CN102751785B - Modularization sequential control system and realization method thereof - Google Patents

Modularization sequential control system and realization method thereof Download PDF

Info

Publication number
CN102751785B
CN102751785B CN201210158608.8A CN201210158608A CN102751785B CN 102751785 B CN102751785 B CN 102751785B CN 201210158608 A CN201210158608 A CN 201210158608A CN 102751785 B CN102751785 B CN 102751785B
Authority
CN
China
Prior art keywords
configuration
module
control system
information
sequential control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210158608.8A
Other languages
Chinese (zh)
Other versions
CN102751785A (en
Inventor
樊陈
倪益民
窦仁晖
赵东坡
姚志强
吴艳平
姜玉磊
黄树帮
任辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
Original Assignee
State Grid Corp of China SGCC
China Electric Power Research Institute Co Ltd CEPRI
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, China Electric Power Research Institute Co Ltd CEPRI filed Critical State Grid Corp of China SGCC
Priority to CN201210158608.8A priority Critical patent/CN102751785B/en
Publication of CN102751785A publication Critical patent/CN102751785A/en
Application granted granted Critical
Publication of CN102751785B publication Critical patent/CN102751785B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention provides a modularization sequential control system and a realization method thereof. The modularization sequential control system is characterized in that an operation order acquires module acquires operation content and transmits the information of the operation content to an operation configuration module, the operation configuration module transmits the information to an operation simulation module for correctness inspection, if the configuration is correct, the information is returned to a status monitoring module so as to perform the specific operation control, and if the configuration is wrong, the information is returned to the operation control module to be changed; and a five-prevention locking correlation module acquires a result of the five-prevention locking of each single-step operation and transmits the result to the status monitoring module, after the five-prevention locking meets the operation requirement, a sequential control system transmits generic object oriented substation event (GOOSE) interlocking information to a controlled device through a video interlocking module, and an operation recording and query module records a historical record and log of operation success or operation failure. Through the modularization design and standardized communication interfaces, the normalization of the sequential control function is realized, the system not only can be used as an independent system to realize the cross-platform installation and application, but also can be used as an application sub-function of a transformer substation background monitoring system, so that reference can be provided for the modularized, standardized and normalized construction of top-grade application functions of an intelligent transformer substation.

Description

A kind of modularization sequential control system and its implementation
Technical field
The invention belongs to field of electric power automation, be specifically related to a kind of modularization sequential control system and its implementation.
Background technology
At present, global energy and environmental crisis make intelligent grid turn world's common recognition into, and become the national strategy of the developed countries such as America and Europe.The intelligent grid construction of China is in conjunction with the feature of self-growth, relate to the links such as generating, transmission of electricity, power transformation, distribution, electricity consumption, scheduling and information communication, and intelligent substation construction is exactly power transformation link wherein, its overall level of building directly affects the overall height of China's intelligent grid.
Sequential control, as intelligent substation basic function, is under transformer station's normalizing operation prerequisite, and the order automatically specified according to operation order by automated system performs associative operation task, the disposable operation automatically completing multiple rate-determining steps.This technology also has use in traditional transformer station, effectively raises the operation maintenance efficiency at full station, ensure that correctness and the reliability of operation, avoid the serious harm thought and slip up and cause greatly.This technology was not only widely applied in the intelligent substation construction period, had also had new development and improvement simultaneously.Along with the propelling that intelligent substation pilot project is built, the application of senior application function becomes one of the core and key of intelligent substationization construction, and sequential control function is exactly use one comparatively widely in numerous senior application function.But because sequential control lacks unified, the sequential control model of standard and interactive mode, different manufacturers is caused to occur great difference in sequential control functional realiey mode, some producer by realizing sequential control function on wall measure and control device, some producer realizes sequential control function jointly by station level background system and wall measure and control device, Ye You producer realizes this function by arranging independently sequential control server, these not only cause the confusion of sequential control functional realiey mode, also be unfavorable for intelligent substation standardization simultaneously, large-scale promotion.
Summary of the invention
In order to overcome above-mentioned the deficiencies in the prior art, the invention provides a kind of modularization sequential control system and its implementation, based on the information model of IEC61850 standard design sequential control function standardizing, and based on this, by modularized design and Standardization Communication interface, realize the standardization of sequential control function, this system can not only realize cross-platform installation and use as independently system, simultaneously also can according to demand as an application subfunction of transformer station's background monitoring system, for the modularization of the numerous senior application function of intelligent substation, standardization and standardization construction provide reference.
In order to realize foregoing invention object, the present invention takes following technical scheme:
A kind of modularization sequential control system, is characterized in that: described sequence control system comprises operation order acquisition module, five-defence block relating module, video interlink module, state monitoring module, operative configuration module, operational simulation module and operation note enquiry module, described operation order acquisition module obtains concrete operations content, and give described operative configuration module by the information transmission of content of operation described in it, realize all operations configuration and with the associating of controlled device, information transmission is carried out verifying correctness to operational simulation module by described operative configuration module, if configuration is correct, information is back to described state monitoring module and carries out concrete operation control, five-defence block relating module obtains the result of each single-step operation five-defence block and is transferred to described state monitoring module, the information transmission of controlled device is given described video interlink module by described sequence control system, the daily record of operation note enquiry module record successful operation or failure.
Described operation order acquisition module obtains concrete operations content by Aptitude Operation Order Sheet System in the mode of automatic acquisition or artificial input.Described video interlink module sends video interlink signal to video monitoring system by GOOSE, is switched to by operating equipment to realize camera The Cloud Terrace.
Under logic blocking, operation exception, accident generation and operation return timeout case, described state monitoring module makes the automatic shut-down operation of described sequence control system, and reported failures reason.
The content of operation of described sequence control system comprises the disjunction/closed procedure of primary equipment, the change of described primary equipment operational mode, the throwing of protection pressing plate are moved back, transformer gear regulates and the switching in protection definite value district.
The configuration mode of the operating process of described sequence control system is divided into manual configuration, Typical Disposition and combination configuration.The disjunction of the inner primary equipment of transformer station, closed and operational mode change and are configured in advance, form the configuration of integrated operation flow process; Namely described manual configuration re-starts configuration according to concrete operations, and do not adopt any existing configuration, all operations all reconfigures; Namely described Typical Disposition comparatively typically operates according in substation operation, and pre-defined sequential control flow process and relevant configuration, directly can call when carrying out associative operation, avoiding repeated configuration work; Described combination configuration, namely according to for comparatively complicated operation, is broken down into existing multiple little operative combination, while the configuration making full use of existing operation storehouse, in conjunction with manual configuration, carries out the configuration of Controlling model.
An implementation method for modularization sequential control system, said method comprising the steps of:
Step 1: judge whether the operation order acquisition module of described sequence control system has operation order automatic acquisition function, if then directly obtain operation order; If not, then operation order described in manual entry;
Step 2: configure each single-step operation, and the concrete path obtaining operating equipment;
Step 3: whether simulated operation inspection configuration mates with operation requirements, if abnormal, return step 2 and continues to perform, if correct, perform next step;
Step 4: inquiry five-defence block information, if locking, shut-down operation, if unlock, executive control operation;
Step 5: judge whether described sequence control system configures described video interlink module, if then start video interlink signal, then directly operates if not;
Step 6: judge whether to receive the state displacement information returned by operating equipment at the appointed time, then return successful operation information to described sequence control system in this way, and be presented at described state monitoring module; Then reporting operations failure if not, and stop subsequent operation.
The described stipulated time is set to 10s ~ 30s, specifically can adjust according to Practical Project.
Described state monitoring module monitors the state model in the whole implementation of sequential control, described state model comprises the overall operation step of operation, the operation of current execution, operating mistake, successful operation, operation suspension, operation continues, operation cancels and operation suddenly stops, all state informations all adopt IEC61850 standard Modling model, the integrality before cross-platform display sequence control Dynamic System, after operation neutralization operation.
Controlling model in the whole implementation of described operative configuration block configuration sequential control, described Controlling model take single-step operation as object, comprise the data attribute set of operation, described data attribute set comprises forms data attribute or structured data, and all sets up based on IEC61850 master pattern.
Described forms data attribute definition pressing plate throwing is moved back, definite value district revises and transformer gear regulates; Described structured data is used for the operation of primary equipment, and it comprises band value and selects (SBOw), perform (Operate) and cancel (Cancel).
Described state model and Controlling model are shown by visual interface, and described state model is general information, exposing operational state information, also realize suspending and continuing operation to sequential control simultaneously; Described Controlling model shows concrete operating procedure according to the requirement of operation order, and each operating procedure only shows practical operation information, does not directly show concrete configuration.
Compared with prior art, beneficial effect of the present invention is:
1. this system can not only realize cross-platform installation and use as independently system, simultaneously also can according to demand as an application subfunction of transformer station's background monitoring system, for the modularization of the numerous senior application function of intelligent substation, standardization and standardization construction provide reference;
2. carry out information interaction with Aptitude Operation Order Sheet System, five-prevention locking system, also there is the interface carrying out unified fusion with five-prevention locking system simultaneously, support the interlock with video monitoring subsystem, and then effectively improve standardization and the standardized level of sequential control function, promote the senior application function of intelligent substation to modularization, generalization development;
3. have monospace and the function across interval, sequence control system can not only realize the sequential control of equipment operational mode in same interval, realizes the operational mode of entirely standing across interval simultaneously and adjusts and operation;
4. sequence control system described in can realize cross-platform operation, can incorporate different background monitoring systems, also can become separately functional module and be installed on other backstage.All functions all realize on backstage, and not needing increases extra external equipment.
Accompanying drawing explanation
Fig. 1 is the sequence control system application operating schematic cross-section of the specific embodiment of the invention;
Fig. 2 is the sequence control system operative configuration modular configuration diagram of the specific embodiment of the invention;
Fig. 3 is the sequence control system applicating flow chart of the specific embodiment of the invention.
Embodiment
Below in conjunction with accompanying drawing, the present invention is described in further detail.
As shown in Figure 1-Figure 3, a kind of modularization sequential control system, is characterized in that: described sequence control system comprises operation order acquisition module, five-defence block relating module, video interlink module, state monitoring module, operative configuration module, operational simulation module and operation note enquiry module, described operation order acquisition module obtains concrete operations content, and give described operative configuration module by the information transmission of content of operation described in it, realize all operations configuration and with the associating of controlled device, information transmission is carried out verifying correctness to operational simulation module by described operative configuration module, if configuration is correct, information is back to described state monitoring module and carries out concrete operation control, five-defence block relating module obtains the result of each single-step operation five-defence block and is transferred to described state monitoring module, the information transmission of controlled device is given described video interlink module by described sequence control system, the daily record of operation note enquiry module record successful operation or failure.
Described operation order acquisition module obtains concrete operations content by Aptitude Operation Order Sheet System in the mode of automatic acquisition or artificial input.Described video interlink module sends video interlink signal to video monitoring system by GOOSE, is switched to by operating equipment to realize camera The Cloud Terrace.
Under logic blocking, operation exception, accident generation and operation return timeout case, described state monitoring module makes the automatic shut-down operation of described sequence control system, and reported failures reason.
The content of operation of described sequence control system comprises the disjunction/closed procedure of primary equipment, the change of described primary equipment operational mode, the throwing of protection pressing plate are moved back, transformer gear regulates and the switching in protection definite value district.
Sequence control system can carry out information interaction with Aptitude Operation Order Sheet System, five-prevention locking system, also there is the interface carrying out unified fusion with five-prevention locking system simultaneously, support the interlock with video monitoring subsystem, information interaction between all systems all adopts IEC61850 standard, ensure that standard and the unification of information interaction.
The configuration mode of the operating process of described sequence control system is divided into manual configuration, Typical Disposition and combination configuration.The disjunction of the inner primary equipment of transformer station, closed and operational mode change and are configured in advance, form the configuration of integrated operation flow process; Namely described manual configuration re-starts configuration according to concrete operations, and do not adopt any existing configuration, all operations all reconfigures; Namely described Typical Disposition comparatively typically operates according in substation operation, and pre-defined sequential control flow process and relevant configuration, directly can call when carrying out associative operation, avoiding repeated configuration work; Described combination configuration, namely according to for comparatively complicated operation, is broken down into existing multiple little operative combination, while the configuration making full use of existing operation storehouse, in conjunction with manual configuration, carries out the configuration of Controlling model.
An implementation method for modularization sequential control system, said method comprising the steps of:
Step 1: judge whether the operation order acquisition module of described sequence control system has operation order automatic acquisition function, if then directly obtain operation order; If not, then operation order described in manual entry;
Step 2: configure each single-step operation, and the concrete path obtaining operating equipment;
Step 3: whether simulated operation inspection configuration mates with operation requirements, if abnormal, return step 2 and continues to perform, if correct, perform next step;
Step 4: inquiry five-defence block information, if locking, shut-down operation, if unlock, executive control operation;
Step 5: judge whether described sequence control system configures described video interlink module, if then start video interlink signal, then directly operates if not;
Step 6: judge whether to receive the state displacement information returned by operating equipment at the appointed time, then return successful operation information to described sequence control system in this way, and be presented at described state monitoring module; Then reporting operations failure if not, and stop subsequent operation.
The described stipulated time is set to 10s ~ 30s, specifically can adjust according to Practical Project.
Described state monitoring module monitors the state model in the whole implementation of sequential control, described state model comprises the overall operation step of operation, the operation of current execution, operating mistake, successful operation, operation suspension, operation continues, operation cancels and operation suddenly stops, all state informations all adopt IEC61850 standard Modling model, the integrality before cross-platform display sequence control Dynamic System, after operation neutralization operation.
Controlling model in the whole implementation of described operative configuration block configuration sequential control, described Controlling model take single-step operation as object, comprise the data attribute set of operation, described data attribute set comprises forms data attribute or structured data, and all sets up based on IEC61850 master pattern.
Described forms data attribute definition pressing plate throwing is moved back, definite value district revises and transformer gear regulates; Described structured data is used for the operation of primary equipment, and it comprises band value and selects (SBOw), perform (Operate) and cancel (Cancel).
Described state model and Controlling model are shown by visual interface, and described state model is general information, exposing operational state information, also realize suspending and continuing operation to sequential control simultaneously; Described Controlling model shows concrete operating procedure according to the requirement of operation order, and each operating procedure only shows practical operation information, does not directly show concrete configuration.
Unified standard and definition are carried out in the requirement that IEC61850 standard extension followed by the model of state model; The content of Controlling model derives from the configuration on backstage completely, and namely backstage connects the specifying information of each equipment obtained of entirely standing, and from these information, directly chooses the data attribute required for sequential control, realize flexible configuration and the unrestricted choice of sequential control.
Its essence of the configuration of Controlling model uses the existing model in full station, but in order to the convenience shown, the content of model does not directly show on interface, but show concrete operating process according to the content of operation order, divide into two parts in the configuration of this Controlling model, one is external display description, and one is the configuration of model.Namely the operating procedure of interface display is the content of operation order, and the mode by manually inputting fills in concrete content of operation, and the interface also by operation ticket system and sequential control function obtains operation order content.The concrete information model of concrete operative association is walked afterwards for each, for the straighforward operation of the primary equipment such as circuit breaker, isolating switch, its concrete information model is structure, obtained device model is associated with full station equipment by background monitoring system, find the control logic node of logical device (LD) in the concrete IED involved by operation, the structure type SBOw of logical node, Operate, Cancel are added in the single-step operation wherein related to, and then forms the structure content of single-step operation in sequential control.It is also that the model obtained by background monitoring system is directly associated that move back for soft pressing plate throwing, customised regions switching etc. operates, and because sequence control system can cross-platformly realize, for this reason, final model needs manual adding wherein.
After Controlling model completes, final operative configuration is also formed, and total operating procedure is also determined, and now, in stateful configuration model, overall operation step just can accurately show.Correct for guaranteeing that model configures, emulated by analogue system, to guarantee the consistent of actual disposition and schedules operations, the practical operation of accurate rear beginning sequential control to be configured.
Clicking operation starts, the flow process that can control in order carries out operation progressively, system can detect the latching logic of each single-step operation automatically, only have conditions permit just to control concrete operation, if be now configured with video interlink signal, then can send interlock signal, guarantee that video frequency pick-up head is switched to by the equipment operated, realize the real time monitoring to operating equipment, start to perform actual control operation while sending interlock signal, every successful execution single stepping, (successful execution number of steps/total number of steps that current state in state model will show, as: 2/6, successful execution 2 step, total step number is 6).If break down in operation failure, operation overtime, operating process, sequential control meeting emergent stopping, and show error reason.
In operation, if operating personnel run into special circumstances, can realize suspending control to sequential control operation according to the reality of self, continuation operation is restarted after conditions permit, the operating procedure that now sequential control can continue according to configuring before operates, to meet the diversified demand of substation operation maintenance.
Associative operation due to transformer station is mostly similar operation, therefore sets up typical operation repository by this sequence control system, is about to conventional operation and associates with the model of relevant device.Transformer substation system, at the beginning of Installation and Debugging, can be set up by way of manual operation.First set up the repository of the primary equipments such as each circuit breaker, isolating switch, then set up but the repository at interval according to the actual construction of transformer station; Afterwards after transformer station puts into operation according to the accumulation of multi-pass operation, progressively set up the repository of each operation, and then convenient calling from now on generic operation.When running into new sequential control operation, the mode by combination configuration realizes, and namely from existing storehouse, calls similar configuration, carries out cutting based on this, and combination new needs manually adds, and carries out forming new sequence operation flow process.
Finally should be noted that: above embodiment is only in order to illustrate that technical scheme of the present invention is not intended to limit, although with reference to above-described embodiment to invention has been detailed description, those of ordinary skill in the field are to be understood that: still can modify to the specific embodiment of the present invention or equivalent replacement, and not departing from any amendment of spirit and scope of the invention or equivalent replacement, it all should be encompassed in the middle of right of the present invention.

Claims (5)

1. a modularization sequential control system, is characterized in that: described sequence control system comprises operation order acquisition module, five-defence block relating module, video interlink module, state monitoring module, operative configuration module, operational simulation module and operation note enquiry module, described operation order acquisition module obtains concrete operations content, and give described operative configuration module by the information transmission of content of operation described in it, realize all operations configuration and with the associating of controlled device, information transmission is carried out verifying correctness to operational simulation module by described operative configuration module, if configuration is correct, information is back to described state monitoring module and carries out concrete operation control, five-defence block relating module obtains the result of each single-step operation five-defence block and is transferred to described state monitoring module, the information transmission of controlled device is given described video interlink module by described sequence control system, the daily record of operation note enquiry module record successful operation or failure,
Described operation order acquisition module obtains concrete operations content by Aptitude Operation Order Sheet System in the mode of automatic acquisition or artificial input;
Described video interlink module sends video interlink signal to video monitoring system by GOOSE, is switched to by operating equipment to realize camera The Cloud Terrace;
Under logic blocking, operation exception, accident generation and operation return timeout case, described state monitoring module makes the automatic shut-down operation of described sequence control system, and reported failures reason;
The content of operation of described sequence control system comprises the disjunction/closed procedure of primary equipment, the change of described primary equipment operational mode, the throwing of protection pressing plate are moved back, transformer gear regulates and the switching in protection definite value district;
The configuration mode of the operating process of described sequence control system is divided into manual configuration, Typical Disposition and combination configuration;
The disjunction of the inner primary equipment of transformer station, closed and operational mode change and are configured in advance, form the configuration of integrated operation flow process; Namely described manual configuration re-starts configuration according to concrete operations, and do not adopt any existing configuration, all operations all reconfigures; Namely described Typical Disposition comparatively typically operates according in substation operation, and pre-defined sequential control flow process and relevant configuration, directly can call when carrying out associative operation, avoiding repeated configuration work; Described combination configuration, namely according to for comparatively complicated operation, is broken down into existing multiple little operative combination, while the configuration making full use of existing operation storehouse, in conjunction with manual configuration, carries out the configuration of Controlling model.
2. an implementation method for modularization sequential control system according to claim 1, is characterized in that: said method comprising the steps of:
Step 1: judge whether the operation order acquisition module of described sequence control system has operation order automatic acquisition function, if then directly obtain operation order; If not, then operation order described in manual entry;
Step 2: configure each single-step operation, and the concrete path obtaining operating equipment;
Step 3: whether simulated operation inspection configuration mates with operation requirements, if abnormal, return step 2 and continues to perform, if correct, perform next step;
Step 4: inquiry five-defence block information, if locking, shut-down operation, if unlock, executive control operation;
Step 5: judge whether described sequence control system configures described video interlink module, if then start video interlink signal, then directly operates if not;
Step 6: judge whether to receive the state displacement information returned by operating equipment at the appointed time, then return successful operation information to described sequence control system in this way, and be presented at described state monitoring module; Then reporting operations failure if not, and stop subsequent operation;
Described state monitoring module monitors the state model in the whole implementation of sequential control, described state model comprises the overall operation step of operation, the operation of current execution, operating mistake, successful operation, operation suspension, operation continues, operation cancels and operation suddenly stops, all state informations all adopt IEC61850 standard Modling model, the integrality before cross-platform display sequence control Dynamic System, after operation neutralization operation;
Controlling model in the whole implementation of described operative configuration block configuration sequential control, described Controlling model take single-step operation as object, comprise the data attribute set of operation, described data attribute set comprises forms data attribute or structured data, and all sets up based on IEC61850 master pattern.
3. the implementation method of modularization sequential control system according to claim 2, is characterized in that: the described stipulated time is set to 10s ~ 30s, specifically can adjust according to Practical Project.
4. the implementation method of modularization sequential control system according to claim 2, is characterized in that: described forms data attribute definition pressing plate throwing is moved back, definite value district revises and transformer gear regulates; Described structured data is used for the operation of primary equipment, and it comprises band value and selects (SBOw), perform (Operate) and cancel (Cancel).
5. the implementation method of modularization sequential control system according to claim 2, it is characterized in that: described state model and Controlling model are shown by visual interface, described state model is general information, exposing operational state information, also realizes suspending and continuing operation to sequential control simultaneously; Described Controlling model shows concrete operating procedure according to the requirement of operation order, and each operating procedure only shows practical operation information, does not directly show concrete configuration.
CN201210158608.8A 2012-05-21 2012-05-21 Modularization sequential control system and realization method thereof Active CN102751785B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210158608.8A CN102751785B (en) 2012-05-21 2012-05-21 Modularization sequential control system and realization method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210158608.8A CN102751785B (en) 2012-05-21 2012-05-21 Modularization sequential control system and realization method thereof

Publications (2)

Publication Number Publication Date
CN102751785A CN102751785A (en) 2012-10-24
CN102751785B true CN102751785B (en) 2015-02-04

Family

ID=47031756

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210158608.8A Active CN102751785B (en) 2012-05-21 2012-05-21 Modularization sequential control system and realization method thereof

Country Status (1)

Country Link
CN (1) CN102751785B (en)

Families Citing this family (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103336857B (en) * 2012-12-24 2016-11-23 国家电网公司 Microcomputer anti-error Simulation system of lunar rover and its implementation towards power system
CN103425846B (en) * 2013-08-27 2017-04-19 国家电网公司 Simulation method oriented towards distribution line operating maintenance process
CN105630581A (en) * 2014-11-07 2016-06-01 南京南瑞继保电气有限公司 Task processing method and device, and computer storage medium
CN105137360B (en) * 2015-08-31 2018-09-11 山东智洋电气股份有限公司 One key charging method of storage batteries of transformer substation group
CN107885170B (en) * 2016-09-30 2021-01-01 珠海优特电力科技股份有限公司 Safety production control device, system and method
CN107608291A (en) * 2017-09-29 2018-01-19 中国电力科学研究院 A kind of intelligent substation application function linkage rule verification method and system
CN108321930B (en) * 2018-01-30 2021-03-23 珠海华伟电气科技股份有限公司 Sequence control system and method
CN108376966B (en) * 2018-03-09 2022-08-19 中国电力科学研究院有限公司 Method and system for analyzing correlation relationship between misoperation-preventive locking logic intervals of intelligent substation
CN108875967A (en) * 2018-06-04 2018-11-23 国网浙江省电力有限公司温州供电公司 A kind of distribution network failure processing method
CN108879663B (en) * 2018-06-28 2021-03-16 山东鲁能软件技术有限公司智能电气分公司 One-key sequence control method and system for electric power system with exception handling
CN109445957A (en) * 2018-09-26 2019-03-08 迪瑞医疗科技股份有限公司 A kind of synchronization and asynchronous communication control method, system and device
CN110620908A (en) * 2019-09-17 2019-12-27 深圳供电局有限公司 Remote operation system of central station and operation method thereof
CN114421615B (en) * 2021-12-28 2023-11-28 厦门市同耀电器实业有限公司 Control method and system for improving maintenance safety coefficient of distribution box

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101257224A (en) * 2008-04-17 2008-09-03 国电南瑞科技股份有限公司 Technique for realizing transforming plant anti mis-closedown function in transforming plant observe and control apparatus
CN102412624A (en) * 2011-11-08 2012-04-11 湖北省电力公司电力试验研究院 Virtual monitoring method for transformer substation sequence control

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101257224A (en) * 2008-04-17 2008-09-03 国电南瑞科技股份有限公司 Technique for realizing transforming plant anti mis-closedown function in transforming plant observe and control apparatus
CN102412624A (en) * 2011-11-08 2012-04-11 湖北省电力公司电力试验研究院 Virtual monitoring method for transformer substation sequence control

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
变电站智能操作票***与程序化操作***结合方式探讨;张丰等;《电力自动化设备》;20101231;第30卷(第12期);117-120 *
智能变电站中顺序控制的功能分析与实现;谷月雁等;《电气技术》;20111231(第1期);58-62 *
智能变电站功能架构及设计原则;李瑞生等;《电力***保护与控制》;20101101;第38卷(第21期);24-27 *

Also Published As

Publication number Publication date
CN102751785A (en) 2012-10-24

Similar Documents

Publication Publication Date Title
CN102751785B (en) Modularization sequential control system and realization method thereof
CN109617241B (en) Intelligent sequential control system and method based on panoramic data in transformer substation
CN104135068B (en) A kind of distribution terminal plug and play method based on IEC61850 standard
CN104460346B (en) Feeder automation action logic test method based on power distribution terminal service verification
CN203233238U (en) Intelligent type fault recording online management system
CN202586494U (en) Fixed value modification and check system used for relay protection
CN110363447B (en) Urban rail transit line network level power dispatching system
CN113422820B (en) Automatic joint debugging device and method for remote information of main station
CN109873497B (en) Power distribution main station and terminal automatic joint debugging acceptance method based on intelligent acceptance device
CN103414251A (en) Substation network communication simulation system based on IEC 61850
CN107276229A (en) A kind of intelligent substation remote control overall process check system and method
CN204291050U (en) A kind of dispatching and monitoring information check system
CN110086252A (en) A kind of polymorphic feeder automation on-site testing device
CN113437798B (en) Master-substation data consistency verification method for master-substation telecontrol information
CN103023147A (en) Remote vision linkage method for electric power master station and substation based on computer integrated manufacturing (CIM) data model
CN103425847B (en) Based on circuit anticipation modernization system and the method for work thereof of dispatching of power netwoks anti-error system
CN113364120B (en) Method, device and equipment for checking control process of intelligent substation and storage medium
CN107947356A (en) Electrified railway digital traction substation automated system
CN104184208A (en) Integrated automation information proofreading system of transformer substation
CN104158297A (en) Composite energy structure micro-grid monitoring platform based on energy management
CN110611312B (en) On-line simulation system and method for panoramic data of substation bay level
CN104201766B (en) The method determining prepared auto restart sequential and combination is followed the trail of based on power supply point
CN210327143U (en) Automatic field test device for multi-state feeder
CN109991905A (en) A kind of integrated small hydropower station automatic control system
CN211428996U (en) Information, networking and intelligent power control system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Effective date: 20130715

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20130715

Address after: 100192 Beijing city Haidian District Qinghe small Camp Road No. 15

Applicant after: China Electric Power Research Institute

Applicant after: State Grid Corporation of China

Address before: 100192 Beijing city Haidian District Qinghe small Camp Road No. 15

Applicant before: China Electric Power Research Institute

C14 Grant of patent or utility model
GR01 Patent grant