CN102759100A CN2012101967516A CN201210196751A CN102759100A CN 102759100 A CN102759100 A CN 102759100A CN 2012101967516 A CN2012101967516 A CN 2012101967516A CN 201210196751 A CN201210196751 A CN 201210196751A CN 102759100 A CN102759100 A CN 102759100A
Authority
CN
China
Prior art keywords
pipe
slagging
slagging pipe
boiler
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012101967516A
Other languages
Chinese (zh)
Inventor
计彬鹏
曹忠宁
朱松柏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHAANXI HUADIAN YAOCHI POWER GENERATION CO Ltd
Original Assignee
SHAANXI HUADIAN YAOCHI POWER GENERATION CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHAANXI HUADIAN YAOCHI POWER GENERATION CO Ltd filed Critical SHAANXI HUADIAN YAOCHI POWER GENERATION CO Ltd
Priority to CN2012101967516A priority Critical patent/CN102759100A/en
Publication of CN102759100A publication Critical patent/CN102759100A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Removal Of Floating Material (AREA)

Abstract

The invention relates to a boiler slagging pipe. The boiler slagging pipe comprises an upper slagging pipe, a lower slagging pipe and a slag cooler inlet pipe, wherein the upper slagging pipe is connected with the lower slagging pipe through the slag cooler inlet pipe, a high-temperature gate valve is arranged on the upper part of the upper slagging pipe, a water-cooling nonmetal expansion joint is sleeved on the lower slagging pipe, the output end of the water-cooling nonmetal expansion joint is connected with a connecting pipe, and an accident slagging pipe is vertically arranged on the lower part of the upper slagging pipe. The boiler slagging pipe is capable of adequately ensuring slagging in completely sealed state when the boiler operates, the three-dimensional displacement of the slagging pipe can reach the axle compression of 180-230mm, the radial direction dislocation can reach 50-80mm, reliability and sealing of the device during long time processing can be maximally improved, the characteristics of strong three-dimensional displacement absorption and convenience for later period maintenance are obtained; and a circulating path of the recirculated water does not enter into the slagging pipe, thus a refractory castable is not needed to be laid inside.

Description

The boiler slag removal pipe
Technical field
The invention belongs to boiler slag removal equipment, be specifically related to a kind of boiler slag removal pipe.
Background technology
The CFBB that uses at present, design adopt continuous, surface-cooled mode to carry out deslagging, and every boiler is equipped with cylinder surface formula slag cooler; Through the production practice over one year operation; Scum pipe and slag cooler approach cone body place weld bond cracking and sealing plate repeatedly occur and lead slag pipe distortion, cause that fire, leakage slag phenomenon frequently take place with Louing, and equipment and personnel are caused certain potential safety hazard; A large amount of outwards spray slag phenomenons are increasingly sharpened; Stove zero a rice slag is piled into the mountain, need employ a large amount of labours to clear at every turn, has had a strong impact on economic benefit and site safety normally the carrying out of work of carrying out production strictly in line with rules and regulations.
Summary of the invention
The technical problem that the present invention solved provides a kind of reliability and safe, not stifled slag, the boiler slag removal pipe that temperature tolerance is strong.
For solving above-mentioned technical problem, the technical scheme that the present invention takes:
The boiler slag removal pipe; Its special character is: comprise scum pipe, lower dreg discharging pipe, slag cooler slag feed pipe; Last scum pipe is connected with the lower dreg discharging pipe through the slag cooler slag feed pipe, and the top of last scum pipe is provided with the high temperature push-pull valve, is arranged with the water-cooled non-metal expansion joint on the lower dreg discharging pipe; The port of export of water-cooled non-metal expansion joint is connected with adapter, and the lower vertical of last scum pipe is provided with the accident scum pipe.
Above-mentioned water-cooled non-metal expansion joint is provided with down logical cinder hole.
Above-mentioned last scum pipe is provided with logical cinder hole.
The bottom of above-mentioned adapter is provided with has returned scum pipe.
Compared with prior art, when the present invention can fully guarantee boiler operatiopn, at complete sealing state lower dreg discharging; The three-dimensional displacement energy of scum pipe reaches axial compression 180-230mm; The 50-80mm that radially can misplace can guarantee to improve to greatest extent the reliability and the sealing of equipment long-time running, has three-D displacement and absorbs strong, convenient later maintenance characteristics; Because the circulating pathway of recirculated water does not get into scum pipe inside, so pours need not laid in inside.
Description of drawings
Fig. 1 is a structural representation of the present invention.
The specific embodiment
Below in conjunction with the accompanying drawing and the specific embodiment the present invention is elaborated.
Referring to Fig. 1; The present invention includes scum pipe 1, lower dreg discharging pipe 2, slag cooler slag feed pipe 3; Last scum pipe 1 is connected with lower dreg discharging pipe 2 through slag cooler slag feed pipe 3, and the top of last scum pipe 1 is provided with high temperature push-pull valve 7, is arranged with water-cooled non-metal expansion joint 4 on the lower dreg discharging pipe 2; The port of export of water-cooled non-metal expansion joint 4 is connected with takes over 9, and the lower vertical of last scum pipe 1 is provided with accident scum pipe 5.
Above-mentioned water-cooled non-metal expansion joint 4 is provided with down logical cinder hole 6.
The bottom of above-mentioned adapter 9 is provided with has returned scum pipe 8.

Claims (4)

1. boiler slag removal pipe; It is characterized in that: comprise scum pipe (1), lower dreg discharging pipe (2), slag cooler slag feed pipe (3); Last scum pipe (1) is connected with lower dreg discharging pipe (2) through slag cooler slag feed pipe (3); The top of last scum pipe (1) is provided with high temperature push-pull valve (7); Be arranged with water-cooled non-metal expansion joint (4) on the lower dreg discharging pipe (2), the port of export of water-cooled non-metal expansion joint (4) is connected with adapter (9), and the lower vertical of last scum pipe (1) is provided with accident scum pipe (5).
2. boiler slag removal pipe according to claim 1 is characterized in that: described water-cooled non-metal expansion joint (4) is provided with down logical cinder hole (6).
3. boiler slag removal pipe according to claim 1 and 2 is characterized in that: the described scum pipe of going up is provided with logical cinder hole (10).
4. boiler slag removal pipe according to claim 3 is characterized in that: the bottom of described adapter (9) is provided with has returned scum pipe (8).
CN2012101967516A 2012-06-15 2012-06-15 Boiler slagging pipe Pending CN102759100A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012101967516A CN102759100A (en) 2012-06-15 2012-06-15 Boiler slagging pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012101967516A CN102759100A (en) 2012-06-15 2012-06-15 Boiler slagging pipe

Publications (1)

Publication Number Publication Date
CN102759100A true CN102759100A (en) 2012-10-31

Family

ID=47053659

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012101967516A Pending CN102759100A (en) 2012-06-15 2012-06-15 Boiler slagging pipe

Country Status (1)

Country Link
CN (1) CN102759100A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103711951A (en) * 2013-12-11 2014-04-09 天津钢研广亨特种装备股份有限公司 Sand-seal temperature compensation high-temperature eject valve
CN106322371A (en) * 2016-08-22 2017-01-11 中国能源建设集团湖南火电建设有限公司 Anti-blocking method and device for dry type slag drainage system of biomass boiler
CN108050512A (en) * 2017-12-05 2018-05-18 赣州华兴钨制品有限公司 A kind of boiler hearth of circulating fluidized bed slag-draining device and its operating method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103711951A (en) * 2013-12-11 2014-04-09 天津钢研广亨特种装备股份有限公司 Sand-seal temperature compensation high-temperature eject valve
CN106322371A (en) * 2016-08-22 2017-01-11 中国能源建设集团湖南火电建设有限公司 Anti-blocking method and device for dry type slag drainage system of biomass boiler
CN108050512A (en) * 2017-12-05 2018-05-18 赣州华兴钨制品有限公司 A kind of boiler hearth of circulating fluidized bed slag-draining device and its operating method

Similar Documents

Publication Publication Date Title
CN201163151Y (en) Residual heat utilization apparatus of gangue brick tunnel kiln
CN102759100A (en) Boiler slagging pipe
CN204007783U (en) A kind of level monitoring device and gasification system
CN104315896A (en) Detachable heat exchanger for blast furnace slag flushing water
CN103773912B (en) Waste heat recovery system for ironmaking implemented by using coal direct reduction process
CN202884906U (en) Slag discharging pipe of boiler
CN202193462U (en) Hermetically-deslagging and lifting dumping device
CN205014347U (en) Novel circulating fluidized bed boiler abrasionproof fin
CN203704664U (en) Electric furnace water cooling furnace shell device
CN203021308U (en) Reaction kettle
CN203737426U (en) Liquid skimming pipe of scraper centrifuge
CN203421314U (en) Sealing device of connection pipe of water-cooling vibration fire grate
CN105219915A (en) A kind of continuous adjustable aqueous vapor atomization converter shell epimere refrigerating unit
CN203668440U (en) Waste heat recovery system for iron making by using coal direct reduction method
CN204460197U (en) A kind of slag dropping tube tube cap structure
CN203869015U (en) Device for sealing support in through-wall position of collection box
CN204268929U (en) A kind of detachable heat exchanger for blast furnace slag quenching water
CN202032595U (en) Cold tube type boiler slag cooling device in jacket
CN202836193U (en) Low pollution lead smelting furnace heating device
CN202955685U (en) Boiler furnace corner sealing device
CN204198762U (en) A kind of autocompensation installation of blast furnace top gearbox cooling system
CN201935401U (en) Fin type vertical water pipe return stroke
CN203999675U (en) A kind of converter trunnion ring aqueous vapor medium moves towards arrangement
CN204283576U (en) Mine car anti-explosion diesel engine gas exhaust manifold
CN204514047U (en) Bottom convertor charge door protective device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20121031