CN102808420A - Bearing platform and construction method for connection between bearing platform and foundation pile - Google Patents

Bearing platform and construction method for connection between bearing platform and foundation pile Download PDF

Info

Publication number
CN102808420A
CN102808420A CN2012103019072A CN201210301907A CN102808420A CN 102808420 A CN102808420 A CN 102808420A CN 2012103019072 A CN2012103019072 A CN 2012103019072A CN 201210301907 A CN201210301907 A CN 201210301907A CN 102808420 A CN102808420 A CN 102808420A
Authority
CN
China
Prior art keywords
cushion cap
foundation pile
bearing platform
taper liner
main body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012103019072A
Other languages
Chinese (zh)
Other versions
CN102808420B (en
Inventor
曾晓文
***
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jianhua Construction Materials China Co Ltd
Original Assignee
Jiangsu Builds China Pipe Pile Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Builds China Pipe Pile Co Ltd filed Critical Jiangsu Builds China Pipe Pile Co Ltd
Priority to CN201210301907.2A priority Critical patent/CN102808420B/en
Publication of CN102808420A publication Critical patent/CN102808420A/en
Application granted granted Critical
Publication of CN102808420B publication Critical patent/CN102808420B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

The invention provides a bearing platform and a construction method for connection between the bearing platform and a foundation pile. The bearing platform comprises a bearing platform main body, a conical lining and a conical depressed part, wherein the bearing platform main body is a concrete structure; the conical lining is arranged from the bottom surface of the bearing platform main body to the internal part of the bearing platform main body and is provided with a top flat surface and a side inclined surface; and the conical depressed part is arranged in the bearing platform main body and is in contact with the external surface of the conical lining. A pile head of the foundation pile which is matched with the bearing platform supports the top flat surface of the conical lining. The upper flat surface of the bearing platform is connected with a beam or a column of a building component through stirrups. Since the conical lining is arranged in the bottom surface of the bearing platform and the conical lining is connected with top (pile head) of the foundation pile in a supported way, the connection between the bearing platform and the top of the foundation pile is non-rigid connection, the connection method allows the pile head to rotate in the conical lining, the influence on the building component caused by bending torque produced by the foundation pile due to earthquakes or other reasons is reduced to a very great extent, and the damage to the component during geological change is decreased.

Description

The job practices that cushion cap and cushion cap are connected with foundation pile
Technical field
The present invention relates to building engineering field, the job practices that is connected with foundation pile in particular to a kind of cushion cap and cushion cap.
Background technology
At present in the building pile foundation field; Being connected between foundation pile and the cushion cap all is to adopt to be rigidly connected; That is: the reinforcing bar on the foundation pile (concrete pile of cast-in-site, piling bar, concrete precast pile etc.) is connected with the concrete bearing platform basic fixed, even also be like this in seismic design.When earthquake took place, the huge moment of deflection that is produced by earthquake can act on foundation pile and the basic joint portion of cushion cap.Being rigidly connected between foundation pile and the cushion cap basis makes can't turn round between foundation pile and cushion cap basis, thereby causes the foundation pile pile body to be destroyed easily.For self bending resistance concrete precast pile on the weak side, the moment of deflection that earthquake produces is bigger to the influence of concrete precast pile.
Summary of the invention
The present invention aims to provide the job practices that a kind of cushion cap and cushion cap are connected with foundation pile; Be rigidly connected, can't turn round to solve foundation pile and the cushion cap that job practices that cushion cap of the prior art and cushion cap be connected with foundation pile causes, thus when receiving moment of deflection easy ruined technical problem.
To achieve these goals, according to an aspect of the present invention, a kind of cushion cap is provided, has comprised: the cushion cap main body is concrete structure; The taper liner by the bottom surface of the cushion cap main body set inside towards the cushion cap main body, has plane, top and skew back face; Conical indentation, in the inside of cushion cap main body, the external surface of applying taper liner forms; The pile crown of the foundation pile that wherein, cooperates with cushion cap supports the plane, top of taper liner.
Further, the last plane of cushion cap links to each other with the fine strain of millet or the post of building unit through stirrup.
Further, the taper liner is that 1 millimeter to 4 millimeters metal sheet is made by thickness.
Further, the height of sidewall is not less than 200 millimeters.
Further, on the end face of taper liner bolt penetration hole is set.
Further, the shape of cross section of taper type depression and taper liner is circular or square or polygon, with the shape of the pile crown of cooperation foundation pile.
According to a further aspect in the invention, the job practices that provides a kind of cushion cap to be connected with foundation pile comprises: step S1 is provided with foundation pile; Step S2 places the taper liner at the top of foundation pile, and taper liner and foundation pile is fixed; Step S3 builds cushion cap on the taper liner.
Further, before step S2, also comprise: step S11, the ground of leveling, compacting cushion cap bottom; The top of cleaning foundation pile.
Further, between step S2 and step S3, also comprise: step S21, lay hardcore bed, and on hardcore bed, cover levelling with cement mortar bedding cushion on the ground in cushion cap making zone.
Further, before step S3, also comprise: step S31, to the cushion cap arrangement of reinforcement.
Further, through bolt, after step S31, before the step S3, also comprise between taper liner and the foundation pile: step S32, remove the fixedly bolt of taper liner.
Use technical scheme of the present invention; The set inside taper liner in the bottom surface of cushion cap; The taper liner again with foundation pile top (pile crown) support and connection, so be non-rigid the connection between the top of cushion cap and foundation pile, this connected mode allows pile crown in the taper liner, to rotate; Alleviated to a great extent because of earthquake or other reasons cause moment of deflection that foundation pile produces to the influence that building unit causes, the destruction that member is received when geology changes reduces.
Description of drawings
The Figure of description that constitutes the application's a part is used to provide further understanding of the present invention, and illustrative examples of the present invention and explanation thereof are used to explain the present invention, do not constitute improper qualification of the present invention.In the accompanying drawings:
The sectional view that Fig. 1 shows cushion cap of the present invention and is connected with foundation pile;
Fig. 2 shows the sketch map of taper liner of first embodiment of cushion cap of the present invention;
Fig. 3 shows the sketch map of taper liner of second embodiment of cushion cap of the present invention; And
Fig. 4 shows the sketch map of taper liner of the 3rd embodiment of cushion cap of the present invention.
The specific embodiment
Need to prove that under the situation of not conflicting, embodiment and the characteristic among the embodiment among the application can make up each other.Below with reference to accompanying drawing and combine embodiment to specify the present invention.
The sectional view that Fig. 1 shows cushion cap of the present invention and is connected with foundation pile.Cushion cap 1 main body is a concrete structure, is shaped as round platform or terrace with edge.The last plane of cushion cap 1 links to each other with the fine strain of millet or the post of building unit through stirrup; The bottom surface of cushion cap 1 has plane, top and skew back face cone shape liner 2 towards set inside, and the bottom surface of cushion cap 1 inwardly forms the depression applying taper liner 2 of taper type, and depression has last plane and angled side walls and open lower end.The end face of taper liner 2 is supported in the top (pile crown) of foundation pile 3.Taper liner 2 is that the metal sheet of t=1mm to 4mm is made by thickness; Be preferably steel plate; The sidewall height is not less than 200mm, and end face is provided with the bolt penetration hole 21 (with GB GB13476 prefabricated tubular pile is example, and the diameter of this perforation can be Φ 30mm) that connects foundation pile pile crown 3.
Fig. 2 to Fig. 4 shows the specific embodiment of taper liner 2 of the cushion cap of invention.As shown in Figure 2, the taper liner 2 of first embodiment is set to truncated cone-shaped; As shown in Figure 3, it is foursquare side's platform shape that the taper liner 2 of second embodiment is set to end face; As shown in Figure 4, it is pentagonal polygon platform that the taper liner 2 of the 3rd embodiment is set to end face.These difform settings are in order to match with difform foundation pile 3.
The job practices that a kind of cushion cap 1 of the present invention is connected with foundation pile 3, construction method step comprises:
The first step: foundation pile 3 is set, constructs by the norm of construction requirement.
Second step: the ground of leveling, compacting cushion cap 1 bottom.
The 3rd step: plane on cleaning foundation pile 3 heads.
The 4th step: place taper liner 2 at foundation pile 3 heads, pass bolt penetration hole 21 with bolt taper liner 2 is fixed in foundation pile 3 heads.
The 5th step: make the certain thickness hardcore bed 4 of laying on the regional ground at cushion cap 1, and cover levellings with cement mortar bedding cushion 5, the height that makes foundation pile 3 heads expose cement bonded sand oar bed course 5 planes is not less than 50mm.
The 6th step: cushion cap 1 arrangement of reinforcement (for example,, the rod iron of anti-appropriation need be set) if foundation pile 3 is anti-group of stake.
The 7th step: remove the fixedly bolt of taper liner 2, fluid concrete constitutes cushion cap 1 then.
From above description, can find out that the above embodiments of the present invention have realized following technique effect:
The job practices that the invention provides a kind of cushion cap that is connected with foundation pile and be connected with foundation pile.Because of the bottom of cushion cap of the present invention is provided with the taper liner; Therefore it is non-rigid the connection between the top (pile crown) of cushion cap and foundation pile; This connected mode allows pile crown in the taper liner, to turn round; Alleviated significantly because of earthquake or other reasons cause moment of deflection that foundation pile produces to the influence that building unit causes, the destruction that member is received when geology changes reduces.
The above is merely the preferred embodiments of the present invention, is not limited to the present invention, and for a person skilled in the art, the present invention can have various changes and variation.All within spirit of the present invention and principle, any modification of being done, be equal to replacement, improvement etc., all should be included within protection scope of the present invention.

Claims (11)

1. a cushion cap is characterized in that, comprising:
The cushion cap main body is concrete structure;
Taper liner (2) by the bottom surface of the said cushion cap main body set inside towards said cushion cap main body, has plane, top and skew back face;
Conical indentation, the external surface of the said taper liner (2) of fitting in the inside of said cushion cap main body forms;
The pile crown of the foundation pile (3) that wherein, cooperates with said cushion cap (1) supports the plane, top of said taper liner (2).
2. cushion cap according to claim 1 is characterized in that, the last plane of said cushion cap (1) links to each other with the fine strain of millet or the post of building unit through stirrup.
3. cushion cap according to claim 1 is characterized in that, said taper liner (2) is that 1 millimeter to 4 millimeters metal sheet is made by thickness.
4. cushion cap according to claim 1 is characterized in that, the height of said skew back face is not less than 200 millimeters.
5. cushion cap according to claim 1 is characterized in that, on the plane, top of said taper liner (2) bolt penetration hole is set.
6. cushion cap according to claim 1 is characterized in that, the shape of cross section of said conical indentation and said taper liner (2) is circular or square or polygon, with the shape of the pile crown that cooperates said foundation pile (3).
7. the job practices that cushion cap is connected with foundation pile is characterized in that, comprising:
Step S1 is provided with foundation pile (3);
Step S2 places taper liner (2) at the top of said foundation pile (3), and said taper liner (2) and said foundation pile (3) is fixing;
Step S3 builds the cushion cap main body on said taper liner (2).
8. job practices according to claim 7 is characterized in that, before said step S2, also comprises:
Step S11 flattens, tamps the ground of said cushion cap (1) bottom; Clear up the top of said foundation pile (3).
9. job practices according to claim 7 is characterized in that, between step S2 and step S3, also comprises:
Step S21 lays hardcore bed (4) on the ground in said cushion cap (1) making zone, and goes up with cement mortar bedding cushion (5) covering levelling at said hardcore bed (4).
10. job practices according to claim 7 is characterized in that, before step S3, also comprises:
Step S31 is to said cushion cap (1) arrangement of reinforcement.
11. job practices according to claim 10 is characterized in that, through bolt, after step S31, before the step S3, also comprises between said taper liner (2) and the said foundation pile (3):
Step S32 removes the bolt of fixing said taper liner (2).
CN201210301907.2A 2012-08-23 2012-08-23 Bearing platform and construction method for connection between bearing platform and foundation pile Active CN102808420B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210301907.2A CN102808420B (en) 2012-08-23 2012-08-23 Bearing platform and construction method for connection between bearing platform and foundation pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210301907.2A CN102808420B (en) 2012-08-23 2012-08-23 Bearing platform and construction method for connection between bearing platform and foundation pile

Publications (2)

Publication Number Publication Date
CN102808420A true CN102808420A (en) 2012-12-05
CN102808420B CN102808420B (en) 2015-05-13

Family

ID=47232276

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210301907.2A Active CN102808420B (en) 2012-08-23 2012-08-23 Bearing platform and construction method for connection between bearing platform and foundation pile

Country Status (1)

Country Link
CN (1) CN102808420B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104074199A (en) * 2014-06-17 2014-10-01 杭州华能大坝安全工程技术有限公司 Underwater bearing platform construction method
CN107090841A (en) * 2017-04-17 2017-08-25 广州电力设计院 Prefabricated cushion cap foundation, transmission tower and its construction method
CN108797628A (en) * 2018-07-03 2018-11-13 上海市城市建设设计研究总院(集团)有限公司 Lift-off formula subtracts shock insulation pile foundation construction
CN109137959A (en) * 2018-07-26 2019-01-04 中建空列(北京)科技有限公司 It is a kind of sky iron zero excavate environmentally friendly column foundation pile and its construction method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63289124A (en) * 1987-05-20 1988-11-25 Tokyu Constr Co Ltd Pin-joint work of pile head in pile foundation of building
JPH08120687A (en) * 1994-10-26 1996-05-14 Taisei Corp Pile head bearing construction and pile reinforcement holding form
CN1295638A (en) * 1999-02-03 2001-05-16 日本皮拉工业株式会社 Pile foundation structure
CN102535500A (en) * 2012-02-28 2012-07-04 上海现代建筑设计(集团)有限公司 Reducing and sinking pile-supported embankment for treating soft soil foundation under large-area stacked load at ground and design method for reducing and sinking pile-supported embankment
CN102605722A (en) * 2012-03-23 2012-07-25 陈兴冲 Method for seismic reinforcement of pier by the aid of reinforced concrete cover
CN202830955U (en) * 2012-08-23 2013-03-27 江苏建华管桩有限公司 Bearing platform

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS63289124A (en) * 1987-05-20 1988-11-25 Tokyu Constr Co Ltd Pin-joint work of pile head in pile foundation of building
JPH08120687A (en) * 1994-10-26 1996-05-14 Taisei Corp Pile head bearing construction and pile reinforcement holding form
CN1295638A (en) * 1999-02-03 2001-05-16 日本皮拉工业株式会社 Pile foundation structure
CN102535500A (en) * 2012-02-28 2012-07-04 上海现代建筑设计(集团)有限公司 Reducing and sinking pile-supported embankment for treating soft soil foundation under large-area stacked load at ground and design method for reducing and sinking pile-supported embankment
CN102605722A (en) * 2012-03-23 2012-07-25 陈兴冲 Method for seismic reinforcement of pier by the aid of reinforced concrete cover
CN202830955U (en) * 2012-08-23 2013-03-27 江苏建华管桩有限公司 Bearing platform

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104074199A (en) * 2014-06-17 2014-10-01 杭州华能大坝安全工程技术有限公司 Underwater bearing platform construction method
CN107090841A (en) * 2017-04-17 2017-08-25 广州电力设计院 Prefabricated cushion cap foundation, transmission tower and its construction method
CN108797628A (en) * 2018-07-03 2018-11-13 上海市城市建设设计研究总院(集团)有限公司 Lift-off formula subtracts shock insulation pile foundation construction
CN109137959A (en) * 2018-07-26 2019-01-04 中建空列(北京)科技有限公司 It is a kind of sky iron zero excavate environmentally friendly column foundation pile and its construction method
CN109137959B (en) * 2018-07-26 2023-08-18 中建空列(北京)科技有限公司 Construction method of empty-iron zero-excavation environment-friendly upright post foundation pile

Also Published As

Publication number Publication date
CN102808420B (en) 2015-05-13

Similar Documents

Publication Publication Date Title
KR102007938B1 (en) earth-quake-resistant construction between the slabs and Wall in Buildings
CN106522270A (en) Pile foundation and retaining wall anti-earthquake retaining structure comprising EPS buffer layers and construction method
CN102808420B (en) Bearing platform and construction method for connection between bearing platform and foundation pile
CN103510530A (en) Embedded foundation of composite wallboard and implementation method thereof
CN103526781A (en) Integrated-tray, shock-insulation and reinforcing structure for historic building foundation and construction method thereof
JP6021993B1 (en) Rigid connection structure of lower end of support and concrete pile
CN110107038B (en) Anti-seismic concrete prefabricated staircase
CN102561377A (en) Seismic-resistant-columned rock bolt foundation with enlarged toe and construction method of seismic-resistant-columned rock bolt foundation with enlarged toe
JP5976373B2 (en) Pile foundation reinforcement structure and reinforcement method
CN202830955U (en) Bearing platform
CN213572819U (en) First floor terrace structure is pour after frame construction reserves reinforcing bar
KR20120102480A (en) Phc pile with improved end bearing capacity and piling method of phc pile using the same
KR101331219B1 (en) Method for constructing micro pile using reinforcing end bearing capacity
JP5509374B1 (en) Seismic strengthening structure and seismic strengthening method for existing buildings
CN216616975U (en) Reinforced structure with existing reinforced concrete column of space steel framework restraint
JP6855365B2 (en) Underground structure of new building
CN203049567U (en) Lower section of solid square pile of partial prestressed concrete
CN107642207A (en) A kind of assembled stair attachment means
JP6461690B2 (en) Foundation structure and foundation construction method
JP2000144904A (en) Joint construction between pile and upper structural skeleton in structure
CN204645025U (en) A kind of device utilizing soil bearing capacity between grout pile
JP2002256571A (en) Reconstructing method for building, using method for existing pile and building
CN204645071U (en) A kind of device utilizing soil bearing capacity between PHC pipe pile
JP2016223208A (en) Pile foundation structure
CN202170513U (en) No undergoing force slab prestressed high strength concrete pipe pile base

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee
CP01 Change in the name or title of a patent holder

Address after: 212413 Development Zone along the Yangtze River, Shu Shu Town, Jiangsu, Jurong

Patentee after: Jianhua building materials (Jiangsu) Co., Ltd.

Address before: 212413 Development Zone along the Yangtze River, Shu Shu Town, Jiangsu, Jurong

Patentee before: Jiangsu builds China pipe pile Co., Ltd.

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 212413 Development Zone along the Yangtze River in Jurong, Jiangsu

Patentee after: Jianhua building materials (China) Co., Ltd.

Address before: 212413 Development Zone along the Yangtze River in Jurong, Jiangsu

Patentee before: Jianhua building materials (Jiangsu) Co., Ltd.