CN102758630B - Method for extracting part of fault protection coal pillars - Google Patents

Method for extracting part of fault protection coal pillars Download PDF

Info

Publication number
CN102758630B
CN102758630B CN201210262343.6A CN201210262343A CN102758630B CN 102758630 B CN102758630 B CN 102758630B CN 201210262343 A CN201210262343 A CN 201210262343A CN 102758630 B CN102758630 B CN 102758630B
Authority
CN
China
Prior art keywords
filling
coal
coal column
fault protection
width
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210262343.6A
Other languages
Chinese (zh)
Other versions
CN102758630A (en
Inventor
张培森
颜伟
杨健
李伟
张广鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University of Science and Technology
Original Assignee
Shandong University of Science and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University of Science and Technology filed Critical Shandong University of Science and Technology
Priority to CN201210262343.6A priority Critical patent/CN102758630B/en
Publication of CN102758630A publication Critical patent/CN102758630A/en
Application granted granted Critical
Publication of CN102758630B publication Critical patent/CN102758630B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Analysing Materials By The Use Of Radiation (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses a method for extracting a part of fault protection coal pillars. The method is used for replacing a part of fault protection coal pillars by applying fill mining methods. The method is divided into four categories, namely, a method for replacing and extracting the fault protection coal pillars by adopting a strip-type filling manner, a method for replacing and extracting the fault protection coal pillars in an arch-bridge type filling manner, a method for replacing and extracting the fault protection coal pillars in a continuous filling manner and a method for replacing and extracting the fault protection coal pillars by an interval-type filling manner. The method disclosed by the invention has the advantages of replacing a part of the fault protection coal pillars in consideration of using filling mining methods for the first time. According to the invention, different filling method can be given according to circumstances aiming at different geological conditions, the minimum fault protection coal pillar is set on the premise of ensuring that a part of fault protection coal pillars are safely extracted and no water burst accident is caused. The method disclosed by the invention can be widely applied to engineering practices of extracting the fault protection coal pillars in various geological conditions, realizes maximized utilization of resources, can create considerable economic values and is more scientific and practical.

Description

The method of back production part faults protecting coal column
Technical field
The present invention relates to a kind of method of back production part faults protecting coal column, be specially a kind of series methods using filling mining method back production part faults protecting coal column, belong to colliery special exploitation technical field.
Background technology
Mine floor water inrush accident about 80% is all relevant with tomography.Address this problem, targetedly some measures, as grout transformation, leting speeper with stay water of setting up defences (protection) coal column etc., wherein stay and establish barrier pillar the most common.According to the regulation in code, fault waterproof pillar stays establishes width to be at least 20m, and at some mine, because geological conditions is severe, the width of barrier pillar has even exceeded 100m.Although stay the guarantee of establishing protection coal pillar to improve safe coal back production; but also result in the loss of resource; if after barrier pillar rational width is determined, certain specific process can be used, under the prerequisite of exploitation that ensures safety; back production goes out a part of barrier pillar again; it not only reduces Coal Loss, improves coal mining rate and colliery economic benefit, less for coal reserves; and by the mine that inrush through faults threatens, there is more great meaning.The staying of barrier pillar is established and can be prevented tomography exploitation from causing tomography " activation ", avoids the water in aquifer to be linked up by tomography and base plate water producing fractures, causes Water Inrush.Tomography " activation ", also can make not water conductive fault be converted into water conductive fault, cause the gushing water on face roof or work plane direction.Both wanted to separate and released part faults protecting coal column, and reduced resources loss, avoid fault activation to cause water inrush accident again, not yet provide effective method and measure at present.But coal is non-renewable resources; coal mining dynamics not only strengthens; the research reducing Coal Loss is very urgent; for this part resources loss of faults protecting coal column; be necessary to further investigate, the back production inventing a set of science goes out the method for part tomography (waterproof) protection coal pillar.
Summary of the invention
The invention provides a kind of method of back production part faults protecting coal column, be that further back production goes out part faults protecting coal column order, carry out the utilization of resource to greatest extent.
For solving above technical problem, the technical solution used in the present invention is: a kind of method of back production part faults protecting coal column, and it uses the method replacing section faults protecting coal column of filling mining, and its method is divided into four classes, concrete grammar and operating procedure as follows:
A. strip-type filling displacement back production faults protecting coal column method:
After the rational width L of faults protecting coal column determines, at distance tomography L 1place, exploitation coal pillar width is b, to reserve after strip coal pillar a extraction coal pillar width b, the exploitation space b that filling is original while exploiting again; Circulation like this is gone down, until adopt distance tomography L place, then the coal column between returning obturation has been adopted and filling;
B. arch (bridge) type filling displacement back production faults protecting coal column method:
After the rational width L of faults protecting coal column determines, at distance tomography L 2place, exploitation coal pillar width is b, to reserve after strip coal pillar a extraction coal pillar width b, the exploitation space b that filling is original while exploiting again; Circulation like this is gone down, until adopt distance tomography L place, then the coal column between returning obturation has been adopted, and no longer carries out filling, allows it be caving voluntarily;
C. continuous filling displacement back production faults protecting coal column method:
After the rational width L of faults protecting coal column determines, at distance tomography L 3place's exploitation protection coal pillar, when controlling top width degree and reaching c, just at rear, goaf filling d, so circulates, and meets c and fills d, until adopt distance tomography L place;
D. compartment filling displacement back production faults protecting coal column method:
After the rational width L of faults protecting coal column determines, at distance tomography L 4place's exploitation protection coal pillar, when control top width degree reaches c, just the empty e filling d at rear, goaf, continues exploitation, and when controlling top width degree and reaching and reach c, then at rear, goaf sky e filling d, so circulation is gone down, until adopt distance tomography L place.
Superiority of the present invention is to consider first and uses filling mining method, displaces part faults protecting coal column; The present invention can for different geological conditions, and that suits measures to local conditions provides different placement methods, is ensuring safety extraction part faults protecting coal column and under not causing the prerequisite of water inrush accident, stay and establish minimum faults protecting coal column.This method can be widely used in the engineering practice of back production faults protecting coal column under various geological conditions, realizes the maximum using of resource, can create considerable economic worth, more science, practicality.
Accompanying drawing explanation
Below in conjunction with the drawings and specific embodiments, the present invention is further detailed explanation.
Fig. 1 is structural representation of the present invention.
Fig. 2 is strip-type filling displacement back production faults protecting coal column method schematic diagram.
Fig. 3 is arch (bridge) type filling displacement back production faults protecting coal column method schematic diagram.
Fig. 4 is continuous filling displacement back production faults protecting coal column method schematic diagram.
Fig. 5 is compartment filling displacement back production faults protecting coal column method schematic diagram.
In figure: 1. coal seam, 2. obturation, 3. moisture limestone, 4. tomography, L. former faults protecting coal column rational width, L 0(L 1~ L 1). minimum faults protecting coal column, a. strip coal pillar width, b. mining width, the maximum distance of face roof under control of c., d. filling width, e. filling spacing after filling displacement.
Detailed description of the invention
The present invention is according to coal mining relevant regulations; after faults protecting coal column rational width L determines; adopt strip-type, arch (bridge) type, continous way and compartment four kinds of modes; filling displacement back production part tomography (waterproof) protection coal pillar; during research filling displacement coal column, tomography top, coal seam floor failure situation, near tomography side coal column plastic strain situation and adopt situation affected on tomography.Filling parameters respective in research least residue coal pillar width and the maximum distance of face roof under control of pillar extraction and four kinds of series methods, guarantee to adopt to pushing up, base plate and tomography under-effected to make water inrush accident occurs for face roof, base plate or work plane direction.
Four kinds of mining types, concrete grammar and step as follows:
1, strip-type filling displacement back production faults protecting coal column method:
As shown in Figure 2, after the rational width L of faults protecting coal column determines, at distance tomography L 1place, exploitation coal pillar width is b, to reserve after strip coal pillar a extraction coal pillar width b, the exploitation space b that filling is original while exploiting again; Circulation like this is gone down, until adopt distance tomography L place, then the coal column between returning obturation has been adopted and filling.
2, arch (bridge) type filling displacement back production faults protecting coal column method:
As shown in Figure 3, after the rational width L of faults protecting coal column determines, at distance tomography L 2place, exploitation coal pillar width is b, to reserve after strip coal pillar a extraction coal pillar width b, the exploitation space b that filling is original while exploiting again; Circulation like this is gone down, until adopt distance tomography L place, then the coal column between returning obturation has been adopted, and no longer carries out filling, allows it be caving voluntarily.
3, continuous filling displacement back production faults protecting coal column method:
As shown in Figure 4, after the rational width L of faults protecting coal column determines, at distance tomography L 3place's exploitation protection coal pillar, when controlling top width degree and reaching c, just at rear, goaf filling d, so circulates, and meets c and fills d, until adopt distance tomography L place.
4, compartment filling displacement back production faults protecting coal column method:
As shown in Figure 5, after the rational width L of faults protecting coal column determines, at distance tomography L 4place's exploitation protection coal pillar, when control top width degree reaches c, just the empty e filling d at rear, goaf, continues exploitation, and when controlling top width degree and reaching and reach c, then at rear, goaf sky e filling d, so circulation is gone down, until adopt distance tomography L place.
The method of above-mentioned four kinds of fillings displacement back production protection coal pillar can before the normal back production of tomography, the barrier pillar of first extraction part, and carries out filling, when having adopted this part coal column, and just can tomography normally outside back production barrier pillar; Also can after seam mining be complete, then recovery section faults protecting coal column.
Four above-mentioned class embodiments are not limitations of the present invention; the present invention is also not limited in above-mentioned citing; the change that those skilled in the art make within the scope of technical scheme of the present invention, remodeling, interpolation or replacement, also all belong to protection scope of the present invention.

Claims (1)

1. a method for back production part faults protecting coal column, is characterized in that: it uses the method replacing section faults protecting coal column of filling mining, and its method is divided into four classes, concrete grammar and operating procedure as follows:
A. strip-type filling displacement back production faults protecting coal column method:
After the rational width L of faults protecting coal column determines, at distance tomography L 1place, exploitation coal pillar width is b, to reserve after strip coal pillar a extraction coal pillar width b, the exploitation space b that filling is original while exploiting again; Circulation like this is gone down, until adopt distance tomography L place, then the coal column between returning obturation has been adopted and filling;
B. arch (bridge) type filling displacement back production faults protecting coal column method:
After the rational width L of faults protecting coal column determines, at distance tomography L 2place, exploitation coal pillar width is b, to reserve after strip coal pillar a extraction coal pillar width b, the exploitation space b that filling is original while exploiting again; Circulation like this is gone down, until adopt distance tomography L place, then the coal column between returning obturation has been adopted, and no longer carries out filling, allows it be caving voluntarily;
C. continuous filling displacement back production faults protecting coal column method:
After the rational width L of faults protecting coal column determines, at distance tomography L 3place's exploitation protection coal pillar, when controlling top width degree and reaching c, just at rear, goaf filling d, so circulates, and meets c and fills d, until adopt distance tomography L place;
D. compartment filling displacement back production faults protecting coal column method:
After the rational width L of faults protecting coal column determines, at distance tomography L 4place's exploitation protection coal pillar, when control top width degree reaches c, just the empty e filling d at rear, goaf, continues exploitation, and when controlling top width degree and reaching again c, then at rear, goaf sky e filling d, so circulation is gone down, until adopt distance tomography L place.
CN201210262343.6A 2012-07-27 2012-07-27 Method for extracting part of fault protection coal pillars Active CN102758630B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210262343.6A CN102758630B (en) 2012-07-27 2012-07-27 Method for extracting part of fault protection coal pillars

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210262343.6A CN102758630B (en) 2012-07-27 2012-07-27 Method for extracting part of fault protection coal pillars

Publications (2)

Publication Number Publication Date
CN102758630A CN102758630A (en) 2012-10-31
CN102758630B true CN102758630B (en) 2014-12-17

Family

ID=47053251

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210262343.6A Active CN102758630B (en) 2012-07-27 2012-07-27 Method for extracting part of fault protection coal pillars

Country Status (1)

Country Link
CN (1) CN102758630B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103291303B (en) * 2013-06-27 2016-02-17 山东科技大学 A kind ofly stay the exploitation method of establishing strip coal pillar
CN103924976B (en) * 2014-04-04 2016-10-19 太原理工大学 A kind of method in outdoor second mining Guo Canmei district
CN105422099B (en) * 2015-12-11 2018-05-25 太原理工大学 A kind of bilateral method that all coal column is left in the residual exploiting field of filling second mining by column
CN107013215B (en) * 2017-05-15 2018-11-30 太原理工大学 A kind of subregion domain construction filling mining is to reduce the method for safety pillar under wa ter bodies size
CN109236296B (en) * 2018-08-02 2019-09-13 缪协兴 A kind of design method of safe working water conservation coal column
CN114837663B (en) * 2022-05-20 2023-01-17 安徽建筑大学 Construction method for improving recovery rate of fault waterproof coal pillar through ground pre-grouting
CN116906046B (en) * 2023-07-27 2024-02-06 山东省煤田地质局第四勘探队 Working surface fault passing method based on coal field geological exploration

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4377353A (en) * 1978-08-03 1983-03-22 Granges Ab Method of selective underground mining and stabilization of rock cavities
CN1952349A (en) * 2006-11-09 2007-04-25 中国矿业大学 Mining method for replacement of pressed coal under village by waste rock

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4377353A (en) * 1978-08-03 1983-03-22 Granges Ab Method of selective underground mining and stabilization of rock cavities
CN1952349A (en) * 2006-11-09 2007-04-25 中国矿业大学 Mining method for replacement of pressed coal under village by waste rock

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
条带充填法煤柱稳定性影响因素数值模拟试验研究;柳宏儒;《中国优秀硕士学位论文全文数据库工程科技Ⅰ辑》;20120315(第03期);文章的第2.3-2.4节,图2.1-2.34 *
林盛矿Ⅰ级铁路下开采方案设计研究;宋双;《中国优秀硕士学位论文全文数据库工程科技Ⅰ辑》;20120615(第06期);文章的第2.7节,图2.4-2.5 *

Also Published As

Publication number Publication date
CN102758630A (en) 2012-10-31

Similar Documents

Publication Publication Date Title
CN102758630B (en) Method for extracting part of fault protection coal pillars
CN103161480B (en) Initiatively support the method for roadside packing gob side entry retaining
CN101864956B (en) Sectional coal pillar-free exploitation method
CN103306714B (en) Coal seam group with near interval Di Chou holes in lane the mash gas harnessing method in a hole three
CN103557002A (en) Panel mechanized centralized ore-pass upward horizontal cut-and-filling stoping method
CN103557000B (en) Method for preventing gob-side entry rock burst through side-drawing filling
CN100560937C (en) A kind of thin basic rock shallow buried coal seam longwall face water retaining exploitation method
CN103615286B (en) Working face open-off cut top pressure relief method
US20180195386A1 (en) Parallel digging, mining and filling operation coal mining method for controlling overlaying strata fracture and surface subsidence
CN202731991U (en) Test model for banded filling, replacement and mining of fault protective coal pillar
CN104088638A (en) Steep coal seam long-wall large-mining height workface coal wall caving and roof caving control technique
CN101881167B (en) Coal face stump mining method
CN107829736A (en) A kind of colliery Striping noise and filling displacement coal column method
CN104330107A (en) Method for evaluating filling quality of solid filling coal mining working face
CN204646285U (en) A kind of coal mine paste filling exploitation high efficiency isolation liquid pressure support
CN104453996A (en) Upward layered wall type bag filling mining method
CN106968707A (en) A kind of coal seam prevents and treats design method for the water damage of Main aquifer mine
CN103939135A (en) Rapid construction method for support dismantling channel of fully mechanized coal mining face
CN104863588A (en) Advanced pier column pre-arranging gob-side entry retaining method
CN115749776A (en) Coal pillar recovery method based on fault grouting transformation
CN103953346A (en) Non-chain-pillar exploitation method
CN105909284A (en) Sloughing prevention and control method for large mining height coal wall
CN102852532B (en) Grouting method for preventing rib walk caving
CN107013215B (en) A kind of subregion domain construction filling mining is to reduce the method for safety pillar under wa ter bodies size
CN103557023A (en) Hydraulic bracket for extremely soft coal bed

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant