CN102758032A - Method for real-time predication of blast furnace pipeline fault probability - Google Patents

Method for real-time predication of blast furnace pipeline fault probability Download PDF

Info

Publication number
CN102758032A
CN102758032A CN2011101084316A CN201110108431A CN102758032A CN 102758032 A CN102758032 A CN 102758032A CN 2011101084316 A CN2011101084316 A CN 2011101084316A CN 201110108431 A CN201110108431 A CN 201110108431A CN 102758032 A CN102758032 A CN 102758032A
Authority
CN
China
Prior art keywords
pipeline
blast furnace
probability
causes
furnace
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2011101084316A
Other languages
Chinese (zh)
Other versions
CN102758032B (en
Inventor
王训富
陶卫忠
陈永明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Baoshan Iron and Steel Co Ltd
Original Assignee
Baoshan Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baoshan Iron and Steel Co Ltd filed Critical Baoshan Iron and Steel Co Ltd
Priority to CN 201110108431 priority Critical patent/CN102758032B/en
Publication of CN102758032A publication Critical patent/CN102758032A/en
Application granted granted Critical
Publication of CN102758032B publication Critical patent/CN102758032B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Blast Furnaces (AREA)
  • Waste-Gas Treatment And Other Accessory Devices For Furnaces (AREA)

Abstract

The invention relates to a method for real-time predication of blast furnace pipeline fault probability. A blast furnace pipeline fault probability index P is predicated and analyzed in real time according to various detection data of current blast furnace operation parameters including air pressure, ejection pressure, gas flow, static pressure detection, furnace top temperature, blast furnace air oxygen quantity and the like. Operators can timely adjust corresponding operation parameters according to information prompted by a system when the probability index rises, so that pipeline faults can be avoided, and stability and smoothness in operation of a furnace can be guaranteed.

Description

A kind of real-time estimate blast furnace generation pipeline probability method
Technical field
The present invention relates to the blast furnace detection method of field of metallurgy; Particularly; The present invention relates to a kind of real-time estimate blast furnace generation pipeline probability method that blast furnace detects that is used for; Said method is carried out real-time estimate according to the parameter of operation of blast furnace to blast furnace generation pipeline probability, avoiding blast furnace generation pipeline, thereby guarantees the steady running of the working of a furnace.
Background technology
In the operating process of metallurgy high furnace; The factor that occurs much influencing the blast furnace stable smooth operation through regular meeting; Said factor comprises that pipeline, hanging, slump material wait for the unusual working of a furnace, and these unusual working of a furnaces can have influence on the stable and safety of output, each item economic and technical norms or even harm equipment of blast furnace.
Wherein, the basic reason of blast furnace generation pipeline is: a certain regional gas flow is excessive on the blast furnace cross section, and gas speed is too fast, causes this zone furnace material fluidization.And the major cause that causes these unusual working of a furnaces has a lot, comprises blast furnace crude fuel situation, the hot state of State of Blast Furnace, air-flow situation, slagging regime, stokehold operation situation etc.
For avoiding blast furnace generation pipeline, thereby guarantee the steady running of the working of a furnace, must carry out real-time estimate blast furnace generation pipeline probability.
Existing pipeline Prediction and Control Technology be last century the eighties from the GO-STOP system of external introduction.This system worsens the working of a furnace and is divided into the furnace charge not direct motion that descends, and the stove thermal change is moving or stove is hot low excessively, and the bad three major types of slagging tap taps a blast furnace.This system is at first judged respectively each parameter of blast furnace, carries out comparing in three scopes according to each operating parameters of blast furnace and the cut off value of setting separately, declares a result in " good ", " attention ", " bad ", carries out sub-category to each parameter again.
Secondly; Each operating parameters is divided into level differentiation and change differentiation and calculates the GS number of these two kinds of differentiations; Wherein the level differentiation is divided into 8 types; Comprise slag iron residual quantity (PSB), stock gas situation (GAS) etc. in full stove ventilation property (DPF2), local ventilation property (DSP), the hot state of stove (HI), furnace charge decline situation (SHI), the cupola well, the change differentiation is divided into 4 classifications.Comprise pressure of air supply, shaft pressure, stove heat number, stock gas.Each classification is set cut off value respectively, judge a result in " good ", " attention ", " bad " according to cut off value.Then, respectively 8 levels differentiations and 4 change differentiations are added up as total level differentiation GS number and total change differentiation GS number, and declare a result in " good ", " attention ", " bad ".At last total level differentiation GS number and total change differentiation GS number are carried out addition, declare a result in " good ", " attention ", " bad " based on the boundary value of setting.
The GO-STOP system of the external introduction used of blast furnace is at present differentiated the level of blast furnace operating parameter and change is differentiated the result that provides for three of " good ", " attention ", " bad " result qualitatively, can not provide quantized result with operability.
Because the development of blast furnace operation technology and detection technique, original GO-STOP expert systems can not satisfy the higher level development of blast furnace to the judgement of blast furnace generation pipeline.
Summary of the invention
The technical problem that the present invention will solve is: a kind of real-time estimate blast furnace generation pipeline probability method is provided; It can come real-time estimate blast furnace generation pipeline probability according to the parameter of operation of blast furnace;, operator just can information according to system suggestion in time adjust corresponding operation parameter when finding that this probability index raises; Thereby avoid taking place pipeline, thereby guaranteed the stable smooth operation of the working of a furnace.
In order to solve the problems of the technologies described above, the present invention provides a kind of real-time estimate blast furnace generation pipeline probability method, and establishing blast furnace generation pipeline probability is P:
P=W_BSG* ∑ W jP j, j=1 wherein, 2 ... 7;
In the formula,
W jThe probability index P that causes pipeline for each factor jTo the weight of total probability indices P, j=1 wherein, 2 ... 7, W jThe factor of indication and P jEach factor of indication is consistent, like P 1Indication be the conditions of blast furnace factor to producing the probability of pipeline, W 1Be the conditions of blast furnace factor to producing the weight of pipeline probability.Its span is between 0 to 1, and is big more to the influence that causes the pipeline probability, and its weight is also just big more, and different blast furnace institute value is different.
P 1For the conditions of blast furnace present situation causes the probability index of pipeline, W 1Usually between 0.4-0.8, preferred W 1=0.7.
That conditions of blast furnace embodied is the permeability index K value and the blast furnace pressure differential deltap P of blast furnace, big more if K value or Δ P have departed from the specified standards value, explains that the possibility of blast furnace stock column generation fluidization (that is pipeline takes place) is big more, probability index P 1Scope between 0-100%, its value is low more good more, big more explanation conditions of blast furnace causes the possibility of pipeline big more.Because conditions of blast furnace is big to the influence degree that causes the blast furnace pipeline, so its corresponding weights W 1Also relatively large, generally between 0.4-0.8.
P 2For the blast furnace gas distributions causes the probability index of pipeline, W 2Span between 0.3-0.6, preferred W 2=0.5.
Blast furnace is to record the power that gas temperature is represented gas fluid in blast furnace through being installed in thermometric galvanic couple in the blast furnace.Blast furnace is equipped with the cross temperature galvanic couple at the furnace throat place; Have 21, wherein the blast furnace central point has a galvanic couple inspection center temperature (representing with CCT), and all the other 20 are waited radius to be divided into 5 circles; Every circle has 4 galvanic couples, representes 4 temperature in edge near 4 temperature of a circle of furnace wall.Steel brick on the blast furnace circumferential direction, coal gas fan housing are higher than the position of cross temperature, 8 galvanic couples all respectively are installed to detect the intensity of edge air-flow.4 medial temperatures of CCT temperature and edge of general cross temperature are represented the power of gas fluid in blast furnace central gas stream and edge air-flow, and because of the air-flow total amount through blast furnace is fixed, the edge air-flow is few at most if pass through the air-flow at center; The edge is many at least for air-flow through the center; So center and peripheral air-flow power all will be in a reasonable range, the center is strong excessively, and the edge is too weak can to cause the blast furnace gas utilization ratio to descend; Fuel consumption increases; The center excessively a little less than, the edge can cause blast furnace permeability to descend too by force, direct motion is unusual.And the reason that pipeline takes place generally all to be blast furnace edge air-flow too strong and cause the local fluidization of material of blast furnace.In addition, the deviation of 4 temperature in edge, 8 temperature of steel brick and 8 temperature of coal gas fan housing is represented the blast furnace homogeneity of air-flow on the edge of, at the blast furnace edge; If the air-flow of certain point is very strong; Other point is relatively low, and promptly the deviation of edge air-flow is big, just is easy to cause the generation of pipeline.W 2Expression blast furnace gas distributions is to sending out the influence degree that causes taking place pipeline.Probability index P 2Scope between 0-100% because the coal gas distributions is bigger to the influence degree that causes pipeline, W 2Span between 0.3-0.6, concrete value need be decided according to the characteristics of each blast furnace operating.
P 3For furnace heat load causes the probability index of pipeline, W 3Span between 0.2-0.6, preferred W 3=0.5.
Furnace heat load calculates according to the blast furnace furnace wall water coolant water temperature difference and the water yield, characterizes the blast furnace inner furnace wall by slag iron agglutinating situation, if furnace wall is more by slag iron agglutinating, then water temperature difference can reduce, and thermal load reduces; It is less to bond, and causes water temperature difference to raise, and thermal load raises.The too high or too low stable smooth operation that does not utilize blast furnace of thermal load, too high then furnace wall directly contact with slag iron with gas stream in the stove and damage furnace lining and water cooler easily, and too low blast furnace causes the furnace wall knot thick easily.If the furnace wall thermal load is very high always on certain direction, explain that agglutinating slag iron is few, the furnace wall circumferential direction occurs inhomogeneous, causes pipeline at the thermal load higher position easily.In addition, thermal load raises suddenly from lower level, explains that blast furnace furnace wall agglutinating slag iron comes off suddenly, also can cause pipeline to take place.So when thermal load in the value of being above standard scope, or thermal load fluctuation pipeline occurs, probability index P when big easily 3Scope between 0-100%, W 3The expression blast furnace heat load is to causing taking place the influence degree of pipeline, W 3Span between 0.2-0.6, concrete value need be decided according to the characteristics of each blast furnace operating.
P 4For fluctuating, roof pressure causes the probability index of pipeline, W 4Span between 0.7-0.9, preferred W 4=0.9.
The roof pressure of blast furnace generally is set in a fixed value, under the prerequisite of non-artificial setting and equipment failure, the reason of roof pressure fluctuation be exactly in the State of Blast Furnace certain zone resistance occurs and descend suddenly, the pressure reduction between roof pressure and the blast reduces suddenly.Reducing of this resistance is most because the furnace charge fluidization causes.The probability that pipeline has taken place appearance roof pressure fluctuation explanation blast furnace is very big.If pipeline has taken place, its important performance blast furnace roof pressure fluctuation just.Probability index P 4Scope between 0-100%, W 4The fluctuation of expression blast furnace roof pressure is to causing taking place the influence degree of pipeline, W 4Span between 0.7-0.9, concrete value need be decided according to the characteristics of each blast furnace operating.
P 5The probability index that causes pipeline when fluctuation taking place for the shaft static pressure, W 5Span between 0.1-0.6, preferred W 5=0.2.
Generally which floor pressure detection meter is the short transverse along blast furnace be provided with, and every layer generally has four detections by circumferential direction, and such pressure detection meter is referred to as the shaft static pressure.Along short transverse, that pressure is minimum is top pressure TP, and pressure the highest be blast BP, during, direct motion stable at blast furnace, the static pressure difference between each layer is stable, the pressure difference between four static pressures of every layer should be 0.But when not direct motion of conditions of blast furnace, it is unstable that each layer static pressure difference becomes, and the pressure difference between every layer the static pressure is also non-vanishing.So when fluctuation takes place static pressure, possibly be to cause because the fluidization (being pipeline) of stock column appears in regional area.So probability index P 5Scope generally between 0-100%, W 5Expression shaft static pressure causes taking place the influence degree of pipeline when fluctuation takes place, also possibly cause other the special working of a furnace, W because of static pressure fluctuates 5Span between 0.1-0.6, concrete value need be decided according to the characteristics of each blast furnace operating.
P 6The probability index that causes pipeline when descending unusually for the blast furnace gas utilization ratio, W 6Span between 0.1-0.3, preferred W 6=0.1.
Before possibly pipeline occurring, an important sign is exactly that gas utilization rate can descend suddenly.This is that coal gas with stock column heat exchange does not take place fully and reacts, and causes the CO too high levels in the coal gas, shows that the blast furnace gas utilization ratio descends suddenly after fluidization occurring because of stock column.But when the calculating other factors causes the probability index higher (P>50%) of pipeline takes place,, the probability very high (>80%) that pipeline takes place is described if gas utilization rate descends suddenly.Cause taking place the probability index of pipeline when not high (P≤50%) at other factors, the unusual reason that descends of gas utilization rate is a lot of owing to causing, and causes the probability index weights W of pipeline so descend because of the blast furnace gas utilization ratio is unusual 6Span between 0.1-0.3, concrete value need be decided according to the characteristics of each blast furnace operating.
P 7The probability index that causes pipeline when raising for blast furnace furnace roof temperature anomaly, W 7Span between 0.1-0.3, preferred W 7=0.1.
Similar with the unusual situation about descending of gas utilization rate, before possibly pipeline occurring, another important sign is exactly that gas temperature can descend suddenly.This is that coal gas with stock column heat exchange does not take place fully after fluidization occurring because of stock column, causes gas temperature high, shows that throat temperature TT raises suddenly.But when the calculating other factors causes the probability index higher (P>50%) of pipeline takes place,, the probability very high (>80%) that pipeline takes place is described if throat temperature raises unusually.Cause taking place the probability index of pipeline when not high (P≤50%) at other factors, the unusual reason that raises of throat temperature is a lot of owing to causing, so cause the probability index weights W of pipeline because of blast furnace furnace roof temperature anomaly raises 7Span between 0.1-0.3, concrete value need be decided according to the characteristics of each blast furnace operating.
W_BSG is that bosh coal gas amount is to producing the weight of pipeline influence.
The air quantity that blast furnace blasted and the furnace volume ratio ratio that is referred to as to blow has a suitable air-supply ratio, according to the experience of Baosteel in every blast furnace production process; Suitable air-supply is than between 1.6 to 1.7, produces in than scope in suitable air-supply, and conditions of blast furnace, index etc. all can appear at optimal state; If but be lower than or be higher than this suitable air-supply ratio; Then the working of a furnace of blast furnace, index can descend, and depart from greatly more, and unusual probability possibly occur can be high more.It is all different that suitable air-supply is compared to every blast furnace.The influence of air-supply comparison blast furnace mainly embodies the influence of the coal gas amount (being called for short bosh coal gas amount) at unit interval blast-furnace bosh position; Air-supply can cause bosh portion coal gas amount high or low than high or low, and the bosh coal gas amount (BSG) of different blast furnaces is different based on the characteristics of each blast furnace to the weights W _ BSG that produces the pipeline influence.Be that Baosteel four blast-furnace bosh coal gas amounts (BSG) are to producing the weights W _ BSG of pipeline influence below.
In described real-time estimate blast furnace generation pipeline probability method, said conditions of blast furnace present situation causes the probability index P of pipeline 1=α P 11+ β P 12, wherein,
α, β are weight; Span is between 0 to 1; α=0.8 in Baosteel four blast furnaces prediction pipeline probability of occurrence index, β=0.2, this is to select for use according to the experience of blast furnace production; Because the blast of blast furnace or ventilation property pressure reduction cause the probability of pipeline can be very high, and that the unusual working of a furnace causes taking place the probability of pipeline is relatively low.
P 11The probability index that causes pipeline for blast or ventilation property pressure reduction;
P 12The probability index that causes taking place pipeline for the unusual working of a furnace.
In described real-time estimate blast furnace generation pipeline probability method, said blast furnace gas distributions causes the probability index P of pipeline 2Size (is installed in four cantilever temperature measuring equipments at furnace throat place with 4 temperature in cross temperature edge; Have 5 to 6 galvanic couples to detect the temperature distribution of blast furnace charge level place air-flow on the every cantilever), 8 temperature of throat armour (whenever evenly are equipped with 8 galvanic couples at a distance from 45 ° at blast furnace throat steel brick place; To detect lip temperature) with reach 8 temperature of coal gas sealing cover and (whenever 8 galvanic couples evenly be installed at a distance from 45 ° at blast furnace gas sealing cover place; To detect lip temperature) variation tendency of calculation deviation is identical; The deviation of calculating is big more, and the pipeline probability of generation is also big more.
Prediction blast furnace generation pipeline probability method of the present invention; Through the current operating parameter of blast furnace, as comprise that tens kinds of blast, roof pressure, coal gas stream, static pressure detection, throat temperature, blast furnace wind oxygen amounts or the like detect data and come real-time estimate to analyze the probability index of blast furnace generation pipeline.When operating personnel find that this probability index raises, just can in time adjust corresponding operation parameter, thereby avoid taking place pipeline, thereby guarantee the stable smooth operation of the working of a furnace based on the information of system prompt.
Description of drawings
Fig. 1 is blast furnace pipeline total probability exponential reasoning from logic figure in the prediction blast furnace generation pipeline probability method according to the invention;
Fig. 2 causes the reasoning from logic figure of the probability index of blast furnace generation pipeline for conditions of blast furnace in the prediction blast furnace generation pipeline probability method according to the invention;
Fig. 3 is the reasoning from logic figure of the probability index of blast furnace generation pipeline when the blast furnace gas distributions is unusual in the prediction blast furnace generation pipeline probability method according to the invention;
Fig. 4 is the reasoning from logic figure of the probability index of blast furnace generation pipeline when furnace heat load fluctuates in the prediction blast furnace generation pipeline probability method according to the invention;
Fig. 5 is the reasoning from logic figure that causes the probability index of pipeline generation when roof pressure, static pressure, blast furnace gas utilization ratio and throat temperature are unusual in the prediction blast furnace generation pipeline probability method according to the invention.
Embodiment
Below, combine accompanying drawing that the present invention is made more detailed description with embodiment.Present embodiment only is the description to best mode for carrying out the invention, scope of the present invention is not had any restriction.
Embodiment
As shown in Figure 1, for conditions of blast furnace in the prediction blast furnace generation pipeline probability method according to the invention causes the reasoning from logic figure of the probability index P of blast furnace generation pipeline.The calculation formula of blast furnace generation pipeline probability P is:
P=W_BSG* ∑ W jP j, j=1 wherein, 2 ... 7;
In the formula,
W jThe probability index P that causes pipeline for each factor jTo the weight of total probability indices P, j=1 wherein, 2 ... 7,
P 1For the conditions of blast furnace present situation causes the probability index of pipeline, note W 1=0.7;
P 2For the blast furnace gas distributions causes the probability index of pipeline, note W 2=0.5;
P 3For furnace heat load causes the probability index of pipeline, note W 3=0.5;
P 4For fluctuating, roof pressure causes the probability index of pipeline, note W 4=0.9;
P 5The probability index that causes pipeline when fluctuation taking place for the shaft static pressure, note W 5=0.2;
P 6The probability index that causes pipeline when descending unusually for the blast furnace gas utilization ratio, note W 6=0.1;
P 7The probability index that causes pipeline when raising for blast furnace furnace roof temperature anomaly, note W 7=0.1;
W_BSG is that bosh coal gas amount is to producing the weight of pipeline influence.
Simultaneously,, the blast furnace parameter control is taked different treatment processs, is specially according to the probability index P value of the blast furnace generation pipeline that calculates:
1), when P value scope is 0~30%, the possibility of expression blast furnace generation pipeline is little;
2), when P value scope is 30~70%, the expression blast furnace pipeline possibly take place;
3), when P value scope is 70% when above, pipeline very might take place in the expression blast furnace;
For these three kinds of probability, the mode of its processing is different.Possibility occurrence hour is just listed out prediction result and is not proposed to handle suggestion; For contingent, not only list predicting the outcome, also to advise; For what might take place very much, should list predict, also detailed suggestion to be proposed, even close loop maneuver.
As shown in Figure 2, for conditions of blast furnace in the prediction blast furnace generation pipeline probability method according to the invention causes the reasoning from logic figure of the probability index of blast furnace generation pipeline.The parameter of estimating the conditions of blast furnace present situation mainly is situation about occurring in blast furnace blast level (representing with BP), blast trend, blast wandering situation, blast furnace furnace roof roof pressure (representing with TP), smelting cycle of blast furnace permeability index (representing with K) blast furnace the unusual working of a furnace such as slump material, pipeline, hanging or the like.
The sign of pipeline is that blast continues to descend, and blast and air quantity are asymmetric, and pressure reduction reduces, and ventilation property K value is very low.
Same hypothesis permeability index K value
Figure BDA0000058132440000091
promptly not thought at 2.3~2.5 o'clock pipeline trip can take place or the pipeline probability takes place minimum, or differential pressure Δ P (=BP-TP) when 160~180KPa, not think and pipeline trip can take place or generation pipeline probability is minimum.If but K value≤2.3 or Δ P≤160KPa just have the possibility that pipeline takes place.
So when K value≤2.3 or Δ P≤160Kpa, start the calculating that the pipeline probability index takes place in prediction.
Start the calculating back and predict the probability that pipeline takes place according to blast trend, ventilation property (pressure reduction) trend, it is P that note blast or ventilation property (pressure reduction) cause the probability of pipeline 11
If the unusual working of a furnace takes place, behind slump material, pipeline, the hanging etc. pipeline takes place easily also as in a smelting cycle, taking place.Remember that the probability index that the unusual working of a furnace causes taking place pipeline is P 12
P 11With p 12The common P that forms 1, promptly the working of a furnace causes taking place the probability index P of pipeline 1=α P 11+ β P 12, its weight, β are according to the desirable different value of difference of each blast furnace.
Among Fig. 2; K or Δ P are currency; K ' or Δ P ' they are a last value,
Figure BDA0000058132440000092
or
Figure BDA0000058132440000093
for starting the set(ting)value of design conditions.
K representes the blast furnace permeability index; The lower limit of permeability index scope during expression conditions of blast furnace stable smooth operation; In [2.52.8] interval,
Figure BDA0000058132440000095
is 2.5 like Baosteel four blast furnace permeability index ranges;
P representes the current blast of blast furnace;
The lower limit of blast furnace blast during
Figure BDA0000058132440000096
expression conditions of blast furnace stable smooth operation; In [395KPa415KPa] interval,
Figure BDA0000058132440000097
then is 395KPa like Baosteel four blast furnace blast scopes;
N is illustrated in the number that occurs the slump material in time of blast furnace 40 batch of materials of packing into;
M is illustrated in the interior number that pipeline takes place of time of blast furnace 40 batch of materials of packing into;
K ' is illustrated in a last permeability index of current permeability index;
P ' is illustrated in a last wind pressure value of current blast;
L representes the number of times that permeability index K or blast P raise;
K 0Permeability index scope during expression conditions of blast furnace stable smooth operation.Like Baosteel four blast furnace permeability index ranges in [2.5 2.8] interval;
P 0Blast furnace blast scope during expression conditions of blast furnace stable smooth operation, like Baosteel four blast furnace blast scopes in [395KPa415KPa] interval;
R representes to get K/K 0And P/P 0Minimum value;
As shown in Figure 3, the reasoning from logic figure of the probability index of blast furnace generation pipeline when the blast furnace gas distributions is unusual in the prediction blast furnace generation pipeline probability method according to the invention.Take place before the pipeline, ANOMALOUS VARIATIONS can take place in local air flow, shows that mainly air-flow is inclined to one side, can pass through cross temperature, throat armour temperature, coal gas sealing cover temperature etc. present air-flow distribution situation is found in the detection of coal gas stream.
According to 4 temperature in cross temperature edge, 8 temperature of throat armour and 8 temperature of coal gas sealing cover, according to the temperature computation deviation of these temperature spots.The possibility of the big more generation pipeline of deviation is just big more.
Rule of thumb, the air-flow through the edge is more than the air-flow through the center.If the edge seriously receives to press down, the center is very strong, than being easier to the generative center pipeline.
Among Fig. 3,
T 1The relative deviation that the expression edge is 4;
T 2Expression steel brick temperature (T Sft) 8 relative deviation;
T3 representes the relative deviation of 8 of coal gas fan housing temperature;
T MaxExpression edge vertex temperature;
As shown in Figure 4, the reasoning from logic figure of the probability index of blast furnace generation pipeline when fluctuating for furnace heat load in the prediction blast furnace generation pipeline probability method according to the invention.When the furnace wall big area came off, the position gas-flow resistance that comes off reduced suddenly, and mass air flow is from coming off through causing pipeline.The furnace wall big area comes off and can represent through horizontal Q of thermal load and thermal load fluctuation (Δ Q).The note furnace wall comes off and causes the probability P of pipeline 3
Wherein Q is the thermal load of full stove; Δ Q is the lift velocity of for some time span DTime,
Figure BDA0000058132440000101
As shown in Figure 5, cause the reasoning from logic figure of the probability index that pipeline takes place when roof pressure, static pressure, blast furnace gas utilization ratio and throat temperature are unusual in the prediction blast furnace generation pipeline probability method according to the invention.When blast furnace generation pipeline, roof pressure can fluctuate, and the size of roof pressure fluctuation and the frequency of fluctuation can be represented the size of pipeline.When TP fluctuates greater than 8Kpa, explain that roof pressure produces fluctuation.When Δ TP >=8Kpa or in 20min TP fluctuation secondary, then the probability index P=80% of pipeline.The pipeline probability index was P when fluctuation took place the note roof pressure 4
When blast furnace generation pipeline, shaft static pressure curve is vertical configuration, and pressure reduction is zero or is negative value on certain section height.If the arbitrary two-layer pressure difference Δ P of BP, TP, each layer static pressure≤and (20-N) Kpa, probability index P=(70+N) % (N=0,1,2 that pipeline then takes place ...), the probability P of pipeline when fluctuation takes place the note static pressure 5
When blast furnace generation pipeline, because scurrying out from the part, air-flow cause the chemical energy utilization to reduce, gas utilization rate descends.If probability index P>=70% of pipeline takes place, and η COThe probability index P=80% of pipeline then takes place greater than 0.5% in the reduction amplitude in 10s.The probability that pipeline takes place when descending unusually the note gas utilization rate is P 6
When blast furnace generation pipeline, the contacting and react minimizing of air-flow and raw material, heat exchanger effectiveness reduces, and causes the top temperature sharply to raise.If probability index P>=70% of pipeline takes place, and the warm TT in top has risen 50 ℃ in 5s, and the probability index P=80% of pipeline then takes place, and the probability of pipeline was P when note top temperature abnormality raise 7
Among Fig. 5,
η CO representes the gas utilization rate of blast furnace gas;
Δ η CO representes that the gas utilization rate of blast furnace gas changes;
TT representes throat temperature, i.e. the top temperature;
Δ TT representes the variation of throat temperature;
In addition, large blast furnace has a suitable air-supply ratio, and blast furnace is at the different times of stove labour, and its wind oxygen amount (output) can be different; If large blast furnace air-supply ratio is less than its suitable air-supply ratio, then pairing conditions of blast furnace can change, the large blast furnace of Baosteel; In wind oxygen amount hour, the working of a furnace is difficult to control on the contrary more, and is inclined to one side like air-flow; Blast wandering is big, but because wind oxygen amount is little, the probability that pipeline takes place on the contrary can be lower; In the prediction of pipeline probability, considered of the influence of wind oxygen amount, wind oxygen water gaging has been put down represent, on the basis of the final probability index P that calculates, revised with blast-furnace bosh coal gas amount to the working of a furnace.
According to real-time estimate blast furnace generation pipeline probability method of the present invention; It can come real-time estimate blast furnace generation pipeline probability according to the parameter of operation of blast furnace;, operator just can information according to system suggestion in time adjust corresponding operation parameter when finding that this probability index raises; Thereby avoid taking place pipeline, thereby guaranteed the stable smooth operation of the working of a furnace.

Claims (7)

1. real-time estimate blast furnace generation pipeline probability method, it is characterized in that: establishing blast furnace generation pipeline probability is P, and its calculation formula is: P=W_BSG* ∑ W jP j, j=1 wherein, 2 ... 7;
In the formula,
W jThe probability index P that causes pipeline for each factor jTo the weight of total probability indices P, be 0-1, j=1 wherein, 2 ... 7,
P 1For the conditions of blast furnace present situation causes the probability index of pipeline, note W 1=0.4-0.8;
P 2For the blast furnace gas distributions causes the probability index of pipeline, note W 2=0.3-0.6;
P 3For furnace heat load causes the probability index of pipeline, note W 3=0.2-0.6;
P 4For fluctuating, roof pressure causes the probability index of pipeline, note W 4=0.7-0.9;
P 5The probability index that causes pipeline when fluctuation taking place for the shaft static pressure, note W 5=0.1-06;
P 6The probability index that causes pipeline when descending unusually for the blast furnace gas utilization ratio, note W 6=0.1-0.3;
P 7The probability index that causes pipeline when raising for blast furnace furnace roof temperature anomaly, note W 7=0.1-0.3;
W_BSG is that bosh coal gas amount is to producing the weight of pipeline influence, 1.0-1.6.
2. real-time estimate blast furnace generation pipeline probability method according to claim 1, it is characterized in that: said conditions of blast furnace present situation causes the probability index P of pipeline 1=α P 11+ β P 12, wherein,
α, β are weight, and span is between 0 to 1;
P 11For blast or ventilation property pressure reduction cause the probability of pipeline, between 0-100%;
P 12For the unusual working of a furnace causes taking place the probability index of pipeline, between 0-100%.
3. real-time estimate blast furnace generation pipeline probability method according to claim 1 is characterized in that:
Said W 1=0.7, W 2=0.5, W 3=0.5, W 4=0.9, W 5=0.2, W 6=0.1, W 7=0.1.
4. real-time estimate blast furnace generation pipeline probability method according to claim 1 is characterized in that:
Said W_BSG=1.2-1.4.
5. real-time estimate blast furnace generation pipeline probability method according to claim 1 is characterized in that:
Said blast furnace gas distributions causes the probability index P of pipeline 24 temperature of variation tendency and cross temperature edge, 8 temperature of throat armour and and the variation tendency of the temperature computation deviation of 8 temperature of coal gas sealing cover identical.
6. real-time estimate blast furnace generation pipeline probability method according to claim 2 is characterized in that: α=0.6-0.8, β=0.2-0.4.
7. real-time estimate blast furnace generation pipeline probability method according to claim 6 is characterized in that: α=0.8, β=0.2.
CN 201110108431 2011-04-28 2011-04-28 Method for real-time predication of blast furnace pipeline fault probability Active CN102758032B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201110108431 CN102758032B (en) 2011-04-28 2011-04-28 Method for real-time predication of blast furnace pipeline fault probability

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201110108431 CN102758032B (en) 2011-04-28 2011-04-28 Method for real-time predication of blast furnace pipeline fault probability

Publications (2)

Publication Number Publication Date
CN102758032A true CN102758032A (en) 2012-10-31
CN102758032B CN102758032B (en) 2013-09-25

Family

ID=47052681

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201110108431 Active CN102758032B (en) 2011-04-28 2011-04-28 Method for real-time predication of blast furnace pipeline fault probability

Country Status (1)

Country Link
CN (1) CN102758032B (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105219899A (en) * 2015-10-30 2016-01-06 天津钢铁集团有限公司 A kind of method for early warning judging Blast Furnace Abnormal Conditions Judgement according to static pressure difference
CN109284942A (en) * 2018-10-31 2019-01-29 山西太钢不锈钢股份有限公司 Method for determining blast furnace crude fuel Rational Parameters range
CN109685289A (en) * 2019-01-21 2019-04-26 重庆电子工程职业学院 Conditions of blast furnace direct motion prediction technique, apparatus and system
CN111710135A (en) * 2020-05-26 2020-09-25 广东韶钢松山股份有限公司 Early warning and control process for brick collapse of blast furnace hot blast stove fire well wall
CN112961949A (en) * 2021-03-12 2021-06-15 鞍钢股份有限公司 Method for rapidly judging pipeline stroke of blast furnace
CN114941044A (en) * 2022-05-25 2022-08-26 江苏省沙钢钢铁研究院有限公司 Prediction and processing method of 2000-grade blast furnace pipeline
CN115305299A (en) * 2022-08-05 2022-11-08 广东韶钢松山股份有限公司 Blast furnace pipeline airflow pre-judging and processing method and device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1173542A (en) * 1997-06-13 1998-02-18 冶金工业部自动化研究院 Blast furnace operating consulting system
JP2002266011A (en) * 2001-03-12 2002-09-18 Nippon Steel Corp Method for estimating furnace condition in blast furnace
CN1624158A (en) * 2003-12-04 2005-06-08 首钢总公司 In-line moniting controlling system of blast furnace coal powder injection
JP2007270211A (en) * 2006-03-30 2007-10-18 Jfe Steel Kk Method for operating blast furnace and detector for accumulated quantity of target component in blast furnace, and program
JP2008163381A (en) * 2006-12-27 2008-07-17 Nippon Steel Corp Method for monitoring state of gas flow at furnace top, monitoring device and computer program

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1173542A (en) * 1997-06-13 1998-02-18 冶金工业部自动化研究院 Blast furnace operating consulting system
JP2002266011A (en) * 2001-03-12 2002-09-18 Nippon Steel Corp Method for estimating furnace condition in blast furnace
CN1624158A (en) * 2003-12-04 2005-06-08 首钢总公司 In-line moniting controlling system of blast furnace coal powder injection
JP2007270211A (en) * 2006-03-30 2007-10-18 Jfe Steel Kk Method for operating blast furnace and detector for accumulated quantity of target component in blast furnace, and program
JP2008163381A (en) * 2006-12-27 2008-07-17 Nippon Steel Corp Method for monitoring state of gas flow at furnace top, monitoring device and computer program

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
MAKOTO GOCHE 等: "福山5号高炉管道现象机理的研究", 《武钢技术》 *
山本 等: "高炉炉况失常预测***的研制", 《武钢技术》 *

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105219899A (en) * 2015-10-30 2016-01-06 天津钢铁集团有限公司 A kind of method for early warning judging Blast Furnace Abnormal Conditions Judgement according to static pressure difference
CN109284942A (en) * 2018-10-31 2019-01-29 山西太钢不锈钢股份有限公司 Method for determining blast furnace crude fuel Rational Parameters range
CN109284942B (en) * 2018-10-31 2021-08-03 山西太钢不锈钢股份有限公司 Method for determining reasonable range of blast furnace raw fuel parameters
CN109685289A (en) * 2019-01-21 2019-04-26 重庆电子工程职业学院 Conditions of blast furnace direct motion prediction technique, apparatus and system
CN109685289B (en) * 2019-01-21 2020-11-10 重庆电子工程职业学院 Method, device and system for forward prediction of blast furnace conditions
CN111710135A (en) * 2020-05-26 2020-09-25 广东韶钢松山股份有限公司 Early warning and control process for brick collapse of blast furnace hot blast stove fire well wall
CN112961949A (en) * 2021-03-12 2021-06-15 鞍钢股份有限公司 Method for rapidly judging pipeline stroke of blast furnace
CN114941044A (en) * 2022-05-25 2022-08-26 江苏省沙钢钢铁研究院有限公司 Prediction and processing method of 2000-grade blast furnace pipeline
CN114941044B (en) * 2022-05-25 2024-03-01 江苏省沙钢钢铁研究院有限公司 2000-level high furnace pipeline prediction and treatment method
CN115305299A (en) * 2022-08-05 2022-11-08 广东韶钢松山股份有限公司 Blast furnace pipeline airflow pre-judging and processing method and device

Also Published As

Publication number Publication date
CN102758032B (en) 2013-09-25

Similar Documents

Publication Publication Date Title
CN102758032B (en) Method for real-time predication of blast furnace pipeline fault probability
CN103439999B (en) Method for controlling abnormal furnace temperature of blast furnace according to temperature changes of cooling wall
Worrell Energy efficiency improvement and cost saving opportunities for the US iron and steel industry an ENERGY STAR (R) guide for energy and plant managers
EP3190194B1 (en) Method for detecting air flow distribution in blast furnace
CN107368125B (en) A kind of blast furnace temperature control system and method based on CBR Yu the parallel mixed inference of RBR
CN101881955B (en) blast furnace condition evaluation method
CN103544273A (en) Method for assessing integral states of furnace conditions by aid of pattern recognition technology
Hashimoto et al. Development and validation of kinematical blast furnace model with long-term operation data
CN102925602A (en) Furnace profile maintenance method for blast furnace operation
CN111575421B (en) Method for adjusting shape of soft melt belt by scanning radar
CN106319118B (en) Method for prolonging service life of blast furnace copper cooling wall
CN110373508B (en) Reflow strip identification method and device and electronic equipment
Agrawal et al. Advances in thermal level measurement techniques using mathematical models, statistical models and decision support systems in blast furnace
CN113961865A (en) Method for accurately controlling addition amount of temperature regulator in TSC (thyristor switched capacitor) stage of large converter
JP5381899B2 (en) Blast furnace operation method
Bernasowski et al. Support algorithm for blast furnace operation with optimal fuel consumption
JP5277636B2 (en) How to operate a vertical furnace
KR101277973B1 (en) Method for controlling blow energy of blast furnace
Fan et al. Expert system for sintering process control
TWI435936B (en) Method for predicting channeling phenomenon of blast furnace
CN111270029A (en) Method for representing molten iron temperature and application thereof
CN117806169B (en) Furnace temperature early warning optimization method, system, terminal and medium based on neural network
CN112410486B (en) Method for judging furnace protection effect of blast furnace hearth
CN111850202B (en) Blast furnace inner shape adjusting method and blast furnace
KR100776036B1 (en) The Method For Decision Of Upper Core Change using Central Gas Distribution Ratio

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant