CN102794519A - 一种设置在加热区的线圈式冷却器 - Google Patents
一种设置在加热区的线圈式冷却器 Download PDFInfo
- Publication number
- CN102794519A CN102794519A CN2011101421146A CN201110142114A CN102794519A CN 102794519 A CN102794519 A CN 102794519A CN 2011101421146 A CN2011101421146 A CN 2011101421146A CN 201110142114 A CN201110142114 A CN 201110142114A CN 102794519 A CN102794519 A CN 102794519A
- Authority
- CN
- China
- Prior art keywords
- coil
- stainless steel
- flexible hose
- steel flexible
- thermal treatment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- General Induction Heating (AREA)
Abstract
本发明涉及一种设置在加热区的线圈式冷却器,设置回流焊炉加热区的一侧,该冷却器包括安装板、不锈钢软管线圈、线圈固定装置及固定板,安装板设在不锈钢软管线圈的上方,线圈固定装置将不锈钢软管线圈固定安装在底板上,固定板经固定螺丝固定在不锈钢软管线圈的侧部。与现有技术相比,本发明具有安全可靠、结构简单、安装检修方便的优点,能取得更佳的冷却效果。
Description
技术领域
本发明涉及一种冷却装置,尤其是涉及一种设置在加热区的线圈式冷却器。
背景技术
回流焊炉(Reflow Oven)是用于对载有电子元器件的电路板进行钎焊的设备。它通过提供一种加热环境,使焊锡膏受热融化从而让表面贴装的元器件和电路板通过焊锡膏合金可靠地结合在一起。钎焊使用的焊锡膏是将脂状的助焊剂与粉末焊料制成膏状,通过印刷涂敷在电路板各元器件的钎焊部位,并在其上精确贴装电子元件,利用回流焊炉进行加热熔化,达到对元器件的可靠钎焊。
焊锡膏中的助焊剂通常是以松香为主要成分的混合物,是保证钎焊过程顺利进行的辅助材料。助焊剂的主要作用是清除焊料和被焊母材表面的氧化物,使金属表面达到必要的清洁度,防止焊接时表面的再次氧化,降低焊料表面张力,提高焊接性能。加热熔化焊锡膏时,助焊剂会气化变成蒸汽。当气化的助焊剂接触到回流炉中的低温区(约110℃以下)时会发生液化。若温度足够低时,助焊剂会由液态变成固态,这是助焊剂的温度状态特性。
回流焊炉中存在有“加热区散热器“的选项。该功能是在加热区中安装一个很小的散热器,在其中通水,从而取得该加热区较低的温度,并与其它加热区的温度区分开来,然而它一个很大的缺点是该散热器存在严重的漏水问题。
发明内容
本发明的目的就是为了克服上述现有技术存在的缺陷而提供一种安全可靠、冷却效果好、结构简单、安装检修方便的设置在加热区的线圈式冷却器。
本发明的目的可以通过以下技术方案来实现:
一种设置在加热区的线圈式冷却器,设置回流焊炉加热区的一侧,其特征在于,该冷却器包括安装板、不锈钢软管线圈、线圈固定装置及固定板,所述的安装板设在不锈钢软管线圈的上方,所述的线圈固定装置将不锈钢软管线圈固定安装在底板上,所述的固定板经固定螺丝固定在不锈钢软管线圈的侧部。
所述的不锈钢软管线圈经整根的不锈钢软管缠绕得到,不锈钢软管线圈的上下两端经螺丝分别连接冷却水进管及冷却水出管。
所述的线圈固定装置为十字型结构,穿设在不锈钢软管线圈中,在十字型结构的线圈固定装置的其中一侧纵向开设有圆孔。
所述的线圈固定装置的顶部与设置在不锈钢软管线圈上方的安装板焊接连接,底部连接在加热区的底板上,不锈钢软管线圈穿设在侧部开设的圆孔内。
与现有技术相比,本发明具有以下的优点:
(1)安全可靠:由于由整根不锈钢软管缠绕而成,所以不存在漏水的问题;
(2)效果更好:使用该产品能取得更佳冷却效果;
(3)结构简单:该产品相当简单,主要由线圈缠绕而成;
(4)安装方便:本产品安装方式简单、牢固;
(5)检修方便:只需要将固定螺丝松开,就可以从加热区中拿出来检修。
附图说明
图1为本发明的安装结构示意图;
图2为不锈钢软管线圈的结构示意图。
图中1为加热区、2为安装板、3为不锈钢软管线圈、4为线圈固定装置、5为固定板、6为固定螺丝。
具体实施方式
下面结合附图和具体实施例对本发明进行详细说明。
实施例
一种设置在加热区的线圈式冷却器,其结构如图1所示,冷却器设置回流焊炉加热区1的一侧,该冷却器包括安装板2、不锈钢软管线圈3、线圈固定装置4及固定板5,安装板2设在不锈钢软管线圈3的上方,线圈固定装置4将不锈钢软管线圈3固定安装在底板上,固定板5经固定螺丝6固定在不锈钢软管线圈3的侧部。
不锈钢软管线圈3的结构如图2所示,该不锈钢软管线圈3经整根的不锈钢软管缠绕得到,不锈钢软管线圈3的上下两端经螺丝分别连接冷却水进管及冷却水出管,线圈固定装置4为十字型结构,穿设在不锈钢软管线圈3中,在十字型结构的线圈固定装置4的其中一侧纵向开设有圆孔,线圈固定装置4的顶部与设置在不锈钢软管线圈3上方的安装板2焊接连接,底部连接在加热区1的底板上,不锈钢软管线圈3穿设在侧部开设的圆孔内。
Claims (4)
1.一种设置在加热区的线圈式冷却器,设置回流焊炉加热区的一侧,其特征在于,该冷却器包括安装板、不锈钢软管线圈、线圈固定装置及固定板,所述的安装板设在不锈钢软管线圈的上方,所述的线圈固定装置将不锈钢软管线圈固定安装在底板上,所述的固定板经固定螺丝固定在不锈钢软管线圈的侧部。
2.根据权利要求1所述的一种设置在加热区的线圈式冷却器,其特征在于,所述的不锈钢软管线圈经整根的不锈钢软管缠绕得到,不锈钢软管线圈的上下两端经螺丝分别连接冷却水进管及冷却水出管。
3.根据权利要求1所述的一种设置在加热区的线圈式冷却器,其特征在于,所述的线圈固定装置为十字型结构,穿设在不锈钢软管线圈中,在十字型结构的线圈固定装置的其中一侧纵向开设有圆孔。
4.根据权利要求3所述的一种设置在加热区的线圈式冷却器,其特征在于,所述的线圈固定装置的顶部与设置在不锈钢软管线圈上方的安装板焊接连接,底部连接在加热区的底板上,不锈钢软管线圈穿设在侧部开设的圆孔内。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110142114.6A CN102794519B (zh) | 2011-05-28 | 2011-05-28 | 一种设置在加热区的线圈式冷却器 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110142114.6A CN102794519B (zh) | 2011-05-28 | 2011-05-28 | 一种设置在加热区的线圈式冷却器 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102794519A true CN102794519A (zh) | 2012-11-28 |
CN102794519B CN102794519B (zh) | 2014-09-03 |
Family
ID=47193957
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110142114.6A Active CN102794519B (zh) | 2011-05-28 | 2011-05-28 | 一种设置在加热区的线圈式冷却器 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102794519B (zh) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1643999A (zh) * | 2002-03-15 | 2005-07-20 | 恩德莱斯和豪瑟尔两合公司 | 用于装配和焊接电路板的方法、回流焊炉和用于该方法的电路板 |
GB2410202B (en) * | 2001-05-30 | 2005-12-14 | Btu Int | Filtering apparatus |
CN201499365U (zh) * | 2009-07-31 | 2010-06-02 | 江苏达胜加速器制造有限公司 | 加速器配套水箱制冷装置 |
CN102031365A (zh) * | 2010-11-09 | 2011-04-27 | 廖维秀 | 气密封水冷却装置 |
CN202147074U (zh) * | 2011-05-28 | 2012-02-22 | 上海朗仕电子设备有限公司 | 一种在回流焊炉加热器使用的线圈式冷却器 |
-
2011
- 2011-05-28 CN CN201110142114.6A patent/CN102794519B/zh active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2410202B (en) * | 2001-05-30 | 2005-12-14 | Btu Int | Filtering apparatus |
CN1643999A (zh) * | 2002-03-15 | 2005-07-20 | 恩德莱斯和豪瑟尔两合公司 | 用于装配和焊接电路板的方法、回流焊炉和用于该方法的电路板 |
CN201499365U (zh) * | 2009-07-31 | 2010-06-02 | 江苏达胜加速器制造有限公司 | 加速器配套水箱制冷装置 |
CN102031365A (zh) * | 2010-11-09 | 2011-04-27 | 廖维秀 | 气密封水冷却装置 |
CN202147074U (zh) * | 2011-05-28 | 2012-02-22 | 上海朗仕电子设备有限公司 | 一种在回流焊炉加热器使用的线圈式冷却器 |
Also Published As
Publication number | Publication date |
---|---|
CN102794519B (zh) | 2014-09-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103192156B (zh) | 一种小型氮气保护焊料泵*** | |
CN102430827B (zh) | 一种等离子切割电极的真空钎焊方法 | |
CN103152996A (zh) | 一种密间距长镀金插针的通孔回流工艺 | |
CN203265821U (zh) | 一种紧凑型选择性焊接*** | |
CN202147074U (zh) | 一种在回流焊炉加热器使用的线圈式冷却器 | |
CN109175562B (zh) | 一种铜铝异种金属tig钎焊工艺 | |
CN102794519B (zh) | 一种设置在加热区的线圈式冷却器 | |
CN103639558A (zh) | 热-超声-电磁多场复合再流焊方法 | |
CN106102315A (zh) | 印刷电路板的波峰焊焊接方法及印刷电路板 | |
CN203380465U (zh) | 波峰焊锡炉 | |
CN203992821U (zh) | 柔性电路板堆栈式激光焊接装置 | |
CN101468417B (zh) | 回流焊炉冷却模块中的回流孔板 | |
CN201483119U (zh) | 一种无铅波峰焊锡炉喷口 | |
CN113492242A (zh) | 一种水冷式真空密封门*** | |
CN102513635A (zh) | 一种铜/铝超声液相扩散钎焊工艺及钎焊装置 | |
CN104416257A (zh) | 自动焊接机 | |
CN209785891U (zh) | 一种功率半导体用自动固晶机 | |
CN220533188U (zh) | 一种回流焊机水冷冷却装置 | |
CN204657686U (zh) | 汽相焊接装置 | |
JP2015099894A (ja) | 電子部品のリワーク方法 | |
CN201950323U (zh) | 一种回流焊空气控温装置 | |
CN103464852B (zh) | 一种电子器件三维回流焊方法 | |
CN205496728U (zh) | Led回流焊机 | |
CN201960241U (zh) | 一种回流焊的调宽滚轮组快速夹紧装置 | |
CN202147073U (zh) | 一种防止回流焊炉助焊剂冷凝滴落的装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |