CN102813347A - Method for manufacturing gold jewellery - Google Patents

Method for manufacturing gold jewellery Download PDF

Info

Publication number
CN102813347A
CN102813347A CN2012103312951A CN201210331295A CN102813347A CN 102813347 A CN102813347 A CN 102813347A CN 2012103312951 A CN2012103312951 A CN 2012103312951A CN 201210331295 A CN201210331295 A CN 201210331295A CN 102813347 A CN102813347 A CN 102813347A
Authority
CN
China
Prior art keywords
car
raw material
preparation
flower
gold jewelry
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012103312951A
Other languages
Chinese (zh)
Other versions
CN102813347B (en
Inventor
叶伟洪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHENZHEN BATAR INVESTMENT HOLDING GROUP CO., LTD.
Original Assignee
SHENZHEN BAITAI JEWELLERY CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN BAITAI JEWELLERY CO Ltd filed Critical SHENZHEN BAITAI JEWELLERY CO Ltd
Priority to CN201210331295.1A priority Critical patent/CN102813347B/en
Publication of CN102813347A publication Critical patent/CN102813347A/en
Application granted granted Critical
Publication of CN102813347B publication Critical patent/CN102813347B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Adornments (AREA)

Abstract

The invention belongs to the field of manufacturing of precious metal jewellery and in particular relates to a method for manufacturing gold jewellery. The jewellery comprises a plurality of part units which are tuned with patterns on the surfaces, and the method comprises the following steps: turning patterns on the surfaces of raw materials by using a pattern turning knife; cutting the raw materials with the patterns into the part units; and finally, assembling the part units into the finished gold jewellery. As the raw materials have long lengths, the materials can be continuously or discontinuously fed by using a stepping device, and automatic, continuous, integral and high-efficiency machining can be realized, the pattern turning efficiency is high, and the turned patterns are high in consistency and uniform in brightness.

Description

A kind of preparation method of gold jewelry
Technical field
The invention belongs to the manufacturing field of noble metal jewelry, in particular, relate to a kind of preparation method of gold jewelry.
Background technology
A lot of gold jewelries be by the small parts unit through assembling, chain class jewellery especially, people are sometimes at the component unit flower of getting on the bus; The component unit of Che Huahou has decorative pattern, and relatively brighter, very attractive in appearance; When making the component unit of such gold jewelry, the method for employing is to produce the original-shape of component unit earlier in the prior art, and then at the enterprising driving flower of original-shape; Because the general volume of component unit is less, artificial location is difficult when surperficial car is spent, and wastes time and energy; Working (machining) efficiency is low, and the decorative pattern that car goes out is inhomogeneous easily, irregular, because jewellery possibly have dozens or even hundreds of component unit; So car flower working (machining) efficiency is low, can obviously have influence on the processing charges of jewellery.
Summary of the invention
Technical problem to be solved by this invention provides the preparation method of the higher gold jewelry of a kind of car flower efficient.
Technical scheme of the present invention is: a kind of preparation method of gold jewelry, said jewellery comprise the dapple component unit of a plurality of surperficial cars, said method comprising the steps of:
At first go out decorative pattern with car flower cutter car on the raw material surface;
And then cut into component unit to the raw material that has a decorative pattern;
Be assembled into the gold jewelry finished product to component unit at last.
Preferably, said component unit is a laminated structure, and said raw material is the band material.
Preferably, said raw material is moved along band material length direction and width by the step device drive, and said car flower cutter is along cutter shaft continuous rotary carriage flower in vertical plane.
Preferably, said component unit is a column structure, and said raw material is the post material.
Preferably, said post material one end is driven continuous axial by a feed arrangement simultaneously and is advanced by the rotation of whirligig drive continuous axial, and said car flower cutter is along cutter shaft continuous rotary carriage flower in vertical plane.
Preferably, said component unit is a linear structure, and said raw material is the line material.
Preferably; Said line material two ends are provided with the whirligig of synchronous rotation; Said whirligig drives the rotation of line material continuous axial, and said line material is by a feed arrangement tensioning and drive continuous axial and advance simultaneously, and said car flower cutter is along cutter shaft rotary carriage flower continuously in vertical plane.
Preferably, before former truck flower, elder generation is at the surface coated car caul-fat of raw material.Said car caul-fat has lubrication, and the decorative pattern that car goes out is brighter more attractive in appearance.
Preferably, be rolled in the wet cloth that contains the car caul-fat on the raw material, thereby in the process of raw material feeding, evenly be coated with the car caul-fat.
The beneficial effect of technical scheme of the present invention is: the preparation method of gold jewelry of the present invention is when making the component unit of jewellery, goes out decorative pattern on the surface of raw material with car flower cutter car earlier, and then cuts out component unit from raw material; Because raw material length is longer; Can realize that automation is continuous, all-in-one-piece, processing efficiently, so car flower efficient is very high with step device continuously or compartment of terrain feeding feeding; And the decorative pattern unanimity degree that car goes out is high, and light evenly; On the dapple raw material of car, cut out component unit compared with prior art in addition, also do not increase how many difficulties, only need when cutting, note dodging the decorative pattern face and get final product.
Description of drawings
Fig. 1 is embodiment one structural representation of gold jewelry component unit according to the invention;
Fig. 2 is the band material sketch map that adopts after the method for the invention car is spent;
Fig. 3 adopts the method for the invention to expect to get on the bus colored sketch map at band;
Embodiment two structural representations of Fig. 4 gold jewelry component unit according to the invention;
Fig. 5 adopts the method for the invention at the post material colored sketch map of getting on the bus.
Wherein: 1, component unit; 2, band material; 3, car flower cutter; 4, post material.
The specific embodiment
The present invention discloses a kind of preparation method of gold jewelry; Said jewellery comprise the dapple component unit of a plurality of surperficial cars; As the embodiment one of the method for the invention, to shown in Figure 3, said component unit 1 is the laminated structure of a rhombus like Fig. 1; Said raw material is band material 2, and method may further comprise the steps:
At first go out decorative pattern with car flower cutter car on the raw material surface;
And then cut into component unit to the raw material that has a decorative pattern;
Be assembled into the gold jewelry finished product to component unit at last.
The preparation method of gold jewelry of the present invention is when making the component unit 1 of jewellery, goes out decorative pattern on the surface of raw material with car flower cutter car earlier, and then cuts out component unit from raw material; Because raw material length is longer; Can realize that automation is continuous, all-in-one-piece, processing efficiently, so car flower efficient is very high with step device continuously or compartment of terrain feeding feeding; And the decorative pattern unanimity degree that car goes out is high, and light evenly; On the dapple raw material of car, cut out component unit compared with prior art in addition, also do not increase how many difficulties, only need when cutting, note dodging the decorative pattern face and get final product.
In the present embodiment; Said band material 2 is driven along band material length direction and width by step device and moves; Said car flower cutter 3 is along cutter shaft continuous rotary carriage flower in vertical plane; Can go out a plurality of grooves with rule compositor by car, and the width of groove, shape are all relevant with the shape of car flower cutter 3, the degree of depth of groove is then relevant with the following cutter degree of depth of car flower cutter 3.
In the present embodiment, before former truck flower, elder generation is at the surface coated car caul-fat of raw material; Concrete mode can be for being rolled in the wet cloth that contains the car caul-fat on the raw material; Thereby the surface evenly is coated with the car caul-fat in the process of raw material feeding, and said car caul-fat has lubrication, and the decorative pattern that car goes out is brighter more attractive in appearance; Realized automatic coating in addition, needn't be again by manual work brush oil.
Embodiment two as the preparation method of gold jewelry according to the invention; Like Fig. 4 and shown in Figure 5, be that with embodiment one difference said component unit 1 is a column structure; Said raw material is a post material 4; Because post material 4 length can be very long, can realize that automation is continuous, all-in-one-piece, processing efficiently with feed arrangement continuously or compartment of terrain feeding feeding.
In the present embodiment; Said post material 4 one ends drive the continuous axial rotation by whirligig; Drive continuous axial by a feed arrangement simultaneously and advance, said car flower cutter 3 can go out a plurality of grooves with rule compositor at post material 4 surperficial cars along cutter shaft continuous rotary carriage flower in vertical plane.Because 4 rotations of post material, feeding and car flower cutter 3 all are not have continuous operation stagnantly, so working (machining) efficiency is very high.Through the rotary speed of adjustment post material 4 rotary speeies, feed speed and car flower cutter 3, can produce the decorative pattern of different arrangement regulations, the shape that can also change car flower cutter 3 in addition changes the shape of groove.
Embodiment three as the preparation method of gold jewelry according to the invention is that with embodiment two differences said component unit is a linear structure, and said raw material is the line material.
Because the post material self has rigidity, only need an end to be rotated the device drive and just can axially rotate, but the line material does not have rotational stiffness, could be when having only two ends to be tensioned around axial rotation.
In the present embodiment, said line material two ends are provided with the whirligig of synchronous rotation, and said whirligig drives the rotation of line material continuous axial; Simultaneously said line material is by a feed arrangement tensioning and drive continuous axial and advance; Said car flower cutter is along cutter shaft rotary carriage flower continuously in vertical plane, because the line material is when being tensioned, and machining status and post material machining status basically identical; Beneficial effect is also consistent with embodiment two, repeats no more here.
Above content is to combine concrete preferred implementation to the further explain that the present invention did, and can not assert that practical implementation of the present invention is confined to these explanations.For the those of ordinary skill of technical field under the present invention, under the prerequisite that does not break away from the present invention's design, can also make some simple deduction or replace, all should be regarded as belonging to protection scope of the present invention.

Claims (9)

1. the preparation method of a gold jewelry, said jewellery comprise the dapple component unit of a plurality of surperficial cars, said method comprising the steps of:
At first go out decorative pattern with car flower cutter car on the raw material surface;
And then cut into component unit to the raw material that has a decorative pattern;
Be assembled into the gold jewelry finished product to component unit at last.
2. according to the preparation method of the said gold jewelry of claim 1, it is characterized in that said component unit is a laminated structure, said raw material is the band material.
3. according to the preparation method of the said gold jewelry of claim 2, it is characterized in that said raw material is moved along band material length direction and width by the step device drive, said car flower cutter is along cutter shaft continuous rotary carriage flower in vertical plane.
4. according to the preparation method of the said gold jewelry of claim 1, it is characterized in that said component unit is a column structure, said raw material is the post material.
5. according to the preparation method of the said gold jewelry of claim 4; It is characterized in that; Said post material one end is driven continuous axial by a feed arrangement simultaneously and is advanced by the rotation of whirligig drive continuous axial, and said car flower cutter is along cutter shaft continuous rotary carriage flower in vertical plane.
6. according to the preparation method of the said gold jewelry of claim 1, it is characterized in that said component unit is a linear structure, said raw material is the line material.
7. according to the preparation method of the said gold jewelry of claim 6; It is characterized in that; Said line material two ends are provided with the whirligig of synchronous rotation; Said whirligig drives the rotation of line material continuous axial, and said line material is by a feed arrangement tensioning and drive continuous axial and advance simultaneously, and said car flower cutter is along cutter shaft rotary carriage flower continuously in vertical plane.
8. according to the preparation method of each said gold jewelry of claim 1 to 7, it is characterized in that before former truck flower, elder generation is at the surface coated car caul-fat of raw material.
9. the preparation method of said gold jewelry according to Claim 8 is characterized in that, be rolled in the wet cloth that contains the car caul-fat on the raw material, thereby in the process of raw material feeding even coating car caul-fat.
CN201210331295.1A 2012-09-10 2012-09-10 Method for manufacturing gold jewellery Active CN102813347B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210331295.1A CN102813347B (en) 2012-09-10 2012-09-10 Method for manufacturing gold jewellery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210331295.1A CN102813347B (en) 2012-09-10 2012-09-10 Method for manufacturing gold jewellery

Publications (2)

Publication Number Publication Date
CN102813347A true CN102813347A (en) 2012-12-12
CN102813347B CN102813347B (en) 2015-06-24

Family

ID=47298055

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210331295.1A Active CN102813347B (en) 2012-09-10 2012-09-10 Method for manufacturing gold jewellery

Country Status (1)

Country Link
CN (1) CN102813347B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103349404A (en) * 2013-08-02 2013-10-16 深圳市金艺珠宝有限公司 Belt processing method and equipment of multi-edge surface reflecting groove ornament
CN112338211A (en) * 2020-10-29 2021-02-09 福大利珠宝(深圳)有限公司 Automatic sheet turning machine

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2188261A (en) * 1986-03-26 1987-09-30 Wong Min Lu Manufacture of a bead chain
GR3018018T3 (en) * 1992-04-02 1996-02-29 Krupp Vdm Gmbh Bimetallic coin blank.
FR2873326B1 (en) * 2004-07-21 2006-11-03 Bruno Caby PROCESS FOR OBTAINING CHAINON PATTERNS, AND OBJECT, ESPECIALLY JEWELRY, COMPRISING A CHAIN OF PATTERNS
CN101601523A (en) * 2008-06-11 2009-12-16 深圳市金利珠宝首饰有限公司 Surface carving technology of metal jewelry
CN101692942A (en) * 2009-10-20 2010-04-14 张国王 Gold engraving and manufacturing process of gold-jade jewellery
CN202278194U (en) * 2011-09-30 2012-06-20 深圳市龙兴机械科技有限公司 Automatic facetting machine for shoe-shaped gold ingot
CN102641024A (en) * 2012-05-14 2012-08-22 山东蓝天首饰有限公司 Manufacturing process of hollow ornamental pendant and manufacturing equipment of hollow ornamental pendant
CN202411424U (en) * 2011-10-31 2012-09-05 深圳市龙兴机械科技有限公司 Numerical control tube and bead embroidery machine

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB2188261A (en) * 1986-03-26 1987-09-30 Wong Min Lu Manufacture of a bead chain
GR3018018T3 (en) * 1992-04-02 1996-02-29 Krupp Vdm Gmbh Bimetallic coin blank.
FR2873326B1 (en) * 2004-07-21 2006-11-03 Bruno Caby PROCESS FOR OBTAINING CHAINON PATTERNS, AND OBJECT, ESPECIALLY JEWELRY, COMPRISING A CHAIN OF PATTERNS
CN101601523A (en) * 2008-06-11 2009-12-16 深圳市金利珠宝首饰有限公司 Surface carving technology of metal jewelry
CN101692942A (en) * 2009-10-20 2010-04-14 张国王 Gold engraving and manufacturing process of gold-jade jewellery
CN202278194U (en) * 2011-09-30 2012-06-20 深圳市龙兴机械科技有限公司 Automatic facetting machine for shoe-shaped gold ingot
CN202411424U (en) * 2011-10-31 2012-09-05 深圳市龙兴机械科技有限公司 Numerical control tube and bead embroidery machine
CN102641024A (en) * 2012-05-14 2012-08-22 山东蓝天首饰有限公司 Manufacturing process of hollow ornamental pendant and manufacturing equipment of hollow ornamental pendant

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103349404A (en) * 2013-08-02 2013-10-16 深圳市金艺珠宝有限公司 Belt processing method and equipment of multi-edge surface reflecting groove ornament
CN112338211A (en) * 2020-10-29 2021-02-09 福大利珠宝(深圳)有限公司 Automatic sheet turning machine

Also Published As

Publication number Publication date
CN102813347B (en) 2015-06-24

Similar Documents

Publication Publication Date Title
CN101850567B (en) Reciprocating method for removing green rinds on moso bamboo surface
CN102486953A (en) Cable peeling device
CN102813347B (en) Method for manufacturing gold jewellery
CN108861742B (en) A kind of dipper crowding gear extruding cigarette paper plastics core
CN102715626A (en) Double-roller peeling mechanism of litchi peeling machine
CN203227871U (en) Machine for dividing into strips
CN105032989A (en) Correcting mechanism of wall rail forming device
CN203566748U (en) Flexible graphite slitting hobbing cutter
CN204843106U (en) Profile of tooth band steel slitting machine
CN201868158U (en) Cable peeling device
CN205671373U (en) A kind of circular single cake machine surface trimming shaping device
CN201231334Y (en) Multi-cutter combined special topping device
CN203401136U (en) Plate shearing machine
CN105438808A (en) Roller rotation distributing and gathering machine
CN204894142U (en) Wood greenwood biax cutting machine
CN202540093U (en) Special-shaped sanding multi-shaft head assembly body
CN201940782U (en) Flaky in-groove edge knurling machine
CN202462642U (en) Mosaic stone particle cutter
CN104400814B (en) Tangerine peel slitting machine
CN203227895U (en) Automatic burr removing machine for commutator
CN205735449U (en) A kind of cutting mechanism of unbaked tile section bar automatic gas cutting machine
CN204366052U (en) Reinforcing bar edge knurling machine
CN205343226U (en) Double knives cutting machine
CN203751419U (en) Steel wire gauze slitting machine
CN201988917U (en) Edge cutting and curling machine for special-shaped product

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: SHENZHEN BAITAI INVESTMENT HOLDINGS GROUP CO., LTD

Free format text: FORMER NAME: SHENZHEN BAITAI JEWELLERY CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: Yantian District of Shenzhen city in Guangdong province 518000 comprehensive building Beishan Industrial Zone 3F1-F8 and the exhibition hall (only office)

Patentee after: SHENZHEN BATAR INVESTMENT HOLDING GROUP CO., LTD.

Address before: Yantian District of Shenzhen city in Guangdong province 518000 comprehensive building Beishan Industrial Zone 3F1-F8 and the exhibition hall (only office)

Patentee before: Shenzhen Baitai Jewellery Co., Ltd.