CN102767378A - Double-column type tunnel portal method for bent frame construction tunnel - Google Patents

Double-column type tunnel portal method for bent frame construction tunnel Download PDF

Info

Publication number
CN102767378A
CN102767378A CN2012101737001A CN201210173700A CN102767378A CN 102767378 A CN102767378 A CN 102767378A CN 2012101737001 A CN2012101737001 A CN 2012101737001A CN 201210173700 A CN201210173700 A CN 201210173700A CN 102767378 A CN102767378 A CN 102767378A
Authority
CN
China
Prior art keywords
headwall
scaffold
template
concrete
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012101737001A
Other languages
Chinese (zh)
Other versions
CN102767378B (en
Inventor
郑永胜
李波
赵飞
吴波
陈辉
张恩生
刘茂兵
刘学伟
高飞
连小涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Second Engineering Co Ltd of CTCE Group
Original Assignee
China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Second Engineering Co Ltd of CTCE Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Tiesiju Civil Engineering Group Co Ltd CTCE Group, Second Engineering Co Ltd of CTCE Group filed Critical China Tiesiju Civil Engineering Group Co Ltd CTCE Group
Priority to CN201210173700.1A priority Critical patent/CN102767378B/en
Publication of CN102767378A publication Critical patent/CN102767378A/en
Application granted granted Critical
Publication of CN102767378B publication Critical patent/CN102767378B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses a bent frame construction tunnel double-column type tunnel portal method, which comprises the following steps: pouring foundation concrete and leveling a foundation; erecting a scaffold; constructing and reinforcing a template; pouring concrete on the wall body of the end wall; and constructing the end wall upright column template. The method for constructing the tunnel portal concrete can meet the construction quality requirement, is convenient for field operation control, does not influence the execution of other working procedures in the tunnel, and ensures the safety of the construction process.

Description

Framed bent construction tunnel queen post portal method
Technical field
The present invention relates to a kind of framed bent construction tunnel queen post portal method.
Background technology
Eight bush tunnels, iron clad road, capital are that envelope curve Jining, capital to header section increases and builds the second two-wire emphasis Control Engineering; Tunnel the beginning and the end mileage DK525+046~DK533+230; Total length 8184m, according to actual landform, geological conditions, slope excavation height is faced upward on the control limit; Consider the harmony of portal and surrounding environment, the portal headwall adopts queen post portal headwall pattern.
Portal headwall design Breadth Maximum is 50.18m, design height 14.79m, and wall thickness 1.7 ~ 3.0m, the metope gradient is 10:1, adopts steel concrete casting and constructing (design concreting side amount 946m 3)., lining arch top bit concrete formwork erection big to portal headwall section built difficulty, and we determine to adopt the scaffold support shuttering that headwall and top, hole concrete are built.Other considers headwall and column monobloc cast formwork erection difficulty, and we are employed in headwall and reserve and connect the mode that a batch reinforcing bar, column adopt the typing punching block separately to build and build.Through taking above-mentioned measure, completed successfully under the situation that does not influence in-cavity construction that portal headwall and column are concrete builds.
The present invention is directed to actual landform, geological conditions, a kind of construction scheme efficiently is provided.
Summary of the invention
The present invention provides a kind of can satisfy the construction quality requirement, is convenient to execute-in-place control, does not influence the carrying out of other operation construction operations in the tunnel, has guaranteed the framed bent construction tunnel queen post portal method of work progress safety.
Technical solution problem of the present invention provides following scheme:
A kind of framed bent construction tunnel queen post portal method may further comprise the steps:
A) base concrete is built and the ground leveling;
B) scaffold building;
C) template construction and reinforcing;
D) headwall wall body concrete pouring construction;
E) headwall model of the column and concrete construction;
Specifically comprise step by step following among the said step a:
1. at first in the headwall work progress, carry out the headwall base concrete and build;
2. secondly for making things convenient for postorder template construction and reinforcing, decision is widened 20-30cm on the basis of former concreting design basis width;
3. treat base concrete build finish after, the ground in the scaffold boundary of works area is carried out spreading leveling, guarantee in the scaffold building scope basis and draining all around is unimpeded, ponding not;
Specifically comprise following steps among the said step b:
1. tell somebody what one's real intentions are according to designing and calculating and scheme and carry out scaffold building, in setting up process, consider the needs of headwall concreting in lifts; Said scaffold is constructed at twice, carries out the first floor scaffold earlier and sets up: at first on the ground of headwall one side, lay a plurality of chocks, a plurality of perpendicular supports are installed on the said chock; Between a plurality of perpendicular supports, fixedly mount stull; The horizontal bridging of fixed installation between said stull and the perpendicular support, a side fixed support of said perpendicular support has diagonal brace, and scaffolding height is 5-7m;
2. carry out setting up of second layer scaffold again; Above the first floor scaffold, continue to set up stull and perpendicular support; On the sidewall of headwall, be drilled with boring, mounting reinforcing steel bars in boring, said reinforcing bar is reinforced the stull of scaffold; Between adjacent two stulls, lay foot guard plate, scaffolding height is 13-15m;
3. after first floor scaffold and second layer scaffold set up completion, at the close order safety net of the outer parcel of scaffold;
4. for guaranteeing normal construction in the hole, on the scaffold of tunnel portal, reserve 2 door openings, as crossing vehicle passage and geomantic omen tube passage;
5. after treating that scaffold building is accomplished, tissue engineering technique and peace matter personnel carry out safe mass and check and accept;
Specifically comprise following steps among the said step c:
1. in the building of scaffold, carry out setting up of template; At first a plurality of transverse reinforcements of fixed installation support on the end face of headwall; Between a plurality of transverse reinforcements, set up vertical reinforcement again, in the fixing welding of end " L " type support of transverse reinforcement, " L " type that template is leaned against supports;
2. along end wall surface vertical supporting steel pipe is installed again after, the horizontal steel pipe of fixed installation is pressed purlin between vertical supporting steel pipe again, and said steel pipe presses purlin to be pressed in the template top, and clamping pine wood a tree, used in making timber for boats compresses template between said steel pipe and the template;
Said steps d specifically comprises following steps:
1. adopt the mechanical hoisting funnel, funnel is transported to headwall and template top, gap between funnel feed opening aligning headwall and the template is poured into a mould, said headwall wall body concrete divides builds for three times, builds for the first time highly to be 3.5m on basic end face;
2. treat after the first floor concrete setting, carry out again building the second time, build to the lining arch top bit;
3. treat to build for the third time after the second layer concrete setting, build to more than the lining cutting vault and cap stone position;
4. after treating that the headwall concrete solidifies fully,, accomplish building of headwall with the template dismounting;
Said step e specifically comprises following steps:
1. reserve in stud in advance on one's body at the headwall wall of building and connect a batch reinforcing bar, protruded length is different on-the-spot concrete definite according to column thickness;
2. model of the column is installed; Said model of the column is employed in the headwall wall body of constructing and is drilled with the mode that hole for the expansion bolt and scaffold support and fixes; The headwall model of the column adopts typing punching block factory process to make, and form surfacing thickness is 3mm, and the back side adopts the channel-section steel ribbing to support;
3. after treating that the template fixed installation is good, carry out concreting;
4. treat after concrete setting well template and scaffold to be removed, carry out quality examination again and check and accept.
Said scaffold adopts standard steel pipe and fastener to construct, and it sets up advance is 1.2m, transfer 1.3m, and step pitch adopts 1.5m, the pole clearance chock 0.2m that sweeps the floor, 0.3m at the bottom of the inside stand pole clearance headwall.
The said headroom size of reserving vehicle passage and geomantic omen tube passage is respectively 4.8m*4.75m, 2.4m*3.0 m.
Said headwall template adopts 18mm film coating plywood and the thick plastic-aluminum sheet material of 5mm to carry out processing and fabricating, and the support of the 10*10cm lumps of wood, spacing 0.3m are vertically established in the template back side; Lumps of wood support outside laterally adopts two row's standard steel pipes to do the pressure purlin, spacing 0.6m, and the mode that the form joint consolidation process adopts double φ 48 steel pipes and the lumps of wood to support is reinforced.
Headwall wall body concrete pouring construction, headwall wall body concrete divides builds for three times, builds for the first time highly to be 3.5m on basic end face to build to the lining arch top bit for the second time, builds the above and cap stone position of lining cutting vault for the third time.Concrete field by using mechanical hoisting funnel mode is built.
Because of headwall concreting belongs to mass concrete construction; In the process of building; Decision is mainly from reducing hydration heat of cement, reduction concrete molding temperature, embedded steel tube water flowing heat radiation, strengthening concrete curing; Several respects such as strict control striking time are carried out concrete temperature control work, guarantee that internal-external temperature difference is controlled in 20 ° of C, and assurance headwall concrete is accomplished smoothly and built.
Headwall model of the column and concrete construction treat to begin to construct after the concreting of headwall wall body finishes the headwall column.The headwall model of the column adopts typing punching block factory process to make, and form surfacing thickness is 3mm, and the back side adopts the channel-section steel ribbing to support.During the concrete construction of headwall metope; Reserve in stud in advance and connect a batch reinforcing bar, connect batch reinforcing bar and adopt the construction of φ 16 screw-thread steels, rebar spacing 30*30cm; Length of embedment 50cm, protruded length is according to column thickness different on-the-spot concrete confirm (construction of headwall model of the column sees Fig. 7 for details).
Model of the column is employed in the headwall wall body of constructing and is drilled with the mode that hole for the expansion bolt and scaffold support and fixes.
Construction precautions
1, during the entrance construction scaffold, the scene must be established the special messenger and commanded vehicle turnover in the hole, crosses vehicle passage and must install crash bearer and carry out alarming sign for four jiaos, crosses 20m position, the place ahead, vehicle passage both sides in addition limited speed belt must be set.
2, the reply ground flattens and spreading is handled before the scaffold building, disposes can carry out the next procedure construction after qualified on inspection.
3, during scaffold building, must tell somebody what one's real intentions are in strict accordance with designing and calculating and scheme and construct, set up completion after, agree without the security staff, forbid arbitrarily to remove fastener and connector.
4, scaffold connects and must use standard fastener to construct, and joint will stagger, and bolt is fastening.
Must stop scaffold building when 5, meeting the strong wind thunderstorm weather, remove operation.Behind strong wind, heavy rain weather, must carry out comprehensive maintenance and inspection, can continue construction after the passed examination construction scaffolding.
When 6, removing scaffold, should establish guardrail or caution notice on every side, and should remove from top to down, double-deck operation up and down.Scaffold, the transmission of plate using artificial or the crane removed hang and send, and close inspection, must hang that steady rear is capable of hoisting to be sent, and forbid random throwing.
Section is big, the tunnel portal of novel structure is along with the lifting of class of track and design concept, in the traffic network construction, can often run into.Adopt the method construction tunnel portal concrete, can satisfy the construction quality requirement, be convenient to execute-in-place control, do not influence the carrying out of other operation construction operations in the tunnel, guaranteed the safety of work progress.This job practices development prospect is better.
This method constructing operation is practical simply, construction speed is fast, does not influence other operations constructions of tunnel, has guaranteed the safety of work progress, and similar tunnel portal construction is had certain experiences and directive function.
Description of drawings
Fig. 1: the portal headwall scaffold whole elevation of constructing.
Fig. 2: the scaffold sectional drawing of constructing for the first time.
Fig. 3: the scaffold sectional drawing of constructing for the second time.
Fig. 4: formwork bracing system sketch map.
Fig. 5: sketch map is reinforced in form joint.
Fig. 6: " L " type support location sketch map.
Fig. 7: headwall model of the column construction sketch map.
The specific embodiment
Referring to accompanying drawing, a kind of framed bent construction tunnel queen post portal method may further comprise the steps:
F) base concrete is built and the ground leveling;
G) scaffold building;
H) template construction and reinforcing;
I) headwall wall body concrete pouring construction;
J) headwall model of the column and concrete construction;
Specifically comprise step by step following among the said step a:
1. at first in the headwall work progress, carry out the headwall base concrete and build;
2. secondly for making things convenient for postorder template construction and reinforcing, decision is widened 20-30cm on the basis of former concreting design basis width;
3. treat base concrete build finish after, the ground in the scaffold boundary of works area is carried out spreading leveling, guarantee in the scaffold building scope basis and draining all around is unimpeded, ponding not;
Specifically comprise following steps among the said step b:
1. tell somebody what one's real intentions are according to designing and calculating and scheme and carry out scaffold building; In setting up process, consider the needs of headwall concreting in lifts, said scaffold is constructed at twice; Carrying out first floor scaffold 1 earlier sets up: at first on the ground of headwall one side, lay a plurality of chocks; A plurality of perpendicular supports are installed on the said chock, between a plurality of perpendicular supports, fixedly mount stull, the horizontal bridging of fixed installation between said stull and the perpendicular support; One side fixed support of said perpendicular support has diagonal brace, and scaffolding height is 5-7m;
2. carry out setting up of second layer scaffold 2 again; Above the first floor scaffold, continue to set up stull and perpendicular support; On the sidewall of headwall, be drilled with boring, mounting reinforcing steel bars in boring, said reinforcing bar is reinforced the stull of scaffold; Between adjacent two stulls, lay foot guard plate, scaffolding height is 13-15m;
3. after first floor scaffold and second layer scaffold set up completion, at the close order safety net of the outer parcel of scaffold;
4. for guaranteeing normal construction in the hole, on the scaffold of tunnel portal, reserve 2 door openings, as crossing vehicle passage and geomantic omen tube passage;
5. after treating that scaffold building is accomplished, tissue engineering technique and peace matter personnel carry out safe mass and check and accept;
Specifically comprise following steps among the said step c:
1. in the building of scaffold, carry out setting up of template; At first a plurality of transverse reinforcements of fixed installation support on the end face of headwall; Between a plurality of transverse reinforcements, set up vertical reinforcement again, in the fixing welding of end " L " type support of transverse reinforcement, " L " type that template is leaned against supports;
2. along end wall surface vertical supporting steel pipe is installed again after, the horizontal steel pipe of fixed installation is pressed purlin between vertical supporting steel pipe again, and said steel pipe presses purlin to be pressed in the template top, and clamping pine wood a tree, used in making timber for boats compresses template between said steel pipe and the template;
Said steps d specifically comprises following steps:
1. adopt the mechanical hoisting funnel, funnel is transported to headwall and template top, gap between funnel feed opening aligning headwall and the template is poured into a mould, said headwall wall body concrete divides builds for three times, builds for the first time highly to be 3.5m on basic end face;
2. treat after the first floor concrete setting, carry out again building the second time, build to the lining arch top bit;
3. treat to build for the third time after the second layer concrete setting, build to more than the lining cutting vault and cap stone position;
4. after treating that the headwall concrete solidifies fully,, accomplish building of headwall with the template dismounting;
Said step e specifically comprises following steps:
1. reserve in stud in advance on one's body at the headwall wall of building and connect a batch reinforcing bar, protruded length is different on-the-spot concrete definite according to column thickness;
2. model of the column is installed; Said model of the column is employed in the headwall wall body of constructing and is drilled with the mode that hole for the expansion bolt and scaffold support and fixes; The headwall model of the column adopts typing punching block factory process to make, and form surfacing thickness is 3mm, and the back side adopts the channel-section steel ribbing to support;
3. after treating that the template fixed installation is good, carry out concreting;
4. treat after concrete setting well template and scaffold to be removed, carry out quality examination again and check and accept.
Said scaffold adopts standard steel pipe and fastener to construct, and it sets up advance is 1.2m, transfer 1.3m, and step pitch adopts 1.5m, the pole clearance chock 0.2m that sweeps the floor, 0.3m at the bottom of the inside stand pole clearance headwall.
The said headroom size of reserving vehicle passage and geomantic omen tube passage is respectively 4.8m*4.75m, 2.4m*3.0 m.
Said headwall template adopts 18mm film coating plywood and the thick plastic-aluminum sheet material of 5mm to carry out processing and fabricating, and the support of the 10*10cm lumps of wood, spacing 0.3m are vertically established in the template back side; Lumps of wood support outside laterally adopts two row's standard steel pipes to do the pressure purlin, spacing 0.6m, and the mode that the form joint consolidation process adopts double φ 48 steel pipes and the lumps of wood to support is reinforced.
Headwall wall body concrete pouring construction, headwall wall body concrete divides builds for three times, builds for the first time highly to be 3.5m on basic end face to build to the lining arch top bit for the second time, builds the above and cap stone position of lining cutting vault for the third time.Concrete field by using mechanical hoisting funnel mode is built.

Claims (4)

1. framed bent construction tunnel queen post portal method may further comprise the steps:
A) base concrete is built and the ground leveling;
B) scaffold building;
C) template construction and reinforcing;
D) headwall wall body concrete pouring construction;
E) headwall model of the column and concrete construction;
It is characterized in that: specifically comprise step by step following among the said step a:
1. at first in the headwall work progress, carry out the headwall base concrete and build;
2. secondly for making things convenient for postorder template construction and reinforcing, decision is widened 20-30cm on the basis of former concreting design basis width;
3. treat base concrete build finish after, the ground in the scaffold boundary of works area is carried out spreading leveling, guarantee in the scaffold building scope basis and draining all around is unimpeded, ponding not;
Specifically comprise following steps among the said step b:
1. tell somebody what one's real intentions are according to designing and calculating and scheme and carry out scaffold building, in setting up process, consider the needs of headwall concreting in lifts; Said scaffold is constructed at twice, carries out the first floor scaffold earlier and sets up: at first on the ground of headwall one side, lay a plurality of chocks, a plurality of perpendicular supports are installed on the said chock; Between a plurality of perpendicular supports, fixedly mount stull; The horizontal bridging of fixed installation between said stull and the perpendicular support, a side fixed support of said perpendicular support has diagonal brace, and scaffolding height is 5-7m;
2. carry out setting up of second layer scaffold again; Above the first floor scaffold, continue to set up stull and perpendicular support; On the sidewall of headwall, hole, skyhook in boring, said anchor pole is reinforced the stull of scaffold; Between adjacent two stulls, lay foot guard plate, scaffolding height is 13-15m;
3. after first floor scaffold and second layer scaffold set up completion, at the close order safety net of the outer parcel of scaffold;
4. for guaranteeing normal construction in the hole, on the scaffold of tunnel portal, reserve 2 door openings, as crossing vehicle passage and geomantic omen tube passage;
5. after treating that scaffold building is accomplished, tissue engineering technique and peace matter personnel carry out safe mass and check and accept;
Specifically comprise following steps among the said step c:
1. in the building of scaffold, carry out setting up of template; At first a plurality of transverse reinforcements of fixed installation support on the end face of headwall; Between a plurality of transverse reinforcements, set up vertical reinforcement again, in the fixing welding of end " L " type support of transverse reinforcement, " L " type that template is leaned against supports;
2. along end wall surface vertical supporting steel pipe is installed again after, the horizontal steel pipe of fixed installation is pressed purlin between vertical supporting steel pipe again, and said steel pipe presses purlin to be pressed in the template top, and clamping pine wood a tree, used in making timber for boats compresses template between said steel pipe and the template;
Said steps d specifically comprises following steps:
1. adopt the mechanical hoisting funnel, funnel is transported to headwall and template top, gap between funnel feed opening aligning headwall and the template is poured into a mould, said headwall wall body concrete divides builds for three times, builds for the first time highly to be 3.5m on basic end face;
2. treat after the first floor concrete setting, carry out again building the second time, build to the lining arch top bit;
3. treat to build for the third time after the second layer concrete setting, build to more than the lining cutting vault and cap stone position;
4. after treating that the headwall concrete solidifies fully,, accomplish building of headwall with the template dismounting;
Said step e specifically comprises following steps:
1. reserve in stud in advance on one's body at the headwall wall of building and connect a batch reinforcing bar, protruded length is different on-the-spot concrete definite according to column thickness;
2. model of the column is installed; Said model of the column is employed in the headwall wall body of constructing and is drilled with the mode that hole for the expansion bolt and scaffold support and fixes; The headwall model of the column adopts typing punching block factory process to make, and form surfacing thickness is 3mm, and the back side adopts the channel-section steel ribbing to support;
3. after treating that the template fixed installation is good, carry out concreting;
4. treat after concrete setting well template and scaffold to be removed, carry out quality examination again and check and accept.
2. according to the said framed bent construction tunnel of claim 1 queen post portal method, it is characterized in that: said scaffold adopts standard steel pipe and fastener to construct, and it sets up advance is 1.2m; Transfer 1.3m; Step pitch adopts 1.5m, the pole clearance chock 0.2m that sweeps the floor, 0.3m at the bottom of the inside stand pole clearance headwall.
3. according to the said framed bent construction tunnel of claim 1 queen post portal method, it is characterized in that: the said headroom size of reserving vehicle passage and geomantic omen tube passage is respectively 4.8m*4.75m, 2.4m*3.0 m.
4. according to the said framed bent construction tunnel of claim 1 queen post portal method, it is characterized in that: said headwall template adopts 18mm film coating plywood and the thick plastic-aluminum sheet material of 5mm to carry out processing and fabricating, and the support of the 10*10cm lumps of wood, spacing 0.3m are vertically established in the template back side; Lumps of wood support outside laterally adopts two row's standard steel pipes to do the pressure purlin, spacing 0.6m, and the mode that the form joint consolidation process adopts double φ 48 steel pipes and the lumps of wood to support is reinforced.
CN201210173700.1A 2012-05-30 2012-05-30 Double-column type tunnel portal method for bent frame construction tunnel Expired - Fee Related CN102767378B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210173700.1A CN102767378B (en) 2012-05-30 2012-05-30 Double-column type tunnel portal method for bent frame construction tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210173700.1A CN102767378B (en) 2012-05-30 2012-05-30 Double-column type tunnel portal method for bent frame construction tunnel

Publications (2)

Publication Number Publication Date
CN102767378A true CN102767378A (en) 2012-11-07
CN102767378B CN102767378B (en) 2014-04-09

Family

ID=47094918

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210173700.1A Expired - Fee Related CN102767378B (en) 2012-05-30 2012-05-30 Double-column type tunnel portal method for bent frame construction tunnel

Country Status (1)

Country Link
CN (1) CN102767378B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103362523A (en) * 2013-07-22 2013-10-23 重庆千牛建设工程有限公司 Suspended formwork lining method for cover arch outside tunnel portal with weak surrounding rocks
CN105649651A (en) * 2015-12-31 2016-06-08 中铁二十五局集团第五工程有限公司 Construction method of secondary tunnel lining
CN106812090A (en) * 2017-03-28 2017-06-09 四川西南交大土木工程设计有限公司 It is a kind of to can be used for the new road anti-collision facility construction of underground space ventilation
CN108691416A (en) * 2018-06-21 2018-10-23 中铁建工集团有限公司 Cast-in-place special-shaped beam plain form system with arc-shaped side edges

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100676914B1 (en) * 2006-06-13 2007-02-01 주식회사 무진네오테크 Excavating method of tunnel with slight vibration
CN101260806A (en) * 2008-04-24 2008-09-10 重庆交通科研设计院 Preposition type opening construction method
JP2010053574A (en) * 2008-08-27 2010-03-11 Kajima Corp Construction method for tunnel entrance
CN101818645A (en) * 2010-03-22 2010-09-01 中铁十二局集团第二工程有限公司 Construction method for newly increasing arched open cut tunnel at railway operating line tunnel portal
CN101781993B (en) * 2010-01-19 2012-05-23 中铁四局集团第二工程有限公司 Shield driving construction method for bearing water-rich soil layer

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100676914B1 (en) * 2006-06-13 2007-02-01 주식회사 무진네오테크 Excavating method of tunnel with slight vibration
CN101260806A (en) * 2008-04-24 2008-09-10 重庆交通科研设计院 Preposition type opening construction method
JP2010053574A (en) * 2008-08-27 2010-03-11 Kajima Corp Construction method for tunnel entrance
CN101781993B (en) * 2010-01-19 2012-05-23 中铁四局集团第二工程有限公司 Shield driving construction method for bearing water-rich soil layer
CN101818645A (en) * 2010-03-22 2010-09-01 中铁十二局集团第二工程有限公司 Construction method for newly increasing arched open cut tunnel at railway operating line tunnel portal

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103362523A (en) * 2013-07-22 2013-10-23 重庆千牛建设工程有限公司 Suspended formwork lining method for cover arch outside tunnel portal with weak surrounding rocks
CN105649651A (en) * 2015-12-31 2016-06-08 中铁二十五局集团第五工程有限公司 Construction method of secondary tunnel lining
CN106812090A (en) * 2017-03-28 2017-06-09 四川西南交大土木工程设计有限公司 It is a kind of to can be used for the new road anti-collision facility construction of underground space ventilation
CN106812090B (en) * 2017-03-28 2022-04-15 四川西南交大土木工程设计有限公司 Road anti-collision facility structure capable of being used for ventilation of underground space
CN108691416A (en) * 2018-06-21 2018-10-23 中铁建工集团有限公司 Cast-in-place special-shaped beam plain form system with arc-shaped side edges

Also Published As

Publication number Publication date
CN102767378B (en) 2014-04-09

Similar Documents

Publication Publication Date Title
CN106223360B (en) Using the open cut cast in place and precast construction subway station construction method of stake supporting system
CN108265885B (en) Construction method of high-large non-orthogonal large-inclination-angle special-shaped concrete inclined column
CN104060629B (en) The superimposed wall construction method in covered back-digging subway station and portable side wall formwork jumbo
CN102493341A (en) Construction method for hollow thin-walled high pier non-bracket formwork turnover of railway
CN205025086U (en) Strength nature skeleton concrete beam construction suspend template in midair
CN106088148B (en) Pipe gallery template and its application
CN101761092A (en) Construction method of movable side wall of large overall template of large-span deep foundation pit
CN103255717A (en) Method for constructing hit-preventing wall
CN107574762A (en) A kind of construction method for strengthening Cast-in-situ Beam 0# block construction qualities
CN109267487A (en) A kind of long big section bent cap bracket system of overhanging
US20140223851A1 (en) Prefabricated reinforced concrete wall panel and installation method
CN104532754B (en) A kind of prestressed concrete box girder end-blocking template construction method
CN105525753A (en) Method and structure for simultaneously constructing constructional column and main body structure
CN111794254A (en) Railway slope prefabricated assembled post-cast framework slope protection structure and construction method thereof
CN107100083A (en) A kind of T-shaped high pier Cast-in-place Bent Cap formwork erecting structure and construction method
CN102767378B (en) Double-column type tunnel portal method for bent frame construction tunnel
CN107386246B (en) A kind of lock chamber wall Construction Through Form on Traveler method
CN112302255A (en) Frame column inverted insertion combined system and construction method
CN109577206B (en) Hollow high pier formwork system and construction method
CN110952995A (en) Construction method for external tunnel door post-cast ring beam
CN208168479U (en) A kind of prefabricated rod structure in inspection hole
CN206956979U (en) A kind of Linear shear wall with fore-set
CN217204165U (en) Assembled anchor rod frame beam
CN114439291B (en) Column type inspection pit cast-in-place concrete track column and construction method
CN216108007U (en) Concrete beam type bridge and cast-in-situ hidden cover beam thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20140409

Termination date: 20210530