tooth bar fixed base plates that are between second section of " L " type batten and constitute; Two outsides that are second section of " L " type batten, the installation of interval and symmetry is by the compound roller bearing of compound roller shaft bonded assembly respectively;
Supporting plate folder jig arm is identical left and right two of structure; Left and right two jig arm are the compound roller bearing of bonded assembly on second section outside of " L " type batten through its separately two respectively; In the 5th guide rail that is installed in the relative C type channel-section steel formation of two notches of bracing frame of symmetry; The cylinder tail of the 5th hydraulic ram is fixed on the oil cylinder seat on the cross sill that is provided with between the relative C type channel-section steel center bottom of two notches of bracing frame, the rod end of the 5th hydraulic ram be arranged on the rod end seat that two of right jig arm are on the gusset between second section of " L " type batten and be connected; Be provided with entablatrance between the C type channel-section steel top relative with corresponding two notches of bracing frame cross sill; Be fixed with synchronizer gear on the bottom face of this entablatrance; Being installed in two of left and right jig arm is on the tooth bar fixed base plate between second section of " L " type batten; Fixing respectively synchronous tooth bar, the other end of tooth bar meshes with the synchronizer gear that is fixed on the entablatrance bottom face respectively synchronously;
Promote the bottom of link span in the supporting plate bont, be fastened on the both sides of entablatrance in the supporting plate folder;
Promote between the upper end and bottom on both sides, fixed mount front and back in the upper end on both sides, lifting fixed mount front and back and bottom and the supporting plate bont in the fragment of brick bont; Connecting rod between affixed makes fragment of brick bont and supporting plate bont connect into an integral body respectively; Fragment of brick bont and supporting plate bont; Promote in the fixed mount the compound roller bearing of installing on two traversing plates of C type channel-section steel lower outside vertical, that notch is relative separately through being connected to it; Be installed in the pedestal in first guide rail that two relative C type channel-section steels of notch form, make that fragment of brick bont and supporting plate bont soar aloft to be installed on the pedestal;
Translating device is made up of HM Hydraulic Motor, HM Hydraulic Motor seat, reducer of turbodrill, gear shaft block and gear, tooth bar; HM Hydraulic Motor seat, HM Hydraulic Motor, reducer of turbodrill, gear shaft block and gear are connected successively; HM Hydraulic Motor and gear shaft block are separately fixed in the fragment of brick bont on the end face of the two C types channel-section steel bottom, front and back that promotes fixed mount, gear be fixed on the engagement of the tooth bar on the C type channel-section steel upper surface, back on the back timber in the pedestal.
Its technique effect is: start hydraulic pump motor; The jig arm of upper and lower two brick clamps is opened under the effect of second hydraulic ram simultaneously in the fragment of brick bont; And leave initial position under the effect of first hydraulic ram in the fragment of brick bont and begin to descend; After being installed in opto-electronic pickup on the brick clamp and having detected brick, stopping to descend and drive second hydraulic ram through Controlled by Programmable Controller first hydraulic ram begins the brick folding action: the jig arm on following brick clamp both sides is done contractive action earlier, will pile up at gapped fragment of brick on the supporting plate and open after bearing against together; Then the jig arm that goes up the brick clamp both sides repeats the above-mentioned action of brick clamp both sides jig arm down; Thereby make and pile up that gapped fragment of brick all is brought together into together on supporting plate, then, four side jig arm of upper and lower two brick clamps are shunk simultaneously and are clamped fragment of brick; The rod end of first hydraulic ram in the fragment of brick bont shrinks, and stops after brick clamp is risen to upper limit; Drive HM Hydraulic Motor; Make fragment of brick bont and supporting plate bont on the pedestal back timber by two be parallel to each other, first guide rail that C type channel-section steel that notch is relative forms; Whole mobile to the pedestal right direction simultaneously; Be set in the spacing place (being fragment of brick piling place) on pedestal right side when arrival after, HM Hydraulic Motor stops to drive, and the rod end of the first and the 4th hydraulic ram in fragment of brick bont and the supporting plate bont is upheld downwards simultaneously; Brick clamp and supporting plate folder descend thereupon; After being installed in opto-electronic pickup on the brick clamp and having detected brick, stop to descend and driving second hydraulic ram unclamping the brick clamp jig arm through Controlled by Programmable Controller first hydraulic ram, the fragment of brick pulsation-free is placed on the piling; Meanwhile, after being installed in opto-electronic pickup on the supporting plate clamping plate and having detected supporting plate, stopping to descend and drive the 5th hydraulic ram through Controlled by Programmable Controller the 4th hydraulic ram clamps supporting plate; Subsequently; The rod end of the first and the 4th hydraulic ram in fragment of brick bont and the supporting plate bont upwards shrinks simultaneously, stops the driving HM Hydraulic Motor after brick clamp and supporting plate folder are risen to the upper limit place; Make fragment of brick bont and supporting plate bont on the pedestal back timber by two be parallel to each other, notch relative to first guide rail that forms of C type channel-section steel move to the pedestal left direction is whole simultaneously; Be set in the spacing place (being supporting plate piling place) in pedestal left side when arrival after, HM Hydraulic Motor stops to drive, and the rod end of the 4th hydraulic ram in the supporting plate bont is upheld downwards; The supporting plate folder descends thereupon; When supporting plate folder drop to withstand the part of stretching in the right angle equilateral triangle shape hook that supporting plate folder middle clamp plate bottom is provided with by the supporting plate in the supporting plate piling place after, the supporting plate folder stops to descend and opening clamp arm, and the supporting plate pulsation-free on the supporting plate folder is placed on the supporting plate piling; Thereupon; The rod end of the 4th hydraulic ram in the supporting plate bont upwards shrinks, and stops after the supporting plate folder is risen to the upper limit place, thereby accomplishes carrying, the piling task of fragment of brick and supporting plate.After the carrying of a fragment of brick of every completion, the piling task, it is half-twist that brick clamp rises after being raised to upper limit in brick folding, reaches the purpose of the staggered piling of fragment of brick with this.It is saving of labor, laborsaving both, and work efficiency is high again; And it is simple in structure, and is reliable, easy to use, is applicable to manufacturing enterprises such as concrete segment in the building material industry, pavement brick, gardens brick.
Description of drawings:
Fig. 1 is an integral structure scheme drawing of the present invention;
Fig. 2 is the partial enlarged drawing of A among Fig. 1;
Fig. 3 is the partial enlarged drawing of B among Fig. 1;
Fig. 4 is the brick clamp structural representation;
Fig. 5 is a brick clamp holder arm clamping structure scheme drawing;
Fig. 6 is a supporting plate clamping structure scheme drawing;
Fig. 7 is the hook assembly structural representation in the supporting plate folder.
The specific embodiment
As shown in Figure 1, a kind of brick plate separation device that is used for machine-processed non-burning brick carrying comprises pedestal, fragment of brick bont, supporting plate bont, translating device and the autonomous cruise speed system that is made up of Programmable Logic Controller; Said pedestal 1 is made up of the C type channel-section steel 12 that left and right two bracing frames 11 and two parallel interval are fixed on the pair of supporting back timber, and two C type channel-section steel notches that are parallel to each other are relative, form first guide rail.
Fragment of brick bont 2 is formed by promoting fixed mount, lifting link span and hydraulic ram and brick clamp; Promote link span 22 and pass through the compound roller of bonded assembly on the fixing compound roller shaft in both sides, the C type channel-section steel outside, its upper end; Be movably arranged on and promote in second guide rail that forms by two C type channel-section steels vertical, that notch is relative in the fixed mount 21; Promote fixed mount and promote between the link span and connected by first hydraulic ram: the cylinder tail of first hydraulic ram is fixed on and promotes on fixed mount 21 top cross beam 211; Cylinder head is fixed by being arranged on the supporting plate that promotes link span 22 upper ends, and rod end is connected with rod end seat on being fixed on lifting link span middle beam 221.Promote link span cross sill position placed in the middle and be welded with revolving bed 66, the parallel affixed oil cylinder installation seat plate 67 of a side of this cross sill, an end of oil cylinder installation seat plate are welded with changes oil cylinder installation axle bed 68 (see figure 3)s.
Brick clamp 27 is formed (see figure 4) by bracing frame, jig arm and second, third hydraulic ram; Bracing frame 271 is won in succession by two C type channel-section steels 2712 that are parallel to each other and two and is constituted; Two C type channel-section steel notches that are parallel to each other are relative; Form the 3rd guide rail, the two ends of the C type channel-section steel that two notches are relative, respectively by win in succession 2713 connect fixing.
Brick clamp jig arm 272 by two respectively bending be first and second sections and be " L " type batten 2722, be connected two and be the clamping plate 2721 of first section bottom of " L " type batten and be installed in two gussets 2726 that are between second section of " L " type batten and constitute (see figure 5)s with tooth bar fixed base plate 2723; Two second section outsides that is " L " type batten, the installation of interval and symmetry is by the compound roller bearing 2724 of compound roller shaft bonded assembly respectively.
The brick clamp jig arm is left and right two, and left and right two jig arm are the compound roller bearing of bonded assembly on second section outside of " L " type batten through its separately two respectively, being installed in the 3rd guide rail that the relative C type channel-section steel of 271 two notches of bracing frame forms of symmetry; The cylinder tail of second hydraulic ram 273 is fixed on the oil cylinder seat on the cross sill 2716 that is provided with between the relative C type channel-section steel center bottom of two notches of bracing frame, the rod end of second hydraulic ram be arranged on the rod end seat 2725 that two of right jig arm are on the gusset between second section batten of " L " type batten and be connected; Be provided with entablatrance 714 between C type channel-section steel 2712 tops relative with bracing frame cross sill 2716 corresponding two notches; Be fixed with synchronizer gear 274 on the bottom face of entablatrance; Being installed in two of left and right jig arm is on the tooth bar fixed base plate 2723 between second section of " L " type batten; Fixing respectively synchronous tooth bar 275, the other end of tooth bar meshes with the synchronizer gear that is fixed on the entablatrance bottom face respectively synchronously.
Brick clamp is essentially identical upper and lower two an of structure, is the welding of " ten " font overlapping between upper and lower two brick clamps and forms whole.
Be fixed with and promote the revolving bed 66 bonded assembly gripping sleeves 2718 of link span cross sill place welding in the last brick clamp on the upper surface of entablatrance 2714; One face down bonding of this gripping sleeve is connected to and the 3rd hydraulic ram 69 rod end bonded assembly oil cylinder mount pad (see figure 3)s; The cylinder tail of the 3rd hydraulic ram is installed axle bed 68 with the oil cylinder that parallel affixed oil cylinder installation seat plate 67 1 ends of lifting link span cross sill one side weld and is connected.Control the flexible of the 3rd hydraulic cylinder piston rod, through the cooperation of bonded assembly revolving bed on the gripping sleeve, the whole brick clamp of may command is done 0 °-90 ° rotation.
Supporting plate bont 3 is made up of lifting fixed mount, lifting link span and hydraulic ram and supporting plate folder; Promote link span 32 and pass through the compound roller of bonded assembly on the fixing compound roller shaft in both sides, the C type channel-section steel outside, its upper end; Be movably arranged on and promote in the 4th guide rail that forms by two C type channel-section steels vertical, that notch is relative in the fixed mount 31; Promote fixed mount and promote between the link span and connected by the 4th hydraulic ram: the cylinder tail of the 4th hydraulic ram is fixed on and promotes on fixed mount 31 top cross beam 311; Cylinder head is fixed by being arranged on the supporting plate that promotes link span 32 upper ends, and rod end is connected with rod end seat on being fixed on lifting link span middle beam 321.
Supporting plate folder 38 is made up of bracing frame, jig arm and hydraulic ram; Bracing frame 381 is won in succession by two C type channel-section steels 3812 that are parallel to each other and two and 3813 is constituted (see figure 6), and two C type channel-section steel notches that are parallel to each other are relative, form the 5th guide rail, and the two ends of the C type channel-section steel that two notches are relative connect fixing respectively by winning in succession.
Supporting plate folder jig arm 382 by two respectively bending be first and second sections and be " L " type batten 3822, be connected two and be the clamping plate 3821 of first section one end of " L " type batten and be installed in two gussets 3826 that are between second section of " L " type batten and constitute with tooth bar fixed base plate 3823; Two outsides that are second section of " L " type batten, the installation of interval and symmetry is by the compound roller bearing 3824 of compound roller shaft bonded assembly respectively.
Supporting plate folder jig arm is identical left and right two of structure; Left and right two jig arm are the compound roller bearing of bonded assembly on second section outside of " L " type batten through its separately two respectively; In the 5th guide rail that is installed in the relative C type channel-section steel formation of 381 two notches of bracing frame of symmetry; The cylinder tail of the 5th hydraulic ram 383 is fixed on the oil cylinder seat on the cross sill 3816 that is provided with between the relative C type channel-section steel center bottom of two notches of bracing frame, the rod end of the 5th hydraulic ram be arranged on the rod end seat 3825 that two of right jig arm are on the gusset between second section of " L " type batten and be connected; Be provided with entablatrance 3814 between C type channel-section steel 3812 tops relative with bracing frame cross sill 3816 corresponding two notches; Be fixed with synchronizer gear 384 on the bottom face of this entablatrance; Being installed in two of left and right jig arm is on the tooth bar fixed base plate 3823 between second section of " L " type batten; Fixing respectively synchronous tooth bar 3875, the other end of tooth bar meshes with the synchronizer gear that is fixed on the entablatrance bottom face respectively synchronously.
The bottom of above-mentioned clamping plate 3821 is interval with two pairs of axle beds; Be separately installed with hook assembly 386 (see figure 7)s that are made up of rotating shaft, bearing, link plate and hook between every pair of axle bed, hook 3863 is a right angle equilateral triangle shape, at the end near one side, right angle; Offer bearings mounted bearing hole; Weld a hook respectively on the end face on link plate 3862 both sides, the bearing hole of offering on the hook is passed in rotating shaft 3861, is fixed on the axle bed 387 of clamping plate bottom setting; The clamping plate bottom is fixed with and links up with hypotenuse respectively and mate the positive stop 388 that combines near the position of outside axle bed.
For preventing the axial motion of hook assembly 386 shafts 3861, in the rotating shaft 3861 between the bearing in axle bed 387 and hook 3863 locating bush 3864 is housed.
Promote the bottom of link span 32 in the supporting plate bont 3, be fastened on the both sides of entablatrance 3814 in the supporting plate folder 38.
Promote between the upper end and bottom on both sides, fixed mount 31 front and back in the upper end on lifting both sides, fixed mount 21 front and back and bottom and the supporting plate bont 3 in the fragment of brick bont 2; Connecting rod 5 between affixed makes fragment of brick bont and supporting plate bont connect into an integral body respectively.Fragment of brick bont 2 and supporting plate bont 3; Promote in the fixed mount the compound roller bearing of installing on two traversing plates of C type channel-section steel lower outside vertical, that notch is relative separately through being connected to it; Be installed in first guide rail of the relative C type channel-section steel of 1 two notches of pedestal 12 formation, make that fragment of brick bont and supporting plate bont soar aloft to be installed on the pedestal.Translating device 7 constitutes (see figure 2) by HM Hydraulic Motor, HM Hydraulic Motor seat, reducer of turbodrill and gear, tooth bar; HM Hydraulic Motor seat 71, HM Hydraulic Motor 72, reducer of turbodrill 73, gear shaft block 74 and gear 75 are connected successively; HM Hydraulic Motor and gear shaft block are separately fixed in the fragment of brick bont 2 on the end face of the two C types channel-section steel bottom, front and back that promotes fixed mount 21, gear be fixed on the engagement of the tooth bar on the C type channel-section steel upper surface, back on the back timber in the pedestal 1.

Claims (3)

1. a brick plate separation device that is used for machine-processed non-burning brick carrying is characterized in that: comprise pedestal, fragment of brick bont, supporting plate bont, translating device and the autonomous cruise speed system that is made up of Programmable Logic Controller; Said pedestal (1) is made up of the C type channel-section steel (12) that left and right two bracing frames (11) and two parallel interval are fixed on the pair of supporting back timber, and two C type channel-section steel notches that are parallel to each other are relative, form first guide rail;
Fragment of brick bont (2) is formed by promoting fixed mount, lifting link span and hydraulic ram and brick clamp; Promote link span (22) and pass through the compound roller of bonded assembly on the fixing compound roller shaft in both sides, the C type channel-section steel outside, its upper end; Be movably arranged on and promote in second guide rail that forms by two C type channel-section steels vertical, that notch is relative in the fixed mount (21); Promote fixed mount and promote between the link span and connected by first hydraulic ram: the cylinder tail of first hydraulic ram is fixed on and promotes on the fixed mount top cross beam (211); Cylinder head is fixed by being arranged on the supporting plate that promotes link span (22) upper end, and rod end is connected with rod end seat on being fixed on lifting link span middle beam (221); Promote link span cross sill position placed in the middle and be welded with revolving bed (66), the parallel affixed oil cylinder installation seat plate of a side of this cross sill (67), an end of oil cylinder installation seat plate are welded with changes oil cylinder installation axle bed (68);
Brick clamp (27) is made up of bracing frame, jig arm and second, third hydraulic ram; Bracing frame (271) is won in succession by two C type channel-section steels that are parallel to each other and two and is constituted; Two C type channel-section steel (2712) notches that are parallel to each other are relative; Form the 3rd guide rail, the two ends of the C type channel-section steel that two notches are relative connect fixing by win in succession (2713) respectively;
Brick clamp jig arm (272) by two respectively bending be first and second sections and be " L " type batten (2722), be connected two and be the clamping plate (2721) of first section bottom of " L " type batten and be installed in two gussets (2726) and tooth bar fixed base plate (2723) formation that are between second section of " L " type batten; Two second section outsides that is " L " type batten, the installation of interval and symmetry is by the compound roller bearing of compound roller shaft bonded assembly (2724) respectively;
The brick clamp jig arm is left and right two; Left and right two jig arm are the compound roller bearing of bonded assembly on second section outside of " L " type batten through its separately two respectively, being installed in the 3rd guide rail that the relative C type channel-section steel of (271) two notches of bracing frame forms of symmetry; The cylinder tail of second hydraulic ram (273) is fixed on the oil cylinder seat on the cross sill (2716) that is provided with between the relative C type channel-section steel center bottom of two notches of bracing frame, the rod end of second hydraulic ram be arranged on the rod end seat (2725) that two of right jig arm are on the gusset between second section batten of " L " type batten and be connected; Be provided with entablatrance (2714) between C type channel-section steel (2712) top relative with corresponding two notches of bracing frame cross sill (2716); Be fixed with synchronizer gear (274) on the bottom face of entablatrance; Being installed in two of left and right jig arm is on the tooth bar fixed base plate (2723) between second section of " L " type batten; A fixing respectively synchronous tooth bar (275), the other end of tooth bar meshes with the synchronizer gear that is fixed on the entablatrance bottom face respectively synchronously;
Brick clamp is essentially identical upper and lower two an of structure, is the welding of " ten " font overlapping between upper and lower two brick clamps and forms whole;
Be fixed with and promote revolving bed (66) the bonded assembly gripping sleeve (2718) of link span cross sill place welding on the upper surface of entablatrance in the last brick clamp (2714); One face down bonding of this gripping sleeve is connected to and the 3rd hydraulic ram (69) rod end bonded assembly oil cylinder mount pad; The cylinder tail of the 3rd hydraulic ram is installed axle bed (68) with the oil cylinder that parallel affixed oil cylinder installation seat plate (67) one ends of lifting link span cross sill one side weld and is connected;
Supporting plate bont (3) is made up of lifting fixed mount, lifting link span and hydraulic ram and supporting plate folder; Promote link span (32) and pass through the compound roller of bonded assembly on the fixing compound roller shaft in both sides, the C type channel-section steel outside, its upper end; Be movably arranged on and promote in the 4th guide rail that forms by two C type channel-section steels vertical, that notch is relative in the fixed mount (31); Promote fixed mount and promote between the link span and connected by the 4th hydraulic ram: the cylinder tail of the 4th hydraulic ram is fixed on and promotes on the fixed mount top cross beam (311); Cylinder head is fixed by being arranged on the supporting plate that promotes link span (32) upper end, and rod end is connected with rod end seat on being fixed on lifting link span middle beam (321);
Supporting plate folder (38) is made up of bracing frame, jig arm and hydraulic ram; Bracing frame (381) by two C type channel-section steels (3812) that are parallel to each other and two win in succession (3813) constitute, two C type channel-section steel notches that are parallel to each other are relative, form the 5th guide rail, the two ends of the C type channel-section steel that two notches are relative connect fixing respectively by winning in succession;
Supporting plate folder jig arm (382) by two respectively bending be first and second sections and be the batten (3822) of " L " type; Being connected two is the clamping plate (3821) of first section one end of " L " type batten and is installed in two gusset (3826) and tooth bar fixed base plates (3823) that are between second section of " L " type batten and constitute; Two outsides that are second section of " L " type batten, the installation of interval and symmetry is by the compound roller bearing of compound roller shaft bonded assembly (3824) respectively;
Supporting plate folder jig arm is identical left and right two of structure; Left and right two jig arm are the compound roller bearing of bonded assembly on second section outside of " L " type batten through its separately two respectively; In the 5th guide rail that is installed in the relative C type channel-section steel formation of (381) two notches of bracing frame of symmetry; The cylinder tail of the 5th hydraulic ram (383) is fixed on the oil cylinder seat on the cross sill (3816) that is provided with between the relative C type channel-section steel center bottom of two notches of bracing frame, the rod end of the 5th hydraulic ram be arranged on the rod end seat (3825) that two of right jig arm are on the gusset between second section of " L " type batten and be connected; Be provided with entablatrance (3814) between C type channel-section steel (3812) top relative with corresponding two notches of bracing frame cross sill (3816); Be fixed with synchronizer gear (384) on the bottom face of this entablatrance; Being installed in two of left and right jig arm is on the tooth bar fixed base plate (3823) between second section of " L " type batten; A fixing respectively synchronous tooth bar (3875), the other end of tooth bar meshes with the synchronizer gear that is fixed on the entablatrance bottom face respectively synchronously;
Promote the bottom of link span (32) in the supporting plate bont (3), be fastened on the both sides of entablatrance (3814) in the supporting plate folder (38);
Promote between the upper end and bottom on both sides, fixed mount (31) front and back before and after fragment of brick bont (2) the middle lifting fixed mount (21) in the upper end on both sides and bottom and the supporting plate bont (3); Connecting rod (5) between affixed makes fragment of brick bont and supporting plate bont connect into an integral body respectively; Fragment of brick bont and supporting plate bont; Promote in the fixed mount the compound roller bearing of installing on two traversing plates of C type channel-section steel lower outside vertical, that notch is relative separately through being connected to it; Be installed in the pedestal (1) in first guide rail that two relative C type channel-section steels (12) of notch form, make that fragment of brick bont and supporting plate bont soar aloft to be installed on the pedestal;
Translating device (7) is made up of HM Hydraulic Motor, HM Hydraulic Motor seat, reducer of turbodrill, gear shaft block and gear, tooth bar; HM Hydraulic Motor seat (71), HM Hydraulic Motor (72), reducer of turbodrill (73), gear shaft block (74) and gear (75) are connected successively; HM Hydraulic Motor and gear shaft block are separately fixed on the end face of the two C types channel-section steel bottom, front and back that promotes fixed mount (21) in the fragment of brick bont, gear be fixed on the engagement of the tooth bar on the C type channel-section steel upper surface, back on the back timber in the pedestal (1).
2. a kind of brick plate separation device that is used for machine-processed non-burning brick carrying according to claim 1; It is characterized in that: the bottom of said supporting plate folder jig arm (382) middle clamp plate (3821) is interval with two pairs of axle beds (387); Be separately installed with the hook assembly (386) that is made up of rotating shaft, bearing, link plate and hook between every pair of axle bed, hook (3863) is a right angle equilateral triangle shape, at the end near one side, right angle; Offer bearings mounted bearing hole; Weld a hook respectively on the end face on link plate (3862) both sides, the bearing hole of offering on the hook is passed in rotating shaft (3861), is fixed on the axle bed of clamping plate bottom setting; The clamping plate bottom is fixed with and links up with hypotenuse respectively and mate the positive stop (388) that combines near the position of outside axle bed (387).
3. a kind of brick plate separation device that is used for machine-processed non-burning brick carrying according to claim 2 is characterized in that: in the rotating shaft (3861) between the bearing in said axle bed (387) and the hook (3863), locating bush (3864) is housed.
CN201210345225.1A 2012-09-08 2012-09-08 Brick and plate separating mechanism for conveying machine-made baking-free brick Expired - Fee Related CN102837862B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210345225.1A CN102837862B (en) 2012-09-08 2012-09-08 Brick and plate separating mechanism for conveying machine-made baking-free brick

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210345225.1A CN102837862B (en) 2012-09-08 2012-09-08 Brick and plate separating mechanism for conveying machine-made baking-free brick

Publications (2)

Publication Number Publication Date
CN102837862A true CN102837862A (en) 2012-12-26
CN102837862B CN102837862B (en) 2014-04-02

Family

ID=47365642

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210345225.1A Expired - Fee Related CN102837862B (en) 2012-09-08 2012-09-08 Brick and plate separating mechanism for conveying machine-made baking-free brick

Country Status (1)

Country Link
CN (1) CN102837862B (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104163338A (en) * 2014-08-30 2014-11-26 南通市恒达机械制造有限公司 Offline stacking system of green bricks
CN104803057A (en) * 2015-03-23 2015-07-29 上海翡诺医药设备有限公司 Frame removal mechanism suitable for automatic frame type material feeding and discharging
CN105059953A (en) * 2015-08-18 2015-11-18 浙江曼得丽涂料有限公司 Coating bucket stacking device
CN105600488A (en) * 2016-02-26 2016-05-25 安徽昆蒙新型建材有限公司 Automatic air brick stacker crane
CN106743711A (en) * 2016-11-30 2017-05-31 潘云清 A kind of pneumatic stacking folder
CN107932715A (en) * 2017-11-17 2018-04-20 重庆市瑞轩豪邦新型建材有限公司 Divide brick device
CN109132585A (en) * 2018-10-09 2019-01-04 长春知和智能包装设备有限公司 A kind of stacking machine integrates pawl tool and grasping means
CN110255167A (en) * 2019-06-28 2019-09-20 广东利元亨智能装备股份有限公司 A kind of workpiece dislocation grabbing device

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3917081A (en) * 1974-01-09 1975-11-04 Aircraft Mechanics Brick handling system
US5443357A (en) * 1993-05-28 1995-08-22 Artech Apparatus for forming a tyne layer in an automatic brick stacking system
CN2717649Y (en) * 2004-08-16 2005-08-17 高忠良 Vibrating demoulding machine for concrete colour bricks
CN201824459U (en) * 2010-10-21 2011-05-11 济源市金通源科技建材有限公司 Automatic green brick separating mould
CN202148052U (en) * 2010-12-25 2012-02-22 洛阳中冶重工机械有限公司 Automatic stacking device
CN202828265U (en) * 2012-09-08 2013-03-27 合肥汉德贝尔属具科技有限公司 Brick-plate separating mechanism used for transporting machine-made baking-free brick

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3917081A (en) * 1974-01-09 1975-11-04 Aircraft Mechanics Brick handling system
US5443357A (en) * 1993-05-28 1995-08-22 Artech Apparatus for forming a tyne layer in an automatic brick stacking system
CN2717649Y (en) * 2004-08-16 2005-08-17 高忠良 Vibrating demoulding machine for concrete colour bricks
CN201824459U (en) * 2010-10-21 2011-05-11 济源市金通源科技建材有限公司 Automatic green brick separating mould
CN202148052U (en) * 2010-12-25 2012-02-22 洛阳中冶重工机械有限公司 Automatic stacking device
CN202828265U (en) * 2012-09-08 2013-03-27 合肥汉德贝尔属具科技有限公司 Brick-plate separating mechanism used for transporting machine-made baking-free brick

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104163338A (en) * 2014-08-30 2014-11-26 南通市恒达机械制造有限公司 Offline stacking system of green bricks
CN104803057A (en) * 2015-03-23 2015-07-29 上海翡诺医药设备有限公司 Frame removal mechanism suitable for automatic frame type material feeding and discharging
CN105059953A (en) * 2015-08-18 2015-11-18 浙江曼得丽涂料有限公司 Coating bucket stacking device
CN105059953B (en) * 2015-08-18 2017-05-03 浙江曼得丽涂料有限公司 Coating bucket stacking device
CN105600488A (en) * 2016-02-26 2016-05-25 安徽昆蒙新型建材有限公司 Automatic air brick stacker crane
CN106743711A (en) * 2016-11-30 2017-05-31 潘云清 A kind of pneumatic stacking folder
CN107932715A (en) * 2017-11-17 2018-04-20 重庆市瑞轩豪邦新型建材有限公司 Divide brick device
CN107932715B (en) * 2017-11-17 2019-09-17 重庆市瑞轩豪邦新型建材有限公司 Divide brick device
CN109132585A (en) * 2018-10-09 2019-01-04 长春知和智能包装设备有限公司 A kind of stacking machine integrates pawl tool and grasping means
CN110255167A (en) * 2019-06-28 2019-09-20 广东利元亨智能装备股份有限公司 A kind of workpiece dislocation grabbing device

Also Published As

Publication number Publication date
CN102837862B (en) 2014-04-02

Similar Documents

Publication Publication Date Title
CN102837862B (en) Brick and plate separating mechanism for conveying machine-made baking-free brick
CN202828265U (en) Brick-plate separating mechanism used for transporting machine-made baking-free brick
CN106735812B (en) Reinforcement cage seam welder
CN201338861Y (en) Full-automatic hydraulic hacking machine
CN102502269B (en) Stacking method for green bricks and stacking device for green bricks
CN103011027B (en) Clamping device for conveying machine-made baking-free brick supporting plate
CN110860910B (en) Steel arch frame production line
CN203033680U (en) Crane for finished green bricks
CN203767546U (en) Automatic pulp feeding conveyor
CN102978071A (en) Fermented grains discharging device for liquor making
CN203173506U (en) Cantilever stack-moving type brick stacking machine
CN103803276A (en) Automatic feeding conveyor for feeding dregs of rice
CN104554888A (en) Clamping conveying device for aerated concrete block
CN202208537U (en) Full-automatic brick-grabbing and setting machine
CN105819221B (en) A kind of air-conditioning collet automates offline system
CN208409325U (en) Workpiece quickly overturns transfer mechanism
CN105936423A (en) Sintered brick setting machine
CN201693099U (en) Reinforcing steel bar bending forming machine
CN103213803A (en) Automatic plate conveying machine
CN106112442B (en) A kind of EV motor rotor magnetic steels automatic placement device bed
CN202201504U (en) Single chuck unpiler
CN204470322U (en) A kind of portal-type hydraulic calibration equipment for large-scale steel structure
CN207576819U (en) Inner wall of oil tank rolling paint fixture
CN105947693A (en) Full-automatic sintered brick setting machine
CN202924685U (en) Clamping device used for machine-made baking-free brick supporting plate transportation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140402

Termination date: 20210908

CF01 Termination of patent right due to non-payment of annual fee