CN102787855A - 含流沙层的巷道掘进支护方法 - Google Patents
含流沙层的巷道掘进支护方法 Download PDFInfo
- Publication number
- CN102787855A CN102787855A CN2012102865312A CN201210286531A CN102787855A CN 102787855 A CN102787855 A CN 102787855A CN 2012102865312 A CN2012102865312 A CN 2012102865312A CN 201210286531 A CN201210286531 A CN 201210286531A CN 102787855 A CN102787855 A CN 102787855A
- Authority
- CN
- China
- Prior art keywords
- supporting
- roadway
- quicksand layer
- excavating
- sand formation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
本发明公开了一种含流沙层的巷道掘进支护方法,第一步在巷道掘进前,沿巷道设计断面线向掘进前方的流沙层中打入注浆管,用注浆泵向流沙层中注入胶结浆液,使流沙层胶结为一体,再采取超前临时支护方法;第二步按常规掘进方法开挖巷道,达到安全进尺后按常规支护方法进行锚网喷一次支护;第三步进行锚索二次支护,锚索采用Φ12-16mm、长度5-8m的钢绞线,锚固长度应大于1m;第四步采用U形钢可缩性支架加强支护,U形钢可缩性支架间距0.8-1.0m。本发明解决了流沙层容易垮塌造成的巷道成形难,施工不安全问题;而且增加了支护能力,使支护后巷道变形得到了较大的改善,达到了长期稳定性要求。
Description
技术领域
本发明涉及巷道掘进支护方法。
背景技术
目前在煤矿井下巷道(尤其是石门)掘进中,经常遇到巷道穿过流沙层的情况,掘进施工时如采用普通的临时支护措施,流沙层容易垮塌,巷道断面很难成形,施工也不安全;而且开挖后如单纯采用普通的锚网喷支护方法很难达到支护效果,支护完成一个月时顶板便表现出明显的变形增大现象,变形量达到500mm以上,同时两帮变形也在300mm,变形速率达到11mm/d,超出了一般锚杆支护所允许的极限变形;同时在锚杆支护下出现了托盘内陷现象,很难达到支护效果。
发明内容
为解决上述问题,本发明提出一种安全穿过流沙层的巷道掘进支护方法。
本发明采取的技术方案是,一种安全穿过弱胶结软岩及流沙层的巷道支护方法,其特征在于,它包括以下步骤:
第一步、在巷道掘进前,沿巷道设计断面线向掘进前方的流沙层中打入注浆管,用注浆泵向流沙层中注入胶结浆液,使流沙层胶结为一体,再采取超前临时支护方法,即在巷道断面顶部轮廓线上打间距0.3m,直径38mm,深3.0m的钻孔,钻孔中***长4m的1吋钢管或φ30圆钢,***后钻孔外留有1.0m的外露端头,并架设拱形架棚托住钢管外露端头;
第二步、按常规掘进方法开挖巷道,达到安全进尺后按常规支护方法进行锚网喷一次支护;
第三步、锚网喷一次支护后,再进行锚索二次支护,锚索采用Φ12-16mm、长度5-8m的钢绞线,锚固长度应大于1m;
第四步、锚索二次支护后,再采用U形钢可缩性支架加强支护,U形钢可缩性支架间距0.8-1.0m。
为了进一步加强支护效果,在锚索二次支护时,可同时在巷道顶板部位安装上钢筋梯子梁;所述的钢筋梯子梁是用钢筋焊接而成的桁架。
本发明解决了流沙层容易垮塌造成的巷道成形难,施工不安全问题;而且增加了支护能力,使支护后巷道变形得到了较大的改善,达到了长期稳定性要求。
附图说明
图1为本发明实施例的断面示意图。
具体实施方式
参照附图和发明内容所述的技术方案,本领域技术人员即可实施。
下面对技术方案的第一步具体说明。
1、注浆管采用直径为1吋、长度为3.5m的钢管,钢管管壁上梅花形布置若干小孔,孔径为6mm,孔距为200mm,钢管管头削尖。
2、注浆管的安装还应符合下列规定:
注浆管间距应根据围岩状况确定。当采用单层布置时,其间距宜为200~400mm;当采用双层布置时,其间距宜为400~600mm,上下层应错开布置。
注浆管外张角度应根据注浆胶结拱的厚度确定,宜为10°~25°。
注浆压力应根据地层致密程度决定,一般为0.5~1.0MPa。
Claims (2)
1.一种含流沙层的巷道掘进支护方法,其特征在于,它包括以下步骤:
第一步、在巷道掘进前,沿巷道设计断面线向掘进前方的流沙层中打入注浆管,用注浆泵向流沙层中注入胶结浆液,使流沙层胶结为一体,再采取超前临时支护方法,即在巷道断面顶部轮廓线上打间距0.3m,直径38mm,深3.0m的钻孔,钻孔中***长4m的1吋钢管或φ30圆钢,***后钻孔外留有1.0m的外露端头,并架设拱形架棚托住钢管外露端头;
第二步、按常规掘进方法开挖巷道,达到安全进尺后按常规支护方法进行锚网喷一次支护;
第三步、锚网喷一次支护后,再进行锚索二次支护,锚索采用Φ12-16mm、长度5-8m的钢绞线,锚固长度应大于1m;
第四步、锚索二次支护后,再采用U形钢可缩性支架加强支护,U形钢可缩性支架间距0.8-1.0m。
2.如权利要求1所述的含流沙层的巷道掘进支护方法,其特征在于,在锚索二次支护时,同时在巷道顶板部位安装上钢筋梯子梁。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012102865312A CN102787855A (zh) | 2012-08-13 | 2012-08-13 | 含流沙层的巷道掘进支护方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012102865312A CN102787855A (zh) | 2012-08-13 | 2012-08-13 | 含流沙层的巷道掘进支护方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102787855A true CN102787855A (zh) | 2012-11-21 |
Family
ID=47153416
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012102865312A Pending CN102787855A (zh) | 2012-08-13 | 2012-08-13 | 含流沙层的巷道掘进支护方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102787855A (zh) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103061779A (zh) * | 2012-12-25 | 2013-04-24 | 中鼎国际工程有限责任公司 | 矿山隧道新型支护结构及其施工方法 |
CN104100280A (zh) * | 2014-07-07 | 2014-10-15 | 中冶交通工程技术有限公司 | 一种双翼挑梁初期支护结构及其隧道施工方法 |
CN104879150A (zh) * | 2014-12-31 | 2015-09-02 | 龙口矿业集团有限公司 | 深部软岩巷道无稳定岩层锚索支护方法 |
CN105484753A (zh) * | 2015-12-29 | 2016-04-13 | 龙口矿业集团有限公司 | 高水压大流量破碎带的掘进支护方法 |
CN105507923A (zh) * | 2015-12-29 | 2016-04-20 | 大同煤矿集团有限责任公司 | 大跨度硐室中锚网喷+锚索耦合支护方法 |
CN105927231A (zh) * | 2016-05-24 | 2016-09-07 | 中国矿业大学 | 斜井穿越富水致密流砂层循环诱导帷幕注浆方法 |
CN109184747A (zh) * | 2018-10-24 | 2019-01-11 | 中南大学 | 一种深部软岩巷道的支护方法 |
CN117248915A (zh) * | 2023-11-16 | 2023-12-19 | 矿冶科技集团有限公司 | 一种流砂地层井巷建造方法 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4052860A (en) * | 1974-12-09 | 1977-10-11 | Environmental Engineering Dr. Ing. Alterman Ltd. | Construction of underground tunnels and rock chambers |
CN101498220A (zh) * | 2009-03-16 | 2009-08-05 | 煤炭科学研究总院西安研究院 | 立井工作面承压水流砂层保浆旋喷注浆工艺 |
-
2012
- 2012-08-13 CN CN2012102865312A patent/CN102787855A/zh active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4052860A (en) * | 1974-12-09 | 1977-10-11 | Environmental Engineering Dr. Ing. Alterman Ltd. | Construction of underground tunnels and rock chambers |
CN101498220A (zh) * | 2009-03-16 | 2009-08-05 | 煤炭科学研究总院西安研究院 | 立井工作面承压水流砂层保浆旋喷注浆工艺 |
Non-Patent Citations (2)
Title |
---|
亓荣强等: "弱胶结软岩巷道支护实践与合理支护形式探讨", 《采矿技术》, vol. 11, no. 1, 31 January 2011 (2011-01-31), pages 28 - 29 * |
周少杰: "谈管棚法穿越暗河沙层段施工过程的监理", <<山西建筑>>, vol. 38, no. 20, 31 July 2012 (2012-07-31), pages 228 - 229 * |
Cited By (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103061779A (zh) * | 2012-12-25 | 2013-04-24 | 中鼎国际工程有限责任公司 | 矿山隧道新型支护结构及其施工方法 |
CN103061779B (zh) * | 2012-12-25 | 2014-11-05 | 中鼎国际工程有限责任公司 | 矿山隧道新型支护结构的施工方法 |
CN104100280A (zh) * | 2014-07-07 | 2014-10-15 | 中冶交通工程技术有限公司 | 一种双翼挑梁初期支护结构及其隧道施工方法 |
CN104879150A (zh) * | 2014-12-31 | 2015-09-02 | 龙口矿业集团有限公司 | 深部软岩巷道无稳定岩层锚索支护方法 |
CN105484753A (zh) * | 2015-12-29 | 2016-04-13 | 龙口矿业集团有限公司 | 高水压大流量破碎带的掘进支护方法 |
CN105507923A (zh) * | 2015-12-29 | 2016-04-20 | 大同煤矿集团有限责任公司 | 大跨度硐室中锚网喷+锚索耦合支护方法 |
CN105484753B (zh) * | 2015-12-29 | 2018-01-23 | 龙口矿业集团有限公司 | 高水压大流量破碎带的掘进支护方法 |
CN105927231A (zh) * | 2016-05-24 | 2016-09-07 | 中国矿业大学 | 斜井穿越富水致密流砂层循环诱导帷幕注浆方法 |
CN105927231B (zh) * | 2016-05-24 | 2018-06-29 | 中国矿业大学 | 斜井穿越富水致密流砂层循环诱导帷幕注浆方法 |
CN109184747A (zh) * | 2018-10-24 | 2019-01-11 | 中南大学 | 一种深部软岩巷道的支护方法 |
CN117248915A (zh) * | 2023-11-16 | 2023-12-19 | 矿冶科技集团有限公司 | 一种流砂地层井巷建造方法 |
CN117248915B (zh) * | 2023-11-16 | 2024-02-20 | 矿冶科技集团有限公司 | 一种流砂地层井巷建造方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102787855A (zh) | 含流沙层的巷道掘进支护方法 | |
CN104389628B (zh) | 滑坡地段隧道加固装置及加固施工方法 | |
CN107762533B (zh) | 一种高压富水软弱围岩山岭隧道的超前预注浆方法 | |
CN103161480B (zh) | 主动支撑巷旁充填沿空留巷的方法 | |
CN109372555A (zh) | 一种断层破碎区巷道三维立体注浆支护方法 | |
CN102322273A (zh) | 一种巷道底板锚注一体化加固方法 | |
CN111119935B (zh) | 一种巷道松软破碎构造围岩多层次注浆加固方法 | |
CN110374600B (zh) | 一种极近距离煤层群回采巷道无错距式布置方法 | |
CN104047613B (zh) | 煤矿巷道底板用锚固方法 | |
CN110878696B (zh) | 上软下硬地层盾构法与矿山法交界处隧道段围岩加固方法 | |
CN103993892A (zh) | 一种用于软弱破碎不均匀地层隧道施工的支护方法 | |
CN105781597A (zh) | 深井软岩沿空留巷巷内锚注加固方法 | |
CN112855223A (zh) | 一种煤巷穿越采空区壁后-超前帷幕空间一体化注浆方法 | |
CN103216244B (zh) | 巷道软弱顶板锚固梁-拱组合结构支护***及支护方法 | |
CN212296427U (zh) | 双巷布置工作面外圈巷道窄煤柱稳定支护结构 | |
CN103742158B (zh) | 倾斜隧道的超前支护和挖掘方法 | |
CN110529151A (zh) | 一种综掘工作面分级分区综合加固过陷落柱方法 | |
CN106988760A (zh) | 易滑地层隧道洞口加固构造及施工方法 | |
CN106014443B (zh) | 一种预防沿空留巷的巷道底鼓及墙体滑移的方法 | |
CN102704950B (zh) | 矿山开采过导水断裂构造的支护方法 | |
CN104863588A (zh) | 超前预设墩柱沿空留巷方法 | |
CN103089277A (zh) | 砂层巷道的空间加固施工工艺 | |
CN110273700A (zh) | 一种控制红页岩巷道强力锚注支护结构及其施工方法 | |
CN109578032A (zh) | 一种高应力破碎围岩硐室加固方法 | |
CN101737078B (zh) | 一种防止沿空留巷充填墙体滑移结构及方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C12 | Rejection of a patent application after its publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20121121 |