CN102735461A - Identification method for problem cables and angular support displacement on basis of temperature variation and cable force monitoring - Google Patents

Identification method for problem cables and angular support displacement on basis of temperature variation and cable force monitoring Download PDF

Info

Publication number
CN102735461A
CN102735461A CN2012101735400A CN201210173540A CN102735461A CN 102735461 A CN102735461 A CN 102735461A CN 2012101735400 A CN2012101735400 A CN 2012101735400A CN 201210173540 A CN201210173540 A CN 201210173540A CN 102735461 A CN102735461 A CN 102735461A
Authority
CN
China
Prior art keywords
cable structure
temperature
data
vector
initial
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012101735400A
Other languages
Chinese (zh)
Inventor
韩玉林
万江
韩佳邑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southeast University
Original Assignee
Southeast University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southeast University filed Critical Southeast University
Priority to CN2012101735400A priority Critical patent/CN102735461A/en
Publication of CN102735461A publication Critical patent/CN102735461A/en
Pending legal-status Critical Current

Links

Landscapes

  • Testing Of Devices, Machine Parts, Or Other Structures Thereof (AREA)

Abstract

The invention provides an identification method for problem cables and angular support displacement on the basis of temperature variation and cable force monitoring. The identification method comprises the following steps of: determining whether to update a mechanical calculation reference model of a cable structure or not through monitoring a cable structure temperature and an environmental temperature, thus obtaining the mechanical calculation reference model of the cable structure, including the cable structure temperature and the environmental temperature; figuring out a unit change matrix of a unit damage monitored quantity on the basis of the reference model; figuring out a non-inferior solution of a current nominal damage vector of an to-be-solved evaluated object according to an approximate linear relation among a current numerical vector of the monitored quantity, a current initial numerical vector of the monitored quantity, the unit change matrix of the unit damage monitored amount, a unit damage or unit angular displacement vector and the current nominal damage vector of the to-be-solved evaluated object; and rapidly identifying the damaged cable, the loosened cable and the angular support displacement according to the relation when the temperatures change.

Description

The problem rope of temperature variation cable force monitoring and bearing angular displacement recognition methods
Technical field
Structures such as cable-stayed bridge, suspension bridge, truss-frame structure have a common ground; Be exactly that they have many parts that bear tensile load; Like suspension cable, main push-towing rope, hoist cable, pull bar or the like; The common ground of this class formation is to be support unit with rope, cable or the rod member that only bears tensile load, and this method is " Cable Structure " with such structure representation for simplicity.Variation along with environment temperature; The temperature of Cable Structure also can change; When the Cable Structure temperature changes; (for example bearing is around the rotation of coordinate axis X, Y, Z in that the bearing angular displacement is arranged; In fact be exactly the angular displacement of bearing around coordinate axis X, Y, Z) time, this method is discerned damaged cable, slack line (truss-frame structure just is meant the impaired or lax rod member that only bears tensile load) and the bearing angular displacement in the supporting system of Cable Structure based on cable force monitoring, belong to the engineering structure health monitoring field.The supporting system of Cable Structure refers to all ropeway carrying-ropes, reaches all rod members that only bear tensile load that play supporting role; For simplicity; This patent is called " cable system " with whole support unit unifications of this class formation; But in fact cable system not only refers to support rope, also comprises the rod member that only bears tensile load, censures all ropeway carrying-ropes and the rod member that only bears tensile load that all play supporting role with " supporting rope " this noun in this method.This method is called the supporting rope of unsoundness problem with damaged cable and slack line, abbreviates the problem rope as.
Background technology
Cable Structure (particularly large-scale Cable Structure; For example large-scale cable-stayed bridge, suspension bridge) damage, structural health problem such as lax can appear in its supporting rope behind the long service; Structural health problems such as angular displacement can appear in its bearing, and these structural health problems all will cause the variation of structural internal force, and the safety of structure is caused harmful effect; Will cause the inefficacy of structure when serious, therefore accurately and timely discerning needs slack line, damaged cable and bearing angular displacement to be very important.
The supporting cable system health status change with bearing generation angular displacement after; Can cause the variation of the measurable parameter of structure; For example can cause the variation of supporting cable force; In fact the variation of Suo Li has comprised the health status information of Cable Structure; That is to say the health status that to utilize the rope force data to judge structure, can discern damaged cable, slack line (or damage to relax and have both at the same time) and bearing angular displacement based on cable force monitoring (this method is called monitored Suo Li " monitored amount ", and the back is mentioned " monitored amount " and just is meant monitored Suo Li).Monitored amount is except the influence that receives the Cable Structure health status; Also can receive the influence of Cable Structure temperature variation (usually can take place); Under the condition that the Cable Structure temperature changes; If can realize based on monitoring to the supporting rope of unsoundness problem and the identification of bearing angular displacement to monitored amount, the safety of Cable Structure is had significant values, also there are not a kind of disclosed, effective health monitoring systems and method to solve this problem at present.
Summary of the invention
Technical matters: the purpose of this method is when Cable Structure has temperature variation, discloses a kind of based on health monitor method cable force monitoring, that can discern damaged cable in the Cable Structure, slack line and bearing angular displacement rationally and effectively.
Reason according to the Suo Li that supports rope changes can change the four kinds of situation that be divided into the Suo Li of supporting rope: the one, and the supporting rope has received damage, for example supports rope and localized cracks and corrosion or the like have occurred; The 2nd, supporting rope and not damaged; But variation has also taken place in Suo Li; The one of the main reasons that this variation occurs is that the Suo Changdu under the supporting rope free state (this moment, Suo Zhangli claimed that also Suo Li is 0) (is called drift; This method specially refers to support the drift of that section rope between rope two supporting end points) variation has taken place, one of purpose of this method will identify drift exactly the supporting rope that changes has taken place, and identifies the change amount of their drift; This change amount provides direct foundation for the Suo Li adjustment of this rope; The reason that supporting rope drift changes is not single, and for ease, this method is referred to as slack line with the supporting rope that drift changes; The 3rd, the Suo Li that Cable Structure bearing generation angular displacement causes changes; The 4th, the Suo Li that the Cable Structure temperature variation causes changes.
Technical scheme: this method is made up of three parts.Be respectively the method for setting up required knowledge base of cable structure health monitoring system and parameter, based on knowledge base (containing parameter) and the Cable Structure health status appraisal procedure of the monitored amount of actual measurement, the software and hardware part of health monitoring systems.
If the quantity sum of the quantity of the supporting rope of Cable Structure and the bearing angular displacement component of Cable Structure is N.For the purpose of narrating conveniently, this method is unified claims that support cable and the bearing angular displacement assessed are " evaluation object ", total N evaluation object.Give by the evaluation object serial number, this numbering will be used to generate the vector sum matrix in subsequent step.
If total M1 root supporting rope in the cable system, structure rope force data comprises this M 1The Suo Li of root supporting rope, obviously M 1Less than by the quantity N of evaluation object.Only pass through M 1The M of root supporting rope 1It is impossible by the state of evaluation object that individual rope force data is found the solution unknown N, and this method is at the whole M of monitoring 1On the basis of root supporting cable force, increase being no less than (N-M 1) individual other monitored amounts.
What increase is no less than (N-M 1) other individual monitored amounts remain Suo Li, narration as follows:
Before the structural health detection system is started working, on Cable Structure, artificially increase M earlier 2(M 2Be not less than N-M 1) the root rope, be called the sensing rope, the M that increases newly 2The rigidity of root sensing rope is compared with the rigidity of any supporting rope of Cable Structure, should be little a lot, for example little 10 times, and the M that increases newly 2The Suo Li of root sensing rope should be less, and for example its xsect normal stress should be less than its fatigue limit, and these requirements can guarantee the M that increases newly 2Fatigue damage can not take place in root sensing rope, the M that increases newly 2The fully anchoring of two ends of root sensing rope guarantees can not occur relaxing the M that increases newly 2Root sensing rope should obtain sufficient anti-corrosion protection, guarantees the M that increases newly 2Damage and lax can not take place in root sensing rope, in the monitoring structural health conditions process, will monitor the M that this increases newly 2The Suo Li of root sensing rope.The M that increases newly in the method 2Root sensing rope is as the part of Cable Structure, and when back literary composition was mentioned Cable Structure again, Cable Structure comprises increased M 2Cable Structure before the root sensing rope and the M that increases newly 2Root sensing rope that is to say that the back literary composition refers to comprise the M that increases newly when mentioning Cable Structure 2The Cable Structure of root sensing rope.Therefore when the back literary composition was mentioned and calculated " Cable Structure steady temperature data " according to " the temperature survey method of calculatinging of the Cable Structure of this method " measurement, Cable Structure wherein comprised the M that increases newly 2Root sensing rope, " the Cable Structure steady temperature data " that obtain comprise the M that increases newly 2The steady temperature data of root sensing rope obtain the M that increases newly 2The method of the steady temperature data of root sensing rope is same as the M of Cable Structure 1The preparation method of the steady temperature data of root supporting rope, literary composition is handed over no longer one by one in the back; Measure the M that increases newly 2The method of the Suo Li of root sensing rope is same as the M of Cable Structure 1The rope force measurement method of root supporting rope, literary composition is handed over no longer one by one in the back; During to any measurement of supporting Suo Jinhang of Cable Structure, the M to increasing newly simultaneously 2Root sensing rope carries out same measurement, and literary composition is handed over no longer one by one in the back; The M that increases newly 2Root sensing rope except do not take place damage and lax, the M that increases newly 2The quantity of information of root sensing rope is identical with the quantity of information of the supporting rope of Cable Structure, and literary composition is handed over no longer one by one in the back; The M that increases newly 2The Suo Li of root sensing rope is exactly the (N-M that is no less than that increases 1) other individual monitored amounts.When the various mechanical model of Cable Structure set up in literary composition in the back, with the M that increases newly 2Root sensing rope is treated as the supporting rope of Cable Structure and is treated, and except mentioning damage and the lax occasion of supporting rope, when other occasions are mentioned the supporting rope, comprises the M that increases newly 2Root sensing rope.
Comprehensive above-mentioned monitored amount, whole Cable Structure has M (M=M 1+ M 2) M the monitored amount of root rope, M must not be less than by the quantity N of evaluation object.
For simplicity, in the method " all monitored parameters of Cable Structure " are abbreviated as " monitored amount ".Give M monitored amount serial number, this numbering will be used to generate the vector sum matrix in subsequent step.This method is with representing this numbering with variable j, j=1, and 2,3 ..., M.
The first of this method: the method for setting up required knowledge base of cable structure health monitoring system and parameter.Specific as follows:
1. at first confirm " the temperature survey calculating method of the Cable Structure of this method ".Because the temperature of Cable Structure possibly change; For example the temperature of the different parts of Cable Structure change along with the variation of intensity of sunshine, along with the variation of environment temperature changes; The surface of Cable Structure and temperature inside possibly be time dependent sometimes; The surface of Cable Structure possibly be different with temperature inside, and the surface of Cable Structure and temperature inside difference are time dependent, and the Mechanics Calculation of the Cable Structure when this just makes the account temperature condition is quite complicated with monitoring; For cost is measured in simplification problem, minimizing calculated amount and reduction; In order to improve computational accuracy, this method proposes " the temperature survey calculating method of the Cable Structure of this method ", and is specific as follows especially:
The first step; Inquiry or actual measurement obtain the temperature variant thermal conduction study parameter of Cable Structure composition material and Cable Structure environment of living in; Utilize the geometry measured data of design drawing, as-constructed drawing and the Cable Structure of Cable Structure, utilize these data and parameter to set up the thermal conduction study computation model of Cable Structure.Inquiry Cable Structure location is no less than the meteorological data in recent years in 2 years; Cloudy quantity in statistics obtains during this period of time is designated as T cloudy day; Statistics obtains in T cloudy day 0 the highest temperature and the lowest temperature between back 30 minutes of the moment of sunrise next day at each cloudy day; Sunrise be meant constantly on the meteorology that base area revolutions and revolution rule confirm sunrise constantly, the sunrise that can inquire about data or calculate each required day through conventional meteorology constantly, each cloudy day 0 up to sunrise next day constantly the highest temperature between back 30 minutes deduct the maximum temperature difference that the lowest temperature is called this cloudy daily temperature; T cloudy day arranged; The maximum temperature difference of daily temperature that T cloudy day just arranged, the maximal value of getting in the maximum temperature difference of daily temperature at T cloudy day is with reference to temperature difference per day, is designated as Δ T with reference to temperature difference per day rInquiry Cable Structure location and height above sea level interval, place be no less than temperature that meteorological data in recent years or the actual measurement in 2 years obtain Cable Structure environment of living in time with change of elevation data and Changing Pattern, calculate Cable Structure location and height above sea level interval, place and be no less than the temperature of Cable Structure environment of living in recent years in 2 years about the maximum rate of change Δ T of sea level elevation h, for Δ T is got in convenient narration hUnit be ℃/m.On the surface of Cable Structure, get " R Cable Structure surface point "; The back will obtain the temperature of this R Cable Structure surface point through actual measurement; Claim that the temperature data that actual measurement obtains is " R Cable Structure surface temperature measured data "; If utilize the thermal conduction study computation model of Cable Structure, obtain the temperature of this R Cable Structure surface point through Calculation of Heat Transfer, just claim that the temperature data that calculates is " R Cable Structure surface temperature computational data ".When on the surface of Cable Structure, getting " R Cable Structure surface point ", the quantity of " R Cable Structure surface point " is narrated with the condition that must satisfy that distributes in the back.From the residing minimum height above sea level of Cable Structure to the highest height above sea level; On Cable Structure, be uniformly distributed with to choose and be no less than three different altitude above sea level, at each sea level elevation place that chooses, choose two points at least at the intersection place on surface level and Cable Structure surface, from the outer normal of selected point straw line body structure surface; All outer normal directions of choosing are called " measuring the direction of Cable Structure along the Temperature Distribution of wall thickness "; It is crossing with " intersection on surface level and Cable Structure surface " along the direction of the Temperature Distribution of wall thickness to measure Cable Structure, and in the shade the outer normal direction of the measurement Cable Structure of choosing along sunny slope outer normal direction that must comprise Cable Structure in the direction of the Temperature Distribution of wall thickness and Cable Structure, the direction along each measurement Cable Structure along the Temperature Distribution of wall thickness is uniformly distributed with to choose in Cable Structure and is no less than three points; Special; Measure Cable Structure for the supporting rope along each and only get a point, promptly only measure the temperature of the surface point of supporting rope, measure all and be selected temperature a little along the direction of the Temperature Distribution of wall thickness; The temperature that records is called " Cable Structure is along the temperature profile data of thickness ";, wherein edge and same " intersection on surface level and Cable Structure surface " " Cable Structure is along temperature profile data of thickness " crossing, " measuring the direction of Cable Structure along the Temperature Distribution of wall thickness " measurement acquisition are called " identical sea level elevation Cable Structure is along the temperature profile data of thickness " in the method; If chosen H different altitude above sea level; At each sea level elevation place, chosen B the direction of measuring Cable Structure along the Temperature Distribution of wall thickness, measure Cable Structure along each and in Cable Structure, chosen E point along the direction of the Temperature Distribution of wall thickness; Wherein H and E are not less than 3; B is not less than 2, and is special, and E equals 1 for the supporting rope; That " measures the point of Cable Structure along the temperature profile data of thickness " on the meter Cable Structure adds up to HBE; The back will obtain the temperature of this HBE " measuring the point of Cable Structure along the temperature profile data of thickness " through actual measurement, claim to survey the temperature data that obtains and will be " HBE Cable Structure is along thickness temperature measured data ", if utilize the thermal conduction study computation model of Cable Structure; Obtain this HBE the temperature of measuring Cable Structure along the point of the temperature profile data of thickness through Calculation of Heat Transfer, just claim that the temperature data that calculates is " HBE Cable Structure is along thickness temperature computation data "; Will be in this method " at the number temperature profile data of each sea level elevation place that chooses " identical sea level elevation Cable Structure is along the temperature profile data of thickness ".Measure temperature in the Cable Structure location according to meteorology and require to choose a position, will obtain meeting the temperature that meteorology is measured the Cable Structure place environment of temperature requirement in this position actual measurement; The place of blocking chooses a position in the on-site spacious nothing of Cable Structure; This position should can both obtain in each day of the whole year this ground sunshine of fullest of getable this day, the flat board at a carbon steel material of this position of sound production is called reference plate; The one side of this reference plate on the sunny side; Be called sunny slope, the sunny slope of reference plate is coarse and dark color, the sunny slope of reference plate should can both obtain in each day of the whole year one flat plate on this ground sunshine of fullest of getable this day; The non-sunny slope of reference plate is covered with insulation material, monitoring is in real time obtained the temperature of the sunny slope of reference plate.Must not be greater than 30 minutes in this method to the time interval between any twice measurement of same amount monitoring in real time, the moment of survey record data is called the physical record data constantly.
Second step; Monitoring in real time obtains R Cable Structure surface temperature measured data of above-mentioned R Cable Structure surface point; Monitoring in real time simultaneously obtains the temperature profile data of the Cable Structure of front definition along thickness, and monitoring in real time simultaneously obtains meeting the temperature record that meteorology is measured the Cable Structure place environment of temperature requirement; Obtain being carved at sunrise the same day sunrise next day temperature measured data sequence of the place of the Cable Structure between back 30 minutes environment constantly through real-time monitoring; The temperature measured data sequence of Cable Structure place environment by be carved at sunrise the same day sunrise next day constantly the temperature measured data of the place of the Cable Structure between back 30 minutes environment according to the time order and function series arrangement; Find maximum temperature and minimum temperature in the temperature measured data sequence of Cable Structure place environment; Deduct with the maximum temperature in the temperature measured data sequence of Cable Structure place environment and to be carved into the sunrise next day maximum temperature difference between back 30 minutes constantly at sunrise the same day that minimum temperature obtains Cable Structure place environment, be designated as Δ T EmaxThe temperature that obtains Cable Structure place environment through conventional mathematical computations by the temperature measured data sequence of Cable Structure place environment is about the change of time rate, and this rate of change is also along with the time changes; Obtain being carved at sunrise the same day sunrise next day measured data sequence of the temperature of the sunny slope of the reference plate between back 30 minutes constantly through real-time monitoring; The measured data sequence of the temperature of the sunny slope of reference plate by be carved at sunrise the same day next day sunrise constantly the measured data of the temperature of the sunny slope of the reference plate between back 30 minutes according to the time order and function series arrangement; Find maximum temperature and minimum temperature in the measured data sequence of temperature of sunny slope of reference plate; Deduct with the maximum temperature in the measured data sequence of the temperature of the sunny slope of reference plate and to be carved into the sunrise next day maximum temperature difference between back 30 minutes constantly at sunrise same day of temperature that minimum temperature obtains the sunny slope of reference plate, be designated as Δ T PmaxObtain being carved at sunrise the same day sunrise next day Cable Structure surface temperature measured data sequence of all R Cable Structure surface points between back 30 minutes constantly through real-time monitoring; There is R Cable Structure surface point that R Cable Structure surface temperature measured data sequence just arranged; Each Cable Structure surface temperature measured data sequence by be carved at sunrise on same day of a Cable Structure surface point sunrise next day constantly the Cable Structure surface temperature measured data between back 30 minutes according to the time order and function series arrangement; Find maximum temperature and minimum temperature in each Cable Structure surface temperature measured data sequence; Deduct with the maximum temperature in each Cable Structure surface temperature measured data sequence and to be carved into the sunrise next day maximum temperature difference between back 30 minutes constantly at sunrise on same day that minimum temperature obtains the temperature of each Cable Structure surface point; Have R Cable Structure surface point just to have and be carved into the sunrise next day maximum temperature difference numerical value between back 30 minutes constantly R the same day at sunrise, maximal value wherein is designated as Δ T SmaxThe temperature that obtains each Cable Structure surface point through conventional mathematical computations by each Cable Structure surface temperature measured data sequence is about the change of time rate, the temperature of each Cable Structure surface point about the change of time rate also along with the time changes.Through real-time monitoring obtain being carved at sunrise the same day sunrise next day constantly between back 30 minutes, behind synchronization, HBE " Cable Structure is along the temperature profile data of thickness "; Calculating amounts to maximum temperature and the difference of minimum temperature among the BE " identical sea level elevation Cable Structure is along the temperature profile data of thickness " at the sea level elevation place that each is chosen; The absolute value of this difference is called " identical sea level elevation place Cable Structure thickness direction maximum temperature difference "; Chosen H different altitude above sea level H " identical sea level elevation place Cable Structure thickness direction maximum temperature difference " just arranged; Claim that the maximal value in this H " identical sea level elevation place Cable Structure thickness direction maximum temperature difference " is " a Cable Structure thickness direction maximum temperature difference ", be designated as Δ T Tmax
In the 3rd step, measure and calculate acquisition Cable Structure steady temperature data; At first; Confirm to obtain the moment of Cable Structure steady temperature data; The relevant condition of the moment that obtains Cable Structure steady temperature data with decision has six; To be moment of obtaining Cable Structure steady temperature data be carved into sunrise next day constantly between back 30 minutes at sunset between the same day for first condition, sunset be meant constantly on the meteorology that base area revolutions and revolution rule confirm sunset constantly, the sunset that can inquire about data or calculate each required day through conventional meteorology is constantly; The a condition of second condition be the same day be carved at sunrise next day sunrise constantly between back 30 minutes during this period of time in, reference plate maximum temperature difference Δ T PmaxWith Cable Structure surface maximum temperature difference Δ T SmaxAll be not more than 5 degrees centigrade; The b condition of second condition be the same day be carved at sunrise next day sunrise constantly between back 30 minutes during this period of time in, measure the environment maximum error Δ T that calculates in front EmaxBe not more than with reference to temperature difference per day Δ T r, and reference plate maximum temperature difference Δ T PmaxBe not more than Δ T after deducting 2 degrees centigrade Emax, and Cable Structure surface maximum temperature difference Δ T SmaxBe not more than Δ T PmaxOne that only needs to satisfy in second a condition and the b condition just is called satisfied second condition; The 3rd condition is in the moment that obtains Cable Structure steady temperature data, and the temperature of Cable Structure place environment is not more than per hour 0.1 degree centigrade about the absolute value of change of time rate; The 4th condition is in the moment that obtains Cable Structure steady temperature data, and the temperature of each the Cable Structure surface point in R Cable Structure surface point is not more than per hour 0.1 degree centigrade about the absolute value of change of time rate; The 5th condition is in the moment that obtains Cable Structure steady temperature data, and the Cable Structure surface temperature measured data of each the Cable Structure surface point in R Cable Structure surface point is the minimal value that was carved at sunrise the same day between back 30 minutes of the moment of sunrise next day; The 6th condition is at the moment that obtains Cable Structure steady temperature data, " Cable Structure thickness direction maximum temperature difference " Δ T TmaxBe not more than 1 degree centigrade; This method is utilized above-mentioned six conditions; In following three kinds of moment any one is called the mathematics of Cable Structure steady temperature data " obtain constantly "; First kind of moment is first moment to the 5th condition of satisfying in above-mentioned " with the relevant condition of the moment of decision acquisition Cable Structure steady temperature data "; Second kind of moment is the moment of only satisfying the 6th condition in above-mentioned " with the relevant condition of the moment of decision acquisition Cable Structure steady temperature data ", and the third is first moment to the 6th condition of satisfying simultaneously in above-mentioned " with the relevant condition of the moment of decision acquisition Cable Structure steady temperature data " constantly; When the mathematics that obtains Cable Structure steady temperature data is exactly in this method during physical record data in constantly constantly, the moment that obtains Cable Structure steady temperature data be exactly obtain Cable Structure steady temperature data mathematics constantly; If obtain the mathematics of Cable Structure steady temperature data and constantly is not any in constantly of physical record data in this method constantly, then get moment of mathematics those physical record data constantly that this method approaches to obtain Cable Structure steady temperature data most for obtaining the moment of Cable Structure steady temperature data; This method will be used in the amount of the moment survey record that obtains Cable Structure steady temperature data and carry out the relevant health monitoring analysis of Cable Structure; This method is approximate thinks that the Cable Structure temperature field in moment of obtaining Cable Structure steady temperature data is in stable state, and promptly this Cable Structure temperature does not constantly change in time, and this is exactly " obtaining the moment of Cable Structure steady temperature data " of this method constantly; Then; According to the Cable Structure heat transfer characteristic; Utilize " R the Cable Structure surface temperature measured data " and " HBE Cable Structure is along thickness temperature measured data " in the moment that obtains Cable Structure steady temperature data; Utilize the thermal conduction study computation model of Cable Structure; Obtain Temperature Distribution through conventional Calculation of Heat Transfer in the Cable Structure in the moment that obtains Cable Structure steady temperature data; This moment, calculated by stable state in the temperature field of Cable Structure; The temperature profile data in the Cable Structure in the moment that obtains Cable Structure steady temperature data that calculates comprises the accounting temperature of R Cable Structure surface point on the Cable Structure; The accounting temperature of R Cable Structure surface point is called R Cable Structure stable state surface temperature computational data; Also comprise the accounting temperature of HBE " measuring the point of Cable Structure along the temperature profile data of thickness " that Cable Structure is selected in front, the accounting temperature of HBE " measuring the point of Cable Structure along the temperature profile data of thickness " is called " HBE Cable Structure is along thickness temperature computation data ", when R Cable Structure surface temperature measured data and R Cable Structure stable state surface temperature computational data correspondent equal; And when " HBE Cable Structure is along thickness temperature measured data " and " HBE Cable Structure is along thickness temperature computation data " correspondent equal; The temperature profile data in the Cable Structure in the moment that obtains Cable Structure steady temperature data that calculates is called " Cable Structure steady temperature data " in the method, and this moment " R Cable Structure surface temperature measured data " is called " R Cable Structure stable state surface temperature measured data ", and " HBE Cable Structure is along thickness temperature measured data " is called " HBE Cable Structure is along thickness steady temperature measured data "; When on the surface of Cable Structure, getting " R Cable Structure surface point "; The quantity of " R Cable Structure surface point " and necessary three conditions that satisfy that distribute; First condition is when the Cable Structure temperature field is in stable state; When on the Cable Structure surface arbitrarily the temperature of any be through " R Cable Structure surface point " in the Cable Structure surface on the observed temperature linear interpolation of the adjacent point in this arbitrfary point when obtaining, on the Cable Structure surface that linear interpolation obtains on the temperature of this arbitrfary point and the Cable Structure surface error of the actual temperature of this arbitrfary point be not more than 5%; The Cable Structure surface comprises supporting rope surface; Second condition is that the quantity at the point of same sea level elevation is not less than 4 in " R Cable Structure surface point ", and the point in same sea level elevation is uniformly distributed with along the Cable Structure surface in " R Cable Structure surface point "; Maximal value Δ h in the absolute value of the difference of the sea level elevation of all adjacent in twos Cable Structure surface points of " R Cable Structure surface point " coastal degree of lifting is not more than 0.2 ℃ divided by Δ T hThe numerical value that obtains is for Δ T is got in convenient narration hUnit be ℃/m that the unit of getting Δ h for convenient narration is m; The definition of the adjacent in twos Cable Structure surface point of " R Cable Structure surface point " coastal degree of lifting is meant when only considering sea level elevation; In " R Cable Structure surface point ", do not have a Cable Structure surface point, the sea level elevation numerical value of this Cable Structure surface point is between the sea level elevation numerical value of adjacent Cable Structure surface point in twos; The 3rd condition is to inquire about or calculate the Cable Structure location and belong to the interval rule at sunshine of height above sea level by the meteorology routine; Again according to the geometric properties and the bearing data of Cable Structure; On Cable Structure, find the position of those surface points that receive the sunshine-duration fullest whole year, having a Cable Structure surface point in " R Cable Structure surface point " at least is a point in annual those surface points that receive the sunshine-duration fullest on the Cable Structure.
2. set up the initial Mechanics Calculation benchmark model A of Cable Structure o(for example finite element benchmark model) and current initial Mechanics Calculation benchmark model A t oThe method of (for example finite element benchmark model) is set up and A oCorresponding monitored amount initial value vector C oMethod, set up and A t oThe current initial value vector of corresponding monitored amount C t oMethod.A in the method o, C o, A t oAnd C t oBring in constant renewal in.Set up and renewal A o, C o, A t oAnd C t oMethod following.Monitored amount initial value vector C oThe coding rule of coding rule and M monitored amount identical.
Set up initial Mechanics Calculation benchmark model A oIn Cable Structure completion; Perhaps before setting up the cable structure health monitoring system; Calculate " Cable Structure steady temperature data " (can use conventional thermometry to measure, for example use thermal resistance to measure) according to " the temperature survey calculating method of the Cable Structure of this method " measurement, this moment " Cable Structure steady temperature data " are used vector T oExpression is called initial Cable Structure steady temperature data vector T oObtain T in actual measurement oThe time, just at the synchronization in the moment that obtains Cable Structure steady temperature data, use conventional method directly to measure the initial number of all monitored amounts that calculate Cable Structure.Use conventional method (consult reference materials or survey) to obtain the temperature variant physical parameter (for example thermal expansivity) and the mechanical property parameters (for example elastic modulus, Poisson ratio) of the employed various materials of Cable Structure; Calculate initial Cable Structure steady temperature data vector T in actual measurement oThe time, just at the synchronization in the moment that obtains Cable Structure steady temperature data, use the conventional method actual measurement to calculate the actual measurement computational data of Cable Structure.The actual measurement computational data of Cable Structure comprises that Non-Destructive Testing data of supporting rope etc. can express measured datas such as the data of the health status of rope, Cable Structure bearing initial angle displacement measurement data, the initial geometric data of Cable Structure, rope force data, draw-bar pull data, Cable Structure support coordinate data, Cable Structure modal data, structural strain data, structure angle measurement data, structure space measurement of coordinates data.The initial geometric data of Cable Structure can be the spatial data that the spatial data of the end points of all ropes adds a series of point on the structure, and purpose is to confirm according to these coordinate datas the geometric properties of Cable Structure.Cable Structure bearing initial angle displacement measurement data refer to setting up initial Mechanics Calculation benchmark model A oThe time, the Cable Structure bearing is with respect to the angular displacement that bearing took place under the Cable Structure design point.As far as cable-stayed bridge, the spatial data that initial geometric data can be the end points of all ropes adds the spatial data of some points on the bridge two ends, so-called bridge type data that Here it is.The Non-Destructive Testing data of utilization supporting rope etc. can be expressed the data and the Cable Structure bearing initial angle displacement measurement data of the health status of supporting rope and set up by evaluation object initial damage vector d oD is used in (shown in (1)) oThe expression Cable Structure is (with initial Mechanics Calculation benchmark model A oThe expression) by the initial health of evaluation object.If when not supporting Non-Destructive Testing data and other of rope and can express the data of health status of supporting rope, can think that perhaps the structure original state is a not damaged when not having relaxed state, vectorial d oIn get 0 with each element numerical value of supporting Suo Xiangguan, if there are not Cable Structure bearing initial angle displacement measurement data or can think that the displacement of Cable Structure bearing initial angle is at 0 o'clock, vectorial d oIn each element numerical value relevant with the angular displacement of Cable Structure bearing get 0.Utilize temperature variant physics and the mechanical property parameters and the initial Cable Structure steady temperature data vector T of the measured data of design drawing, as-constructed drawing and the initial Cable Structure of Cable Structure, the Non-Destructive Testing data that support rope, Cable Structure bearing initial angle displacement measurement data, the employed various materials of Cable Structure o, utilize mechanics method (for example finite element method) to count " Cable Structure steady temperature data " and set up initial Mechanics Calculation benchmark model A o
d o=[d o1?d o2···d ok···d oN] T (1)
D in the formula (1) Ok(k=1,2,3 ...., N) the initial Mechanics Calculation benchmark model A of expression oIn k by the original state of evaluation object, if should be the rope (or pull bar) in the cable system, d so by evaluation object OkRepresent its initial damage, d OkBeing to represent not damaged at 0 o'clock, is to represent that this rope thoroughly lost load-bearing capacity at 100% o'clock, representes to lose the load-bearing capacity of corresponding proportion in the time of between 0 and 100%, if should be angular displacement component, a d so of a bearing by evaluation object OkRepresent its initial displacement numerical value, T representes the transposition (back together) of vector.
Obtain T in actual measurement oThe time, just at the synchronization in the moment that obtains Cable Structure steady temperature data, use conventional method directly to measure the initial value of all monitored amounts of the Cable Structure that calculates, form monitored amount initial value vector C o(seeing formula (2)).Requirement is obtaining A oThe time obtain C o, monitored amount initial value vector C oExpression is corresponding to A oThe concrete numerical value of " monitored amount ".Because of subject to the foregoing, the monitored amount of calculating gained based on the calculating benchmark model of Cable Structure approaches the measured data of initial monitored amount reliably, in the narration of back, will represent this calculated value and measured value with prosign.
C o=[C o1?C o2···C oj···C oM] T (2)
C in the formula (2) Oj(j=1,2,3 ...., M) be the original bulk of j monitored amount in the Cable Structure, this component according to coding rule corresponding to specific j monitored amount.
No matter which kind of method to obtain initial Mechanics Calculation benchmark model A with o, counting " Cable Structure steady temperature data " (is initial Cable Structure steady temperature data vector T o), based on A oThe Cable Structure computational data that calculates must be very near its measured data, and error generally must not be greater than 5%.Can guarantee to utilize A like this oSuo Li computational data, strain computational data, Cable Structure shape computational data and displacement computational data under the analog case of calculating gained, Cable Structure angle-data, Cable Structure spatial data etc., the measured data when truly taking place near institute's analog case reliably.Model A oIn used by evaluation object initial damage vector d by the health status of evaluation object oExpression, Cable Structure steady temperature data are with initial Cable Structure steady temperature data vector T oExpression.Because based on A oThe evaluation that calculates all monitored amounts is very near the initial value (actual measurement obtains) of all monitored amounts, so also can be used in A oThe basis on, carry out Mechanics Calculation obtains, A oThe evaluation of each monitored amount form monitored amount initial value vector C oT oAnd d oBe A oParameter, also we can say C oBy A oMechanics Calculation result form.
Set up and upgrade current initial Mechanics Calculation benchmark model A t oMethod be: (just set up for the first time A at initial time t oThe time), A t oJust equal A o, A t oCorresponding " Cable Structure steady temperature data " are designated as " current initial Cable Structure steady temperature data vector T t o", at initial time, T t oJust equal T o, vector T t oDefinition mode and vector T oDefinition mode identical.A t oBy the initial health of evaluation object and A oThe health status by evaluation object identical, also use by evaluation object initial damage vector d oExpression, A in the cyclic process of back t oUsed all the time by the initial health of evaluation object by evaluation object initial damage vector d oExpression; Cable Structure is in A t oDuring state, this method is with the current initial value vector of monitored amount C t oThe concrete numerical value of representing all monitored amounts, C t oElement and C oElement corresponding one by one, represent that respectively all monitored amounts are in A in Cable Structure t oAnd A oConcrete numerical value during two states.At initial time, C t oJust equal C o, T t oAnd d oBe A t oParameter, C t oBy At oMechanics Calculation result form; In Cable Structure military service process, constantly survey the current data of calculating acquisition " Cable Structure steady temperature data " according to " the temperature survey calculating method of the Cable Structure of this method " and (be called " current cable structure steady temperature data vector T t", vector T tDefinition mode and vector T oDefinition mode identical); If T tEqual T t o, then need be to A t oUpgrade, otherwise need be to A t oAnd T t oUpgrade, update method is: the first step is calculated T tWith T oPoor, T tWith T oDifference be exactly of the variations of current cable structure steady temperature data about initial Cable Structure steady temperature data, T tWith T oThe difference represent that with steady temperature change vector S S equals T tDeduct T o, S representes the variation of Cable Structure steady temperature data; Second step is to A oIn Cable Structure apply temperature variation, the numerical value of the temperature variation that applies is just taken from steady temperature change vector S, to A oIn the temperature variation that applies of Cable Structure after the current initial Mechanics Calculation benchmark model A that obtains upgrading t o, upgrade A t oThe time, T t oAll elements numerical value is also used T tCorresponding replacement of all elements numerical value, promptly upgraded T t o, so just obtained correctly corresponding to A t oT t oUpgrade C t oMethod be: when upgrading A t oAfter, obtain A through Mechanics Calculation t oIn concrete numerical value all monitored amounts, current, these concrete numerical value are formed C t o
The currency of all monitored amounts is formed the current numerical value vector of monitored amount C (formula (3) is seen in definition) in the Cable Structure.
C=[C 1?C 2···C j···C M] T (3)
C in the formula (3) j(j=1,2,3 ...., M) be the currency of j monitored amount in the Cable Structure, this component C jAccording to coding rule and C OjCorresponding to same " monitored amount ".Obtain current cable structure steady temperature data vector T in actual measurement tSynchronization, actual measurement obtains the current measured value of all monitored amounts of Cable Structure, forms the current numerical value vector of monitored amount C.
3. set up and upgrade the method for Cable Structure unit damage monitored amount unit change matrix Δ C.
Cable Structure unit damage monitored amount unit change matrix Δ C brings in constant renewal in, and is promptly upgrading current initial Mechanics Calculation benchmark model A t oWith the current initial value vector of monitored amount C t oThe time, upgrade Cable Structure unit damage monitored amount unit change matrix Δ C.Concrete grammar is following:
Current initial Mechanics Calculation benchmark model A in Cable Structure t oThe basis on carry out several times and calculate, equal all on the calculation times numerical value by the quantity of evaluation object.Calculating hypothesis each time has only one (to be used vectorial d by evaluation object at initial damage oCorresponding element represent) the basis on increase unit damage or unit angular displacement again; Concrete; If should be a supporting rope in the cable system by evaluation object; So just this supporting rope of hypothesis has unit damage (for example getting 5%, 10%, 20% or 30% equivalent damage is unit damage); If should be by evaluation object be the angular displacement component of a direction of a bearing, just suppose that this bearing this sense of displacement generation unit angular displacement (for example get 100,000/radian, 2/100000ths radians, 3/100000ths radians etc. and be the unit angular displacement), uses D UkWrite down this unit damage or unit angular displacement, wherein k represent to take place unit damage or unit angular displacement by the numbering of evaluation object.With " unit damage or the angular displacement vector D of unit u" (shown in (4)) write down all unit damage or unit angular displacement.Occur in calculating each time unit damage or unit angular displacement be different from by evaluation object other time occur in calculating unit damage or unit angular displacement by evaluation object; Calculate the current calculated value that all utilizes mechanics method (for example finite element method) to calculate all monitored amounts of Cable Structure each time; The current calculated value of the monitored amount of all that calculate each time form a monitored amount calculation current vector (when k of hypothesis had unit damage or unit angular displacement by evaluation object, the monitored amount calculation current vector of available formula (5) expression
Figure BDA00001700408000101
); Calculate monitored amount calculation current vector each time
Figure BDA00001700408000102
Deduct the current initial value vector of monitored amount C t oAfter calculate unit damage or the angular displacement numerical value D of unit supposed divided by this time again Uk, the gained vector be exactly under this condition (with have unit damage or unit angular displacement by the mark that is numbered of evaluation object) monitored amount unit change vector (when k is had unit damage or unit angular displacement by evaluation object, use δ C kRepresent monitored amount unit change vector; Formula (6) is seen in definition), each element representation of monitored amount unit change vector is owing to suppose the unit change amount of that pairing monitored amount of this element that is caused by the unit damage of evaluation object or unit angular displacement that unit damage or unit angular displacement are arranged when calculating; There is N N monitored amount unit change vector just to be arranged by evaluation object; Because M monitored amount arranged; So each monitored amount unit change vector has M element; Form the monitored amount unit change matrix Δ C that M * N element arranged successively by this N monitored amount unit change vector, the definition of Δ C is suc as formula shown in (6).
D u=[D u1?D u2···D uk···D uN] T (4)
Unit damage or the angular displacement vector D of unit in the formula (4) uElement D Uk(k=1,2,3 ...., N) expression k is individual by the unit damage of evaluation object or unit angular displacement numerical value.
C t k = C t 1 k C t 2 k · · · C tj k · · · C tM k T - - - ( 5 )
Elements C in the formula (5) Tj k(k=1,2,3 ...., N; J=1,2,3 ...., when M) expression is had unit damage or unit angular displacement owing to k is individual by evaluation object, according to the current calculated amount of the pairing j of coding rule monitored amount.
δC k = C t k - C o t D uk - - - ( 6 )
ΔC = ΔC 1,1 ΔC 1,2 · ΔC 1 , k · ΔC 1 , N ΔC 2,1 ΔC 2,2 · ΔC 2 , k · ΔC 2 , N · · · · · · ΔC j , 1 ΔC j , 2 · ΔC j , k · ΔC j , N · · · · · · ΔC M , 1 ΔC M , 2 · ΔC M , k · ΔC M , N - - - ( 7 )
Δ C in the formula (7) J, k(k=1,2,3 ...., N; J=1; 2,3 ....; M) expression only since k velamen evaluation object have that unit damage or unit angular displacement cause, according to the unit change (algebraic value) of the current numerical value of calculating of the pairing j of coding rule monitored amount, the vectorial δ C of monitored amount unit change kBe actually the row among the matrix Δ C.
4. the current numerical value vector of monitored amount C (calculating or actual measurement) is with the current initial value vector of monitored amount C t o, unit damage monitored amount unit change matrix Δ C, unit damage or the angular displacement vector D of unit uWith by the linear approximate relationship between the vectorial d of the current name damage of evaluation object, shown in (8) or formula (9).By the definition of the vectorial d of the current name damage of evaluation object referring to formula (10).
C = C o t + ΔC · d - - - ( 8 )
C - C o t = ΔC · d - - - ( 9 )
d=[d 1?d 2···d k···d N] T (10)
D in the formula (10) k(k=1,2,3 ...., be that k is individual by the current health status of evaluation object in the Cable Structure N), if should be the rope (or pull bar) in the cable system, d so by evaluation object kRepresent its current damage, d kBeing to represent not damaged at 0 o'clock, is to represent that this rope thoroughly lost load-bearing capacity at 100% o'clock, representes to lose the load-bearing capacity of corresponding proportion in the time of between 0 and 100%, if should be angular displacement component, a d so of a bearing by evaluation object kRepresent its present bit shift value.
The error of linear relationship shown in the linear relationship error vector e expression (8) of available formula (11) definition or the formula (9).
e = abs ( ΔC · d - C + C o t ) - - - ( 11 )
Abs () is the function that takes absolute value in the formula (11), and each element of the vector of trying to achieve in the bracket is taken absolute value.
The second portion of this method: based on the Cable Structure health status appraisal procedure of knowledge base (containing parameter) and the monitored amount of actual measurement.
Because there are certain error in formula (8) or the represented linear relationship of formula (9), therefore can not be simply come directly to find the solution with the current numerical value vector of the monitored amount of actual measurement C and obtain being damaged vectorial d by the current name of evaluation object according to formula (8) or formula (9).If done like this, what obtain is damaged the element among the vectorial d even bigger negative value can occur by the current name of evaluation object, just negative damage, and this obviously is irrational.Therefore obtain (promptly to be had reasonable error by acceptable the separating of the vectorial d of the current name damage of evaluation object; But can from cable system, confirm the position and the degree of injury thereof of damaged cable more accurately) become a rational solution, available formula (12) is expressed this method.
abs ( ΔC · d - C + C o t ) ≤ g - - - ( 12 )
Abs () is the function that takes absolute value in the formula (12), and vectorial g describes the reasonable deviation that departs from ideal linearity relation (formula (8) or formula (9)), is defined by formula (13).
g=[g 1?g 2···g j···g M] T (13)
G in the formula (13) j(j=1,2,3 ...., M) maximum allowable offset of the ideal linearity relation that departs from shown in formula (8) or the formula (9) has been described.Vector g can be selected according to the error vector e tentative calculation of formula (11) definition.
At the current initial value vector of monitored amount C t o, unit damage monitored amount unit change matrix Δ C, when the current numerical value of the monitored amount of actual measurement vector C is known; Can utilize suitable algorithm (for example multi-objective optimization algorithm) to find the solution formula (12), obtain to be separated by the current name damage of evaluation object the acceptable of vectorial d.
Definition is by the current actual damage vector of evaluation object d a(seeing formula (14)) is by the current actual damage vector of evaluation object d aElement can calculate according to formula (15), just obtained by the current actual damage of evaluation object vector d aThereby, can be by d aConfirm by the health status of evaluation object.
d a = d 1 a d 2 a · · · d k a · · · d N a T - - - ( 14 )
D in the formula (14) a k(k=1,2,3 ...., N) formula (15) is seen in its definition by the current actual health status of evaluation object in k of expression, if should be the rope (or pull bar) in the cable system, d so by evaluation object a kRepresent its current actual damage, d a kBeing to represent not damaged at 0 o'clock, is to represent that this rope thoroughly lost load-bearing capacity at 100% o'clock, representes to lose the load-bearing capacity of corresponding proportion in the time of between 0 and 100%, if should be angular displacement component, a d so of a bearing by evaluation object a kRepresent its current actual displacement angle numerical value, vectorial d aCoding rule and the formula (1) of element in vectorial d oThe coding rule of element identical.
(15)
D in the formula (15) Ok(k=1,2,3 ...., N) be vectorial d oK element, d kBe k the element of vectorial d.
Narration has obtained by the current actual damage vector of evaluation object d below aAfter, how to confirm the position and the relax level of slack line.
By before can know in the Cable Structure total M 1Root supporting rope, Cable Structure rope force data is by M 1The Suo Li of root supporting rope describes.Available " initial rope force vector F o" represent that all support the initial Suo Li (formula (16) is seen in definition) of ropes in the Cable Structure.
F o = F o 1 F o 2 · · · F oh · · · F o M 1 T - - - ( 16 )
F in the formula (16) o(h=1,2,3 ...., M1) being the initial Suo Li of h root supporting rope in the Cable Structure, this element is according to the Suo Li of coding rule corresponding to appointment supporting rope.Vector F oIt is constant.Obtain T in actual measurement oSynchronization, use conventional method directly to measure the rope force data that calculates all supporting ropes, all these rope force datas are formed initial rope force vector F oSetting up the initial Mechanics Calculation benchmark model A of Cable Structure oThe time in fact used vectorial F o
Will be by the current actual damage vector of evaluation object d aIn with the supporting Suo Xiangguan M 1Individual element takes out, and forms supporting Suo Dangqian actual damage vector d Ca, supporting Suo Dangqian actual damage vector d CaThe coding rule and initial rope force vector F of element oThe coding rule of element identical.Supporting Suo Dangqian actual damage vector d CaH element representation Cable Structure in the current actual damage amount of h root supporting rope, h=1,2,3 ...., M 1Current actual damage vector d CaIn numerical value be not 0 element supporting rope corresponding to the unsoundness problem, to the supporting Suo Jinhang Non-Destructive Testing of these unsoundness problems, after Non-Destructive Testing found out that this supporting rope does not damage, this element numerical value (was used d so Ca hExpression) expression should supporting rope and d Ca hRelaxing of impairment value mechanics equivalence just confirmed slack line thus, and the computing method of concrete slack are explained below.
The current cable power (formula (17) is seen in definition) of all supporting ropes in the Cable Structure that obtains with " current cable force vector F " expression actual measurement in this method.
F = F 1 F 2 · · · F h · · · F M 1 T - - - ( 17 )
F in the formula (17) h(h=1,2,3 ...., M1) be the current cable power of h root supporting rope in the Cable Structure.Obtain current cable structure steady temperature data vector T in actual measurement tSynchronization, actual measurement obtains in the Cable Structure rope force data of all supporting ropes, all these rope force datas are formed current cable force vector F.Element and the vectorial F of vector F oThe coding rule of element identical.According to the narration of front, vector T t oEqual vector T t
In this method, under supporting rope original state, in the steady temperature data of Cable Structure with initial Cable Structure steady temperature data vector T oDuring expression, and the supporting rope is when being in free state (free state refers to that Suo Li is 0, back with), and the length of supporting rope is called initial drift, with " initial drift vector l o" represent that all support the initial drift (formula (18) is seen in definition) of ropes in the Cable Structure.Pass through vector T according to " the temperature survey calculating method of the Cable Structure of this method " oCan confirm obtaining vector T oThe Temperature Distribution of all supporting ropes constantly.
l o = l o 1 l o 2 · · · l oh · · · l o M 1 T - - - ( 18 )
L in the formula (18) Oh(h=1,2,3 ...., M1) be the initial drift of h root supporting rope in the Cable Structure.Vector l oBe constant, after when beginning, confirming, just no longer change.
Similarly, under supporting rope original state, in the steady temperature data of Cable Structure with initial Cable Structure steady temperature data vector T oDuring expression, and the supporting rope is when being in free state, and the cross-sectional area of supporting rope is called initial free cross-sectional area, with " initial free cross-sectional area vector A o" represent that all support the initial free cross-sectional area (formula (19) is seen in definition) of ropes in the Cable Structure, the weight of the unit length of supporting rope is called the weight of initial free unit length, with " the weight vector ω of initial free unit length o" represent that all support the weight (formula (20) is seen in definition) of the initial free unit length of ropes in the Cable Structure.
A o = A o 1 A o 2 · · · A oh · · · A o M 1 T - - - ( 19 )
A in the formula (19) Oh(h=1,2,3 ...., M1) be the initial free cross-sectional area of h root supporting rope in the Cable Structure.Vector A oBe constant, after when beginning, confirming, just no longer change.
ω o = ω o 1 ω o 2 · · · ω oh · · · ω o M 1 T - - - ( 20 )
ω in the formula (20) Oh(h=1,2,3 ...., M1) be the weight of the free unit length of initial freedom of h root supporting rope in the Cable Structure.Vector ω oBe constant, after when beginning, confirming, just no longer change.
In this method, in the steady temperature data of Cable Structure with current initial Cable Structure steady temperature data vector T t oDuring expression, with " current initial drift vector l t o" the current initial drift of all supporting ropes in the expression Cable Structure (and formula (21) is seen in definition, refers to that hypothesis supporting cable force is at 0 o'clock, considered the influence of thermal expansivity and temperature variation to supporting rope drift after, the vectorial l of initial drift oWith initial Cable Structure steady temperature data vector T oThe expression the supporting rope in temperature with current initial Cable Structure steady temperature data vector T t oSupporting rope drift during expression).According to " the temperature survey calculating method of the Cable Structure of this method ", through vector T t oCan confirm obtaining vector T t oThe Temperature Distribution of all supporting ropes constantly.
l o t = l o 1 t l o 2 t · · · l oh t · · · l o M 1 t T - - - ( 21 )
L in the formula (21) t Oh(h=1,2,3 ...., be that steady temperature data in Cable Structure are with current initial Cable Structure steady temperature data vector T M1) t oDuring expression, the current initial drift of h root supporting rope can be utilized the thermal expansivity, the l that support rope in the Cable Structure Oh, T oAnd T t oObtain l through conventional physical computing t Oh
Vector d CaElement, the element of vectorial F, vectorial l oElement, vectorial l t oElement, vectorial A oElement, vectorial ω oElement and vectorial F oThe coding rule of element identical, the different information of the same supporting rope of element representation of the identical numbering of these vectors.
In this method, in the steady temperature data of Cable Structure with current initial Cable Structure steady temperature data vector T t oDuring expression, with the current drift (formula (22) is seen in definition, and support Suo Keneng this moment is intact, also possibly be impaired, also possibly relax) of all supporting ropes in " current drift vector l " expression Cable Structure.
l = l 1 l 2 · · · l h · · · l M 1 T - - - ( 22 )
L in the formula (22) h(h=1,2,3 ...., M1) be the current drift of h root supporting rope in the Cable Structure.
In this method, represent the change amount (formula (23) and formula (24) are seen in definition) of the drift of all supporting ropes in the Cable Structure with " drift changes vectorial Δ l " (or claiming supporting Suo Dangqian relax level vector).
Δl = Δ l 1 Δ l 2 · · · Δ l h · · · Δ l M 1 T - - - ( 23 )
Δ l in the formula (23) h(h=1,2,3 ...., be the change amount of the drift of h root supporting rope in the current cable structure M1), formula (24), Δ l are seen in its definition hBe not that 0 rope is a slack line, Δ l hNumerical value be the slack of rope, and the current relax level of expression cable system h root supporting rope, the long adjustment amount of rope of this rope when also being adjustment Suo Li.
Δl h = l h - l oh t - - - ( 24 )
Through slack line is carried out the relax level identification that slack line is carried out in the mechanics equivalence with damaged cable, the mechanical condition of equivalence is in the method:
The mechanics parameters of initial drift, geometrical property parameter and material when one, the nothing of the rope of two equivalences relaxes with not damaged is identical;
Two, after the lax or damage, the Suo Li of the slack line of two equivalences and damage rope be out of shape after length overall identical.
When satisfying above-mentioned two equivalent conditions, the such mechanics function of two support cables in structure is exactly identical, if after promptly replacing slack line with the damaged cable of equivalence, Cable Structure any variation can not take place, vice versa.
Obtained supporting Suo Dangqian actual damage vector d CaAfter, d CaH element d Ca h(h=1,2,3 ...., though M1) the actual damage value of expression h root supporting rope is with d Ca hBe called the actual damage value of h root rope or the actual damage degree of h root rope, but since h root supporting Suo Keneng be impaired also possibly be lax, so d CaH element d Ca hThe actual damage value of the h root supporting rope of expression is actually the actual equivalent damage value of h root supporting rope, when h root supporting rope is actually impaired, and d Ca hJust the h root of expression supports the actual damage value of rope, when h root supporting rope is actually lax, and d a hH root supporting rope and the lax equivalent actual damage value just represented for narrating conveniently, are claimed d in the method a hBeing to represent h root supporting rope not damaged at 0 o'clock, is to represent that this rope thoroughly lost load-bearing capacity at 100% o'clock, representes the load-bearing capacity of h root supporting rope forfeiture corresponding proportion in the time of between 0 and 100%, through the vectorial d of supporting Suo Dangqian actual damage CaThe supporting rope that health status goes wrong just can be identified in the back, but some is impaired in the supporting rope that these health status go wrong, and some is to have relaxed, if h supporting rope is actually and relaxed that (its current relax level is used Δ l hThe current relax level Δ l of h the supporting rope that definition), relaxes so h(Δ l hDefinition see formula (23)) with the current actual damage degree d of damaged cable of equivalence Ca hBetween relation confirm by aforementioned two mechanics equivalent conditions.Δ l hSame d Ca hBetween physical relationship can adopt accomplished in many ways; For example can directly confirm (referring to formula (25)) according to aforementioned equivalent condition; Also can adopt based on the Ernst equivalent elastic modulus to replace the E in the formula (25) to revise back definite (referring to formula (26)), also can adopt and confirm based on other methods such as trial and error procedure of finite element method.
Δ l h t = d h ca 1 - d h ca F h E h t A h t + F h l oh t - - - ( 25 )
Δ l h t = d h ca 1 - d h ca F h [ E h t 1 + ( ω h t l xh t ) 2 A h t E h t 12 ( F h ) 3 ] A h t + F h l oh t - - - ( 26 )
E in formula (25) and the formula (26) t hBe that steady temperature data in Cable Structure are with current initial Cable Structure steady temperature data vector T t oDuring expression, the elastic modulus of h root supporting rope, A t hBe that steady temperature data in Cable Structure are with current initial Cable Structure steady temperature data vector T t oDuring expression, the cross-sectional area of h root supporting rope, F hBe that steady temperature data in Cable Structure are with current initial Cable Structure steady temperature data vector T t oDuring expression, the current cable power of h root supporting rope, d Ca hBe the current actual damage degree of h root supporting rope, ω t hBe that steady temperature data in Cable Structure are with current initial Cable Structure steady temperature data vector T t oDuring expression, the weight of the unit length of h root supporting rope, l t XhBe that steady temperature data in Cable Structure are with current initial Cable Structure steady temperature data vector T t oDuring expression, the horizontal range of two supporting end points of h root supporting rope, l t XhBe current supporting rope two supporting end points horizontal range vector l t xAn element, current supporting rope two supporting end points horizontal ranges vector l t xThe coding rule and initial drift vector l of element oThe coding rule of element identical, E t hCan obtain A according to the characteristic material data of looking into or survey h root supporting rope t hAnd ω t hCan be according to thermal expansivity, the A of h root supporting rope Oh, ω Oh, F h, T oAnd T t oObtain through conventional physics and Mechanics Calculation.Item in the formula (26) in [] is the Ernst equivalent elastic modulus of this supporting rope, can just can confirm to support Suo Dangqian relax level vector Δ l by formula (25) or formula (26).Formula (26) is the correction to formula (25).
The third part of this method: the software and hardware part of health monitoring systems.
Hardware components comprises monitoring system (comprising monitored amount monitoring system, temperature monitoring system), signal picker and computing machine etc.Require the temperature required measured data of monitoring acquisition in real time, require simultaneously each monitored amount of monitoring in real time.
Functions such as the monitoring that software should be accomplished is needed in this method, can use computer realization, record, control, storage, calculating, notice, warning.
This method specifically comprises:
A. for for the purpose of narration is convenient, this method is unified claims that the supporting rope of being assessed is that establishing the quantity of the supporting rope of being assessed and the quantity sum of bearing angular displacement component is N, is N by the quantity of evaluation object promptly by evaluation object with the bearing angular displacement component; Confirm that by the coding rule of evaluation object with all being numbered by evaluation object in the Cable Structure, this numbering will be used to generate the vector sum matrix in subsequent step by this rule; This method is represented this numbering with variable k, k=1, and 2,3 ..., N; If total M in the cable system 1Root supporting rope, Cable Structure rope force data comprises this M 1The Suo Li of root supporting rope, obviously M 1Less than by the quantity N of evaluation object; Only pass through M 1The M of individual supporting rope 1It is impossible by the state of evaluation object that individual rope force data is found the solution unknown N, and this method is at the whole M of monitoring 1On the basis of root supporting cable force, the artificial M that increases on Cable Structure 2The root rope is called the sensing rope, in the cable structure health monitoring process, will monitor the M that this increases newly 2The Suo Li of root sensing rope; Comprehensive above-mentioned monitored amount, M Suo Li of the total M root rope of whole Cable Structure is monitored, and M monitored amount promptly arranged, and wherein M is M 1With M 2Sum; M should be greater than by the quantity N of evaluation object; The M that increases newly 2The rigidity of root sensing rope is compared with the rigidity of any supporting rope of Cable Structure, should be little many; The M that increases newly 2The Suo Li of each sensing rope of root sensing rope should than the Suo Lixiao of any supporting rope of Cable Structure many, even can guarantee the M that this increases newly like this 2Damage or lax has appearred in root sensing rope, and is very little to the influence of the stress of other members of Cable Structure, strain, distortion; The M that increases newly 2Normal stress should be less than its fatigue limit on the xsect of root sensing rope, and these requirements can guarantee the M that increases newly 2Fatigue damage can not take place in root sensing rope; The M that increases newly 2The fully anchoring of two ends of root sensing rope guarantees can not occur relaxing; The M that increases newly 2Root sensing rope should obtain sufficient anti-corrosion protection, guarantees the M that increases newly 2Damage and lax can not take place in root sensing rope; For simplicity, in the method " all monitored parameters of Cable Structure " are abbreviated as " monitored amount "; Give M monitored amount serial number, this method is with representing this numbering with variable j, j=1, and 2,3 ..., M, this numbering will be used to generate the vector sum matrix in subsequent step; The M that increases newly in the method 2Root sensing rope is as the part of Cable Structure, and when back literary composition was mentioned Cable Structure again, Cable Structure comprises increased M 2Cable Structure before the root sensing rope and the M that increases newly 2Root sensing rope that is to say that the back literary composition refers to comprise the M that increases newly when mentioning Cable Structure 2The Cable Structure of root sensing rope; Therefore when the back literary composition was mentioned and calculated " Cable Structure steady temperature data " according to " the temperature survey method of calculatinging of the Cable Structure of this method " measurement, Cable Structure wherein comprised the M that increases newly 2Root sensing rope, " the Cable Structure steady temperature data " that obtain comprise the M that increases newly 2The steady temperature data of root sensing rope obtain the M that increases newly 2The method of the steady temperature data of root sensing rope is same as the M of Cable Structure 1The preparation method of the steady temperature data of root supporting rope, literary composition is handed over no longer one by one in the back; Measure the M that increases newly 2The method of the Suo Li of root sensing rope is same as the M of Cable Structure 1The rope force measurement method of root supporting rope, literary composition is handed over no longer one by one in the back; During to any measurement of supporting Suo Jinhang of Cable Structure, the M to increasing newly simultaneously 2Root sensing rope carries out same measurement, and literary composition is handed over no longer one by one in the back; The M that increases newly 2Damage except not taking place and relaxing, to the M that increases newly in root sensing rope 2The requirement of the quantity of information of root sensing rope is identical with the requirement and the preparation method of the quantity of information of the supporting rope of Cable Structure with preparation method, and literary composition is handed over no longer one by one in the back; When the various mechanical model of Cable Structure set up in literary composition in the back, with the M that increases newly 2Root sensing rope is treated as the supporting rope of Cable Structure and is treated; Below, except the damage and lax occasion of mentioning the supporting rope, said supporting rope comprises the supporting rope of Cable Structure and the M that increases newly when mentioning the supporting rope 2Root sensing rope; Must not be greater than 30 minutes in this method to the time interval between any twice measurement of same amount monitoring in real time, the moment of survey record data is called the physical record data constantly;
B. this method definition " the temperature survey calculating method of the Cable Structure of this method " set by step b1 to b3 carry out;
B1: inquiry or actual measurement obtain the temperature variant thermal conduction study parameter of Cable Structure composition material and Cable Structure environment of living in; Utilize the geometry measured data of design drawing, as-constructed drawing and the Cable Structure of Cable Structure, utilize these data and parameter to set up the thermal conduction study computation model of Cable Structure; Inquiry Cable Structure location is no less than the meteorological data in recent years in 2 years; Cloudy quantity in statistics obtains during this period of time is designated as T cloudy day; One be called the cloudy day all day with what can not see the sun daytime in the method; Statistics obtain in T cloudy day each cloudy day 0 up to the sunrise next day highest temperature and the lowest temperature between back 30 minutes constantly, sunrise is meant the sunrise moment on the meteorology that base area revolutions and revolution rule confirm constantly, does not represent necessarily can see the sun same day; The sunrise that can inquire about data or calculate each required day through conventional meteorology constantly; Each cloudy day 0 up to next day sunrise constantly the highest temperature between back 30 minutes deduct the maximum temperature difference that the lowest temperature is called this cloudy daily temperature, T cloudy day arranged, the maximum temperature difference of T cloudy daily temperature is just arranged; Get maximal value in the maximum temperature difference of daily temperature at T cloudy day for reference to temperature difference per day, be designated as Δ T with reference to temperature difference per day rInquiry Cable Structure location and height above sea level interval, place be no less than temperature that meteorological data in recent years or the actual measurement in 2 years obtain Cable Structure environment of living in time with change of elevation data and Changing Pattern, calculate Cable Structure location and height above sea level interval, place and be no less than the temperature of Cable Structure environment of living in recent years in 2 years about the maximum rate of change Δ T of sea level elevation h, for Δ T is got in convenient narration hUnit be ℃/m; On the surface of Cable Structure, get " R Cable Structure surface point "; Getting the concrete principle of " R Cable Structure surface point " narrates in step b3; The back will obtain the temperature of this R Cable Structure surface point through actual measurement; Claim that the temperature data that actual measurement obtains is " R Cable Structure surface temperature measured data "; If utilize the thermal conduction study computation model of Cable Structure, obtain the temperature of this R Cable Structure surface point through Calculation of Heat Transfer, just claim that the temperature data that calculates is " R Cable Structure surface temperature computational data "; From the residing minimum height above sea level of Cable Structure to the highest height above sea level; On Cable Structure, be uniformly distributed with to choose and be no less than three different altitude above sea level, at each sea level elevation place that chooses, choose two points at least at the intersection place on surface level and Cable Structure surface, from the outer normal of selected point straw line body structure surface; All outer normal directions of choosing are called " measuring the direction of Cable Structure along the Temperature Distribution of wall thickness "; It is crossing with " intersection on surface level and Cable Structure surface " along the direction of the Temperature Distribution of wall thickness to measure Cable Structure, and in the shade the outer normal direction of the measurement Cable Structure of choosing along sunny slope outer normal direction that must comprise Cable Structure in the direction of the Temperature Distribution of wall thickness and Cable Structure, the direction along each measurement Cable Structure along the Temperature Distribution of wall thickness is uniformly distributed with to choose in Cable Structure and is no less than three points; Special; Measure Cable Structure for the supporting rope along each and only get a point, promptly only measure the temperature of the surface point of supporting rope, measure all and be selected temperature a little along the direction of the Temperature Distribution of wall thickness; The temperature that records is called " Cable Structure is along the temperature profile data of thickness ";, wherein edge and same " intersection on surface level and Cable Structure surface " " Cable Structure is along temperature profile data of thickness " crossing, " measuring the direction of Cable Structure along the Temperature Distribution of wall thickness " measurement acquisition are called " identical sea level elevation Cable Structure is along the temperature profile data of thickness " in the method; If chosen H different altitude above sea level; At each sea level elevation place, chosen B the direction of measuring Cable Structure along the Temperature Distribution of wall thickness, measure Cable Structure along each and in Cable Structure, chosen E point along the direction of the Temperature Distribution of wall thickness; Wherein H and E are not less than 3; B is not less than 2, and is special, and E equals 1 for the supporting rope; That " measures the point of Cable Structure along the temperature profile data of thickness " on the meter Cable Structure adds up to HBE; The back will obtain the temperature of this HBE " measuring the point of Cable Structure along the temperature profile data of thickness " through actual measurement, claim to survey the temperature data that obtains and will be " HBE Cable Structure is along thickness temperature measured data ", if utilize the thermal conduction study computation model of Cable Structure; Obtain this HBE the temperature of measuring Cable Structure along the point of the temperature profile data of thickness through Calculation of Heat Transfer, just claim that the temperature data that calculates is " HBE Cable Structure is along thickness temperature computation data "; Will be in this method " at the number temperature profile data of each sea level elevation place that chooses " identical sea level elevation Cable Structure is along the temperature profile data of thickness "; Measure temperature in the Cable Structure location according to meteorology and require to choose a position, will obtain meeting the temperature that meteorology is measured the Cable Structure place environment of temperature requirement in this position actual measurement; The place of blocking chooses a position in the on-site spacious nothing of Cable Structure; This position should can both obtain in each day of the whole year this ground sunshine of fullest of getable this day, the flat board at a carbon steel material of this position of sound production is called reference plate; Reference plate can not contact with ground; Reference plate overhead distance is not less than 1.5 meters, and the one side of this reference plate is called sunny slope on the sunny side; The sunny slope of reference plate is coarse and dark color; The sunny slope of reference plate should can both obtain in each day of the whole year one flat plate on this ground sunshine of fullest of getable this day, the non-sunny slope of reference plate is covered with insulation material, monitoring is in real time obtained the temperature of the sunny slope of reference plate;
B2: monitoring in real time obtains R Cable Structure surface temperature measured data of above-mentioned R Cable Structure surface point; Monitoring in real time simultaneously obtains the temperature profile data of the Cable Structure of front definition along thickness, and monitoring in real time simultaneously obtains meeting the temperature record that meteorology is measured the Cable Structure place environment of temperature requirement; Obtain being carved at sunrise the same day sunrise next day temperature measured data sequence of the place of the Cable Structure between back 30 minutes environment constantly through real-time monitoring; The temperature measured data sequence of Cable Structure place environment by be carved at sunrise the same day sunrise next day constantly the temperature measured data of the place of the Cable Structure between back 30 minutes environment according to the time order and function series arrangement; Find maximum temperature and minimum temperature in the temperature measured data sequence of Cable Structure place environment; Deduct with the maximum temperature in the temperature measured data sequence of Cable Structure place environment and to be carved into the sunrise next day maximum temperature difference between back 30 minutes constantly at sunrise on same day that minimum temperature obtains Cable Structure place environment; Be called the environment maximum temperature difference, be designated as Δ T EmaxThe temperature that obtains Cable Structure place environment through conventional mathematical computations by the temperature measured data sequence of Cable Structure place environment is about the change of time rate, and this rate of change is also along with the time changes; Obtain being carved at sunrise the same day sunrise next day measured data sequence of the temperature of the sunny slope of the reference plate between back 30 minutes constantly through real-time monitoring; The measured data sequence of the temperature of the sunny slope of reference plate by be carved at sunrise the same day next day sunrise constantly the measured data of the temperature of the sunny slope of the reference plate between back 30 minutes according to the time order and function series arrangement; Find maximum temperature and minimum temperature in the measured data sequence of temperature of sunny slope of reference plate; Deduct with the maximum temperature in the measured data sequence of the temperature of the sunny slope of reference plate and to be carved into the sunrise next day maximum temperature difference between back 30 minutes constantly at sunrise on same day of temperature that minimum temperature obtains the sunny slope of reference plate; Be called the reference plate maximum temperature difference, be designated as Δ T PmaxObtain being carved at sunrise the same day sunrise next day Cable Structure surface temperature measured data sequence of all R Cable Structure surface points between back 30 minutes constantly through real-time monitoring; There is R Cable Structure surface point that R Cable Structure surface temperature measured data sequence just arranged; Each Cable Structure surface temperature measured data sequence by be carved at sunrise on same day of a Cable Structure surface point sunrise next day constantly the Cable Structure surface temperature measured data between back 30 minutes according to the time order and function series arrangement; Find maximum temperature and minimum temperature in each Cable Structure surface temperature measured data sequence; Deduct with the maximum temperature in each Cable Structure surface temperature measured data sequence and to be carved into the sunrise next day maximum temperature difference between back 30 minutes constantly at sunrise on same day that minimum temperature obtains the temperature of each Cable Structure surface point; There is R Cable Structure surface point just to have and be carved into the sunrise next day maximum temperature difference numerical value between back 30 minutes constantly R the same day at sunrise; Maximal value wherein is called Cable Structure surface maximum temperature difference, is designated as Δ T SmaxThe temperature that obtains each Cable Structure surface point through conventional mathematical computations by each Cable Structure surface temperature measured data sequence is about the change of time rate, the temperature of each Cable Structure surface point about the change of time rate also along with the time changes; Through real-time monitoring obtain being carved at sunrise the same day sunrise next day constantly between back 30 minutes, behind synchronization, HBE " Cable Structure is along the temperature profile data of thickness "; Calculating amounts to maximum temperature and the difference of minimum temperature among the BE " identical sea level elevation Cable Structure is along the temperature profile data of thickness " at the sea level elevation place that each is chosen; The absolute value of this difference is called " identical sea level elevation place Cable Structure thickness direction maximum temperature difference "; Chosen H different altitude above sea level H " identical sea level elevation place Cable Structure thickness direction maximum temperature difference " just arranged; Claim that the maximal value in this H " identical sea level elevation place Cable Structure thickness direction maximum temperature difference " is " a Cable Structure thickness direction maximum temperature difference ", be designated as Δ T Tmax
B3: measure and calculate acquisition Cable Structure steady temperature data; At first; Confirm to obtain the moment of Cable Structure steady temperature data; The relevant condition of the moment that obtains Cable Structure steady temperature data with decision has six; To be moment of obtaining Cable Structure steady temperature data be carved into sunrise next day constantly between back 30 minutes at sunset between the same day for first condition, sunset be meant constantly on the meteorology that base area revolutions and revolution rule confirm sunset constantly, the sunset that can inquire about data or calculate each required day through conventional meteorology is constantly; The a condition of second condition be the same day be carved at sunrise next day sunrise constantly between back 30 minutes during this period of time in, reference plate maximum temperature difference Δ T PmaxWith Cable Structure surface maximum temperature difference Δ T SmaxAll be not more than 5 degrees centigrade; The b condition of second condition be the same day be carved at sunrise next day sunrise constantly between back 30 minutes during this period of time in, measure the environment maximum error Δ T that calculates in front EmaxBe not more than with reference to temperature difference per day Δ T r, and reference plate maximum temperature difference Δ T PmaxBe not more than Δ T after deducting 2 degrees centigrade Emax, and Cable Structure surface maximum temperature difference Δ T SmaxBe not more than Δ T PmaxOne that only needs to satisfy in second a condition and the b condition just is called satisfied second condition; The 3rd condition is in the moment that obtains Cable Structure steady temperature data, and the temperature of Cable Structure place environment is not more than per hour 0.1 degree centigrade about the absolute value of change of time rate; The 4th condition is in the moment that obtains Cable Structure steady temperature data, and the temperature of each the Cable Structure surface point in R Cable Structure surface point is not more than per hour 0.1 degree centigrade about the absolute value of change of time rate; The 5th condition is in the moment that obtains Cable Structure steady temperature data, and the Cable Structure surface temperature measured data of each the Cable Structure surface point in R Cable Structure surface point is the minimal value that was carved at sunrise the same day between back 30 minutes of the moment of sunrise next day; The 6th condition is at the moment that obtains Cable Structure steady temperature data, " Cable Structure thickness direction maximum temperature difference " Δ T TmaxBe not more than 1 degree centigrade; This method is utilized above-mentioned six conditions; In following three kinds of moment any one is called the mathematics of Cable Structure steady temperature data " obtain constantly "; First kind of moment is first moment to the 5th condition of satisfying in above-mentioned " with the relevant condition of the moment of decision acquisition Cable Structure steady temperature data "; Second kind of moment is the moment of only satisfying the 6th condition in above-mentioned " with the relevant condition of the moment of decision acquisition Cable Structure steady temperature data ", and the third is first moment to the 6th condition of satisfying simultaneously in above-mentioned " with the relevant condition of the moment of decision acquisition Cable Structure steady temperature data " constantly; When the mathematics that obtains Cable Structure steady temperature data is exactly in this method during physical record data in constantly constantly, the moment that obtains Cable Structure steady temperature data be exactly obtain Cable Structure steady temperature data mathematics constantly; If obtain the mathematics of Cable Structure steady temperature data and constantly is not any in constantly of physical record data in this method constantly, then get moment of mathematics those physical record data constantly that this method approaches to obtain Cable Structure steady temperature data most for obtaining the moment of Cable Structure steady temperature data; This method will be used in the amount of the moment survey record that obtains Cable Structure steady temperature data and carry out the relevant health monitoring analysis of Cable Structure; This method is approximate thinks that the Cable Structure temperature field in moment of obtaining Cable Structure steady temperature data is in stable state, and promptly this Cable Structure temperature does not constantly change in time, and this is exactly " obtaining the moment of Cable Structure steady temperature data " of this method constantly; Then; According to the Cable Structure heat transfer characteristic; Utilize " R the Cable Structure surface temperature measured data " and " HBE Cable Structure is along thickness temperature measured data " in the moment that obtains Cable Structure steady temperature data; Utilize the thermal conduction study computation model of Cable Structure; Obtain Temperature Distribution through conventional Calculation of Heat Transfer in the Cable Structure in the moment that obtains Cable Structure steady temperature data; This moment, calculated by stable state in the temperature field of Cable Structure; The temperature profile data in the Cable Structure in the moment that obtains Cable Structure steady temperature data that calculates comprises the accounting temperature of R Cable Structure surface point on the Cable Structure; The accounting temperature of R Cable Structure surface point is called R Cable Structure stable state surface temperature computational data; Also comprise the accounting temperature of HBE " measuring the point of Cable Structure along the temperature profile data of thickness " that Cable Structure is selected in front, the accounting temperature of HBE " measuring the point of Cable Structure along the temperature profile data of thickness " is called " HBE Cable Structure is along thickness temperature computation data ", when R Cable Structure surface temperature measured data and R Cable Structure stable state surface temperature computational data correspondent equal; And when " HBE Cable Structure is along thickness temperature measured data " and " HBE Cable Structure is along thickness temperature computation data " correspondent equal; The temperature profile data in the Cable Structure in the moment that obtains Cable Structure steady temperature data that calculates is called " Cable Structure steady temperature data " in the method, and this moment " R Cable Structure surface temperature measured data " is called " R Cable Structure stable state surface temperature measured data ", and " HBE Cable Structure is along thickness temperature measured data " is called " HBE Cable Structure is along thickness steady temperature measured data "; When on the surface of Cable Structure, getting " R Cable Structure surface point "; The quantity of " R Cable Structure surface point " and necessary three conditions that satisfy that distribute; First condition is when the Cable Structure temperature field is in stable state; When on the Cable Structure surface arbitrarily the temperature of any be through " R Cable Structure surface point " in the Cable Structure surface on the observed temperature linear interpolation of the adjacent point in this arbitrfary point when obtaining, on the Cable Structure surface that linear interpolation obtains on the temperature of this arbitrfary point and the Cable Structure surface error of the actual temperature of this arbitrfary point be not more than 5%; The Cable Structure surface comprises supporting rope surface; Second condition is that the quantity at the point of same sea level elevation is not less than 4 in " R Cable Structure surface point ", and the point in same sea level elevation is uniformly distributed with along the Cable Structure surface in " R Cable Structure surface point "; Maximal value Δ h in the absolute value of the difference of the sea level elevation of all adjacent in twos Cable Structure surface points of " R Cable Structure surface point " coastal degree of lifting is not more than 0.2 ℃ divided by Δ T hThe numerical value that obtains is for Δ T is got in convenient narration hUnit be ℃/m that the unit of getting Δ h for convenient narration is m; The definition of the adjacent in twos Cable Structure surface point of " R Cable Structure surface point " coastal degree of lifting is meant when only considering sea level elevation; In " R Cable Structure surface point ", do not have a Cable Structure surface point, the sea level elevation numerical value of this Cable Structure surface point is between the sea level elevation numerical value of adjacent Cable Structure surface point in twos; The 3rd condition is to inquire about or calculate the Cable Structure location and belong to the interval rule at sunshine of height above sea level by the meteorology routine; Again according to the geometric properties and the bearing data of Cable Structure; On Cable Structure, find the position of those surface points that receive the sunshine-duration fullest whole year, having a Cable Structure surface point in " R Cable Structure surface point " at least is a point in annual those surface points that receive the sunshine-duration fullest on the Cable Structure;
C. directly measure according to " the temperature survey calculating method of the Cable Structure of this method " and calculate the Cable Structure steady temperature data under the original state; Cable Structure steady temperature data under the original state are called initial Cable Structure steady temperature data, are designated as " initial Cable Structure steady temperature data vector T o"; Survey or consult reference materials and obtain the temperature variant physics and the mechanical property parameters of the employed various materials of Cable Structure; Obtain initial Cable Structure steady temperature data vector T in actual measurement oSynchronization, directly measure the initial Suo Li that calculates all supporting ropes, form initial rope force vector F oAccording to Cable Structure design data, completion data obtain that all supporting ropes are in free state that Suo Li is 0 o'clock a length, the weight of cross-sectional area during in free state and the unit length during in free state; And the temperature of all supporting ropes when obtaining these three kinds of data; Utilize the temperature variant physical function parameter and the mechanical property parameters of all supporting ropes on this basis, obtain all supporting ropes at initial Cable Structure steady temperature data vector T according to conventional physical computing oSuo Li under the condition is that length, the Suo Li of 0 o'clock all supporting rope is that 0 o'clock all cross-sectional area and Suo Li that supports ropes is the weight of the unit length of 0 o'clock all supporting rope; Form the initial drift vector of supporting rope, the weight vector of the initial free unit length of initial free cross-sectional area vector sum successively, the coding rule and initial rope force vector F of the element of the initial drift vector of supporting rope, the weight vector of the initial free unit length of initial free cross-sectional area vector sum oThe coding rule of element identical; Obtain T in actual measurement oThe time, just obtaining initial Cable Structure steady temperature data vector T oThe synchronization in the moment; Directly measure the measured data that calculates initial Cable Structure, the measured data of initial Cable Structure comprises the Non-Destructive Testing data, Cable Structure bearing initial angle displacement measurement data, the initial value of all monitored amounts, the initial rope force data of all supporting ropes, initial Cable Structure modal data, initial Cable Structure strain data, initial Cable Structure geometric data, initial Cable Structure support coordinate data, initial Cable Structure angle-data, initial Cable Structure spatial data of the health status of expressing the supporting rope; The initial value of all monitored amounts is formed monitored amount initial value vector C o, monitored amount initial value vector C oThe coding rule of coding rule and M monitored amount identical; Utilize the Non-Destructive Testing data and the Cable Structure bearing initial angle displacement measurement data of the health status that can express the supporting rope to set up by evaluation object initial damage vector d o, vectorial d oExpression is with initial Mechanics Calculation benchmark model A oThe expression Cable Structure by the initial health of evaluation object; By evaluation object initial damage vector d oElement number equal N, d oElement be one-to-one relationship by evaluation object, vectorial d oThe coding rule of element with identical by the coding rule of evaluation object; If d oSome elements corresponding be supporting rope, a d so in the cable system by evaluation object oThe numerical value of this element represent the initial damage degree of corresponding supporting rope; If the numerical value of this element is 0, represent that the pairing supporting rope of this element is intact, do not damage; If its numerical value is 100%; Represent that then the pairing supporting rope of this element has completely lost load-bearing capacity, lost the load-bearing capacity of corresponding proportion if its numerical value between 0 and 100%, is then represented this supporting rope; If d oSome elements corresponding be some angular displacement components of some bearings, d so by evaluation object oThe numerical value of this element represent the initial value of this angular displacement component of this bearing; If when not supporting Non-Destructive Testing data and other of rope and can express the data of health status of supporting rope, can think that perhaps the Cable Structure original state is a not damaged when not having relaxed state, vectorial d oIn get 0 with each element numerical value of supporting Suo Xiangguan, if there are not Cable Structure bearing initial angle displacement measurement data or can think that the displacement of Cable Structure bearing initial angle is at 0 o'clock, vectorial d oIn each element numerical value relevant with the angular displacement of Cable Structure bearing get 0; Initial Cable Structure support coordinate data refer to the support coordinate data under the Cable Structure design point, and Cable Structure bearing initial angle displacement measurement data refer to setting up initial Mechanics Calculation benchmark model A oThe time, the Cable Structure bearing is with respect to the angular displacement that bearing took place under the Cable Structure design point;
D. according to the temperature variant physics of the Non-Destructive Testing data of the measured data of the design drawing of Cable Structure, as-constructed drawing and initial Cable Structure, supporting rope, Cable Structure bearing initial angle displacement measurement data, the employed various materials of Cable Structure and mechanical property parameters, initial Cable Structure steady temperature data vector T oWith all Cable Structure data that obtain with preceding step, set up the initial Mechanics Calculation benchmark model A of the Cable Structure that counts " Cable Structure steady temperature data " o, based on A oThe Cable Structure computational data that calculates must be very near its measured data, and difference therebetween must not be greater than 5%; Corresponding to A o" Cable Structure steady temperature data " be exactly " initial Cable Structure steady temperature data vector T o"; Corresponding to A oUsed by the evaluation object health status by evaluation object initial damage vector d oExpression; Corresponding to A oThe initial value of all monitored amounts with monitored amount initial value vector C oExpression; Set up the current initial Mechanics Calculation benchmark model A of the Cable Structure that counts " Cable Structure steady temperature data " for the first time t o, the current initial value of monitored amount vector C t o" current initial Cable Structure steady temperature data vector T t o"; Set up for the first time the current initial Mechanics Calculation benchmark model A of Cable Structure t oWith the current initial value vector of monitored amount C t oThe time, the current initial Mechanics Calculation benchmark model A of Cable Structure t oJust equal the initial Mechanics Calculation benchmark model A of Cable Structure o, the current initial value vector of monitored amount C t oJust equal monitored amount initial value vector C oA t oCorresponding " Cable Structure steady temperature data " are called " current initial Cable Structure steady temperature data ", are designated as " current initial Cable Structure steady temperature data vector T t o", set up the current initial Mechanics Calculation benchmark model A of Cable Structure the first time t oThe time, T t oJust equal T oA t oBy the initial health of evaluation object and A oThe health status by evaluation object identical, also use by evaluation object initial damage vector d oExpression, A in the cyclic process of back t oUsed all the time by the initial health of evaluation object by evaluation object initial damage vector d oExpression; T oAnd d oBe A oParameter, by A oThe initial value and the C of all monitored amounts of obtaining of Mechanics Calculation result oThe initial value of all monitored amounts of expression is identical, therefore also we can say C oBy A oMechanics Calculation result form; T t oAnd d oBe A t oParameter, C t oBy A t oMechanics Calculation result form;
E. go on foot the o circulation in step from getting into here by e; In Cable Structure military service process; Constantly constantly survey and calculate the current data that obtains " Cable Structure steady temperature data " according to " the temperature survey calculating method of the Cable Structure of this method "; The current data of " Cable Structure steady temperature data " is called " current cable structure steady temperature data ", is designated as " current cable structure steady temperature data vector T t", vector T tDefinition mode and vector T oDefinition mode identical; Obtain current cable structure steady temperature data vector T in actual measurement tThe time, to the M that increases newly 2Root sensing rope carries out Non-Destructive Testing; Therefrom identify and damage or lax sensing rope occur; According to monitored amount coding rule; Remove each vector that before this method, occurs and the appearance damage or the lax corresponding element of sensing rope that identify according to monitored amount coding rule numbering; The appearance damage or the lax corresponding element of sensing rope that also no longer occur in each the vector sum matrix that after this method, occurs and identify; No longer comprise when after this method, mentioning the sensing rope here being identified damage or lax sensing rope occurring, no longer comprise the Suo Li that is identified the sensing rope that damage occurs or relax here when this method after, mentioning monitored amount; Identify several from Cable Structure and damage or lax sensing rope occur, just with M 2Reduce same quantity with M; Obtain current cable structure steady temperature data vector T in actual measurement tSynchronization, actual measurement obtains all M in the Cable Structure 1The rope force data of root supporting rope, all these rope force datas are formed current cable force vector F, the element of vectorial F and vectorial F oThe coding rule of element identical; Obtain current cable structure steady temperature data vector T in actual measurement tSynchronization, actual measurement calculates all M 1The volume coordinate of two supporting end points of root supporting rope; The volume coordinate of two the supporting end points difference of component in the horizontal direction is exactly two supporting end points horizontal ranges; Two supporting end points horizontal range data of all supporting ropes are formed current supporting rope two supporting end points horizontal range vectors, the coding rule and initial rope force vector F of the element of current supporting rope two supporting end points horizontal range vectors oThe coding rule of element identical;
F. according to current cable structure steady temperature data vector T t, upgrade current initial Mechanics Calculation benchmark model A according to step f1 to f3 t o, the current initial value of monitored amount vector C t oWith current initial Cable Structure steady temperature data vector T t o
F1. compare T tWith T t oIf, T tEqual T t o, A then t o, C t oAnd T t oRemain unchanged; Otherwise need follow these steps to A t o, U t oAnd T t oUpgrade;
F2. calculate T tWith T oPoor, T tWith T oDifference be exactly of the variations of current cable structure steady temperature data about initial Cable Structure steady temperature data, T tWith T oThe difference represent that with steady temperature change vector S S equals T tDeduct T o, S representes the variation of Cable Structure steady temperature data;
F3. to A oIn Cable Structure apply temperature variation, the numerical value of the temperature variation that applies is just taken from steady temperature change vector S, to A oIn the temperature variation that applies of Cable Structure after the current initial Mechanics Calculation benchmark model A that obtains upgrading t o, upgrade A t oThe time, T t oAll elements numerical value is also used T tCorresponding replacement of all elements numerical value, promptly upgraded T t o, so just obtained correctly corresponding to A t oT t oUpgrade C t oMethod be: when upgrading A t oAfter, obtain A through Mechanics Calculation t oIn concrete numerical value all monitored amounts, current, these concrete numerical value are formed C t oA t oThe initial health of supporting rope use all the time by evaluation object initial damage vector d oExpression;
G. at current initial Mechanics Calculation benchmark model A t oThe basis on carry out the several times Mechanics Calculation according to step g 1 to g4, through calculate obtaining Cable Structure unit damage monitored amount unit change matrix Δ C and unit damage or the vectorial D of unit angular displacement u
G1. Cable Structure unit damage monitored amount unit change matrix Δ C brings in constant renewal in, and is promptly upgrading current initial Mechanics Calculation benchmark model A t o, the current initial value of monitored amount vector C t oWith current initial Cable Structure steady temperature data vector T t oAfterwards, must then upgrade Cable Structure unit damage monitored amount unit change matrix Δ C and unit damage or the angular displacement vector D of unit u
G2. at the current initial Mechanics Calculation benchmark model A of Cable Structure t oThe basis on carry out the several times Mechanics Calculation, equal all on the calculation times numerical value by the quantity N of evaluation object, have N evaluation object that N calculating is just arranged; According to by the coding rule of evaluation object, calculate successively; Calculating hypothesis each time has only one on the basis of original damage or angular displacement, to be increased unit damage or unit angular displacement again by evaluation object; Concrete; If should be a supporting rope in the cable system by evaluation object, so just this supporting rope of hypothesis increases unit damage again, if should be the angular displacement component of a direction of a bearing by evaluation object; Just suppose that this bearing increases the unit angular displacement again at this sense of displacement, uses D UkWrite down the unit damage or the unit angular displacement of this increase, wherein k represent to increase unit damage or unit angular displacement by the numbering of evaluation object, D UkBe unit damage or the angular displacement vector D of unit uAn element, unit damage or unit angular displacement vector D uThe coding rule and the vectorial d of element oThe coding rule of element identical; Increase again in calculating each time unit damage or unit angular displacement be different from by evaluation object other time increase again in calculating unit damage or unit angular displacement by evaluation object; Calculate the current calculated value that all utilizes mechanics method to calculate all monitored amounts of Cable Structure each time; The current calculated value of the monitored amount of all that calculate is each time formed a monitored amount calculation current vector, the element coding rule of monitored amount calculation current vector and monitored amount initial value vector C oThe element coding rule identical;
G3. the monitored amount calculation current vector that calculates each time deducts the current initial value vector of monitored amount C t oObtain a vector, each element that again should vector all calculates unit damage or the unit angular displacement numerical value of being supposed divided by this time, obtains a monitored amount unit change vector, has N by evaluation object N monitored amount unit change vector just to be arranged;
G4. individual by the coding rule of evaluation object by this N monitored amount unit change vector according to N, form the Cable Structure unit damage monitored amount unit change matrix Δ C that the N row are arranged successively; Each row of Cable Structure unit damage monitored amount unit change matrix Δ C are corresponding to a monitored amount unit change vector; Each row of Cable Structure unit damage monitored amount unit change matrix Δ C is corresponding to the different unit change amplitude of same monitored amount when difference is increased unit damage or unit angular displacement by evaluation object; The coding rule and the vectorial d of the row of Cable Structure unit damage monitored amount unit change matrix Δ C oThe coding rule of element identical, the coding rule of the row of Cable Structure unit damage monitored amount unit change matrix Δ C is identical with the coding rule of M monitored amount;
H. obtain current cable structure steady temperature data vector T in actual measurement tThe time, actual measurement obtains obtaining current cable structure steady temperature data vector T tThe current measured value of all monitored amounts of Cable Structure of synchronization in the moment, form the current numerical value vector of monitored amount C; Current numerical value vector C of monitored amount and the current initial value vector of monitored amount C t oWith monitored amount initial value vector C oDefinition mode identical, the same monitored amount of the element representation of the identical numbering of three vectors is at difference concrete numerical value constantly;
I. define by the vectorial d of the current name damage of evaluation object; Element number by the vectorial d of the current name damage of evaluation object equals by the quantity of evaluation object; By the element of the vectorial d of the current name damage of evaluation object be one-to-one relationship between the evaluation object, represent correspondence by the nominal degree of injury of evaluation object or nominal angular displacement by the element numerical value of the vectorial d of the current name damage of evaluation object; The coding rule and the vectorial d of the element of vector d oThe coding rule of element identical;
J. the current numerical value vector of the monitored amount of foundation C is with the current initial value vector of monitored amount C t o, Cable Structure unit damage monitored amount unit change matrix Δ C, unit damage or the angular displacement vector D of unit uAnd to be asked this linear approximate relationship can be expressed as formula 1 by the linear approximate relationship that exists between the vectorial d of the current name damage of evaluation object, and other amount in the formula 1 except that d is known, finds the solution formula 1 and just can calculate by the current nominal vectorial d of damage of evaluation object;
C = C o t + Δ C · d Formula 1
K. define by the current actual damage vector of evaluation object d a, by the current actual damage vector of evaluation object d aElement number equal by the quantity of evaluation object, by the current actual damage of evaluation object vector d aElement and be one-to-one relationship between the evaluation object, by the current actual damage of evaluation object vector d aElement numerical value represent corresponding by the actual damage degree or the actual displacement angle of evaluation object; Vector d aThe coding rule and the vectorial d of element oThe coding rule of element identical;
L. utilize that formula 2 expresses by the current actual damage vector of evaluation object d aK element d a kTogether by evaluation object initial damage vector d oK element d OkWith k the element d that is damaged vectorial d by the current name of evaluation object kBetween relation, calculate by the current actual damage of evaluation object vector d aAll elements;
Figure BDA00001700408000262
formula 2
K=1 in the formula 2,2,3 ...., N, d a kRepresent k by the current actual health status of evaluation object, d a kBe to represent that k was not had health problem by evaluation object, d at 0 o'clock a kNumerical value be not represented in 0 o'clock k by evaluation object be the unsoundness problem by evaluation object, if should be supporting rope, a d so in the cable system by evaluation object a kThe order of severity of representing its current health problem, the supporting Suo Keneng of unsoundness problem is slack line, also possibly is damaged cable, d a kNumerical response the degree of lax or damage that should the supporting rope, if should be angular displacement component, a d so of a bearing by evaluation object a kRepresent its current actual displacement angle numerical value; So according to by the current actual damage of evaluation object vector d aCan define which the supporting rope unsoundness problem and order of severity thereof, define which bearing angular displacement and numerical value thereof have taken place;
M. will be by the current actual damage vector of evaluation object d aIn with M 1The M of root supporting Suo Xiangguan 1Individual element takes out, and forms supporting Suo Dangqian actual damage vector d Ca, supporting Suo Dangqian actual damage vector d CaThe coding rule and initial rope force vector F of element oThe coding rule of element identical; Supporting Suo Dangqian actual damage vector d CaH element representation Cable Structure in the current actual damage amount of h root supporting rope, h=1,2,3 ...., M 1Supporting Suo Dangqian actual damage vector d CaIn numerical value be not 0 element supporting rope corresponding to the unsoundness problem, from the supporting rope of these unsoundness problems, identify damaged cable, remaining is exactly slack line, supporting Suo Dangqian actual damage vector d CaIn with slack line corresponding to the element numerical expression be the current actual equivalent damage degree with slack line relax level mechanics equivalence;
N. be utilized in current cable structure steady temperature data vector T tSlack line under the condition, that identify in m step and with the vectorial d of supporting Suo Dangqian actual damage CaThese slack lines of expressing, with the current actual equivalent damage degree of its relax level mechanics equivalence, be utilized in that the e step obtains at current cable structure steady temperature data vector T tCurrent cable force vector F under the condition and current supporting rope two supporting end points horizontal ranges vectors, be utilized in that the c step obtains at initial Cable Structure steady temperature data vector T oThe initial drift vector of the supporting rope under the condition, the weight vector of the initial free unit length of initial free cross-sectional area vector sum, initial rope force vector F o, utilize current cable structure steady temperature data vector T tThe supporting Suo Dangqian steady temperature data of expression, be utilized in that c step obtains at initial Cable Structure steady temperature data vector T oThe supporting rope initial steady state temperature data of expression; Be utilized in the temperature variant physics and the mechanical property parameters of the employed various materials of Cable Structure of c step acquisition; Count the influence of temperature variation to supporting rope physics, mechanics and geometric parameter; Through with slack line with damaged cable carry out the mechanics equivalence calculate slack line, with the relax level of current actual equivalent damage degree equivalence, the mechanical condition of equivalence is: one, the mechanics parameters of lax initial drift, geometrical property parameter, density and the material during with not damaged of the nothing of the rope of two equivalences is identical; Two, after the lax or damage, the Suo Li of the slack line of two equivalences and damage rope be out of shape after length overall identical; When satisfying above-mentioned two equivalent conditions, the such mechanics function of two supporting ropes in Cable Structure is exactly identical, if after promptly replacing damaged cable with the slack line of equivalence, Cable Structure any variation can not take place, vice versa; Try to achieve the relax level that those are judged as slack line according to aforementioned mechanics equivalent condition, relax level is exactly the change amount of supporting rope drift, has just confirmed the long adjustment amount of rope of the supporting rope that those need adjust Suo Li; The lax identification and the damage identification of supporting rope have so just been realized; Institute's demand power is provided by current cable force vector F corresponding element during calculating;
O. get back to the e step, beginning goes on foot the o circulation next time in step by e.
Beneficial effect: when receiving the influencing of factors such as sunshine and environment temperature when the temperature field of Cable Structure; The temperature field of Cable Structure is constantly to change; The change of temperature field of Cable Structure must influence the monitored amount of Cable Structure; Have only and partly rejected by the influence in temperature field monitored amount could to carry out rational cable structure health monitoring based on monitored amount; And the temperature field measurement of Cable Structure with calculate to be very complicated, this method discloses and has comprised and adopt this method to occur under the situation of angular displacement at the Cable Structure bearing by a kind of simple, economic, feasible, cable structure health monitoring method of Cable Structure temperature field computing method efficiently that is suitable for cable structure health monitoring; When many ropes of Cable Structure are synchronously impaired or lax; And when the temperature of Cable Structure changed along with the time, monitoring and evaluation identified damaged cable, slack line and bearing angular displacement very exactly, and the disclosed system and method for this method is very useful to effective health monitoring of Cable Structure.
Embodiment
When temperature variation, to the damaged cable of Cable Structure, slack line and bearing angular displacement identification, this method discloses a kind ofly can monitor in the identification Cable Structure each by the system and method for the health status of evaluation object rationally and effectively.The following explanation of the embodiment of this method in fact only is exemplary, and purpose never is to limit the application or the use of this method.
This method adopts a kind of algorithm, and this algorithm is used to discern damaged cable, slack line and bearing angular displacement.During practical implementation, the following step is a kind of in the various steps that can take.
The first step: the quantity sum of bearing angular displacement component of quantity and Cable Structure of establishing the supporting rope of Cable Structure is N.For the purpose of narrating conveniently, this method is unified claims that support cable and the bearing angular displacement assessed are " evaluation object ", total N evaluation object.Give by the evaluation object serial number, this numbering will be used to generate the vector sum matrix in subsequent step, and this method is represented this numbering with variable k, k=1, and 2,3 ..., N.
If total M in the cable system 1Root supporting rope, Cable Structure rope force data comprises this M 1The Suo Li of root supporting rope, obviously M 1Less than by the quantity N of evaluation object.Only pass through M 1The M of root supporting rope 1It is impossible by the state of evaluation object that individual rope force data is found the solution unknown N, and this method is at the whole M of monitoring 1On the basis of root supporting cable force, increase being no less than (N-M 1) individual other monitored amounts.
What increase is no less than (N-M 1) other individual monitored amounts remain Suo Li, narration as follows:
Before the Cable Structure health detecting system is started working, on Cable Structure, artificially increase M earlier 2(M 2Be not less than N-M 1) the root rope, be called the sensing rope, the M that increases newly 2The rigidity of root sensing rope is compared with the rigidity of any supporting rope of Cable Structure, should be little a lot, for example little 20 times, and the M that increases newly 2The Suo Li of root sensing rope should be less, and for example its xsect normal stress should be less than its fatigue limit, and these requirements can guarantee the M that increases newly 2Fatigue damage can not take place in root sensing rope, the M that increases newly 2The fully anchoring of two ends of root sensing rope guarantees can not occur relaxing the M that increases newly 2Root sensing rope should obtain sufficient anti-corrosion protection, guarantees the M that increases newly 2Damage and lax can not take place in root sensing rope, in the cable structure health monitoring process, will monitor the M that this increases newly 2The Suo Li of root sensing rope.
Can also adopt the modes that increase the sensing rope to guarantee the reliability of health monitoring more, for example make M 2Be not less than N-M 12 times; The rope force data of in the cable structure health monitoring process, only selecting intact sensing rope wherein (is called actual operable monitored amount; Writing down its quantity is K, and K must not be less than N) and the corresponding monitored amount unit change of Cable Structure matrix Δ C carry out the health status assessment because M 2Be not less than N-M 12 times, can guarantee that the quantity of actual operable effective sensing rope adds M 1Be not less than N.In the cable structure health monitoring process, will monitor the M that this increases newly 2The Suo Li of root sensing rope.The M that increases newly 2The position that root sensing rope should be installed on the Cable Structure, personnel are easy to arrive is convenient to personnel it is carried out Non-Destructive Testing.
The M that increases newly in the method 2Root sensing rope is as the part of Cable Structure, and when back literary composition was mentioned Cable Structure again, Cable Structure comprises increased M 2Cable Structure before the root sensing rope and the M that increases newly 2Root sensing rope that is to say that the back literary composition refers to comprise the M that increases newly when mentioning Cable Structure 2The Cable Structure of root sensing rope.Therefore when the back literary composition was mentioned and calculated " Cable Structure steady temperature data " according to " the temperature survey method of calculatinging of the Cable Structure of this method " measurement, Cable Structure wherein comprised the M that increases newly 2Root sensing rope, " the Cable Structure steady temperature data " that obtain comprise the M that increases newly 2The steady temperature data of root sensing rope obtain the M that increases newly 2The method of the steady temperature data of root sensing rope is same as the M of Cable Structure 1The preparation method of the steady temperature data of root supporting rope, literary composition is handed over no longer one by one in the back; Measure the M that increases newly 2The method of the Suo Li of root sensing rope is same as the M of Cable Structure 1The rope force measurement method of root supporting rope, literary composition is handed over no longer one by one in the back; During to any measurement of supporting Suo Jinhang of Cable Structure, the M to increasing newly simultaneously 2Root sensing rope carries out same measurement, and literary composition is handed over no longer one by one in the back; The M that increases newly 2Root sensing rope except do not take place damage and lax, the M that increases newly 2The quantity of information of root rope is identical with the quantity of information of the supporting rope of Cable Structure, and literary composition is handed over no longer one by one in the back; The M that increases newly 2The Suo Li of root sensing rope is exactly the (N-M that is no less than that increases 1) other individual monitored amounts.When the various mechanical model of Cable Structure set up in literary composition in the back, with the M that increases newly 2Root sensing rope is treated as the M of Cable Structure 1Root supporting rope is treated, and except the damage of mentioning the supporting rope and lax occasion, when other occasions are mentioned the supporting rope, comprises the M that increases newly 2The root rope.
Comprehensive above-mentioned monitored amount, whole Cable Structure has M (M=M 1+ M 2) M the monitored amount of root rope, M must not be less than by the quantity N of evaluation object.
For simplicity, in the method " all monitored parameters of Cable Structure " are abbreviated as " monitored amount ".Give M monitored amount serial number, this numbering will be used to generate the vector sum matrix in subsequent step.This method is with representing this numbering with variable j, j=1, and 2,3 ..., M.
Confirm " the temperature survey calculating method of the Cable Structure of this method " that these method concrete steps are following:
The a step: inquiry or actual measurement (can use conventional thermometry to measure; For example use thermal resistance to measure) obtain the temperature variant thermal conduction study parameter of Cable Structure composition material and Cable Structure environment of living in; Utilize the geometry measured data of design drawing, as-constructed drawing and the Cable Structure of Cable Structure, utilize these data and parameter to set up the thermal conduction study computation model of Cable Structure (for example finite element model).Inquiry Cable Structure location is no less than the meteorological data in recent years in 2 years; Cloudy quantity in statistics obtains during this period of time is designated as T cloudy day; Statistics obtains in T cloudy day 0 the highest temperature and the lowest temperature between back 30 minutes of the moment of sunrise next day at each cloudy day; Sunrise be meant constantly on the meteorology that base area revolutions and revolution rule confirm sunrise constantly, the sunrise that can inquire about data or calculate each required day through conventional meteorology constantly, each cloudy day 0 up to sunrise next day constantly the highest temperature between back 30 minutes deduct the maximum temperature difference that the lowest temperature is called this cloudy daily temperature; T cloudy day arranged; The maximum temperature difference of daily temperature that T cloudy day just arranged, the maximal value of getting in the maximum temperature difference of daily temperature at T cloudy day is with reference to temperature difference per day, is designated as Δ T with reference to temperature difference per day rInquiry Cable Structure location and height above sea level interval, place be no less than temperature that meteorological data in recent years or the actual measurement in 2 years obtain Cable Structure environment of living in time with change of elevation data and Changing Pattern, calculate Cable Structure location and height above sea level interval, place and be no less than the temperature of Cable Structure environment of living in recent years in 2 years about the maximum rate of change Δ T of sea level elevation h, for Δ T is got in convenient narration hUnit be ℃/m; On the surface of Cable Structure, get " R Cable Structure surface point "; Getting the concrete principle of " R Cable Structure surface point " narrates in step b3; The back will obtain the temperature of this R Cable Structure surface point through actual observation record; Claim that the temperature data that actual measurement obtains is " R Cable Structure surface temperature measured data "; If utilize the thermal conduction study computation model of Cable Structure, obtain the temperature of this R Cable Structure surface point through Calculation of Heat Transfer, just claim that the temperature data that calculates is " R Cable Structure surface temperature computational data ".From the residing minimum height above sea level of Cable Structure to the highest height above sea level; On Cable Structure, be uniformly distributed with to choose and be no less than three different altitude above sea level,, can choose height above sea level 0m, 50m, 100m and height above sea level 200m so if for example the sea level elevation of Cable Structure is between 0m to 200m; Intersect with imaginary surface level and Cable Structure surface at each sea level elevation place that chooses; Obtain intersection, surface level and Cable Structure are crossing to obtain friendship face, and intersection is the outer edge line of friendship face; Intersection place on surface level and Cable Structure surface chooses 6 points; From the outer normal of selected point straw line body structure surface, all outer normal directions of choosing are called " measuring the direction of Cable Structure along the Temperature Distribution of wall thickness ", and it is crossing with " intersection on surface level and Cable Structure surface " along the direction of the Temperature Distribution of wall thickness to measure Cable Structure.In the measurement Cable Structure of choosing along in 6 directions of the Temperature Distribution of wall thickness; At first according to the sunny slope of definite Cable Structure such as the physical dimension of the meteorological data throughout the year in Cable Structure position zone and Cable Structure, volume coordinate, Cable Structure surrounding environment and in the shade, the sunny slope of Cable Structure and in the shade face are the parts on the surface of Cable Structure, at each sea level elevation place that chooses; Aforementioned intersection respectively has one section in sunny slope and in the shade; This of intersection respectively has a mid point for two sections, crosses these two mid points and gets the outer normal of Cable Structure, and this method is called the sunny slope outer normal of Cable Structure and in the shade outer normal of Cable Structure with these two outer normals; This method is called the sunny slope outer normal direction of Cable Structure and in the shade outer normal direction of Cable Structure with these two outer normal directions; The outer normal of obvious sunny slope and in the shade outer normal all intersect with aforementioned intersection, and two intersection points are also just arranged, and these two intersection points are divided into two line segments with intersection; On two line segments, get 2 points respectively; Totally 4 points, each line segment is divided into 3 sections of equal in length in two line segments of the intersection of naming a person for a particular job of getting, and gets the outer normal on Cable Structure surface at these 4 some places; Just chosen the outer normal on 6 Cable Structure surfaces so altogether at each selected sea level elevation place, the direction of 6 outer normals is exactly " measuring the direction of Cable Structure along the Temperature Distribution of wall thickness ".There are two intersection points on the surface of each " measures the direction of Cable Structure along the Temperature Distribution of wall thickness " line and Cable Structure, if Cable Structure is hollow, one at these two intersection points are on the Cable Structure outside surface; Another is on inside surface, if Cable Structure is solid, these two intersection points are all on the Cable Structure outside surface; Connect these two intersection points and obtain a straight-line segment, on straight-line segment, choose three points again, these three these straight-line segments of naming a person for a particular job are divided into four sections; Three points measuring that Cable Structure chooses at this and two end points of straight-line segment, the temperature of 5 points altogether; Concrete can hole on Cable Structure earlier, and temperature sensor is embedded in this 5 some places, special; Can not on the supporting rope, hole; The supporting rope is only measured the temperature that supports the rope surface point, and in any case, the temperature that records all is called this place " Cable Structure is along the temperature profile data of thickness "; Wherein edge and same " intersection on surface level and Cable Structure surface " " Cable Structure is along temperature profile data of thickness " crossing, " measuring the direction of Cable Structure along the Temperature Distribution of wall thickness " measurement acquisition are called " identical sea level elevation Cable Structure is along the temperature profile data of thickness " in the method.If chosen H different altitude above sea level; At each sea level elevation place, chosen B the direction of measuring Cable Structure along the Temperature Distribution of wall thickness, measure Cable Structure along each and in Cable Structure, chosen E point along the direction of the Temperature Distribution of wall thickness; Wherein H and E are not less than 3; B is not less than 2, and is special, and E equals 1 for the supporting rope; That " measures the point of Cable Structure along the temperature profile data of thickness " on the meter Cable Structure adds up to HBE; The back will obtain the temperature of this HBE " measuring the point of Cable Structure along the temperature profile data of thickness " through actual measurement, claim to survey the temperature data that obtains and will be " HBE Cable Structure is along thickness temperature measured data ", if utilize the thermal conduction study computation model of Cable Structure; Obtain this HBE the temperature of measuring Cable Structure along the point of the temperature profile data of thickness through Calculation of Heat Transfer, just claim that the temperature data that calculates is " HBE Cable Structure is along thickness temperature computation data "; Will be in this method " at the number temperature profile data of each sea level elevation place that chooses " identical sea level elevation Cable Structure is along the temperature profile data of thickness ".Measure temperature in the Cable Structure location according to meteorology and require to choose a position, will obtain meeting the temperature that meteorology is measured the Cable Structure place environment of temperature requirement in this position actual observation record; The place of blocking chooses a position in the on-site spacious nothing of Cable Structure; This position should can both obtain in each day of the whole year this ground getable this day fullest sunshine (as long as the same day sunrise arranged, this position just should by solar radiation to), at the flat board (the square flat board that for example the wide 3mm of 30cm is thick) of carbon steel material of this position of sound production (for example No. 45 carbon steels); Be called reference plate; Reference plate can not contact with ground, and reference plate overhead distance is not less than 1.5 meters, and reference plate can place the top of the wooden thermometer screen that meets meteorology temperature measurement requirement; The one side of this reference plate on the sunny side; (for example, in the time of on the Northern Hemisphere, sunny slope faces up towards south to be called sunny slope; Full daytime is all by sunshine; Sunny slope should have the suitable gradient to make snow not accumulate or behind snow, clear up sunny slope), the sunny slope of reference plate is coarse and (helping accepting solar irradiation) dark color, the sunny slope of reference plate should can both obtain in each day of the whole year one flat plate on this ground sunshine of fullest of getable this day; The non-sunny slope of reference plate is covered with insulation material (the for example thick lime carbonate insulation material of 5mm), real-time monitoring record is obtained the temperature of the sunny slope of reference plate.
The b step; Monitoring in real time (can use conventional thermometry to measure; For example use thermal resistance to measure; For example every at a distance from temperature data of 10 minutes survey records) write down R the Cable Structure surface temperature measured data that obtains above-mentioned R Cable Structure surface point, monitoring in real time simultaneously (can be used conventional thermometry to measure, for example use the thermal resistance measurement; For example every at a distance from temperature data of 10 minutes survey records) obtain Cable Structure that the front defines temperature profile data along thickness; Monitoring in real time simultaneously (can use conventional thermometry to measure, for example in the wooden thermometer screen that meets meteorology temperature measurement requirement, lay thermal resistance and measure temperature, be for example every at a distance from temperature data of 10 minutes survey records) record obtains meeting the temperature record that meteorology is measured the Cable Structure place environment of temperature requirement; (can use conventional thermometry to measure through real-time monitoring; For example in the wooden thermometer screen that meets meteorology temperature measurement requirement, lay thermal resistance and measure temperature; For example every at a distance from temperature data of 10 minutes survey records) record obtain being carved at sunrise the same day sunrise next day constantly the Cable Structure between back 30 minutes belong to the temperature measured data sequence of environment; The temperature measured data sequence of Cable Structure place environment by be carved at sunrise the same day sunrise next day constantly the temperature measured data of the place of the Cable Structure between back 30 minutes environment according to the time order and function series arrangement; Find maximum temperature and minimum temperature in the temperature measured data sequence of Cable Structure place environment; Deduct with the maximum temperature in the temperature measured data sequence of Cable Structure place environment and to be carved into the sunrise next day maximum temperature difference between back 30 minutes constantly at sunrise the same day that minimum temperature obtains Cable Structure place environment, be designated as Δ T Emax(the temperature measured data sequence that for example earlier Cable Structure is belonged to environment carries out curve fitting through conventional mathematical computations by the temperature measured data sequence of Cable Structure place environment; Then through ask curve to the derivative of time or through ask with numerical method on the curve each corresponding to the point of survey record data time to the change of time rate) temperature that obtains Cable Structure place environment is about the change of time rate, this rate of change is also along with the time changes; (can use conventional thermometry to measure through real-time monitoring; For example use the temperature of the dull and stereotyped sunny slope of thermal resistance witness mark; For example every at a distance from temperature data of 10 minutes survey records) obtain being carved at sunrise the same day measured data sequence of temperature of the sunny slope of the reference plate between back 30 minutes of the moment of sunrise next day; The measured data sequence of the temperature of the sunny slope of reference plate by be carved at sunrise the same day next day sunrise constantly the measured data of the temperature of the sunny slope of the reference plate between back 30 minutes according to the time order and function series arrangement; Find maximum temperature and minimum temperature in the measured data sequence of temperature of sunny slope of reference plate; Deduct with the maximum temperature in the measured data sequence of the temperature of the sunny slope of reference plate and to be carved into the sunrise next day maximum temperature difference between back 30 minutes constantly at sunrise same day of temperature that minimum temperature obtains the sunny slope of reference plate, be designated as Δ T Pmax(can use conventional thermometry to measure through real-time monitoring; For example use thermal resistance to measure the Cable Structure surface point; For example every at a distance from temperature data of 10 minutes survey records) record obtains being carved at sunrise the same day Cable Structure surface temperature measured data sequence of all R Cable Structure surface points between back 30 minutes of the moment of sunrise next day; There is R Cable Structure surface point that R Cable Structure surface temperature measured data sequence just arranged; Each Cable Structure surface temperature measured data sequence by be carved at sunrise on same day of a Cable Structure surface point sunrise next day constantly the Cable Structure surface temperature measured data between back 30 minutes according to the time order and function series arrangement; Find maximum temperature and minimum temperature in each Cable Structure surface temperature measured data sequence; Deduct with the maximum temperature in each Cable Structure surface temperature measured data sequence and to be carved into the sunrise next day maximum temperature difference between back 30 minutes constantly at sunrise on same day that minimum temperature obtains the temperature of each Cable Structure surface point; Have R Cable Structure surface point just to have and be carved into the sunrise next day maximum temperature difference numerical value between back 30 minutes constantly R the same day at sunrise, maximal value wherein is designated as Δ T Smax(for example earlier each Cable Structure surface temperature measured data sequence is carried out curve fitting through conventional mathematical computations by each Cable Structure surface temperature measured data sequence; Then through ask curve to the derivative of time or through ask with numerical method on the curve each corresponding to the point of survey record data time to the change of time rate) temperature that obtains each Cable Structure surface point is about the change of time rate, the temperature of each Cable Structure surface point about the change of time rate also along with the time changes.Through real-time monitoring obtain being carved at sunrise the same day sunrise next day constantly between back 30 minutes, behind synchronization, HBE " Cable Structure is along the temperature profile data of thickness "; Calculating amounts to maximum temperature and the difference of minimum temperature among the BE " identical sea level elevation Cable Structure is along the temperature profile data of thickness " at the sea level elevation place that each is chosen; The absolute value of this difference is called " identical sea level elevation place Cable Structure thickness direction maximum temperature difference "; Chosen H different altitude above sea level H " identical sea level elevation place Cable Structure thickness direction maximum temperature difference " just arranged; Claim that the maximal value in this H " identical sea level elevation place Cable Structure thickness direction maximum temperature difference " is " a Cable Structure thickness direction maximum temperature difference ", be designated as Δ T Tmax
In the c step, measure and calculate acquisition Cable Structure steady temperature data; At first; Confirm to obtain the moment of Cable Structure steady temperature data; The relevant condition of the moment that obtains Cable Structure steady temperature data with decision has six; To be moment of obtaining Cable Structure steady temperature data be carved into sunrise next day constantly between back 30 minutes at sunset between the same day for first condition, sunset be meant constantly on the meteorology that base area revolutions and revolution rule confirm sunset constantly, the sunset that can inquire about data or calculate each required day through conventional meteorology is constantly; The a condition of second condition be the same day be carved at sunrise next day sunrise constantly between back 30 minutes during this period of time in, Δ T PmaxWith Δ T SmaxAll be not more than 5 degrees centigrade; Second b condition that must satisfy be the same day be carved at sunrise sunrise next day constantly between back 30 minutes during this period of time in, measure the Δ T that calculates in front EmaxBe not more than with reference to temperature difference per day Δ T r, and measure the Δ T that calculates in front PmaxDeduct 2 degrees centigrade and be not more than Δ T Emax, and measure the Δ T that calculates in front SmaxBe not more than Δ T PmaxOne that only needs to satisfy in second a condition and the b condition just is called satisfied second condition; The 3rd condition is in the moment that obtains Cable Structure steady temperature data, and the temperature of Cable Structure place environment is not more than per hour 0.1 degree centigrade about the absolute value of change of time rate; The 4th condition is in the moment that obtains Cable Structure steady temperature data, and the temperature of each the Cable Structure surface point in R Cable Structure surface point is not more than per hour 0.1 degree centigrade about the absolute value of change of time rate; The 5th condition is in the moment that obtains Cable Structure steady temperature data, and the Cable Structure surface temperature measured data of each the Cable Structure surface point in R Cable Structure surface point is the minimal value that was carved at sunrise the same day between back 30 minutes of the moment of sunrise next day; The 6th condition is at the moment that obtains Cable Structure steady temperature data, " Cable Structure thickness direction maximum temperature difference " Δ T TmaxBe not more than 1 degree centigrade.This method is utilized above-mentioned six conditions; In following three kinds of moment any one is called the mathematics of Cable Structure steady temperature data " obtain constantly "; First kind of moment is first moment to the 5th condition of satisfying in above-mentioned " with the relevant condition of the moment of decision acquisition Cable Structure steady temperature data "; Second kind of moment is the moment of only satisfying the 6th condition in above-mentioned " with the relevant condition of the moment of decision acquisition Cable Structure steady temperature data ", and the third is first moment to the 6th condition of satisfying simultaneously in above-mentioned " with the relevant condition of the moment of decision acquisition Cable Structure steady temperature data " constantly; When the mathematics that obtains Cable Structure steady temperature data is exactly in this method during physical record data in constantly constantly, the moment that obtains Cable Structure steady temperature data be exactly obtain Cable Structure steady temperature data mathematics constantly; If obtain the mathematics of Cable Structure steady temperature data and constantly is not any in constantly of physical record data in this method constantly, then get moment of mathematics those physical record data constantly that this method approaches to obtain Cable Structure steady temperature data most for obtaining the moment of Cable Structure steady temperature data; This method will be used in the amount of the moment survey record that obtains Cable Structure steady temperature data and carry out the relevant health monitoring analysis of Cable Structure; This method is approximate thinks that the Cable Structure temperature field in moment of obtaining Cable Structure steady temperature data is in stable state, and promptly this Cable Structure temperature does not constantly change in time, and this is exactly the moment of the acquisition Cable Structure steady temperature data of this method constantly; Then; According to the Cable Structure heat transfer characteristic; Utilize to obtain R Cable Structure surface temperature measured data and " HBE Cable Structure is along the thickness temperature measured data " in the moment of Cable Structure steady temperature data; Utilize the thermal conduction study computation model (for example finite element model) of Cable Structure; Obtain Temperature Distribution through conventional Calculation of Heat Transfer (for example finite element method) in the Cable Structure in the moment that obtains Cable Structure steady temperature data; This moment, calculated by stable state in the temperature field of Cable Structure; The temperature profile data in the Cable Structure in the moment that obtains Cable Structure steady temperature data that calculates comprises the accounting temperature of R Cable Structure surface point on the Cable Structure; The accounting temperature of R Cable Structure surface point is called R Cable Structure stable state surface temperature computational data; The accounting temperature that also comprises HBE " measuring the point of Cable Structure " that Cable Structure is selected in front along the temperature profile data of thickness; The accounting temperature of HBE " measuring the point of Cable Structure along the temperature profile data of thickness " is called " HBE Cable Structure is along thickness temperature computation data "; When R Cable Structure surface temperature measured data and R Cable Structure stable state surface temperature computational data correspondent equal, and when " HBE Cable Structure is along thickness temperature measured data " and " HBE Cable Structure is along thickness temperature computation data " correspondent equal, the temperature profile data in the Cable Structure in moment of acquisition Cable Structure steady temperature data that calculates is called " Cable Structure steady temperature data " in the method; This moment " R Cable Structure surface temperature measured data " is called " R Cable Structure stable state surface temperature measured data ", and " HBE Cable Structure is along thickness temperature measured data " is called " HBE Cable Structure is along thickness steady temperature measured data ".When on the surface of Cable Structure, getting " R Cable Structure surface point "; The quantity of " R Cable Structure surface point " and necessary three conditions that satisfy that distribute; First condition is when the Cable Structure temperature field is in stable state; When on the Cable Structure surface arbitrarily the temperature of any be through " R Cable Structure surface point " in the Cable Structure surface on the observed temperature linear interpolation of the adjacent point in this arbitrfary point when obtaining, on the Cable Structure surface that linear interpolation obtains on the temperature of this arbitrfary point and the Cable Structure surface error of the actual temperature of this arbitrfary point be not more than 5%; The Cable Structure surface comprises supporting rope surface; Second condition is that the quantity at the point of same sea level elevation is not less than 4 in " R Cable Structure surface point ", and the point in same sea level elevation is uniformly distributed with along the Cable Structure surface in " R Cable Structure surface point "; Maximal value Δ h in the absolute value of the difference of the sea level elevation of all adjacent in twos Cable Structure surface points of " R Cable Structure surface point " coastal degree of lifting is not more than 0.2 ℃ divided by Δ T hThe numerical value that obtains is for Δ T is got in convenient narration hUnit be ℃/m that the unit of getting Δ h for convenient narration is m; The definition of the adjacent in twos Cable Structure surface point of " R Cable Structure surface point " coastal degree of lifting is meant when only considering sea level elevation; In " R Cable Structure surface point ", do not have a Cable Structure surface point, the sea level elevation numerical value of this Cable Structure surface point is between the sea level elevation numerical value of adjacent Cable Structure surface point in twos; The 3rd condition is to inquire about or calculate the Cable Structure location and belong to the interval rule at sunshine of height above sea level by the meteorology routine; Again according to the geometric properties and the bearing data of Cable Structure; On Cable Structure, find the position of those surface points that receive the sunshine-duration fullest whole year, having a Cable Structure surface point in " R Cable Structure surface point " at least is a point in annual those surface points that receive the sunshine-duration fullest on the Cable Structure.
Second step: set up initial Mechanics Calculation benchmark model A o
In Cable Structure completion; Perhaps before setting up health monitoring (damaged cable identification) system; Calculating " Cable Structure steady temperature data " according to " the temperature survey calculating method of the Cable Structure of this method " measurement (can use conventional thermometry to measure; For example use thermal resistance to measure), this moment " Cable Structure steady temperature data " are used vector T oExpression is called initial Cable Structure steady temperature data vector T oObtain T in actual measurement oThe time, just at the synchronization in the moment that obtains initial Cable Structure steady temperature data vector, use conventional method directly to measure the initial value of all monitored amounts that calculate Cable Structure, form monitored amount initial value vector C o
Can be specifically in this method according to the synchronization of following method in the moment that obtains so-and-so Cable Structure steady temperature data vector such as (for example initial or current); Use so-and-so method measurement to calculate the data of the monitored amount of so-and-so measured amount (for example all monitored amounts of Cable Structure): in survey record temperature (comprising that Cable Structure belongs to the temperature and the Cable Structure surface temperature of the sunny slope of the temperature of environment, reference plate); For example every at a distance from temperature of 10 minutes survey records, equally also every so simultaneously at a distance from 10 minutes the monitored amount of so-and-so measured amount of survey record (for example all monitored amounts of Cable Structure) data.In case confirmed to obtain the moment of Cable Structure steady temperature data; Data with the monitored amount of so-and-so measured amount (for example all monitored amounts of Cable Structure) of the moment synchronization that obtains Cable Structure steady temperature data just are called the synchronization in the moment that obtains Cable Structure steady temperature data so, use so-and-so method to measure the data of the monitored amount of so-and-so measured amount that computing method obtain.
Use conventional method (consult reference materials or survey) to obtain the temperature variant physical parameter (for example thermal expansivity) and the mechanical property parameters (for example elastic modulus, Poisson ratio) of the employed various materials of Cable Structure; Obtain initial Cable Structure steady temperature data vector T in actual measurement oSynchronization, directly measure the initial Suo Li that calculates all supporting ropes, form initial rope force vector F oAccording to Cable Structure design data, completion data obtain that all supporting ropes are in free state that Suo Li is 0 o'clock a length, the weight of cross-sectional area during in free state and the unit length during in free state; And the temperature of all supporting ropes when obtaining these three kinds of data; Utilize the temperature variant physical function parameter and the mechanical property parameters of all supporting ropes on this basis, obtain all supporting ropes at initial Cable Structure steady temperature data vector T according to conventional physical computing oSuo Li under the condition is that length, the Suo Li of 0 o'clock all supporting rope is that 0 o'clock all cross-sectional area and Suo Li that supports ropes is the weight of the unit length of 0 o'clock all supporting rope, forms the initial drift vector l of supporting rope successively o, initial free cross-sectional area vector A oWeight vector ω with initial free unit length o, the initial drift vector l of supporting rope o, initial free cross-sectional area vector A oWeight vector ω with initial free unit length oThe coding rule and initial rope force vector F of element oThe coding rule of element identical.Calculate initial Cable Structure steady temperature data vector T in actual measurement oThe time, just at the synchronization in the moment that obtains Cable Structure steady temperature data, use the conventional method actual measurement to calculate the actual measurement computational data of Cable Structure.The actual measurement computational data of Cable Structure comprises that the Non-Destructive Testing data that support rope etc. can express measured datas such as the initial geometric data of data, Cable Structure of the health status of rope, rope force data, draw-bar pull data, initial Cable Structure support coordinate data, Cable Structure bearing initial angle displacement measurement data, Cable Structure modal data, Cable Structure strain data, Cable Structure angle measurement data, Cable Structure volume coordinate measurement data.Initial Cable Structure support coordinate data refer to the support coordinate data under the Cable Structure design point, and Cable Structure bearing initial angle displacement measurement data refer to setting up initial Mechanics Calculation benchmark model A oThe time, the Cable Structure bearing is with respect to the angular displacement that bearing took place under the Cable Structure design point.The initial geometric data of Cable Structure can be the spatial data that the spatial data of the end points of all ropes adds a series of point on the Cable Structure, and purpose is to confirm according to these coordinate datas the geometric properties of Cable Structure.As far as cable-stayed bridge, the spatial data that initial geometric data can be the end points of all ropes adds the spatial data of some points on the bridge two ends, so-called bridge type data that Here it is.The Non-Destructive Testing data of utilization supporting rope etc. can be expressed the data and the Cable Structure bearing initial angle displacement measurement data of the health status of supporting rope and set up by evaluation object initial damage vector d oD is used in (shown in (1)) oThe expression Cable Structure is (with initial Mechanics Calculation benchmark model A oThe expression) by the initial health of evaluation object.If when not supporting Non-Destructive Testing data and other of rope and can express the data of health status of supporting rope, can think that perhaps the Cable Structure original state is a not damaged when not having relaxed state, vectorial d oIn get 0 with each element numerical value of supporting Suo Xiangguan, if there are not Cable Structure bearing initial angle displacement measurement data or can think that the displacement of Cable Structure bearing initial angle is at 0 o'clock, vectorial d oIn each element numerical value relevant with the angular displacement of Cable Structure bearing get 0.Utilize the measured data of design drawing, as-constructed drawing and the initial Cable Structure of Cable Structure, the Non-Destructive Testing data of supporting rope, temperature variant physics and the mechanical property parameters and the initial Cable Structure steady temperature data vector T of the employed various materials of Cable Structure o, utilize mechanics method (for example finite element method) to count " Cable Structure steady temperature data " and set up initial Mechanics Calculation benchmark model A o
No matter which kind of method to obtain initial Mechanics Calculation benchmark model A with o, counting " Cable Structure steady temperature data " (is initial Cable Structure steady temperature data vector T o), based on A oThe Cable Structure computational data that calculates must be very near its measured data, and error generally must not be greater than 5%.Can guarantee to utilize A like this oSuo Li computational data, strain computational data, Cable Structure shape computational data and displacement computational data under the analog case of calculating gained, Cable Structure angle-data, Cable Structure spatial data etc., the measured data when truly taking place near institute's analog case reliably.Model A oIn used by evaluation object initial damage vector d by the health status of evaluation object oExpression, Cable Structure steady temperature data are with initial Cable Structure steady temperature data vector T oExpression.Because based on A oThe evaluation that calculates all monitored amounts is very near the initial value (actual measurement obtains) of all monitored amounts, so also can be used in A oThe basis on, carry out Mechanics Calculation obtains, A oThe evaluation of each monitored amount form monitored amount initial value vector C oCorresponding to A o" Cable Structure steady temperature data " be exactly " initial Cable Structure steady temperature data vector T o"; Corresponding to A oUsed by the evaluation object health status by evaluation object initial damage vector d oExpression; Corresponding to A oThe initial value of all monitored amounts with monitored amount initial value vector C oExpression.T oAnd d oBe A oParameter, C oAlso can be by A oMechanics Calculation result form.
The 3rd step: set up current initial Mechanics Calculation benchmark model A for the first time t o, the current initial value of monitored amount vector C t o" current initial Cable Structure steady temperature data vector T t o", concrete grammar is: at initial time, promptly set up for the first time current initial Mechanics Calculation benchmark model A t oWith the current initial value vector of monitored amount C t oThe time, A t oJust equal A o, C t oJust equal C o, A t oCorresponding " Cable Structure steady temperature data " are designated as " current initial Cable Structure steady temperature data vector T t o", (just set up for the first time A at initial time t oThe time), T t oJust equal T o, vector T t oDefinition mode and vector T oDefinition mode identical.A t oThe health status and the A of evaluation object oThe health status of evaluation object (by evaluation object initial damage vector d oExpression) identical, A in cyclic process t oThe health status of evaluation object use all the time by evaluation object initial damage vector d oExpression.T t oAnd d oBe A t oParameter, C t oBy A t oMechanics Calculation result form.
The 4th step: in Cable Structure military service process, constantly survey the current data of calculating acquisition " Cable Structure steady temperature data " according to " the temperature survey calculating method of the Cable Structure of this method " and (be called " current cable structure steady temperature data vector T t", vector T tDefinition mode and vector T oDefinition mode identical).Obtain current cable structure steady temperature data vector T in actual measurement tThe time, just obtaining current cable structure steady temperature data vector T tThe synchronization in the moment, actual measurement obtains the current measured value of all monitored amounts of Cable Structure, forms " the current numerical value vector of monitored amount C ".Obtain current cable structure steady temperature data vector T in actual measurement tThe time, to the M that increases newly 2Root sensing rope carries out Non-Destructive Testing; For example UT (Ultrasonic Testing), visual examination, infrared imaging inspection; Therefrom identify and damage or lax sensing rope occur; According to monitored amount coding rule; Remove each vector that before this method, occurs and the appearance damage or the lax corresponding element of sensing rope that identify according to monitored amount coding rule numbering; The appearance damage or the lax corresponding element of sensing rope that also no longer occur in each the vector sum matrix that after this method, occurs and identify no longer comprise when this method after, mentioning the sensing rope being identified here damage or lax sensing rope occurring, no longer comprise when after this method, mentioning monitored amount here being identified that appearance damages or the Suo Li of the sensing rope that relaxes; Identify several from Cable Structure and damage or lax sensing rope occur, just with M 2Reduce same quantity with M.Obtain current cable structure steady temperature data vector T in actual measurement tSynchronization, actual measurement obtains all M in the Cable Structure 1The rope force data of root supporting rope, all these rope force datas are formed current cable force vector F, the element of vectorial F and vectorial F oThe coding rule of element identical; Obtain current cable structure steady temperature data vector T in actual measurement tSynchronization, actual measurement calculates all M 1The volume coordinate of two supporting end points of root supporting rope, the volume coordinate of two supporting end points difference of component in the horizontal direction are exactly two supporting end points horizontal ranges, all M 1Two supporting end points horizontal range data of root supporting rope are formed current supporting rope two supporting end points horizontal range vector l t x, current supporting rope two supporting end points horizontal range vector l t xThe coding rule and initial rope force vector F of element oThe coding rule of element identical.
The 5th step: according to current cable structure steady temperature data vector T t, upgrade current initial Mechanics Calculation benchmark model A where necessary t o, the current initial value of monitored amount vector C t oWith current initial Cable Structure steady temperature data vector T t oActual measurement obtains current cable structure steady temperature data vector T in the 4th step tAfter, compare T tAnd T t oIf, T tEqual T t o, then need be to A t oAnd T t oUpgrade, otherwise need be to A t oAnd T t oUpgrade, update method was undertaken by following a step to the c step:
The a step is calculated T tWith T oPoor, T tWith T oDifference be exactly of the variations of current cable structure steady temperature data about initial Cable Structure steady temperature data, T tWith T oThe difference represent that with steady temperature change vector S S equals T tDeduct T o, S representes the variation of Cable Structure steady temperature data.
The b step is to A oIn Cable Structure apply temperature variation, the numerical value of the temperature variation that applies is just taken from steady temperature change vector S, to A oIn the Cable Structure bearing apply bearing angular displacement constraint and to A oIn the temperature variation that applies of Cable Structure after the current initial Mechanics Calculation benchmark model A that obtains upgrading t o
The c step is upgraded A t oThe time, T t oAll elements numerical value also with corresponding replacement of all elements numerical value of Tt, has promptly upgraded T t o, so just obtained correctly corresponding to A t oT t oUpgrade C t oMethod be: when upgrading A t oAfter, obtain A through Mechanics Calculation t oIn concrete numerical value all monitored amounts, current, these concrete numerical value are formed C t o
The 6th step: at current initial Mechanics Calculation benchmark model A t oThe basis on carry out the several times Mechanics Calculation, through calculate obtaining Cable Structure unit damage monitored amount unit change matrix Δ C and unit damage or the vectorial D of unit angular displacement uConcrete grammar is: Cable Structure unit damage monitored amount unit change matrix Δ C brings in constant renewal in, and is promptly upgrading current initial Mechanics Calculation benchmark model A t oThe time, must upgrade Cable Structure unit damage monitored amount unit change matrix Δ C simultaneously; Current initial Mechanics Calculation benchmark model A in Cable Structure t oThe basis on carry out the several times Mechanics Calculation; Equal all on the calculation times numerical value by the quantity of evaluation object; Have N by evaluation object N calculatings just to be arranged, calculating each time supposes to have only one by evaluation object unit damage or unit angular displacement to be arranged, and is concrete; If should be a supporting rope in the cable system by evaluation object, so just hypothesis should support rope at vectorial d oOn the basis of the existing damage of this supporting rope of expression unit damage (for example getting 5%, 10%, 20% or 30% equivalent damage is unit damage) is arranged again; If should be by evaluation object be the angular displacement component of a direction of a bearing, just suppose this bearing at this sense of displacement at vectorial d oUnit angular displacement (for example get 100,000/radian, 2/100000ths radians, 3/100000ths radians etc. and be the unit angular displacement) takes place on the basis of the existing angular displacement of this bearing of expression again, uses D UkWrite down this unit damage or unit angular displacement, wherein k represent to take place unit damage or unit angular displacement by the numbering of evaluation object, D UkBe unit damage or the angular displacement vector D of unit uAn element, unit damage or unit angular displacement vector D uThe coding rule and the vectorial d of element oThe coding rule of element identical; Occur in calculating each time unit damage or unit angular displacement be different from by evaluation object other time occur in calculating unit damage or unit angular displacement by evaluation object; Calculate the current calculated value that all utilizes mechanics method to calculate all monitored amounts of Cable Structure each time; The current calculated value of the monitored amount of all that calculate is each time formed a monitored amount calculation current vector C, the element coding rule of monitored amount calculation current vector and monitored amount initial value vector C oThe element coding rule identical; The monitored amount calculation current vector C that calculates each time deducts the current initial value vector of monitored amount C t oAfter calculate unit damage or the unit angular displacement numerical value supposed divided by this time again, obtain a monitored amount unit change vector, have N N monitored amount unit change vector just to be arranged by evaluation object; Form the unit damage monitored amount unit change matrix Δ C that the N row are arranged successively by this N monitored amount unit change vector; Each row of unit damage monitored amount unit change matrix are corresponding to a monitored amount unit change vector, each row of Cable Structure unit damage monitored amount unit change matrix Δ C corresponding to same monitored amount in the different unit change amplitude of difference during by evaluation object generation unit damage or unit angular displacement; The coding rule and the vectorial d of the row of Cable Structure unit damage monitored amount unit change matrix Δ C oThe coding rule of element identical, the coding rule of the row of Cable Structure unit damage monitored amount unit change matrix Δ C is identical with the coding rule of M monitored amount.
The 7th step: set up linear relationship error vector e and vectorial g.Utilize data (the current initial value vector of the monitored amount C of front t o, unit damage monitored amount unit change matrix Δ C), when the 6th step calculated each time, promptly have only one by the increase unit damage of evaluation object or the angular displacement D of unit in by evaluation object calculating hypothesis each time UkIncrease in calculating each time unit damage or unit angular displacement be different from by evaluation object other time increase in calculating unit damage or unit angular displacement by evaluation object; Calculate the current numerical value that all utilizes mechanics method (for example adopting finite element method) to calculate all monitored amounts in the Cable Structure each time; When calculate forming a monitored amount calculation current vector C each time; Calculate to form a vectorial d of damage each time, originally walk out of existing damage vector d, damage in all elements of vectorial d and have only the numerical value of an element to get D only in this step use Uk, the numerical value of other element gets 0, damages the coding rule and the vectorial d of the element of vectorial d oThe coding rule of element identical; With C, C t o, Δ C, D u, d brings formula (11) into, obtains a linear relationship error vector e, calculates a linear relationship error vector e each time; There is N N calculating just to be arranged by evaluation object; N linear relationship error vector e just arranged; With obtaining a vector after this N the linear relationship error vector e addition, the new vector that each element of this vector is obtained after divided by N is exactly final linear relationship error vector e.Vector g equals final error vector e.
The 8th step: the hardware components of pass line structural healthy monitoring system.Hardware components comprises at least: monitored amount monitoring system (for example containing cable force measurement system, signal conditioner etc.), Cable Structure temperature monitoring system (containing temperature sensor, signal conditioner etc.) and Cable Structure ambient temperature measurement system (containing temperature sensor, signal conditioner etc.), signal (data) collector, the computing machine and the panalarm of communicating by letter.Each monitored amount, each temperature all must arrive by monitored system monitoring, and monitoring system is transferred to signal (data) collector with the signal that monitors; Signal is delivered to computing machine through signal picker; Computing machine then be responsible for the operation Cable Structure by the health monitoring software of evaluation object, comprise the signal that the transmission of tracer signal collector comes; When monitoring when being changed by the evaluation object health status, the computer control communication panalarm to monitor staff, owner and (or) personnel of appointment report to the police.
The 9th step: with the current initial value vector of monitored amount C t o, unit damage monitored amount unit change matrix Δ C, unit damage or the angular displacement vector D of unit uParameter is kept on the hard disc of computer of operation health monitoring systems software with the mode of data file.
The tenth step: establishment and problem rope and the bearing angular displacement recognition methods system software of installation and operation temperature variation cable force monitoring on computers, this software will be accomplished functions such as monitoring that this method " the problem rope of temperature variation cable force monitoring and bearing angular displacement recognition methods " required by task wants, record, control, storage, calculating, notice, warning (be in this practical implementation method all can with the work of computing machine completion)
The 11 step: the current numerical value vector of the monitored amount of foundation C is with the current initial value vector of monitored amount C t o, unit damage monitored amount unit change matrix Δ C, unit damage or the angular displacement vector D of unit uWith by the linear approximate relationship (formula (8)) that exists between the vectorial d of the current name damage of evaluation object (forming) by all Suo Dangqian name amount of damage; Calculate by the noninferior solution of the vectorial d of the current name damage of evaluation object according to multi-objective optimization algorithm, just have reasonable error but can from all ropes, confirm the position of damaged cable and separating of nominal degree of injury thereof more exactly.
The multi-objective optimization algorithm that can adopt has a variety of, for example: based on the multiple-objection optimization of genetic algorithm, based on the multiple-objection optimization of artificial neural network, based on the multi-objective optimization algorithm of population, multiple-objection optimization, leash law (Constrain Method), weighted method (Weighted Sum Method), goal programming method (Goal Attainment Method) or the like based on ant group algorithm.Because various multi-objective optimization algorithms all are conventional algorithms; Can realize easily; This implementation step is that example provides the process of finding the solution the vectorial d of current damage with the goal programming method only, and the concrete implementation procedure of other algorithm can realize according to the requirement of its specific algorithm in a similar fashion.
According to the goal programming method; Formula (8) can transform the multi-objective optimization question shown in an accepted way of doing sth (27) and the formula (28); γ is a real number in the formula (27); R is a real number field, and area of space Ω has limited the span (each element of present embodiment requirements vector d is not less than 0, is not more than 1) of each element of vectorial d.The meaning of formula (27) is to seek the real number γ of a minimum, makes formula (28) be met.G (d) is defined by formula (29) in the formula (28), the deviation that allows between middle G (d) of the product representation formula (28) of weighing vector W and γ and the vectorial g in the formula (28), and the definition of g is referring to formula (13), and its value calculates in the 7th step.Vector W can be identical with vectorial g during actual computation.The concrete programming of goal programming method realizes having had universal program directly to adopt.Use the goal programming method just can damage vectorial d in the hope of the current name of evaluation object.
min imize γ γ ∈ R , d ∈ Ω - - - ( 27 )
G(d)-Wγ≤g (28)
G ( d ) = abs ( ΔC · d - C + C o t ) - - - ( 29 )
Element number by the vectorial d of the current name damage of evaluation object equals by the quantity of evaluation object; By the element of the vectorial d of the current name damage of evaluation object be one-to-one relationship between the evaluation object, represent correspondence by the nominal degree of injury of evaluation object or nominal angular displacement by the element numerical value of the vectorial d of the current name damage of evaluation object; The coding rule and the vectorial d of the element of vector d oThe coding rule of element identical.
The 12 step: definition is by the current actual damage vector of evaluation object d a, by the current actual damage vector of evaluation object d aElement number equal by the quantity of evaluation object, by the current actual damage of evaluation object vector d aElement and be one-to-one relationship between the evaluation object, by the current actual damage of evaluation object vector d aElement numerical value represent corresponding by the actual damage degree or the actual displacement angle of evaluation object; Vector d aThe coding rule and the vectorial d of element oThe coding rule of element identical.Utilize that formula (15) expresses by the current actual damage vector of evaluation object d aK element d a kTogether by evaluation object initial damage vector d oK element d OkWith k the element d that is damaged vectorial d by the current name of evaluation object kBetween relation, calculate by the current actual damage of evaluation object vector d aAll elements; d a kRepresent k by the current actual health status of evaluation object, if should be supporting rope, a d so in the cable system by evaluation object a kRepresent its current actual damage, d a kBe to represent that its corresponding supporting rope did not have health problem, d at 0 o'clock a kNumerical value is not to represent that the supporting rope that its corresponding supporting rope is the unsoundness problem, the supporting Suo Keneng of unsoundness problem were slack lines, also possibly are damaged cable at 0 o'clock, its numerical response the degree of lax or damage; If should be angular displacement component, a d so of a bearing by evaluation object a kRepresent its current actual displacement angle numerical value; So according to by the current actual damage of evaluation object vector d aCan define which the supporting rope unsoundness problem and order of severity thereof, define which bearing angular displacement and numerical value thereof have taken place; So far realized the bearing angular displacement identification of Cable Structure.
The 13 step: will be by the current actual damage vector of evaluation object d aIn with the supporting Suo Xiangguan M 1Individual element takes out, and forms supporting Suo Dangqian actual damage vector d Ca, supporting Suo Dangqian actual damage vector d CaThe coding rule and initial rope force vector F of element oThe coding rule of element identical.Supporting Suo Dangqian actual damage vector d CaH element representation Cable Structure in the current actual damage amount of h root supporting rope, h=1,2,3 ...., M 1Supporting Suo Dangqian actual damage vector d CaIn numerical value be not 0 element supporting rope corresponding to the unsoundness problem, from the supporting rope of these unsoundness problems, identify damaged cable, remaining is exactly slack line.The method of differentiating is varied; Can pass through the protective seam of the supporting rope of removal unsoundness problem; To the visual discriminating of supporting Suo Jinhang; Perhaps carry out visual discriminating by optical imaging apparatus, also can be through lossless detection method to supporting rope impaired discriminating the whether, UT (Ultrasonic Testing) is exactly a kind of present widely used lossless detection method.Those do not find that supporting rope that damage, the unsoundness problem is exactly that lax rope has taken place to differentiate the back, need adjust the rope of Suo Li exactly, are exactly slack line, and these ropes that need adjust Suo Li are at supporting Suo Dangqian actual damage vector d CaIn pairing element numerical value (for example one of them element can be used d Ca hExpression) slack line has just been confirmed in expression and these degree of injury that supports the relax level mechanics equivalence of ropes thus, and the computing method of concrete slack are explained below.According to supporting Suo Dangqian actual damage vector d Ca, from the supporting rope of unsoundness problem, identify slack line after, remaining is exactly damaged cable, these damaged cables are at supporting Suo Dangqian actual damage vector d CaThe numerical value of the element of middle correspondence is just represented its degree of injury; The numerical value of corresponding element is to represent that this supporting rope thoroughly lost load-bearing capacity at 100% o'clock; Represent the load-bearing capacity of this supporting rope forfeiture corresponding proportion in the time of between 0 and 100%, so far just identified damaged cable and degree of injury thereof.
The 14 step: be utilized in current cable structure steady temperature data vector T tThe supporting Suo Dangqian actual damage vector d that obtains in the 13 step under the condition CaObtain slack line and the current actual equivalent damage degree equivalence of its relax level mechanics, be utilized in that the 4th step obtained at current cable structure steady temperature data vector T tCurrent cable force vector F under the condition and current supporting rope two supporting end points horizontal range vector l t x, be utilized in that second step obtained at initial Cable Structure steady temperature data vector T oThe initial drift vector l of the supporting rope under the condition o, initial free cross-sectional area vector A oWeight vector ω with initial free unit length o, utilize current cable structure steady temperature data vector T tThe supporting Suo Dangqian steady temperature data of expression, be utilized in that second step obtained at initial Cable Structure steady temperature data vector T oThe supporting rope initial steady state temperature data of expression; Be utilized in the temperature variant physics and the mechanical property parameters of the employed various materials of Cable Structure of second step acquisition; Count the influence of temperature variation to supporting rope physics, mechanics and geometric parameter; Through with slack line with damaged cable carry out the mechanics equivalence calculate slack line, with the relax level of current actual equivalent damage degree equivalence, the mechanical condition of equivalence is: one, the mechanics parameters of lax initial drift, geometrical property parameter, density and the material during with not damaged of the nothing of the rope of two equivalences is identical; Two, after the lax or damage, the Suo Li of the slack line of two equivalences and damage rope be out of shape after length overall identical.When satisfying above-mentioned two equivalent conditions, the such mechanics function of two support cables in Cable Structure is exactly identical, if after promptly replacing damaged cable with the slack line of equivalence, Cable Structure any variation can not take place, vice versa.Try to achieve the relax level that those are judged as slack line according to aforementioned mechanics equivalent condition, relax level is exactly the change amount of supporting rope drift, has just confirmed the long adjustment amount of rope of the supporting rope that those need adjust Suo Li.Particularly can be in the hope of the relax level (being the long adjustment amount of rope) of these ropes according to formula (25) or formula (26).So just realized the lax identification of supporting rope.So far damaged cable, slack line and bearing angular displacement have just all been discerned.
The 15 step: the computing machine in the health monitoring systems regularly generates cable system health condition form automatically or by the personnel operation health monitoring systems.
The 16 step: under specified requirements, the automatic operation communication panalarm of the computing machine in the health monitoring systems to monitor staff, owner and (or) personnel of appointment report to the police.
The 17 the step: got back to for the 4th step, the beginning by the 4th go on foot the 17 the step circulation.

Claims (1)

1. the problem rope of a temperature variation cable force monitoring and bearing angular displacement recognition methods is characterized in that said method comprises:
A. for for the purpose of narration is convenient, this method is unified claims that the supporting rope of being assessed is that establishing the quantity of the supporting rope of being assessed and the quantity sum of bearing angular displacement component is N, is N by the quantity of evaluation object promptly by evaluation object with the bearing angular displacement component; Confirm that by the coding rule of evaluation object with all being numbered by evaluation object in the Cable Structure, this numbering will be used to generate the vector sum matrix in subsequent step by this rule; This method is represented this numbering with variable k, k=1, and 2,3 ..., N; If total M in the cable system 1Root supporting rope, Cable Structure rope force data comprises this M 1The Suo Li of root supporting rope, obviously M 1Less than by the quantity N of evaluation object; Only pass through M 1The M of individual supporting rope 1It is impossible by the state of evaluation object that individual rope force data is found the solution unknown N, and this method is at the whole M of monitoring 1On the basis of root supporting cable force, the artificial M that increases on Cable Structure 2The root rope is called the sensing rope, in the cable structure health monitoring process, will monitor the M that this increases newly 2The Suo Li of root sensing rope; Comprehensive above-mentioned monitored amount, M Suo Li of the total M root rope of whole Cable Structure is monitored, and M monitored amount promptly arranged, and wherein M is M 1With M 2Sum; M should be greater than by the quantity N of evaluation object; The M that increases newly 2The rigidity of root sensing rope is compared with the rigidity of any supporting rope of Cable Structure, should be little many; The M that increases newly 2The Suo Li of each sensing rope of root sensing rope should than the Suo Lixiao of any supporting rope of Cable Structure many, even can guarantee the M that this increases newly like this 2Damage or lax has appearred in root sensing rope, and is very little to the influence of the stress of other members of Cable Structure, strain, distortion; The M that increases newly 2Normal stress should be less than its fatigue limit on the xsect of root sensing rope, and these requirements can guarantee the M that increases newly 2Fatigue damage can not take place in root sensing rope; The M that increases newly 2The fully anchoring of two ends of root sensing rope guarantees can not occur relaxing; The M that increases newly 2Root sensing rope should obtain sufficient anti-corrosion protection, guarantees the M that increases newly 2Damage and lax can not take place in root sensing rope; For simplicity, in the method " all monitored parameters of Cable Structure " are abbreviated as " monitored amount "; Give M monitored amount serial number, this method is with representing this numbering with variable j, j=1, and 2,3 ..., M, this numbering will be used to generate the vector sum matrix in subsequent step; The M that increases newly in the method 2Root sensing rope is as the part of Cable Structure, and when back literary composition was mentioned Cable Structure again, Cable Structure comprises increased M 2Cable Structure before the root sensing rope and the M that increases newly 2Root sensing rope that is to say that the back literary composition refers to comprise the M that increases newly when mentioning Cable Structure 2The Cable Structure of root sensing rope; Therefore when the back literary composition was mentioned and calculated " Cable Structure steady temperature data " according to " the temperature survey method of calculatinging of the Cable Structure of this method " measurement, Cable Structure wherein comprised the M that increases newly 2Root sensing rope, " the Cable Structure steady temperature data " that obtain comprise the M that increases newly 2The steady temperature data of root sensing rope obtain the M that increases newly 2The method of the steady temperature data of root sensing rope is same as the M of Cable Structure 1The preparation method of the steady temperature data of root supporting rope, literary composition is handed over no longer one by one in the back; Measure the M that increases newly 2The method of the Suo Li of root sensing rope is same as the M of Cable Structure 1The rope force measurement method of root supporting rope, literary composition is handed over no longer one by one in the back; During to any measurement of supporting Suo Jinhang of Cable Structure, the M to increasing newly simultaneously 2Root sensing rope carries out same measurement, and literary composition is handed over no longer one by one in the back; The M that increases newly 2Damage except not taking place and relaxing, to the M that increases newly in root sensing rope 2The requirement of the quantity of information of root sensing rope is identical with the requirement and the preparation method of the quantity of information of the supporting rope of Cable Structure with preparation method, and literary composition is handed over no longer one by one in the back; When the various mechanical model of Cable Structure set up in literary composition in the back, with the M that increases newly 2Root sensing rope is treated as the supporting rope of Cable Structure and is treated; Below, except the damage and lax occasion of mentioning the supporting rope, said supporting rope comprises the supporting rope of Cable Structure and the M that increases newly when mentioning the supporting rope 2Root sensing rope; Must not be greater than 30 minutes in this method to the time interval between any twice measurement of same amount monitoring in real time, the moment of survey record data is called the physical record data constantly;
B. this method definition " the temperature survey calculating method of the Cable Structure of this method " set by step b1 to b3 carry out;
B1: inquiry or actual measurement obtain the temperature variant thermal conduction study parameter of Cable Structure composition material and Cable Structure environment of living in; Utilize the geometry measured data of design drawing, as-constructed drawing and the Cable Structure of Cable Structure, utilize these data and parameter to set up the thermal conduction study computation model of Cable Structure; Inquiry Cable Structure location is no less than the meteorological data in recent years in 2 years; Cloudy quantity in statistics obtains during this period of time is designated as T cloudy day; One be called the cloudy day all day with what can not see the sun daytime in the method; Statistics obtain in T cloudy day each cloudy day 0 up to the sunrise next day highest temperature and the lowest temperature between back 30 minutes constantly, sunrise is meant the sunrise moment on the meteorology that base area revolutions and revolution rule confirm constantly, does not represent necessarily can see the sun same day; The sunrise that can inquire about data or calculate each required day through conventional meteorology constantly; Each cloudy day 0 up to next day sunrise constantly the highest temperature between back 30 minutes deduct the maximum temperature difference that the lowest temperature is called this cloudy daily temperature, T cloudy day arranged, the maximum temperature difference of T cloudy daily temperature is just arranged; Get maximal value in the maximum temperature difference of daily temperature at T cloudy day for reference to temperature difference per day, be designated as Δ T with reference to temperature difference per day rInquiry Cable Structure location and height above sea level interval, place be no less than temperature that meteorological data in recent years or the actual measurement in 2 years obtain Cable Structure environment of living in time with change of elevation data and Changing Pattern, calculate Cable Structure location and height above sea level interval, place and be no less than the temperature of Cable Structure environment of living in recent years in 2 years about the maximum rate of change Δ T of sea level elevation h, for Δ T is got in convenient narration hUnit be ℃/m; On the surface of Cable Structure, get " R Cable Structure surface point "; Getting the concrete principle of " R Cable Structure surface point " narrates in step b3; The back will obtain the temperature of this R Cable Structure surface point through actual measurement; Claim that the temperature data that actual measurement obtains is " R Cable Structure surface temperature measured data "; If utilize the thermal conduction study computation model of Cable Structure, obtain the temperature of this R Cable Structure surface point through Calculation of Heat Transfer, just claim that the temperature data that calculates is " R Cable Structure surface temperature computational data "; From the residing minimum height above sea level of Cable Structure to the highest height above sea level; On Cable Structure, be uniformly distributed with to choose and be no less than three different altitude above sea level, at each sea level elevation place that chooses, choose two points at least at the intersection place on surface level and Cable Structure surface, from the outer normal of selected point straw line body structure surface; All outer normal directions of choosing are called " measuring the direction of Cable Structure along the Temperature Distribution of wall thickness "; It is crossing with " intersection on surface level and Cable Structure surface " along the direction of the Temperature Distribution of wall thickness to measure Cable Structure, and in the shade the outer normal direction of the measurement Cable Structure of choosing along sunny slope outer normal direction that must comprise Cable Structure in the direction of the Temperature Distribution of wall thickness and Cable Structure, the direction along each measurement Cable Structure along the Temperature Distribution of wall thickness is uniformly distributed with to choose in Cable Structure and is no less than three points; Special; Measure Cable Structure for the supporting rope along each and only get a point, promptly only measure the temperature of the surface point of supporting rope, measure all and be selected temperature a little along the direction of the Temperature Distribution of wall thickness; The temperature that records is called " Cable Structure is along the temperature profile data of thickness ";, wherein edge and same " intersection on surface level and Cable Structure surface " " Cable Structure is along temperature profile data of thickness " crossing, " measuring the direction of Cable Structure along the Temperature Distribution of wall thickness " measurement acquisition are called " identical sea level elevation Cable Structure is along the temperature profile data of thickness " in the method; If chosen H different altitude above sea level; At each sea level elevation place, chosen B the direction of measuring Cable Structure along the Temperature Distribution of wall thickness, measure Cable Structure along each and in Cable Structure, chosen E point along the direction of the Temperature Distribution of wall thickness; Wherein H and E are not less than 3; B is not less than 2, and is special, and E equals 1 for the supporting rope; That " measures the point of Cable Structure along the temperature profile data of thickness " on the meter Cable Structure adds up to HBE; The back will obtain the temperature of this HBE " measuring the point of Cable Structure along the temperature profile data of thickness " through actual measurement, claim to survey the temperature data that obtains and will be " HBE Cable Structure is along thickness temperature measured data ", if utilize the thermal conduction study computation model of Cable Structure; Obtain this HBE the temperature of measuring Cable Structure along the point of the temperature profile data of thickness through Calculation of Heat Transfer, just claim that the temperature data that calculates is " HBE Cable Structure is along thickness temperature computation data "; Will be in this method " at the number temperature profile data of each sea level elevation place that chooses " identical sea level elevation Cable Structure is along the temperature profile data of thickness "; Measure temperature in the Cable Structure location according to meteorology and require to choose a position, will obtain meeting the temperature that meteorology is measured the Cable Structure place environment of temperature requirement in this position actual measurement; The place of blocking chooses a position in the on-site spacious nothing of Cable Structure; This position should can both obtain in each day of the whole year this ground sunshine of fullest of getable this day, the flat board at a carbon steel material of this position of sound production is called reference plate; Reference plate can not contact with ground; Reference plate overhead distance is not less than 1.5 meters, and the one side of this reference plate is called sunny slope on the sunny side; The sunny slope of reference plate is coarse and dark color; The sunny slope of reference plate should can both obtain in each day of the whole year one flat plate on this ground sunshine of fullest of getable this day, the non-sunny slope of reference plate is covered with insulation material, monitoring is in real time obtained the temperature of the sunny slope of reference plate;
B2: monitoring in real time obtains R Cable Structure surface temperature measured data of above-mentioned R Cable Structure surface point; Monitoring in real time simultaneously obtains the temperature profile data of the Cable Structure of front definition along thickness, and monitoring in real time simultaneously obtains meeting the temperature record that meteorology is measured the Cable Structure place environment of temperature requirement; Obtain being carved at sunrise the same day sunrise next day temperature measured data sequence of the place of the Cable Structure between back 30 minutes environment constantly through real-time monitoring; The temperature measured data sequence of Cable Structure place environment by be carved at sunrise the same day sunrise next day constantly the temperature measured data of the place of the Cable Structure between back 30 minutes environment according to the time order and function series arrangement; Find maximum temperature and minimum temperature in the temperature measured data sequence of Cable Structure place environment; Deduct with the maximum temperature in the temperature measured data sequence of Cable Structure place environment and to be carved into the sunrise next day maximum temperature difference between back 30 minutes constantly at sunrise on same day that minimum temperature obtains Cable Structure place environment; Be called the environment maximum temperature difference, be designated as Δ T EmaxThe temperature that obtains Cable Structure place environment through conventional mathematical computations by the temperature measured data sequence of Cable Structure place environment is about the change of time rate, and this rate of change is also along with the time changes; Obtain being carved at sunrise the same day sunrise next day measured data sequence of the temperature of the sunny slope of the reference plate between back 30 minutes constantly through real-time monitoring; The measured data sequence of the temperature of the sunny slope of reference plate by be carved at sunrise the same day next day sunrise constantly the measured data of the temperature of the sunny slope of the reference plate between back 30 minutes according to the time order and function series arrangement; Find maximum temperature and minimum temperature in the measured data sequence of temperature of sunny slope of reference plate; Deduct with the maximum temperature in the measured data sequence of the temperature of the sunny slope of reference plate and to be carved into the sunrise next day maximum temperature difference between back 30 minutes constantly at sunrise on same day of temperature that minimum temperature obtains the sunny slope of reference plate; Be called the reference plate maximum temperature difference, be designated as Δ T PmaxObtain being carved at sunrise the same day sunrise next day Cable Structure surface temperature measured data sequence of all R Cable Structure surface points between back 30 minutes constantly through real-time monitoring; There is R Cable Structure surface point that R Cable Structure surface temperature measured data sequence just arranged; Each Cable Structure surface temperature measured data sequence by be carved at sunrise on same day of a Cable Structure surface point sunrise next day constantly the Cable Structure surface temperature measured data between back 30 minutes according to the time order and function series arrangement; Find maximum temperature and minimum temperature in each Cable Structure surface temperature measured data sequence; Deduct with the maximum temperature in each Cable Structure surface temperature measured data sequence and to be carved into the sunrise next day maximum temperature difference between back 30 minutes constantly at sunrise on same day that minimum temperature obtains the temperature of each Cable Structure surface point; There is R Cable Structure surface point just to have and be carved into the sunrise next day maximum temperature difference numerical value between back 30 minutes constantly R the same day at sunrise; Maximal value wherein is called Cable Structure surface maximum temperature difference, is designated as Δ T SmaxThe temperature that obtains each Cable Structure surface point through conventional mathematical computations by each Cable Structure surface temperature measured data sequence is about the change of time rate, the temperature of each Cable Structure surface point about the change of time rate also along with the time changes; Through real-time monitoring obtain being carved at sunrise the same day sunrise next day constantly between back 30 minutes, behind synchronization, HBE " Cable Structure is along the temperature profile data of thickness "; Calculating amounts to maximum temperature and the difference of minimum temperature among the BE " identical sea level elevation Cable Structure is along the temperature profile data of thickness " at the sea level elevation place that each is chosen; The absolute value of this difference is called " identical sea level elevation place Cable Structure thickness direction maximum temperature difference "; Chosen H different altitude above sea level H " identical sea level elevation place Cable Structure thickness direction maximum temperature difference " just arranged; Claim that the maximal value in this H " identical sea level elevation place Cable Structure thickness direction maximum temperature difference " is " a Cable Structure thickness direction maximum temperature difference ", be designated as Δ T Tmax
B3: measure and calculate acquisition Cable Structure steady temperature data; At first; Confirm to obtain the moment of Cable Structure steady temperature data; The relevant condition of the moment that obtains Cable Structure steady temperature data with decision has six; To be moment of obtaining Cable Structure steady temperature data be carved into sunrise next day constantly between back 30 minutes at sunset between the same day for first condition, sunset be meant constantly on the meteorology that base area revolutions and revolution rule confirm sunset constantly, the sunset that can inquire about data or calculate each required day through conventional meteorology is constantly; The a condition of second condition be the same day be carved at sunrise next day sunrise constantly between back 30 minutes during this period of time in, reference plate maximum temperature difference Δ T PmaxWith Cable Structure surface maximum temperature difference Δ T SmaxAll be not more than 5 degrees centigrade; The b condition of second condition be the same day be carved at sunrise next day sunrise constantly between back 30 minutes during this period of time in, measure the environment maximum error Δ T that calculates in front EmaxBe not more than with reference to temperature difference per day Δ T r, and reference plate maximum temperature difference Δ T PmaxBe not more than Δ T after deducting 2 degrees centigrade Emax, and Cable Structure surface maximum temperature difference Δ T SmaxBe not more than Δ T PmaxOne that only needs to satisfy in second a condition and the b condition just is called satisfied second condition; The 3rd condition is in the moment that obtains Cable Structure steady temperature data, and the temperature of Cable Structure place environment is not more than per hour 0.1 degree centigrade about the absolute value of change of time rate; The 4th condition is in the moment that obtains Cable Structure steady temperature data, and the temperature of each the Cable Structure surface point in R Cable Structure surface point is not more than per hour 0.1 degree centigrade about the absolute value of change of time rate; The 5th condition is in the moment that obtains Cable Structure steady temperature data, and the Cable Structure surface temperature measured data of each the Cable Structure surface point in R Cable Structure surface point is the minimal value that was carved at sunrise the same day between back 30 minutes of the moment of sunrise next day; The 6th condition is at the moment that obtains Cable Structure steady temperature data, " Cable Structure thickness direction maximum temperature difference " Δ T TmaxBe not more than 1 degree centigrade; This method is utilized above-mentioned six conditions; In following three kinds of moment any one is called the mathematics of Cable Structure steady temperature data " obtain constantly "; First kind of moment is first moment to the 5th condition of satisfying in above-mentioned " with the relevant condition of the moment of decision acquisition Cable Structure steady temperature data "; Second kind of moment is the moment of only satisfying the 6th condition in above-mentioned " with the relevant condition of the moment of decision acquisition Cable Structure steady temperature data ", and the third is first moment to the 6th condition of satisfying simultaneously in above-mentioned " with the relevant condition of the moment of decision acquisition Cable Structure steady temperature data " constantly; When the mathematics that obtains Cable Structure steady temperature data is exactly in this method during physical record data in constantly constantly, the moment that obtains Cable Structure steady temperature data be exactly obtain Cable Structure steady temperature data mathematics constantly; If obtain the mathematics of Cable Structure steady temperature data and constantly is not any in constantly of physical record data in this method constantly, then get moment of mathematics those physical record data constantly that this method approaches to obtain Cable Structure steady temperature data most for obtaining the moment of Cable Structure steady temperature data; This method will be used in the amount of the moment survey record that obtains Cable Structure steady temperature data and carry out the relevant health monitoring analysis of Cable Structure; This method is approximate thinks that the Cable Structure temperature field in moment of obtaining Cable Structure steady temperature data is in stable state, and promptly this Cable Structure temperature does not constantly change in time, and this is exactly " obtaining the moment of Cable Structure steady temperature data " of this method constantly; Then; According to the Cable Structure heat transfer characteristic; Utilize " R the Cable Structure surface temperature measured data " and " HBE Cable Structure is along thickness temperature measured data " in the moment that obtains Cable Structure steady temperature data; Utilize the thermal conduction study computation model of Cable Structure; Obtain Temperature Distribution through conventional Calculation of Heat Transfer in the Cable Structure in the moment that obtains Cable Structure steady temperature data; This moment, calculated by stable state in the temperature field of Cable Structure; The temperature profile data in the Cable Structure in the moment that obtains Cable Structure steady temperature data that calculates comprises the accounting temperature of R Cable Structure surface point on the Cable Structure; The accounting temperature of R Cable Structure surface point is called R Cable Structure stable state surface temperature computational data; Also comprise the accounting temperature of HBE " measuring the point of Cable Structure along the temperature profile data of thickness " that Cable Structure is selected in front, the accounting temperature of HBE " measuring the point of Cable Structure along the temperature profile data of thickness " is called " HBE Cable Structure is along thickness temperature computation data ", when R Cable Structure surface temperature measured data and R Cable Structure stable state surface temperature computational data correspondent equal; And when " HBE Cable Structure is along thickness temperature measured data " and " HBE Cable Structure is along thickness temperature computation data " correspondent equal; The temperature profile data in the Cable Structure in the moment that obtains Cable Structure steady temperature data that calculates is called " Cable Structure steady temperature data " in the method, and this moment " R Cable Structure surface temperature measured data " is called " R Cable Structure stable state surface temperature measured data ", and " HBE Cable Structure is along thickness temperature measured data " is called " HBE Cable Structure is along thickness steady temperature measured data "; When on the surface of Cable Structure, getting " R Cable Structure surface point "; The quantity of " R Cable Structure surface point " and necessary three conditions that satisfy that distribute; First condition is when the Cable Structure temperature field is in stable state; When on the Cable Structure surface arbitrarily the temperature of any be through " R Cable Structure surface point " in the Cable Structure surface on the observed temperature linear interpolation of the adjacent point in this arbitrfary point when obtaining, on the Cable Structure surface that linear interpolation obtains on the temperature of this arbitrfary point and the Cable Structure surface error of the actual temperature of this arbitrfary point be not more than 5%; The Cable Structure surface comprises supporting rope surface; Second condition is that the quantity at the point of same sea level elevation is not less than 4 in " R Cable Structure surface point ", and the point in same sea level elevation is uniformly distributed with along the Cable Structure surface in " R Cable Structure surface point "; Maximal value Δ h in the absolute value of the difference of the sea level elevation of all adjacent in twos Cable Structure surface points of " R Cable Structure surface point " coastal degree of lifting is not more than 0.2 ℃ divided by Δ T hThe numerical value that obtains is for Δ T is got in convenient narration hUnit be ℃/m that the unit of getting Δ h for convenient narration is m; The definition of the adjacent in twos Cable Structure surface point of " R Cable Structure surface point " coastal degree of lifting is meant when only considering sea level elevation; In " R Cable Structure surface point ", do not have a Cable Structure surface point, the sea level elevation numerical value of this Cable Structure surface point is between the sea level elevation numerical value of adjacent Cable Structure surface point in twos; The 3rd condition is to inquire about or calculate the Cable Structure location and belong to the interval rule at sunshine of height above sea level by the meteorology routine; Again according to the geometric properties and the bearing data of Cable Structure; On Cable Structure, find the position of those surface points that receive the sunshine-duration fullest whole year, having a Cable Structure surface point in " R Cable Structure surface point " at least is a point in annual those surface points that receive the sunshine-duration fullest on the Cable Structure;
C. directly measure according to " the temperature survey calculating method of the Cable Structure of this method " and calculate the Cable Structure steady temperature data under the original state; Cable Structure steady temperature data under the original state are called initial Cable Structure steady temperature data, are designated as " initial Cable Structure steady temperature data vector T o"; Survey or consult reference materials and obtain the temperature variant physics and the mechanical property parameters of the employed various materials of Cable Structure; Obtain initial Cable Structure steady temperature data vector T in actual measurement oSynchronization, directly measure the initial Suo Li that calculates all supporting ropes, form initial rope force vector F oAccording to Cable Structure design data, completion data obtain that all supporting ropes are in free state that Suo Li is 0 o'clock a length, the weight of cross-sectional area during in free state and the unit length during in free state; And the temperature of all supporting ropes when obtaining these three kinds of data; Utilize the temperature variant physical function parameter and the mechanical property parameters of all supporting ropes on this basis, obtain all supporting ropes at initial Cable Structure steady temperature data vector T according to conventional physical computing oSuo Li under the condition is that length, the Suo Li of 0 o'clock all supporting rope is that 0 o'clock all cross-sectional area and Suo Li that supports ropes is the weight of the unit length of 0 o'clock all supporting rope; Form the initial drift vector of supporting rope, the weight vector of the initial free unit length of initial free cross-sectional area vector sum successively, the coding rule and initial rope force vector F of the element of the initial drift vector of supporting rope, the weight vector of the initial free unit length of initial free cross-sectional area vector sum oThe coding rule of element identical; Obtain T in actual measurement oThe time, just obtaining initial Cable Structure steady temperature data vector T oThe synchronization in the moment; Directly measure the measured data that calculates initial Cable Structure, the measured data of initial Cable Structure comprises the Non-Destructive Testing data, Cable Structure bearing initial angle displacement measurement data, the initial value of all monitored amounts, the initial rope force data of all supporting ropes, initial Cable Structure modal data, initial Cable Structure strain data, initial Cable Structure geometric data, initial Cable Structure support coordinate data, initial Cable Structure angle-data, initial Cable Structure spatial data of the health status of expressing the supporting rope; The initial value of all monitored amounts is formed monitored amount initial value vector C o, monitored amount initial value vector C oThe coding rule of coding rule and M monitored amount identical; Utilize the Non-Destructive Testing data and the Cable Structure bearing initial angle displacement measurement data of the health status that can express the supporting rope to set up by evaluation object initial damage vector d o, vectorial d oExpression is with initial Mechanics Calculation benchmark model A oThe expression Cable Structure by the initial health of evaluation object; By evaluation object initial damage vector d oElement number equal N, d oElement be one-to-one relationship by evaluation object, vectorial d oThe coding rule of element with identical by the coding rule of evaluation object; If d oSome elements corresponding be supporting rope, a d so in the cable system by evaluation object oThe numerical value of this element represent the initial damage degree of corresponding supporting rope; If the numerical value of this element is 0, represent that the pairing supporting rope of this element is intact, do not damage; If its numerical value is 100%; Represent that then the pairing supporting rope of this element has completely lost load-bearing capacity, lost the load-bearing capacity of corresponding proportion if its numerical value between 0 and 100%, is then represented this supporting rope; If d oSome elements corresponding be some angular displacement components of some bearings, d so by evaluation object oThe numerical value of this element represent the initial value of this angular displacement component of this bearing; If when not supporting Non-Destructive Testing data and other of rope and can express the data of health status of supporting rope, can think that perhaps the Cable Structure original state is a not damaged when not having relaxed state, vectorial d oIn get 0 with each element numerical value of supporting Suo Xiangguan, if there are not Cable Structure bearing initial angle displacement measurement data or can think that the displacement of Cable Structure bearing initial angle is at 0 o'clock, vectorial d oIn each element numerical value relevant with the angular displacement of Cable Structure bearing get 0; Initial Cable Structure support coordinate data refer to the support coordinate data under the Cable Structure design point, and Cable Structure bearing initial angle displacement measurement data refer to setting up initial Mechanics Calculation benchmark model A oThe time, the Cable Structure bearing is with respect to the angular displacement that bearing took place under the Cable Structure design point;
D. according to the temperature variant physics of the Non-Destructive Testing data of the measured data of the design drawing of Cable Structure, as-constructed drawing and initial Cable Structure, supporting rope, Cable Structure bearing initial angle displacement measurement data, the employed various materials of Cable Structure and mechanical property parameters, initial Cable Structure steady temperature data vector T oWith all Cable Structure data that obtain with preceding step, set up the initial Mechanics Calculation benchmark model A of the Cable Structure that counts " Cable Structure steady temperature data " o, based on A oThe Cable Structure computational data that calculates must be very near its measured data, and difference therebetween must not be greater than 5%; Corresponding to A o" Cable Structure steady temperature data " be exactly " initial Cable Structure steady temperature data vector T o"; Corresponding to A oUsed by the evaluation object health status by evaluation object initial damage vector d oExpression; Corresponding to A oThe initial value of all monitored amounts with monitored amount initial value vector C oExpression; Set up the current initial Mechanics Calculation benchmark model A of the Cable Structure that counts " Cable Structure steady temperature data " for the first time t o, the current initial value of monitored amount vector C t o" current initial Cable Structure steady temperature data vector T t o"; Set up for the first time the current initial Mechanics Calculation benchmark model A of Cable Structure t oWith the current initial value vector of monitored amount C t oThe time, the current initial Mechanics Calculation benchmark model A of Cable Structure t oJust equal the initial Mechanics Calculation benchmark model A of Cable Structure o, the current initial value vector of monitored amount C t oJust equal monitored amount initial value vector C oA t oCorresponding " Cable Structure steady temperature data " are called " current initial Cable Structure steady temperature data ", are designated as " current initial Cable Structure steady temperature data vector T t o", set up the current initial Mechanics Calculation benchmark model A of Cable Structure the first time t oThe time, T t oJust equal T oA t oBy the initial health of evaluation object and A oThe health status by evaluation object identical, also use by evaluation object initial damage vector d oExpression, A in the cyclic process of back t oUsed all the time by the initial health of evaluation object by evaluation object initial damage vector d oExpression; T oAnd d oBe A oParameter, by A oThe initial value and the C of all monitored amounts of obtaining of Mechanics Calculation result oThe initial value of all monitored amounts of expression is identical, therefore also we can say C oBy A oMechanics Calculation result form; T t oAnd d oBe A t oParameter, C t oBy A t oMechanics Calculation result form;
E. go on foot the o circulation in step from getting into here by e; In Cable Structure military service process; Constantly constantly survey and calculate the current data that obtains " Cable Structure steady temperature data " according to " the temperature survey calculating method of the Cable Structure of this method "; The current data of " Cable Structure steady temperature data " is called " current cable structure steady temperature data ", is designated as " current cable structure steady temperature data vector T t", vector T tDefinition mode and vector T oDefinition mode identical; Obtain current cable structure steady temperature data vector T in actual measurement tThe time, to the M that increases newly 2Root sensing rope carries out Non-Destructive Testing; Therefrom identify and damage or lax sensing rope occur; According to monitored amount coding rule; Remove each vector that before this method, occurs and the appearance damage or the lax corresponding element of sensing rope that identify according to monitored amount coding rule numbering; The appearance damage or the lax corresponding element of sensing rope that also no longer occur in each the vector sum matrix that after this method, occurs and identify; No longer comprise when after this method, mentioning the sensing rope here being identified damage or lax sensing rope occurring, no longer comprise the Suo Li that is identified the sensing rope that damage occurs or relax here when this method after, mentioning monitored amount; Identify several from Cable Structure and damage or lax sensing rope occur, just with M 2Reduce same quantity with M; Obtain current cable structure steady temperature data vector T in actual measurement tSynchronization, actual measurement obtains all M in the Cable Structure 1The rope force data of root supporting rope, all these rope force datas are formed current cable force vector F, the element of vectorial F and vectorial F oThe coding rule of element identical; Obtain current cable structure steady temperature data vector T in actual measurement tSynchronization, actual measurement calculates all M 1The volume coordinate of two supporting end points of root supporting rope; The volume coordinate of two the supporting end points difference of component in the horizontal direction is exactly two supporting end points horizontal ranges; Two supporting end points horizontal range data of all supporting ropes are formed current supporting rope two supporting end points horizontal range vectors, the coding rule and initial rope force vector F of the element of current supporting rope two supporting end points horizontal range vectors oThe coding rule of element identical;
F. according to current cable structure steady temperature data vector T t, upgrade current initial Mechanics Calculation benchmark model A according to step f1 to f3 t o, the current initial value of monitored amount vector C t oWith current initial Cable Structure steady temperature data vector T t o
F1. compare T tWith T t oIf, T tEqual T t o, A then t o, C t oAnd T t oRemain unchanged; Otherwise need follow these steps to A t o, U t oAnd T t oUpgrade;
F2. calculate T tWith T oPoor, T tWith T oDifference be exactly of the variations of current cable structure steady temperature data about initial Cable Structure steady temperature data, T tWith T oThe difference represent that with steady temperature change vector S S equals T tDeduct T o, S representes the variation of Cable Structure steady temperature data;
F3. to A oIn Cable Structure apply temperature variation, the numerical value of the temperature variation that applies is just taken from steady temperature change vector S, to A oIn the temperature variation that applies of Cable Structure after the current initial Mechanics Calculation benchmark model A that obtains upgrading t o, upgrade A t oThe time, T t oAll elements numerical value is also used T tCorresponding replacement of all elements numerical value, promptly upgraded T t o, so just obtained correctly corresponding to A t oT t oUpgrade C t oMethod be: when upgrading A t oAfter, obtain A through Mechanics Calculation t oIn concrete numerical value all monitored amounts, current, these concrete numerical value are formed C t oA t oThe initial health of supporting rope use all the time by evaluation object initial damage vector d oExpression;
G. at current initial Mechanics Calculation benchmark model A t oThe basis on carry out the several times Mechanics Calculation according to step g 1 to g4, through calculate obtaining Cable Structure unit damage monitored amount unit change matrix Δ C and unit damage or the vectorial D of unit angular displacement u
G1. Cable Structure unit damage monitored amount unit change matrix Δ C brings in constant renewal in, and is promptly upgrading current initial Mechanics Calculation benchmark model A t o, the current initial value of monitored amount vector C t oWith current initial Cable Structure steady temperature data vector T t oAfterwards, must then upgrade Cable Structure unit damage monitored amount unit change matrix Δ C and unit damage or the angular displacement vector D of unit u
G2. at the current initial Mechanics Calculation benchmark model A of Cable Structure t oThe basis on carry out the several times Mechanics Calculation, equal all on the calculation times numerical value by the quantity N of evaluation object, have N evaluation object that N calculating is just arranged; According to by the coding rule of evaluation object, calculate successively; Calculating hypothesis each time has only one on the basis of original damage or angular displacement, to be increased unit damage or unit angular displacement again by evaluation object; Concrete; If should be a supporting rope in the cable system by evaluation object, so just this supporting rope of hypothesis increases unit damage again, if should be the angular displacement component of a direction of a bearing by evaluation object; Just suppose that this bearing increases the unit angular displacement again at this sense of displacement, uses D UkWrite down the unit damage or the unit angular displacement of this increase, wherein k represent to increase unit damage or unit angular displacement by the numbering of evaluation object, D UkBe unit damage or the angular displacement vector D of unit uAn element, unit damage or unit angular displacement vector D uThe coding rule and the vectorial d of element oThe coding rule of element identical; Increase again in calculating each time unit damage or unit angular displacement be different from by evaluation object other time increase again in calculating unit damage or unit angular displacement by evaluation object; Calculate the current calculated value that all utilizes mechanics method to calculate all monitored amounts of Cable Structure each time; The current calculated value of the monitored amount of all that calculate is each time formed a monitored amount calculation current vector, the element coding rule of monitored amount calculation current vector and monitored amount initial value vector C oThe element coding rule identical;
G3. the monitored amount calculation current vector that calculates each time deducts the current initial value vector of monitored amount C t oObtain a vector, each element that again should vector all calculates unit damage or the unit angular displacement numerical value of being supposed divided by this time, obtains a monitored amount unit change vector, has N by evaluation object N monitored amount unit change vector just to be arranged;
G4. individual by the coding rule of evaluation object by this N monitored amount unit change vector according to N, form the Cable Structure unit damage monitored amount unit change matrix Δ C that the N row are arranged successively; Each row of Cable Structure unit damage monitored amount unit change matrix Δ C are corresponding to a monitored amount unit change vector; Each row of Cable Structure unit damage monitored amount unit change matrix Δ C is corresponding to the different unit change amplitude of same monitored amount when difference is increased unit damage or unit angular displacement by evaluation object; The coding rule and the vectorial d of the row of Cable Structure unit damage monitored amount unit change matrix Δ C oThe coding rule of element identical, the coding rule of the row of Cable Structure unit damage monitored amount unit change matrix Δ C is identical with the coding rule of M monitored amount;
H. obtain current cable structure steady temperature data vector T in actual measurement tThe time, actual measurement obtains obtaining current cable structure steady temperature data vector T tThe current measured value of all monitored amounts of Cable Structure of synchronization in the moment, form the current numerical value vector of monitored amount C; Current numerical value vector C of monitored amount and the current initial value vector of monitored amount C t oWith monitored amount initial value vector C oDefinition mode identical, the same monitored amount of the element representation of the identical numbering of three vectors is at difference concrete numerical value constantly;
I. define by the vectorial d of the current name damage of evaluation object; Element number by the vectorial d of the current name damage of evaluation object equals by the quantity of evaluation object; By the element of the vectorial d of the current name damage of evaluation object be one-to-one relationship between the evaluation object, represent correspondence by the nominal degree of injury of evaluation object or nominal angular displacement by the element numerical value of the vectorial d of the current name damage of evaluation object; The coding rule and the vectorial d of the element of vector d oThe coding rule of element identical;
J. the current numerical value vector of the monitored amount of foundation C is with the current initial value vector of monitored amount C t o, Cable Structure unit damage monitored amount unit change matrix Δ C, unit damage or the angular displacement vector D of unit uAnd to be asked this linear approximate relationship can be expressed as formula 1 by the linear approximate relationship that exists between the vectorial d of the current name damage of evaluation object, and other amount in the formula 1 except that d is known, finds the solution formula 1 and just can calculate by the current nominal vectorial d of damage of evaluation object;
C = C o t + Δ C · d Formula 1
K. define by the current actual damage vector of evaluation object d a, by the current actual damage vector of evaluation object d aElement number equal by the quantity of evaluation object, by the current actual damage of evaluation object vector d aElement and be one-to-one relationship between the evaluation object, by the current actual damage of evaluation object vector d aElement numerical value represent corresponding by the actual damage degree or the actual displacement angle of evaluation object; Vector d aThe coding rule and the vectorial d of element oThe coding rule of element identical;
L. utilize that formula 2 expresses by the current actual damage vector of evaluation object d aK element d a kTogether by evaluation object initial damage vector d oK element d OkWith k the element d that is damaged vectorial d by the current name of evaluation object kBetween relation, calculate by the current actual damage of evaluation object vector d aAll elements;
Figure FDA00001700407900111
formula 2
K=1 in the formula 2,2,3 ...., N, d a kRepresent k by the current actual health status of evaluation object, d a kBe to represent that k was not had health problem by evaluation object, d at 0 o'clock a kNumerical value be not represented in 0 o'clock k by evaluation object be the unsoundness problem by evaluation object, if should be supporting rope, a d so in the cable system by evaluation object a kThe order of severity of representing its current health problem, the supporting Suo Keneng of unsoundness problem is slack line, also possibly is damaged cable, d a kNumerical response the degree of lax or damage that should the supporting rope, if should be angular displacement component, a d so of a bearing by evaluation object a kRepresent its current actual displacement angle numerical value; So according to by the current actual damage of evaluation object vector d aCan define which the supporting rope unsoundness problem and order of severity thereof, define which bearing angular displacement and numerical value thereof have taken place;
M. will be by the current actual damage vector of evaluation object d aIn with M 1The M of root supporting Suo Xiangguan 1Individual element takes out, and forms supporting Suo Dangqian actual damage vector d Ca, supporting Suo Dangqian actual damage vector d CaThe coding rule and initial rope force vector F of element oThe coding rule of element identical; Supporting Suo Dangqian actual damage vector d CaH element representation Cable Structure in the current actual damage amount of h root supporting rope, h=1,2,3 ...., M 1Supporting Suo Dangqian actual damage vector d CaIn numerical value be not 0 element supporting rope corresponding to the unsoundness problem, from the supporting rope of these unsoundness problems, identify damaged cable, remaining is exactly slack line, supporting Suo Dangqian actual damage vector d CaIn with slack line corresponding to the element numerical expression be the current actual equivalent damage degree with slack line relax level mechanics equivalence;
N. be utilized in current cable structure steady temperature data vector T tSlack line under the condition, that identify in m step and with the vectorial d of supporting Suo Dangqian actual damage CaThese slack lines of expressing, with the current actual equivalent damage degree of its relax level mechanics equivalence, be utilized in that the e step obtains at current cable structure steady temperature data vector T tCurrent cable force vector F under the condition and current supporting rope two supporting end points horizontal ranges vectors, be utilized in that the c step obtains at initial Cable Structure steady temperature data vector T oThe initial drift vector of the supporting rope under the condition, the weight vector of the initial free unit length of initial free cross-sectional area vector sum, initial rope force vector F o, utilize current cable structure steady temperature data vector T tThe supporting Suo Dangqian steady temperature data of expression, be utilized in that c step obtains at initial Cable Structure steady temperature data vector T oThe supporting rope initial steady state temperature data of expression; Be utilized in the temperature variant physics and the mechanical property parameters of the employed various materials of Cable Structure of c step acquisition; Count the influence of temperature variation to supporting rope physics, mechanics and geometric parameter; Through with slack line with damaged cable carry out the mechanics equivalence calculate slack line, with the relax level of current actual equivalent damage degree equivalence, the mechanical condition of equivalence is: one, the mechanics parameters of lax initial drift, geometrical property parameter, density and the material during with not damaged of the nothing of the rope of two equivalences is identical; Two, after the lax or damage, the Suo Li of the slack line of two equivalences and damage rope be out of shape after length overall identical; When satisfying above-mentioned two equivalent conditions, the such mechanics function of two supporting ropes in Cable Structure is exactly identical, if after promptly replacing damaged cable with the slack line of equivalence, Cable Structure any variation can not take place, vice versa; Try to achieve the relax level that those are judged as slack line according to aforementioned mechanics equivalent condition, relax level is exactly the change amount of supporting rope drift, has just confirmed the long adjustment amount of rope of the supporting rope that those need adjust Suo Li; The lax identification and the damage identification of supporting rope have so just been realized; Institute's demand power is provided by current cable force vector F corresponding element during calculating;
O. get back to the e step, beginning goes on foot the o circulation next time in step by e.
CN2012101735400A 2012-05-30 2012-05-30 Identification method for problem cables and angular support displacement on basis of temperature variation and cable force monitoring Pending CN102735461A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012101735400A CN102735461A (en) 2012-05-30 2012-05-30 Identification method for problem cables and angular support displacement on basis of temperature variation and cable force monitoring

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012101735400A CN102735461A (en) 2012-05-30 2012-05-30 Identification method for problem cables and angular support displacement on basis of temperature variation and cable force monitoring

Publications (1)

Publication Number Publication Date
CN102735461A true CN102735461A (en) 2012-10-17

Family

ID=46991359

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012101735400A Pending CN102735461A (en) 2012-05-30 2012-05-30 Identification method for problem cables and angular support displacement on basis of temperature variation and cable force monitoring

Country Status (1)

Country Link
CN (1) CN102735461A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103616207A (en) * 2013-12-09 2014-03-05 东南大学 Identifying method for problem cable and concentrated loads based on cable force monitoring in time of angular displacement
CN103616238A (en) * 2013-12-09 2014-03-05 东南大学 Concentrated load angular displacement identification method for problem cables in process of cable force monitoring
CN103852299A (en) * 2014-03-10 2014-06-11 东南大学 Linear displacement space coordinate monitoring damaged cable load identification method
CN103913324A (en) * 2014-03-10 2014-07-09 东南大学 Identification method for damaged cable and load through linear displacement monitoring and space coordinate monitoring

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101387600A (en) * 2008-10-17 2009-03-18 东南大学 Cable system health monitoring method in cable structure based on mixed monitor
CN101832874A (en) * 2010-04-02 2010-09-15 东南大学 Progressive cable structure health monitoring method based on angle monitoring
CN101699248B (en) * 2009-11-05 2011-06-08 东南大学 Progressive health monitoring method for identifying loose carrying cable based on angle monitoring
CN102323096A (en) * 2011-05-31 2012-01-18 东南大学 Cable force monitoring based method for recognizing damaged cable, loose cable and supporting seat generalized displacement
CN102331355A (en) * 2011-05-31 2012-01-25 东南大学 Cable force monitoring-based health monitoring method for identifying general displacement of damaged cable support

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101387600A (en) * 2008-10-17 2009-03-18 东南大学 Cable system health monitoring method in cable structure based on mixed monitor
CN101699248B (en) * 2009-11-05 2011-06-08 东南大学 Progressive health monitoring method for identifying loose carrying cable based on angle monitoring
CN101832874A (en) * 2010-04-02 2010-09-15 东南大学 Progressive cable structure health monitoring method based on angle monitoring
CN102323096A (en) * 2011-05-31 2012-01-18 东南大学 Cable force monitoring based method for recognizing damaged cable, loose cable and supporting seat generalized displacement
CN102331355A (en) * 2011-05-31 2012-01-25 东南大学 Cable force monitoring-based health monitoring method for identifying general displacement of damaged cable support

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103616207A (en) * 2013-12-09 2014-03-05 东南大学 Identifying method for problem cable and concentrated loads based on cable force monitoring in time of angular displacement
CN103616238A (en) * 2013-12-09 2014-03-05 东南大学 Concentrated load angular displacement identification method for problem cables in process of cable force monitoring
CN103852299A (en) * 2014-03-10 2014-06-11 东南大学 Linear displacement space coordinate monitoring damaged cable load identification method
CN103913324A (en) * 2014-03-10 2014-07-09 东南大学 Identification method for damaged cable and load through linear displacement monitoring and space coordinate monitoring

Similar Documents

Publication Publication Date Title
CN102735459A (en) Progressive generalized displacement identification method for problem cables and support based on temperature change tension force monitoring
CN102706605A (en) Problem cable and support generalized displacement progressive identification method on basis of strain monitoring during temperature variation
CN102768123A (en) Temperature change cable force monitoring based progressive identification method for defective cables and support angular displacement
CN102706670A (en) Damaged cable and support generalized displacement identification method based on cable force monitoring of temperature change
CN102749212A (en) Generalized displacement identification method for temperature variation hybrid monitored problem cables and supports
CN102735461A (en) Identification method for problem cables and angular support displacement on basis of temperature variation and cable force monitoring
CN102706594A (en) Problem cable and supporting seat generalized displacement identification method based on space coordinate monitoring at moment of temperature variation
CN102721557A (en) Damaged line and support angle displacement identification method based on temperature change and line force monitoring
CN102706600A (en) Problem cable and supporting seat generalized displacement identification method based on angle monitoring at moment of temperature variation
CN102735474A (en) Temperature change and strain monitoring-based problem cable and support angular displacement progressive recognition method
CN102706611A (en) Problem cable and supporting seat generalized displacement identification method based on cable tension monitoring at moment of temperature variation
CN102735476A (en) Problematic cable and support angular displacement identifying method based on strain monitoring at time of temperature change
CN102706610A (en) Problem cable and supporting seat generalized displacement identification method based on strain monitoring at moment of temperature variation
CN102706662A (en) Defective cable and support angular displacement identification method based on angular monitoring of temperature change
CN102721551A (en) Problematic cable and support translation identification method based on space coordinate monitoring during temperature change
CN102706661A (en) Defective cable and support angular displacement identification method based on mixed monitoring of temperature change
CN102735465A (en) Slack cable identifying method based on strain monitoring at time of change in support angular displacement and temperature
CN103776649A (en) Method for identifying problem cable, concentration load, generalized displacement through cable force monitoring
CN102706577A (en) Method for identifying problem cable and support translation based on hybrid monitoring during temperature change
CN102706593A (en) Problem cable and support translation progressive identification method on basis of cable force monitoring during temperature variation
CN102735471A (en) Strain monitoring-based damaged cable recognition method in support generalized displacement and temperature change
CN102735470A (en) Damaged cable identification method based on cable force monitoring of support angular displacement and temperature change
CN102706591A (en) Problem cable and support translation identification method on basis of cable force monitoring during temperature variation
CN102735475A (en) Temperature change and space coordinate monitoring-based problem cable and support angular displacement recognition method
CN102706587A (en) Problem cable and supporting seat translation identification method based on strain monitoring at moment of temperature variation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20121017