CN102817491A CN2012102803138A CN201210280313A CN102817491A CN 102817491 A CN102817491 A CN 102817491A CN 2012102803138 A CN2012102803138 A CN 2012102803138A CN 201210280313 A CN201210280313 A CN 201210280313A CN 102817491 A CN102817491 A CN 102817491A
Authority
CN
China
Prior art keywords
arm
cross
tower
fixing
loop
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012102803138A
Other languages
English (en)
Inventor
樊和平
张秀丽
孙利春
崔尚印
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Handan Power Supply Co of State Grid Hebei Electric Power Co Ltd
Original Assignee
Handan Power Supply Co of State Grid Hebei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Handan Power Supply Co of State Grid Hebei Electric Power Co Ltd filed Critical Handan Power Supply Co of State Grid Hebei Electric Power Co Ltd
Priority to CN2012102803138A priority Critical patent/CN102817491A/zh
Publication of CN102817491A publication Critical patent/CN102817491A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Suspension Of Electric Lines Or Cables (AREA)
  • Electric Cable Installation (AREA)

Abstract

本发明公开一种110kV双回路线路钻越铁塔,由塔身(1)、塔脚板(5)和横担组成,在横担上有固定导、地线的挂点,塔脚板(5)、横担与塔身(1)连为一体,横担为左右两路,对称设在塔身(1)的两侧,横担分上层横担(2)、中层横担(3)和下层横担(4)三层,左、右路的中层横担(3)分别用于固定本回路的一根导线,左、右路的下层横担(4)分别用于固定本回路的其它两根导线,上横担(2)用于固定地线及中层横担(3)所固定导线的跳线,每回路三根导线均呈三角布置。它是一种能钻越已有220kV及以上电压等级线路的一种铁塔。

Description

110kV双回路线路钻越铁塔
技术领域
本发明涉及一种电力杆塔,尤其是一种电力***110kV输电线路用于固定导、地线的双回路线路钻越铁塔。
背景技术
现有的双回路铁塔导线排列形式均为垂直排列(三排横担),连地线横担共有4排横担,虽然能节省线路走廊,但在钻越现有220kV及以上电压等级线路时,大部分钻越点现有铁塔无法实现在不改造现有线路的情况下钻越;因此,设计一种能够钻越现有220kV及以上线路铁塔的110kV双回路线路钻越铁塔,是目前需要解决的技术问题。
发明内容
本本发明所要解决的技术问题是提供一种能够钻越现有220kV及以上线路铁塔的110kV双回路线路钻越铁塔。
本发明解决其技术问题的技术方案是:
110kV双回路线路钻越铁塔,由塔身、塔脚板和横担组成,在横担上有固定导、地线的挂点,塔脚板、横担与塔身连为一体,横担为左右两路,对称设在塔身的两侧,横担分上层横担、中层横担和下层横担三层,左、右路的中层横担分别用于固定本回路的一根导线,左、右路的下层横担分别用于固定本回路的其它两根导线,上横担用于固定地线及中层横担所固定导线的跳线,每回路三根导线均呈三角布置。
优选地,所述的塔身分上中下三节,上节为矩形柱状,中节为梯形,下节为“八”字形腿,所述的塔脚板固定在腿的下端。
优选地,所述的上层横担为“直角三角形”, “直角三角形”的两个直角边分别在上部和侧部,侧部的直角边为塔身的矩形柱状上节的一部分。
优选地,所述的中层横担和下层横担均为“直角三角形”, “直角三角形”的两个直角边分别在下部和侧部,侧部的直角边为塔身的矩形柱状上节的一部分。
优选地,中层横担短于上层横担和下层横担。
与现有的技术相比,本发明能有效的降低铁塔高度(在呼称高度相同的情况下),使110千伏双回路线路在钻越现有220kV及以上电压等级线路时,在不改造现有线路的情况下实现钻越。
附图说明
图1是本发明的结构单线图。
具体实施方式
110kV双回路线路钻越铁塔,由塔身1、塔脚板5和横担组成,在横担上有固定导、地线的挂点,塔脚板5、横担与塔身1连为一体,横担为左右两路,对称设在塔身1的两侧,横担分上层横担2、中层横担3和下层横担4三层,左、右路的中层横担3分别用于固定本回路的一根导线,左、右路的下层横担4分别用于固定本回路的其它两根导线,上横担2用于固定地线及中层横担3所固定导线的跳线,每回路三根导线均呈三角布置。
所述的塔身1分上中下三节,上节为矩形柱状,中节为梯形,下节为“八”字形腿,所述的塔脚板5固定在腿的下端。
所述的上层横担2为“直角三角形”, “直角三角形”的两个直角边分别在上部和侧部,侧部的直角边为塔身1的矩形柱状上节的一部分。
所述的中层横担3和下层横担4均为“直角三角形”, “直角三角形”的两个直角边分别在下部和侧部,侧部的直角边为塔身1的矩形柱状上节的一部分。
中层横担3短于上层横担2和下层横担4。
本发明的技术参数如下:
1.设计条件
导、地线型号及张力
Figure 989307DEST_PATH_IMAGE001
使用条件
Figure 726319DEST_PATH_IMAGE002
荷载表
Figure 718546DEST_PATH_IMAGE003
注:导线水平荷载为下相导线荷载。
2.根开及基础作用力
根开尺寸
Figure 148390DEST_PATH_IMAGE004
基础作用力(kN)
Figure 390016DEST_PATH_IMAGE005

Claims (5)

1. 110kV双回路线路钻越铁塔,由塔身(1)、塔脚板(5)和横担组成,在横担上有固定导、地线的挂点,塔脚板(5)、横担与塔身(1)连为一体,其特征在于:横担为左右两路,对称设在塔身(1)的两侧,横担分上层横担(2)、中层横担(3)和下层横担(4)三层,左、右路的中层横担(3)分别用于固定本回路的一根导线,左、右路的下层横担(4)分别用于固定本回路的其它两根导线,上横担(2)用于固定地线及中层横担(3)所固定导线的跳线,每回路三根导线均呈三角布置。
2.根据权利要求1所述的110kV双回路线路钻越铁塔,其特征在于:所述的塔身(1)分上中下三节,上节为矩形柱状,中节为梯形,下节为“八”字形腿,所述的塔脚板(5)固定在腿的下端。
3.根据权利要求2所述的110kV双回路线路钻越铁塔,其特征在于:所述的上层横担(2)为“直角三角形”, “直角三角形”的两个直角边分别在上部和侧部,侧部的直角边为塔身(1)的矩形柱状上节的一部分。
4.根据权利要求3所述的110kV双回路线路钻越铁塔,其特征在于:所述的中层横担(3)和下层横担(4)均为“直角三角形”, “直角三角形”的两个直角边分别在下部和侧部,侧部的直角边为塔身(1)的矩形柱状上节的一部分。
5.根据权利要求1所述的110kV双回路线路钻越铁塔,其特征在于:中层横担(3)短于上层横担(2)和下层横担(4)。
CN2012102803138A 2012-08-08 2012-08-08 110kV双回路线路钻越铁塔 Pending CN102817491A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012102803138A CN102817491A (zh) 2012-08-08 2012-08-08 110kV双回路线路钻越铁塔

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012102803138A CN102817491A (zh) 2012-08-08 2012-08-08 110kV双回路线路钻越铁塔

Publications (1)

Publication Number Publication Date
CN102817491A true CN102817491A (zh) 2012-12-12

Family

ID=47301901

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012102803138A Pending CN102817491A (zh) 2012-08-08 2012-08-08 110kV双回路线路钻越铁塔

Country Status (1)

Country Link
CN (1) CN102817491A (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104763208A (zh) * 2015-04-09 2015-07-08 国家电网公司 高海拔地区110kV双回路新型蝶形钻越塔
CN105133908A (zh) * 2015-09-29 2015-12-09 中国能源建设集团湖南省电力设计院有限公司 一种220kV单回路重冰区干字型水平排列耐张塔
CN109356429A (zh) * 2018-11-26 2019-02-19 中国能源建设集团陕西省电力设计院有限公司 一种110kV双回路钻越塔

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101404400A (zh) * 2008-11-17 2009-04-08 云南省电力设计院 重冰区双回路共塔耐张型输电铁塔
JP2011021377A (ja) * 2009-07-15 2011-02-03 J-Power Systems Corp 鉄塔嵩上げ工法、及びその工法に用いる仮腕金
CN202017375U (zh) * 2011-01-21 2011-10-26 河北省电力勘测设计研究院 220kV鹰嘴蝶形钻越塔
CN202090661U (zh) * 2010-12-30 2011-12-28 国家电网公司 交流特高压同塔双回路直线塔
CN202718447U (zh) * 2012-08-08 2013-02-06 邯郸供电公司 110kV双回路线路钻越铁塔

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101404400A (zh) * 2008-11-17 2009-04-08 云南省电力设计院 重冰区双回路共塔耐张型输电铁塔
JP2011021377A (ja) * 2009-07-15 2011-02-03 J-Power Systems Corp 鉄塔嵩上げ工法、及びその工法に用いる仮腕金
CN202090661U (zh) * 2010-12-30 2011-12-28 国家电网公司 交流特高压同塔双回路直线塔
CN202017375U (zh) * 2011-01-21 2011-10-26 河北省电力勘测设计研究院 220kV鹰嘴蝶形钻越塔
CN202718447U (zh) * 2012-08-08 2013-02-06 邯郸供电公司 110kV双回路线路钻越铁塔

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104763208A (zh) * 2015-04-09 2015-07-08 国家电网公司 高海拔地区110kV双回路新型蝶形钻越塔
CN105133908A (zh) * 2015-09-29 2015-12-09 中国能源建设集团湖南省电力设计院有限公司 一种220kV单回路重冰区干字型水平排列耐张塔
CN109356429A (zh) * 2018-11-26 2019-02-19 中国能源建设集团陕西省电力设计院有限公司 一种110kV双回路钻越塔
CN109356429B (zh) * 2018-11-26 2024-05-31 中国能源建设集团陕西省电力设计院有限公司 一种110kV双回路钻越塔

Similar Documents

Publication Publication Date Title
CN202520040U (zh) 一种实现双回路输电线双t接用的分歧杆塔
CN104201634A (zh) 一种单回线路交叉开断方法
CN204920402U (zh) 一种输电线路单回路倒角塔
CN102817491A (zh) 110kV双回路线路钻越铁塔
CN104196301B (zh) 一种交叉换位塔
CN202718447U (zh) 110kV双回路线路钻越铁塔
CN105257061A (zh) 一种单回路变呼高杆塔
CN203452435U (zh) 双回路钻跨式钢管杆
CN203961408U (zh) 终端电缆塔和终端电缆塔组合
CN206894191U (zh) 一种单回路钻跨输电线路
CN105155902A (zh) 一种紧凑型双回路变呼高杆塔
CN202073353U (zh) 单回路钻跨式钢管杆
CN205046917U (zh) 双回路单侧开断电缆引下直线塔
CN203412350U (zh) 一种双回路单侧回路电缆方式开断的输电钢管杆
CN204370879U (zh) 一种新型交叉换位塔
CN206220619U (zh) 一种单回架空输电线路电缆t接引下耐张塔
CN105155916A (zh) 一种单回路正逆相序变换角钢塔
CN205046915U (zh) 一种采用v字型组合串的双回路双侧开断钢管杆塔
CN105155911B (zh) 一种采用三角形横担布置的双回路双侧开断钢管杆塔
CN205046908U (zh) 一种紧凑型双回路变呼高杆塔
CN202882514U (zh) 220kv全角度单回路钻越塔
CN204343772U (zh) 四回路电缆下地窄基电缆终端钢管塔
CN105201264B (zh) 一种双回路门字形布置铁塔
CN207469872U (zh) 同塔双回水平排列跳线上绕耐张塔
CN206346561U (zh) 一种单回路垂直排列耐张塔

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA HEBEI ELECTRIC POW

Effective date: 20121214

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20121214

Address after: 056002 No. 48 Zhonghua North Street, Hebei, Handan

Applicant after: Handan Power Supply Company

Applicant after: State Grid Corporation of China

Applicant after: Hebei Electric Power Corporation

Address before: 056002 No. 19 Zhonghua North Street, Hebei, Handan

Applicant before: Handan Power Supply Company

C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB02 Change of applicant information

Address after: 100031 Xicheng District West Chang'an Avenue, No. 86, Beijing

Applicant after: State Grid Corporation of China

Applicant after: Handan Power Supply Company

Applicant after: Hebei Electric Power Corporation

Address before: 056002 No. 48 Zhonghua North Street, Hebei, Handan

Applicant before: Handan Power Supply Company

Applicant before: State Grid Corporation of China

Applicant before: Hebei Electric Power Corporation

COR Change of bibliographic data

Free format text: CORRECT: APPLICANT; FROM: HANDAN POWER SUPPLY COMPANY TO: STATE ELECTRIC NET CROP.

RJ01 Rejection of invention patent application after publication

Application publication date: 20121212

RJ01 Rejection of invention patent application after publication