CN102817482A - 一种钢柱校正装置及其校正施工方法 - Google Patents

一种钢柱校正装置及其校正施工方法 Download PDF

Info

Publication number
CN102817482A
CN102817482A CN2012102921045A CN201210292104A CN102817482A CN 102817482 A CN102817482 A CN 102817482A CN 2012102921045 A CN2012102921045 A CN 2012102921045A CN 201210292104 A CN201210292104 A CN 201210292104A CN 102817482 A CN102817482 A CN 102817482A
Authority
CN
China
Prior art keywords
steel column
correcting
fixed
connecting rod
fixed connecting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012102921045A
Other languages
English (en)
Other versions
CN102817482B (zh
Inventor
方春生
沈洪宇
向纪才
方振亚
于吉圣
杨帅
廖选茂
陶双杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Steel Structure Engineering Co Ltd
Original Assignee
China Construction Steel Structure Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Steel Structure Corp Ltd filed Critical China Construction Steel Structure Corp Ltd
Priority to CN201210292104.5A priority Critical patent/CN102817482B/zh
Publication of CN102817482A publication Critical patent/CN102817482A/zh
Application granted granted Critical
Publication of CN102817482B publication Critical patent/CN102817482B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

本发明提供一种钢柱校正装置及其校正施工方法,该钢柱校正装置包括固定连接杆和可固定于钢柱上的校正夹持部,校正夹持部的数量至少为两个且与所述钢柱的数量相适配,固定连接杆夹置于所述校正夹持部上,校正夹持部包括横向调节部和可与钢柱固定连接的纵向调节部,固定连接杆固定于横向调节部上,纵向调节部与横向调节部固定连接。利用固定连接杆对一排的多个钢柱同时进行校正,解决了高层或超高层建筑密集型钢柱校正难题。同时,利用固定连接杆的固定平衡作用,将固定连接的数个钢柱形成稳定的整体,在后序的钢筋、模板调整及混凝土浇筑等施工作业中,钢柱校正装置起到临时固定定位作用,从而减少施工作业对钢柱校正的影响,提高了施工作业效率。

Description

一种钢柱校正装置及其校正施工方法
技术领域
本发明涉及一种建筑施工装置及其施工方法,尤其涉及一种钢柱校正装置及其校正施工方法。
背景技术
目前,钢结构已广泛应用于超高层建筑和大跨度空间结构领域,例如各种大厦、电视塔、金融中心、体育馆、展览中心、大剧院、航站楼、和一些工业厂房等。例如某主塔楼的核心筒内从地下室底板开始至结构25层设有56根劲性钢柱,考虑到核心筒施工作业面小、钢柱布置密度大,柱间间隙小的特点,钢骨结构安装施工完成前,混凝土难以穿插施工。同时,核心筒处钢柱之间无钢梁连接,安装后无法形成框架体系,在钢筋、模板调整以及混凝土浇筑期间极易影响钢柱的精度。
现有技术提供一种钢梁校正夹具,可对单根钢柱进行精确调节,但是对于钢柱布置密度大,校正施工作业面小的施工现场,需要一根一根调节校正夹具,使用起来极为繁琐,并且只能起到临时校正作用,无法消除钢筋、混凝土等因素对钢柱定位的影响。
发明内容
本发明所要解决的技术问题在于,提供一种钢柱校正装置及其校正施工方法,能够高效精确地对密集型钢柱校正和定位,并且减少施工作业对钢柱校正的影响。
为了解决上述技术问题,本发明提供一种钢柱校正装置,包括固定连接杆和可固定于钢柱上的校正夹持部,所述校正夹持部的数量至少为两个且与所述钢柱的数量相适配,所述固定连接杆夹置于所述校正夹持部上,所述校正夹持部包括横向调节部和可与所述钢柱固定连接的纵向调节部,所述固定连接杆固定于所述横向调节部上,所述纵向调节部与横向调节部固定连接。
进一步地,所述纵向调节部包括翼缘连接板和第一固定组件,所述纵向调节部和横向调节部之间设置有连接件,所述翼缘连接板固定于所述钢柱上,所述第一固定组件穿设固定于所述连接件与翼缘连接板上。
进一步地,所述连接件包括角铁和螺杆,所述角铁包括纵向板和与所述纵向板一体连接的横向板,所述螺杆固定于所述横向板上,所述纵向板与翼缘连接板连接,所述横向板与横向调节部连接,且所述螺杆穿设于所述横向调节部和固定连接杆内。
进一步地,所述纵向板与翼缘连接板上相应地均设置有纵向调节孔,所述第一固定组件穿设于所述纵向调节孔内。
进一步地,所述横向调节部包括第一垫片、第二垫片和第二固定组件,所述第一、第二垫片设置于所述固定连接杆的两侧,所述第一垫片与横向板连接,所述螺杆穿设固定于所述第一垫片、固定连接杆及第二垫片上,所述第二固定组件固定于所述螺杆的末端。
进一步地,所述第一垫片、固定连接杆及第二垫片上相应地设置有横向调节孔,所述螺杆穿设于所述横向调节孔内。
所述钢柱校正装置的校正施工方法,包括如下步骤:
1)吊装同一所述固定连接杆连系的一排钢柱,精确校正钢柱垂直度和水平位置;
2)每根所述钢柱上同一高度固定有所述校正夹持部,将所述固定连接杆的首尾精确定位并夹置固定于同一排所述钢柱的首尾钢柱上;
3)依次将其他钢柱上的所述校正夹持部与固定连接杆固定连接;
4)施工作业后,对所述钢柱位置进行复测,在砼初凝前,调节所述纵向调节部和横向调节部,对所述钢柱进行偏差校正;
5)混凝土浇筑完成初凝后,拆除所述固定连接杆,以循环使用。
进一步地,所述步骤4)中,在所述钢柱与固定连接杆安装完后,进行轴线网和标高复测,对部分误差较大的钢柱进行微调,微调完成后焊接钢柱柱脚,再交付土建进行下一步工序施工。
进一步地,所述下一步工序施工为土建织筋和支模,所述土建织筋和支模完成后,再对钢柱进行复核,确认其位置和标高准确后再进入浇灌工序。
进一步地,所述步骤4)中,对钢柱进行偏差校正采用倒链或者千斤顶。
将同一排数个钢柱根据正确的垂直度和水平位置安装,每个校正夹持部固定于相应钢柱的同一高度,调节横向调节部和纵向调节部,将固定连接杆精确定位并夹置于校正夹持部上。利用固定连接杆,对一排的多个钢柱同时进行校正,解决了高层或超高层建筑密集型钢柱校正难题。同时,利用固定连接杆的固定平衡作用,将固定连接的数个钢柱形成稳定的整体,在后序的钢筋、模板调整及混凝土浇筑等施工作业中,钢柱校正装置起到临时固定定位作用,从而减少施工作业对钢柱校正的影响,提高了施工作业效率。
附图说明
图1为本发明实施例提供的钢柱校正装置的结构示意图;
图2为本发明实施例提供钢柱校正装置的连接件的正视示意图;
图3为本发明实施例提供钢柱校正装置的连接件的侧视示意图;
图4为本发明实施例提供的钢柱校正装置的使用状态示意图。
具体实施方式
为了使本发明所要解决的技术问题、技术方案及有益效果更加清楚明白,以下结合附图及实施例,对本发明进行进一步详细说明。应当理解,此处所描述的具体实施例仅仅用以解释本发明,并不用于限定本发明。
如图1所示,本发明提供一种钢柱校正装置,包括固定连接杆1和校正夹持部2,校正夹持部2的数量至少为两个且与钢柱3的数量相适配,固定连接杆1夹置于校正夹持部2上,校正夹持部2可固定于钢柱3上。校正夹持部2包括横向调节部21和纵向调节部22,固定连接杆1固定于横向调节部21上,纵向调节部22可固定于钢柱3上,纵向调节部22与横向调节部21固定连接。
具体地,上述固定连接杆1本实施例中采用长方钢管,需校正的钢柱3成排安装,固定连接杆1横向跨设于成排的钢柱3上,并且利用校正夹持部2与每个钢柱3固定连接。
纵向调节部22包括翼缘连接板221和第一固定组件222,钢柱3在工厂制作时将翼缘连接板221焊接固定在钢柱3的固定位置,保证钢柱3安装后,翼缘连接板221在同一水平高度。翼缘连接板221可以为小长方形金属块,用于支撑校正夹持部2的其他构件与固定连接杆1的重量。纵向调节部22和横向调节部21之间设置有连接件4并通过连接件4固定连接,第一固定组件222穿设固定于连接件4与翼缘连接板221上,从而将校正夹持部2固定于钢柱3上。
如图2和图3所示,上述连接件4包括角铁41和螺杆42,角铁41呈L型,包括纵向板43和与纵向板43一体连接的横向板44,螺杆42焊接固定于横向板43上,使螺杆42与横向板43连接为一整体。纵向板43与翼缘连接板221叠置连接,横向板43与横向调节部21连接,且螺杆42穿设于横向调节部21和固定连接杆1内。
本实施例中,第一固定组件222包括螺栓223和第一螺帽224,纵向板43与翼缘连接板221上相应地均设置有纵向调节孔225,第一固定组件222的螺栓223穿设于纵向调节孔225内,第一螺帽224紧固于螺栓223的末端,将纵向板43与翼缘连接板221固定连接。纵向调节孔225开设成条形孔,且条形孔长度大于螺栓223的直径,保证足够的空间给螺栓223上下移动,以纵向调节固定连接杆1的位置。第一固定组件222具有两组,分别穿设于条形纵向调节孔225的两端。
横向调节部21包括第一垫片211、第二垫片212和第二固定组件213,第一、第二垫片211、212呈板条型、且设置于固定连接杆1的两侧。第一垫片211与横向板43叠置连接,螺杆42穿设固定于第一垫片211、固定连接杆1及第二垫片212上,第二固定组件213固定于螺杆42的末端,使固定连接杆1夹置固定于第一、第二垫片211、212之间。
进一步地,第一垫片211、固定连接杆1及第二垫片212上相应地设置有横向调节孔214,螺杆42穿设于横向调节孔214内。将横向调节孔214开设成条形孔,且条形孔长度大于螺杆42的直径,保证足够的空间给螺杆42左右移动,以横向调节固定连接杆1的位置。由于固定连接杆1是传递相邻钢柱3间力的主要受力构件,固定连接杆1开横向调节孔214后,其力学性能受到影响,因此第一垫片211、第二垫片212设置于固定连接杆1的两侧起到加强固定作用。
本实施例中,第二固定组件213包括第二螺帽215和第三垫片216,螺杆42上的外螺纹与第二螺帽215的内螺纹相适配。第三垫片216设置于第二垫片212与第二螺帽215之间,其开设有与螺杆直径相适配的通孔,保证螺杆42能够从该通孔穿过。第三垫片216用于以补偿第二垫片212开设的条形横向调节孔214对其力学性能的影响。螺杆42穿过第二垫片212后,还穿设于第三垫片216与第二螺帽215内,第二螺帽215具有两个且相互叠置,紧固于螺杆42的末端。
此外,为了加强螺杆42对固定连接杆1的固定作用,角铁41上焊接固定有两个螺杆42,相对应地,第一垫片211、第二垫片212、固定连接杆1上开设的条形横向调节孔214内穿设有两组螺杆42,第三垫片216上开设有两个通孔,第二螺帽215具有两组来紧固于两组螺杆42的末端。
请一同结合图4所示,对于钢柱校正装置的校正施工方法,包括如下步骤:
1)吊装同一固定连接杆1连系的一排钢柱3,精确校正钢柱3垂直度和水平位置。
2)每根钢柱3上同一高度固定有校正夹持部2,将固定连接杆1的首尾精确定位并夹置固定于同一排钢柱3的首尾钢柱上。由于钢柱3在出厂时在已在同一高度焊接好翼缘连接板221,塔吊将固定连接杆1吊运至安装位置,两个工人同时爬上首尾钢柱3钢爬梯,精确定位固定连接杆1位置后,拧紧第一螺帽224和第二螺帽215。
3)依次将其他钢柱3上的校正夹持部2与固定连接杆1固定连接,使整排钢柱3形成稳定整体。
4)施工作业后,对钢柱3位置进行复测,在砼初凝前,调节纵向调节部22和横向调节部21,对钢柱3进行偏差校正。其中,在钢柱3与固定连接杆1安装完后,进行轴线网和标高复测,对部分误差较大的钢柱3进行微调,微调完成后焊接钢柱柱脚,再交付土建进行下一步工序施工。下一步工序施工为土建织筋和支模,土建织筋和支模完成后,再对钢柱3进行复核,确认其位置和标高准确后再进入浇灌工序。砼浇筑到设计标高后,应立即对钢柱3位置进行复测,对砼浇筑过程中可能导致的位移,在砼初凝前,可放松临时固定连接杆1的第一、第二螺帽224、215,用倒链或者千斤顶对钢柱3及时进行偏差校正。。
5)混凝土浇筑完成初凝后,拆除固定连接杆1,以循环使用。
因此,将同一排数个钢柱3根据正确的垂直度和水平位置安装,每个校正夹持部2固定于相应钢柱3的同一高度,调节横向调节部21和纵向调节部22,将固定连接杆1精确定位并夹置于校正夹持部2上。利用固定连接杆1,对一排的多个钢柱3同时进行校正,解决了高层或超高层建筑密集型钢柱校正难题。同时,利用固定连接杆1的固定平衡作用,将固定连接的数个钢柱3形成稳定的整体,在后序的钢筋、模板调整及混凝土浇筑等施工作业中,钢柱校正装置起到临时固定定位作用,从而减少施工作业对钢柱3校正的影响,提高了施工作业效率。
以上所述仅为本发明的较佳实施例而已,并不用以限制本发明,凡在本发明的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本发明的保护范围之内。

Claims (10)

1.一种钢柱校正装置,其特征在于:包括固定连接杆和可固定于钢柱上的校正夹持部,所述校正夹持部的数量至少为两个且与所述钢柱的数量相适配,所述固定连接杆夹置于所述校正夹持部上,所述校正夹持部包括横向调节部和可与所述钢柱固定连接的纵向调节部,所述固定连接杆固定于所述横向调节部上,所述纵向调节部与横向调节部固定连接。
2.如权利要求1所述钢柱校正装置,其特征在于:所述纵向调节部包括翼缘连接板和第一固定组件,所述纵向调节部和横向调节部之间设置有连接件,所述翼缘连接板固定于所述钢柱上,所述第一固定组件穿设固定于所述连接件与翼缘连接板上。
3.如权利要求2所述钢柱校正装置,其特征在于:所述连接件包括角铁和螺杆,所述角铁包括纵向板和与所述纵向板一体连接的横向板,所述螺杆固定于所述横向板上,所述纵向板与翼缘连接板连接,所述横向板与横向调节部连接,且所述螺杆穿设于所述横向调节部和固定连接杆内。
4.如权利要求3所述钢柱校正装置,其特征在于:所述纵向板与翼缘连接板上相应地均设置有纵向调节孔,所述第一固定组件穿设于所述纵向调节孔内。
5.如权利要求3所述钢柱校正装置,其特征在于:所述横向调节部包括第一垫片、第二垫片和第二固定组件,所述第一、第二垫片设置于所述固定连接杆的两侧,所述第一垫片与横向板连接,所述螺杆穿设固定于所述第一垫片、固定连接杆及第二垫片上,所述第二固定组件固定于所述螺杆的末端。
6.如权利要求5所述钢柱校正装置,其特征在于:所述第一垫片、固定连接杆及第二垫片上相应地设置有横向调节孔,所述螺杆穿设于所述横向调节孔内。
7.如权利要求1-6任一项所述钢柱校正装置的校正施工方法,其特征在于:包括如下步骤:
1)吊装同一所述固定连接杆连系的一排钢柱,精确校正钢柱垂直度和水平位置;
2)每根所述钢柱上同一高度固定有所述校正夹持部,将所述固定连接杆的首尾精确定位并夹置固定于同一排所述钢柱的首尾钢柱上;
3)依次将其他钢柱上的所述校正夹持部与固定连接杆固定连接;
4)施工作业后,对所述钢柱位置进行复测,在砼初凝前,调节所述纵向调节部和横向调节部,对所述钢柱进行偏差校正;
5)混凝土浇筑完成初凝后,拆除所述固定连接杆,以循环使用。
8.如权利要求7所述钢柱校正装置的校正施工方法,其特征在于:所述步骤4)中,在所述钢柱与固定连接杆安装完后,进行轴线网和标高复测,对部分误差较大的钢柱进行微调,微调完成后焊接钢柱柱脚,再交付土建进行下一步工序施工。
9.如权利要求8所述钢柱校正装置的校正施工方法,其特征在于:所述下一步工序施工为土建织筋和支模,所述土建织筋和支模完成后,再对钢柱进行复核,确认其位置和标高准确后再进入浇灌工序。
10.如权利要求7所述钢柱校正装置的校正施工方法,其特征在于:所述步骤4)中,对钢柱进行偏差校正采用倒链或者千斤顶。
CN201210292104.5A 2012-08-07 2012-08-07 一种钢柱校正装置及其校正施工方法 Active CN102817482B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210292104.5A CN102817482B (zh) 2012-08-07 2012-08-07 一种钢柱校正装置及其校正施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210292104.5A CN102817482B (zh) 2012-08-07 2012-08-07 一种钢柱校正装置及其校正施工方法

Publications (2)

Publication Number Publication Date
CN102817482A true CN102817482A (zh) 2012-12-12
CN102817482B CN102817482B (zh) 2015-11-25

Family

ID=47301892

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210292104.5A Active CN102817482B (zh) 2012-08-07 2012-08-07 一种钢柱校正装置及其校正施工方法

Country Status (1)

Country Link
CN (1) CN102817482B (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107013046A (zh) * 2017-06-19 2017-08-04 中冶建工集团有限公司 一种大截面钢管混凝土组合柱的矫正方法
CN112796954A (zh) * 2021-02-02 2021-05-14 上海市机电设计研究院有限公司 风电机组混凝土塔筒和钢塔筒间隙调整方法
CN115075385A (zh) * 2022-06-20 2022-09-20 福建荣德升建设工程有限公司 一种用于建筑钢结构的连接装置
CN115142690A (zh) * 2022-06-15 2022-10-04 中国建筑第八工程局有限公司 智能一体化钢柱自动校正装置
CN115162753A (zh) * 2022-06-15 2022-10-11 中国建筑第八工程局有限公司 智能一体化钢柱自动校正装置及施工方法

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4573294A (en) * 1983-02-03 1986-03-04 Swiss Fabricating, Inc. Framework for building construction
JPS6443637A (en) * 1987-08-07 1989-02-15 Kajima Corp Pillar and beam joint in reinforcing bar ramen
JPH0517996A (ja) * 1991-07-10 1993-01-26 Haseko Corp 建物の構築方法
JPH11193592A (ja) * 1997-12-26 1999-07-21 Nippon Kentetsu Co Ltd カ−テンウォ−ルの取付構造
CN1261638A (zh) * 1999-12-30 2000-08-02 王康强 高层建筑钢结构安装工法
CN201560609U (zh) * 2009-12-14 2010-08-25 北京中广天工技术有限公司 通信塔
CN202194244U (zh) * 2011-07-20 2012-04-18 河北杭萧钢构有限公司 超高层钢结构柱脚预埋定位支架
CN202280259U (zh) * 2011-10-12 2012-06-20 湖南省建筑工程集团总公司 一种箱型钢柱校正夹具

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4573294A (en) * 1983-02-03 1986-03-04 Swiss Fabricating, Inc. Framework for building construction
JPS6443637A (en) * 1987-08-07 1989-02-15 Kajima Corp Pillar and beam joint in reinforcing bar ramen
JPH0517996A (ja) * 1991-07-10 1993-01-26 Haseko Corp 建物の構築方法
JPH11193592A (ja) * 1997-12-26 1999-07-21 Nippon Kentetsu Co Ltd カ−テンウォ−ルの取付構造
CN1261638A (zh) * 1999-12-30 2000-08-02 王康强 高层建筑钢结构安装工法
CN201560609U (zh) * 2009-12-14 2010-08-25 北京中广天工技术有限公司 通信塔
CN202194244U (zh) * 2011-07-20 2012-04-18 河北杭萧钢构有限公司 超高层钢结构柱脚预埋定位支架
CN202280259U (zh) * 2011-10-12 2012-06-20 湖南省建筑工程集团总公司 一种箱型钢柱校正夹具

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107013046A (zh) * 2017-06-19 2017-08-04 中冶建工集团有限公司 一种大截面钢管混凝土组合柱的矫正方法
CN107013046B (zh) * 2017-06-19 2019-04-05 中冶建工集团有限公司 一种大截面钢管混凝土组合柱的矫正方法
CN112796954A (zh) * 2021-02-02 2021-05-14 上海市机电设计研究院有限公司 风电机组混凝土塔筒和钢塔筒间隙调整方法
CN112796954B (zh) * 2021-02-02 2021-10-22 上海市机电设计研究院有限公司 风电机组混凝土塔筒和钢塔筒间隙调整方法
CN115142690A (zh) * 2022-06-15 2022-10-04 中国建筑第八工程局有限公司 智能一体化钢柱自动校正装置
CN115162753A (zh) * 2022-06-15 2022-10-11 中国建筑第八工程局有限公司 智能一体化钢柱自动校正装置及施工方法
CN115142690B (zh) * 2022-06-15 2023-10-13 中国建筑第八工程局有限公司 智能一体化钢柱自动校正装置
CN115162753B (zh) * 2022-06-15 2024-01-23 中国建筑第八工程局有限公司 智能一体化钢柱自动校正装置及施工方法
CN115075385A (zh) * 2022-06-20 2022-09-20 福建荣德升建设工程有限公司 一种用于建筑钢结构的连接装置
CN115075385B (zh) * 2022-06-20 2024-03-22 福建荣德升建设工程有限公司 一种用于建筑钢结构的连接装置

Also Published As

Publication number Publication date
CN102817482B (zh) 2015-11-25

Similar Documents

Publication Publication Date Title
US11680401B2 (en) Precast wall panels and method of erecting a high-rise building using the panels
US8074414B2 (en) Precast wall panels and method of erecting a high-rise building using the panels
CN108035554B (zh) 超高层建筑框架柱的型钢柱支撑架施工方法
CN205875473U (zh) 内置定位预制件钢筋混凝土剪力墙
JP6289046B2 (ja) 仮設架台
CN102817482B (zh) 一种钢柱校正装置及其校正施工方法
CN202706198U (zh) 一种建筑结构
KR100957571B1 (ko) 슬림플로어 시스템에서 비대칭철골보를 위한 좌굴방지용 보강구조 및 이의 시공방법
JP2005325683A (ja) 建造物コネクタのアンカーケージシステム
CN103741817A (zh) 一种改善异形柱节点抗震性能的x形配筋增强方法
JP4284056B2 (ja) 非埋込み型柱脚の施工方法及びその非埋込み型柱脚構造
CN107524096A (zh) 一种悬灌连续梁0#块现浇支架及搭设方法
CN110145024A (zh) 一种采用承压钢板的预制装配式梁柱节点
CN104712141A (zh) 现浇钢筋混凝土密肋梁楼板施工方法
JP4336659B2 (ja) 上路式吊床版橋の構築方法
JP4472726B2 (ja) 免震建物構造
JP5183606B2 (ja) 機器の基礎施工に用いるアンカーボルトのユニット構造物とそれを用いた機器の基礎施工方法
JPH10152998A (ja) 既存建築物の耐震補強構造
KR20170066193A (ko) 건축물의 기둥과 보 연결 구조 및 이를 이용한 건축물의 시공방법
JP5325709B2 (ja) 鉄骨露出型柱脚構造の施工方法
CN104453013A (zh) 预制墙体构件以及装配式钢筋混凝土剪力墙
JP2007002606A (ja) アンカーボルトの支持装置
CN113602937A (zh) 一种电梯井道的安装工艺
KR100837831B1 (ko) 지하구축용 무지보 역타설 시스템
JP7288390B2 (ja) 基礎の施工方法及び基礎

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: Steel column correcting device and correcting construction method thereof

Effective date of registration: 20180129

Granted publication date: 20151125

Pledgee: Bank of Beijing Limited by Share Ltd. Shenzhen branch

Pledgor: China Construction Steel Structure Corp.,Ltd.

Registration number: 2018440020010

CP03 Change of name, title or address

Address after: 3801, 38 / F, Zhongjian science and engineering building, No. 3331, Weilan Coast Community Center Road, Yuehai street, Nanshan District, Shenzhen City, Guangdong Province

Patentee after: China Construction Science And Industry Co.,Ltd.

Address before: Shenzhen City, Guangdong province water building 518040 Futian District Che Kung Temple Tairan eight road building 17-19

Patentee before: China Construction Steel Structure Corp.,Ltd.

CP03 Change of name, title or address
PC01 Cancellation of the registration of the contract for pledge of patent right

Date of cancellation: 20221207

Granted publication date: 20151125

Pledgee: Bank of Beijing Limited by Share Ltd. Shenzhen branch

Pledgor: China Construction Steel Structure Corp.,Ltd.

Registration number: 2018440020010

PC01 Cancellation of the registration of the contract for pledge of patent right
TR01 Transfer of patent right

Effective date of registration: 20221223

Address after: Room 1908, Chengtou Xin Times Building, No. 2009, Pingshan Avenue, Liulian Community, Pingshan Street, Pingshan District, Shenzhen 518000

Patentee after: China Construction Steel Engineering Co.,Ltd.

Address before: 3801, 38 / F, China Construction Science and engineering building, No. 3331, Weilan Coast Community Central Road, Yuehai street, Nanshan District, Shenzhen City, Guangdong Province

Patentee before: China Construction Science And Industry Co.,Ltd.

TR01 Transfer of patent right