CN102777031A - Construction method of template with no split bolt hole - Google Patents

Construction method of template with no split bolt hole Download PDF

Info

Publication number
CN102777031A
CN102777031A CN2012102774578A CN201210277457A CN102777031A CN 102777031 A CN102777031 A CN 102777031A CN 2012102774578 A CN2012102774578 A CN 2012102774578A CN 201210277457 A CN201210277457 A CN 201210277457A CN 102777031 A CN102777031 A CN 102777031A
Authority
CN
China
Prior art keywords
template
wall
external wall
split bolt
layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012102774578A
Other languages
Chinese (zh)
Inventor
张媛媛
高锋
毛宇佳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Sixth Engineering Division Co Ltd
Original Assignee
China Construction Sixth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Division Co Ltd filed Critical China Construction Sixth Engineering Division Co Ltd
Priority to CN2012102774578A priority Critical patent/CN102777031A/en
Publication of CN102777031A publication Critical patent/CN102777031A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The invention discloses a construction method of a template with no split bolt hole. The construction method includes the following steps: (1) sequentially placing a plurality of external wall templates along the longitudinal direction to form a lower-layer external wall template; (2) placing small template strips and split bolts at the top of the lower-layer external wall template at intervals; (3) repeating the step (1) and the step (2) to construct upper-layer external wall templates layer by layer until the upper-layer external wall templates are as high as the installation of the external wall templates; (4) installing a vertical wood square on the outer sides of the external wall templates; (5) installing horizontal double steel pipes arranged along the horizontal direction on the outer side of the vertical wood square; (6) adjusting the evenness and verticality of the external wall templates; (7) pouring wall concrete; (8) loosening the split bolts when the wall concrete achieves the template removing strength, taking down the double steel pipes, dismantling the external wall templates and removing the small template strips; (9) cutting off the exposed portion of the split bolts at the bottom of a groove formed at the position where the small template strips are removed; and (10) trowelling the groove through waterproof mortar. By means of the construction method, rigidity of the template is reliable.

Description

A kind of unmatchful bolt hole template construction method that draws
Technical field
The present invention relates to the job practices of wall column template, relate in particular to a kind of outer wall of basement and adopt the wooden form job practices.
Background technology
In the current reinforced concrete structural element, concrete wall occupy very big ratio, and concrete wall still adopt the wooden form construction mostly.Adopt wooden form construction wall form; Usually generally all adopt split bolt according to the template construction scheme; Pitch of bolts is generally at 400-600mm; Therefore wall form is gone up in use bolt hole must be set, and the spacing of assurance split bolt is to satisfy formwork bracing system in the constructure scheme to the demand of formwork rigidity.In order to reduce the quantity of the bolt hole that on construction formwork, is provided with, in the template construction scheme design process, select split bolt spacing, flitch etc. to need all through calculating meticulously.Particularly when the model customization perforate, also hole, to guarantee the recycling of template in strict accordance with design drawing.
More than usually way still need bolt hole be set on construction formwork, cause the template number of turnover to reduce, opened the template of bolt hole and can only after turnover, use on the wall column template construction, still need drop into a large amount of new template to beam-slab template.For this reason, need a kind of mounting method that the split bolt hole is not set on wall form, increase the number of turnover of template, assembling and disassembling simultaneously is convenient, satisfies the needs that building engineering shuttering is installed.
Summary of the invention
The objective of the invention is to overcome the deficiency of prior art, provide a kind of assembling and disassembling convenient, the split bolt hole need be set on the template, improve a kind of unmatchful bolt hole template construction method that draws of the template number of turnover.
A kind of unmatchful bolt hole template construction method that draws of the present invention, it may further comprise the steps:
(1) the polylith outer wall template is longitudinally placed formation lower floor outer wall template successively; Adopt nail to splice in the described lower floor outer wall template between adjacent two outer wall templates; Vertical piece position is provided with flitch between two adjacent outer wall templates then, and nails;
(2) place little template bar and split bolt at interval at lower floor outer wall template top;
(3) repeat described step (1) and (2) and build the upper strata outer wall template layer by layer, until reaching the outer wall template setting height(from bottom);
(4) in the outer wall template outside vertical flitch is installed;
(5) the two steel pipes of level that along continuous straight runs is provided with are installed in the outside of vertical flitch, the two steel pipe spacings of level are identical with the vertical spacing of split bolt, adopt split bolt that two steel pipes are fixed;
(6) planeness and the verticality of adjustment outer wall template;
(7) water the walling concrete;
(8) the wall concrete unclamps split bolt after reaching form removal intensity, takes off two steel pipes, removes outer wall template, rejects little template bar;
(9) cut off drawing the spiral shell exposed parts at the channel bottom of rejecting the formation of little template bar position;
(10) adopt waterproofing mortar floating groove.
Adopt the inventive method, according to the level interval of template scheme designing and calculating split bolt, template is installed, fixing means is simple, is prone to row, and formwork rigidity is reliable, can put forward template turnover utilization rate.
Description of drawings
Fig. 1 is a kind of unmatchful sectional drawing that draws outer wall of basement template in the bolt hole template construction method of the present invention;
Fig. 2 is a kind of unmatchful drawing that draws template side-looking in the bolt hole template construction method of the present invention;
Fig. 3 be of the present invention a kind of unmatchful draw template inner concrete in the bolt hole template construction method to build to accomplish after the sectional drawing of non-split bolt position;
Fig. 4 be of the present invention a kind of unmatchful draw template inner concrete in the bolt hole template construction method to build to accomplish after the sectional drawing of split bolt position.
The specific embodiment
Below in conjunction with accompanying drawing and specific embodiment the present invention is done to describe in detail.
Shown in Fig. 1-4; A kind of unmatchful bolt hole template construction method of installation of drawing of the present invention; It may further comprise the steps: (1) is longitudinally placed the polylith outer wall template successively and is formed lower floor's outer wall template 3; Adopt nail to splice in lower floor's outer wall template between adjacent two outer wall templates, vertical piece position is provided with flitch between two adjacent outer wall templates then, and nails; (2) place little template bar 1 and split bolt 2 at interval at lower floor outer wall template top; (3) repeat described step (1) and (2) and build the upper strata outer wall template layer by layer, until reaching the outer wall template setting height(from bottom); (4) in the outer wall template outside vertical flitch 4 is installed; (5) the two steel pipes of level that are provided with at the outside of vertical flitch installation along continuous straight runs, the two steel pipe spacings of level are identical with split bolt 2 vertical spacings, adopt split bolt that two steel pipes 5 are fixed; (6) planeness and the verticality of adjustment outer wall template; (7) water walling concrete 6; (8) the wall concrete unclamps split bolt 2 after reaching form removal intensity, takes off two steel pipes 5, removes outer wall template 3, rejects little template bar 1; (9) cut off drawing the spiral shell exposed parts at the channel bottom of rejecting the formation of little template bar position; (10) adopt waterproofing mortar floating groove.
The spacing of described split bolt 2 can be passed through and calculated.
Embodiment 1
(1) the polylith outer wall template is longitudinally placed formation first floor outer wall template 3 successively; Adopt nail to splice in lower floor's outer wall template between adjacent two outer wall templates; Vertical piece position is provided with flitch between two adjacent outer wall templates then, and nails; (2) place little template bar 1 and split bolt 2 at interval at lower floor outer wall template top; Spacing with layer split bolt 2 is 200mm; (3) repeat described step (1) and (2) and build the upper strata outer wall template layer by layer, until reaching the outer wall template setting height(from bottom); (4) in the outer wall template outside vertical flitch 4 is installed; (5) the two steel pipes of level that are provided with at the outside of vertical flitch installation along continuous straight runs, the two steel pipe spacings of level are identical with split bolt 2 vertical spacings, adopt split bolt that two steel pipes 5 are fixed; (6) planeness and the verticality of adjustment outer wall template; (7) water walling concrete 6; (8) the wall concrete unclamps split bolt 2 after reaching form removal intensity, takes off two steel pipes 5, removes outer wall template 3, rejects little template bar 1; (9) cut off drawing the spiral shell exposed parts at the channel bottom of rejecting the formation of little template bar position; (10) adopt waterproofing mortar floating groove.Carry out the next procedure construction then.
Through adopting this method construction concrete wall planeness better, template is not provided with bolt hole, increases the number of turnover of template.

Claims (1)

1. unmatchful bolt hole template construction method that draws is characterized in that it may further comprise the steps:
(1) the polylith outer wall template is longitudinally placed formation lower floor outer wall template successively; Adopt nail to splice in the described lower floor outer wall template between adjacent two outer wall templates; Vertical piece position is provided with flitch between two adjacent outer wall templates then, and nails;
(2) place little template bar and split bolt at interval at lower floor outer wall template top;
(3) repeat described step (1) and (2) and build the upper strata outer wall template layer by layer, until reaching the outer wall template setting height(from bottom);
(4) in the outer wall template outside vertical flitch is installed;
(5) the two steel pipes of level that along continuous straight runs is provided with are installed in the outside of vertical flitch, the two steel pipe spacings of level are identical with the vertical spacing of split bolt, adopt split bolt that two steel pipes are fixed;
(6) planeness and the verticality of adjustment outer wall template;
(7) water the walling concrete;
(8) the wall concrete unclamps split bolt after reaching form removal intensity, takes off two steel pipes, removes outer wall template, rejects little template bar;
(9) cut off drawing the spiral shell exposed parts at the channel bottom of rejecting the formation of little template bar position;
(10) adopt waterproofing mortar floating groove.
CN2012102774578A 2012-08-06 2012-08-06 Construction method of template with no split bolt hole Pending CN102777031A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012102774578A CN102777031A (en) 2012-08-06 2012-08-06 Construction method of template with no split bolt hole

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012102774578A CN102777031A (en) 2012-08-06 2012-08-06 Construction method of template with no split bolt hole

Publications (1)

Publication Number Publication Date
CN102777031A true CN102777031A (en) 2012-11-14

Family

ID=47122125

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012102774578A Pending CN102777031A (en) 2012-08-06 2012-08-06 Construction method of template with no split bolt hole

Country Status (1)

Country Link
CN (1) CN102777031A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103161303A (en) * 2013-04-15 2013-06-19 深圳汇林达科技有限公司 Vertical template system
CN104032841A (en) * 2014-07-02 2014-09-10 中冶天工集团有限公司 Method for treating horizontal construction joint of concrete wall
CN107905534A (en) * 2017-11-30 2018-04-13 上海宝冶集团有限公司 The method for fixing formwork for placing with square steel tube replacement flitch

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000087555A (en) * 1998-09-08 2000-03-28 Taisei Corp Separator
KR20010092471A (en) * 2001-02-26 2001-10-26 하동영 Wall ascending slab descending concrete casting method
CN201605801U (en) * 2010-02-09 2010-10-13 广东浩和建筑有限公司 Fair-faced concrete wall template system
CN101864834A (en) * 2010-06-11 2010-10-20 中国二十二冶集团有限公司 Construction method of wall wood formers adopting steel pipes as back edges
CN102444285A (en) * 2010-10-09 2012-05-09 中国建筑第四工程局有限公司 Method for manufacturing reinforced concrete basement external wall

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000087555A (en) * 1998-09-08 2000-03-28 Taisei Corp Separator
KR20010092471A (en) * 2001-02-26 2001-10-26 하동영 Wall ascending slab descending concrete casting method
CN201605801U (en) * 2010-02-09 2010-10-13 广东浩和建筑有限公司 Fair-faced concrete wall template system
CN101864834A (en) * 2010-06-11 2010-10-20 中国二十二冶集团有限公司 Construction method of wall wood formers adopting steel pipes as back edges
CN102444285A (en) * 2010-10-09 2012-05-09 中国建筑第四工程局有限公司 Method for manufacturing reinforced concrete basement external wall

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
张耀民: "穿墙螺栓不穿过组合钢模", 《建筑技术》, no. 4, 1 May 1983 (1983-05-01), pages 41 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103161303A (en) * 2013-04-15 2013-06-19 深圳汇林达科技有限公司 Vertical template system
CN103161303B (en) * 2013-04-15 2014-06-18 深圳汇林达科技有限公司 Vertical template system
CN104032841A (en) * 2014-07-02 2014-09-10 中冶天工集团有限公司 Method for treating horizontal construction joint of concrete wall
CN107905534A (en) * 2017-11-30 2018-04-13 上海宝冶集团有限公司 The method for fixing formwork for placing with square steel tube replacement flitch

Similar Documents

Publication Publication Date Title
CN104895318A (en) Aluminum alloy template system and construction method of same
CN102392536B (en) Construction method for long-span hanging vestibule type template support system
CN103321421A (en) Construction method for one-time formation of concrete pool wall
CN102146731B (en) Supporting structure for floor formwork of steel structure building and construction method
CN103541463B (en) Wallboard and shear wall allowing floor location provided with post-pouring belt comprising same and construction method for shear wall
CN104295088A (en) Steel-wood combined formwork structure of shear walls on two sides of deformation joint and construction method of steel-wood combined formwork structure
CN103669865A (en) Stair construction method through shaped supports
CN204001701U (en) Be applicable to the construction formwork system of multilayer rammed earth wall
CN207228617U (en) A kind of concrete-pouring template float Structure for basement barricade single side formwork
CN104153579B (en) A kind of formwork for placing structure of non-standard layers structure and construction method
CN111501839B (en) Cable shaft
CN210976328U (en) Secondary structure capable of being assembled for construction
CN102777031A (en) Construction method of template with no split bolt hole
CN104294984A (en) Thin-wall square box anti-floating structure and construction method thereof
CN106592996B (en) The construction method that small ocean housing reform is made
CN101886470B (en) Construction method of exposed concrete ribbed beams
CN204059420U (en) Late poured band support structure
CN204174854U (en) A kind of vertical fragmentation Assembled rotary cat ladder
CN106567543A (en) Slab-bottom structural concrete column reserved hole construction method
CN113090025B (en) Aluminum mold matching overhanging outer frame construction method of full concrete outer wall structure
CN204059943U (en) A kind of formwork for placing structure of non-standard layers structure
CN104908150B (en) A kind of piping shaft making template and the method based on factorial praluction piping shaft
CN202689365U (en) Prefabricated reinforced concrete roof gutter
CN102650153B (en) Prefabricated reinforced concrete gutter
CN102409846B (en) Hollow floor slab template for building and assembling method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20121114