CN102795540A - Large-span variable-capacity grab bucket - Google Patents

Large-span variable-capacity grab bucket Download PDF

Info

Publication number
CN102795540A
CN102795540A CN2012101377542A CN201210137754A CN102795540A CN 102795540 A CN102795540 A CN 102795540A CN 2012101377542 A CN2012101377542 A CN 2012101377542A CN 201210137754 A CN201210137754 A CN 201210137754A CN 102795540 A CN102795540 A CN 102795540A
Authority
CN
China
Prior art keywords
bucket
bucket body
grab bucket
transfiguration
capacity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012101377542A
Other languages
Chinese (zh)
Inventor
丁建新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuxi Xinhua Lifting Tools Co Ltd
Original Assignee
Wuxi Xinhua Lifting Tools Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuxi Xinhua Lifting Tools Co Ltd filed Critical Wuxi Xinhua Lifting Tools Co Ltd
Priority to CN2012101377542A priority Critical patent/CN102795540A/en
Publication of CN102795540A publication Critical patent/CN102795540A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The invention relates to a large-span variable-capacity grab bucket which is particularly used for grabbing materials with different specific gravities, belonging to the technical field of crane equipment. The large-span variable-capacity grab bucket mainly comprises a bucket body, a connecting rod, a main rib plate, a lower bearer, an upper bearer, lifting ropes, an upper pulley wheel set, a lower pulley wheel set, a bearing balance beam, support rods and a variable-capacity plate, wherein two ends of the bearing balance beam are connected with the lifting ropes; the middle of the bearing balance beam is connected with the upper bearer in a hinging way; the two sides of the upper bearer are respectively connected with the two support rods in a hinging way; the lower ends of the support rods are articulated with the bucket body; the lower bearer is connected with the bucket body by the connecting rod; the lower bearer is connected with the connecting rod in a hinging way; and the bucket body comprises two left/right symmetrical bucket valves, and the tail end of the bucket body is connected with the variable-capacity plate. The large-span variable-capacity grab bucket is simple, compact and reasonable in structure, can realize the large-span variable capacity of the grab bucket and grabs the materials with great different specific gravities, such as coal and ore, and is high in work efficiency, so that the equipment cost can be reduced.

Description

Large span transfiguration grab bucket
Technical field
The present invention relates to a kind of large span transfiguration grab bucket, specifically grasp the material of different specific weight, belong to the crane facility technical field.
Background technology
Orange-peel bucket is mainly used in industries such as goods station, port machine factory, power plant, shipbuilding yard, steel mill, is used to grasp the bulk goods of various proportions.
If orange-peel bucket does not have variable bucket capacity structure, when grasping material, can't be implemented in the general of different specific weight storeroom.Such as being used for grabbing the little material of proportion with the grab bucket of grasping the great material of ore geometric ratio, efficient is seriously low; The little grab buckets of proportion such as extracting coal are used for grabbing heavy material, seriously overload.
In prior art, common transfiguration grab bucket structure is to cut off one section at original grab bucket bottom sheet tail end; Increase by one section detouchable plate again; Reach the effect of transfiguration, such transfiguration structural span is very little, can only between the close material of proportion, realize the purpose of transfiguration; The material of coal, ore geometric ratio heavy phase difference great disparity can't be used for grasping simultaneously, otherwise serious overload or inefficiency can be caused.Coal bunker and ore need two kinds of grab buckets to grasp respectively, and cost increases.
Summary of the invention
The objective of the invention is to overcome above-mentioned weak point, thereby a kind of large span transfiguration grab bucket is provided, can realize the extracting of different specific weight material, simple in structure, high efficiency has lowered equipment cost.
According to technical scheme provided by the invention; Large span transfiguration grab bucket mainly comprises bucket body, connecting rod, main gusset, through beam, deck beam, ropes, top sheave group, downslide wheels, load-bearing equalizing bar, strut and transfiguration plate; Said load-bearing equalizing bar two ends connect ropes, and deck beam is articulated and connected in the middle of the load-bearing equalizing bar.Said deck beam both sides two struts that are articulated and connected respectively, the lower end of the strut bucket body that is articulated and connected.Be connected through connecting rod on said through beam and the bucket body, through beam is connected with rod hinge connection.Said main gusset one end and through beam are articulated and connected, and the other end is connected with a plurality of connection pipes that are located at the bucket body side.
Said bucket body comprises two symmetrical bucket lobes, at bucket body end joint connection transfiguration plate.
Sheave is installed in said deck beam upper end, in deck beam, installs assembly pulley, and the downslide wheels are installed on through beam.Said top sheave group and downslide wheels include symmetrical two groups of pulleys, and two groups of pulleys of top sheave group are located on the top sheave axle by two pulley sleeves respectively, and two groups of pulleys of downslide wheels are located on the downslide wheel shaft by two pulley sleeves respectively.Said downslide wheels both sides are provided with cover of wedge.In load-bearing equalizing bar both sides the switching rope is set.
Compared with present technology the present invention has the following advantages:
The present invention is simple, compact and reasonable for structure; The material of coal, ore geometric ratio heavy phase difference great disparity is grasped in can realize the grabbing bucket transfiguration of large span; High efficiency has reduced equipment cost.
Description of drawings
Fig. 1 is a front view of the present invention.
Fig. 2 is a lateral plan of the present invention.
Description of reference numerals: 1-bucket body, 2-connecting rod, 3-main gusset, 4-bucket lobe, 5-through beam, 6-deck beam, 7-ropes, 8-open and close rope, 9-top sheave group, 10-downslide wheels, 11-load-bearing equalizing bar, 12-strut, 13-sheave, 14-cover of wedge, 15-top sheave axle, 16-downslide wheel shaft, 17-connection pipe, 18-transfiguration plate.
The specific embodiment
Following the present invention will combine the embodiment in the accompanying drawing to further describe:
Shown in Fig. 1 ~ 2; The present invention mainly comprises bucket body 1, connecting rod 2, main gusset 3, through beam 5, deck beam 6, ropes 7, top sheave group 9, downslide wheels 10, load-bearing equalizing bar 11, strut 12 and transfiguration plate 18; Said load-bearing equalizing bar 11 two ends connect ropes 7, and deck beam 6 is articulated and connected in the middle of the load-bearing equalizing bar 11.Said deck beam 6 both sides two struts 12 that are articulated and connected respectively, the lower end of strut 12 bucket body 1 that is articulated and connected.Be connected through connecting rod 2 on said through beam 5 and the bucket body 1, through beam 5 is articulated and connected with connecting rod 2.Said main gusset 3 one ends and through beam 5 are articulated and connected, and the other end is connected with a plurality of connection pipes 17 that are located at bucket body 1 side.
Said bucket body 1 comprises two symmetrical bucket lobes 4, at bucket body 1 end joint connection transfiguration plate 18, according to the material of different specific weight, changes the transfiguration plate 18 of differing heights.
Sheave 13 is installed in said deck beam 6 upper ends, in deck beam 6, installs assembly pulley 9, and downslide wheels 10 are installed on through beam 5.Said top sheave group 9 includes symmetrical two groups of pulleys with downslide wheels 10, and two groups of pulleys of top sheave group 9 are located on the top sheave axle 15 by two pulley sleeves respectively, and two groups of pulleys of downslide wheels 10 are located on the downslide wheel shaft 16 by two pulley sleeves respectively.Said downslide wheels 10 both sides are provided with cover of wedge 14.Switching rope 8 is set in load-bearing equalizing bar 11 both sides.
Bucket body 1 afterbody of the present invention is penetrating, and transfiguration plate 18 is connected bucket body 1 tail end, and when grasping greatly than heavy material, it is little that material is gone to sleep angle, and it is little to grasp cubic number; In the connection behind the transfiguration plate 18, bucket body 1 tail end forms a bigger enclosed construction, and it is big that material is gone to sleep angle, realizes that bucket body 1 grasps the effect of cubic number multiplication.
Through calculating and actual the use, the present invention can grasp the various ores of proportion more than the coal below 1.0 and 2.5, has improved the commonality of grab bucket.

Claims (7)

1. large span transfiguration grab bucket; Comprise bucket body (1), connecting rod (2), main gusset (3), through beam (5), deck beam (6), ropes (7), top sheave group (9), downslide wheels (10), load-bearing equalizing bar (11) and strut (12); Said load-bearing equalizing bar (11) two ends connect ropes (7), and deck beam (6) is articulated and connected in the middle of the load-bearing equalizing bar (11); Said deck beam (6) both sides two struts (12) that are articulated and connected respectively, the lower end of strut (12) bucket body (1) that is articulated and connected; Said through beam (5) is gone up with bucket body (1) and is connected through connecting rod (2), and through beam (5) and connecting rod (2) are articulated and connected; Said main gusset (3) one ends and through beam (5) are articulated and connected, and the other end is connected with a plurality of connection pipes (17) that are located at bucket body (1) side; In deck beam (6), install assembly pulley (9), go up at through beam (5) downslide wheels (10) are installed, it is characterized in that: also comprise transfiguration plate (18), at bucket body (1) end joint connection transfiguration plate (18).
2. large span transfiguration grab bucket as claimed in claim 1, it is characterized in that: said bucket body (1) comprises two symmetrical bucket lobes (4).
3. large span transfiguration grab bucket as claimed in claim 1, it is characterized in that: said downslide wheels (10) both sides are provided with cover of wedge (14).
4. large span transfiguration grab bucket as claimed in claim 1 is characterized in that: said load-bearing equalizing bar (11) both sides are provided with and open and close rope (8).
5. large span transfiguration grab bucket as claimed in claim 1, it is characterized in that: said top sheave group (9) comprises symmetrical two groups of pulleys, two groups of pulleys of top sheave group (9) are located on the top sheave axle (15) by two pulley sleeves respectively.
6. large span transfiguration grab bucket as claimed in claim 1, it is characterized in that: said downslide wheels (10) comprise symmetrical two groups of pulleys, two groups of pulleys of downslide wheels (10) are located on the downslide wheel shaft (16) by two pulley sleeves respectively.
7. large span transfiguration grab bucket as claimed in claim 1 is characterized in that: sheave (13) is installed in said deck beam (6) upper end.
CN2012101377542A 2012-05-05 2012-05-05 Large-span variable-capacity grab bucket Pending CN102795540A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012101377542A CN102795540A (en) 2012-05-05 2012-05-05 Large-span variable-capacity grab bucket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012101377542A CN102795540A (en) 2012-05-05 2012-05-05 Large-span variable-capacity grab bucket

Publications (1)

Publication Number Publication Date
CN102795540A true CN102795540A (en) 2012-11-28

Family

ID=47194888

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012101377542A Pending CN102795540A (en) 2012-05-05 2012-05-05 Large-span variable-capacity grab bucket

Country Status (1)

Country Link
CN (1) CN102795540A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103523660A (en) * 2013-11-04 2014-01-22 无锡市新华起重工具有限公司 Combined grab bucket with multiple storage-variable plates
CN103539004A (en) * 2013-11-04 2014-01-29 无锡市新华起重工具有限公司 Box capacity-variable structure grab bucket
CN103539003A (en) * 2013-11-04 2014-01-29 无锡市新华起重工具有限公司 Eight-rope large orange-peel bucket
CN103552912A (en) * 2013-11-04 2014-02-05 无锡市新华起重工具有限公司 Special nickel ore grab bucket for grabbing machine
CN112325324A (en) * 2020-11-10 2021-02-05 重庆秋松环保科技有限公司 Garbage pyrolysis gasification incineration system and method

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2007704A (en) * 1934-01-17 1935-07-09 Owen Bucket Company Bucket
JPH034398B2 (en) * 1980-03-29 1991-01-22 Toppan Printing Co Ltd
CN2154249Y (en) * 1993-03-06 1994-01-26 镇海发电厂 Bump-resistant grab
CN2603798Y (en) * 2003-01-28 2004-02-18 烟台大学 Asynchronous hydraulic orange-peel bucket
JP4034398B2 (en) * 1998-01-06 2008-01-16 丸順重工株式会社 Clam Ciel Attachment Grab Unit
CN201228200Y (en) * 2008-05-19 2009-04-29 林宗旭 Grab-bucket with scraping apparatus
CN201634318U (en) * 2010-04-26 2010-11-17 李华广 Large-capacity wood chip orange-peel grab bucket
CN101979304A (en) * 2010-11-05 2011-02-23 无锡市新华起重工具有限公司 Remote control grab bucket
CN201932815U (en) * 2010-12-14 2011-08-17 天津港远航矿石码头有限公司 Ore grab bucket provided with variable bucket capacity mechanism
CN201999637U (en) * 2011-03-08 2011-10-05 宁波远成石化电力机械有限公司 Fully-sealed grab bucket pulley mechanism
CN202729587U (en) * 2012-05-05 2013-02-13 无锡市新华起重工具有限公司 Longspan volume-variable grab bucket

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2007704A (en) * 1934-01-17 1935-07-09 Owen Bucket Company Bucket
JPH034398B2 (en) * 1980-03-29 1991-01-22 Toppan Printing Co Ltd
CN2154249Y (en) * 1993-03-06 1994-01-26 镇海发电厂 Bump-resistant grab
JP4034398B2 (en) * 1998-01-06 2008-01-16 丸順重工株式会社 Clam Ciel Attachment Grab Unit
CN2603798Y (en) * 2003-01-28 2004-02-18 烟台大学 Asynchronous hydraulic orange-peel bucket
CN201228200Y (en) * 2008-05-19 2009-04-29 林宗旭 Grab-bucket with scraping apparatus
CN201634318U (en) * 2010-04-26 2010-11-17 李华广 Large-capacity wood chip orange-peel grab bucket
CN101979304A (en) * 2010-11-05 2011-02-23 无锡市新华起重工具有限公司 Remote control grab bucket
CN201932815U (en) * 2010-12-14 2011-08-17 天津港远航矿石码头有限公司 Ore grab bucket provided with variable bucket capacity mechanism
CN201999637U (en) * 2011-03-08 2011-10-05 宁波远成石化电力机械有限公司 Fully-sealed grab bucket pulley mechanism
CN202729587U (en) * 2012-05-05 2013-02-13 无锡市新华起重工具有限公司 Longspan volume-variable grab bucket

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103523660A (en) * 2013-11-04 2014-01-22 无锡市新华起重工具有限公司 Combined grab bucket with multiple storage-variable plates
CN103539004A (en) * 2013-11-04 2014-01-29 无锡市新华起重工具有限公司 Box capacity-variable structure grab bucket
CN103539003A (en) * 2013-11-04 2014-01-29 无锡市新华起重工具有限公司 Eight-rope large orange-peel bucket
CN103552912A (en) * 2013-11-04 2014-02-05 无锡市新华起重工具有限公司 Special nickel ore grab bucket for grabbing machine
CN103523660B (en) * 2013-11-04 2016-02-10 无锡市新华起重工具有限公司 The board-like combination grab bucket of polylith transfiguration
CN103539004B (en) * 2013-11-04 2016-04-06 无锡市新华起重工具有限公司 Box capacity-variable structure is grabbed bucket
CN112325324A (en) * 2020-11-10 2021-02-05 重庆秋松环保科技有限公司 Garbage pyrolysis gasification incineration system and method

Similar Documents

Publication Publication Date Title
CN202729587U (en) Longspan volume-variable grab bucket
CN102795540A (en) Large-span variable-capacity grab bucket
CN203998697U (en) Movable type gantry mast-up
CN102795542B (en) Grab bucket special for nickel ore
CN202400745U (en) Trusswork portal crane
CN202399986U (en) Hydraulic tail ladder of vehicle
CN201634318U (en) Large-capacity wood chip orange-peel grab bucket
CN202988574U (en) Bivalve grab bucket for grabbing viscous material
CN204847846U (en) Web heavier -duty crane girder structure
CN203229310U (en) Loading and transporting lifting appliance for steel truss floor bearing plate
CN203740882U (en) Novel shearing grab bucket
CN202785297U (en) Special grab bucket for nickel ore
CN202175529U (en) Movable gantry crane
CN101898724B (en) Double-jaw grab bucket fetching device
CN112249921A (en) Containerized modular combined arm support with large bearing capacity
CN102556847A (en) Light lifting beam of monorail crane for mine and monomer for light lifting beam
CN103523660B (en) The board-like combination grab bucket of polylith transfiguration
CN102602796A (en) Grab bucket for nickel ore crane
CN103204428A (en) Loading-transporting lifting appliance for steel bar truss floor support plate
CN202785300U (en) Asynchronous steel-scrap grab bucket
CN203545489U (en) Large eight-rope two-jaw bucket
CN202449719U (en) Grab bucket for nickel ore crane
CN202880680U (en) Four-rope remote control grab bucket
CN203212224U (en) Free-type nickel ore grab bucket
CN2578164Y (en) Caterpillar pipe carryig tipper

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20121128