CN102733373A - Post grouting concrete hollow circular corner triangular pile - Google Patents

Post grouting concrete hollow circular corner triangular pile Download PDF

Info

Publication number
CN102733373A
CN102733373A CN2012102015727A CN201210201572A CN102733373A CN 102733373 A CN102733373 A CN 102733373A CN 2012102015727 A CN2012102015727 A CN 2012102015727A CN 201210201572 A CN201210201572 A CN 201210201572A CN 102733373 A CN102733373 A CN 102733373A
Authority
CN
China
Prior art keywords
pile
concrete hollow
stake
fillet triangle
lining concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012102015727A
Other languages
Chinese (zh)
Inventor
梁军起
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Zhongji Pile Industry Co Ltd
Original Assignee
Shanghai Zhongji Pile Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Zhongji Pile Industry Co Ltd filed Critical Shanghai Zhongji Pile Industry Co Ltd
Priority to CN2012102015727A priority Critical patent/CN102733373A/en
Publication of CN102733373A publication Critical patent/CN102733373A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The invention relates to a post grouting concrete hollow circular corner triangular pile, wherein the post grouting concrete hollow circular corner triangular pile is provided with a center through hole which penetrates through the whole post grouting concrete hollow circular corner triangular pile along the vertical axis direction, the inner peripheral cross section of the post grouting concrete hollow circular corner triangular pile is circular, the outer peripheral cross section of the post grouting concrete hollow circular corner triangular pile is triangular, the geometric sizes of the inner peripheral cross section of the post grouting concrete hollow circular corner triangular pile along the whole vertical axis direction are the same as one another, the geometric sizes of the outer peripheral cross section of the post grouting concrete hollow circular corner triangular pile along the whole vertical axis direction are the same as one another as well, the post grouting concrete hollow circular corner triangular pile extends to be provided with main reinforcements and stirrups spirally wound on the main reinforcements along the length direction, the three main reinforcements are available, the three main reinforcements are arranged on three edges of the circular corner triangular hollow pile, the main reinforcements are non-prestressed main reinforcements, and grouting pipes are embedded in three corners of the circular corner triangular hollow pile.

Description

The stake of grouting behind shaft or drift lining concrete hollow fillet triangle
Technical field
The invention belongs to building field, relate to the improvement of foundation pile shape and structure in the building field, is the stake of a kind of grouting behind shaft or drift lining concrete hollow fillet triangle specifically.
Background technology
The building materials of foundation pile engineering are more on market, if any pile tube, all kinds of side stake, castinplace pile, drilled pile etc.These pilings mainly are divided into non-prestressed member and prestressed member two big classes.The prestressed member piling comprises, pile tube, centrifugal prestress square pile etc.Their shortcoming is, often fragility is bigger, and is shorter from the time to rupture that ftractures, and pile body ductility is relatively poor, when earthquake takes place, causes the moment building collapsing, makes that personnel do not have the sufficient time escape in the building.
Existing concrete prefabricated units cross section is various, and many on the market is square and circular cross-section, and as carrying effect member the time, its maximum purpose is to improve the pile body bearing capacity that unit materials can provide, thereby economical with materials reduces cost.The very big characteristics of preformed pile are a side and soil phase mutual effect, utilize the frictional force between stake and the soil to improve pile body bearing capacity.
Circular cross-section is relative and the section ratio surface area is less relatively, so do not take advantage at pile tube aspect the raising stake side-friction force; Side's stake is bigger with soil body frictional force, and the bearing capacity ratio pile tube is good, but solid side stake is heavy, feed consumption is many; Hollow square pile has combined the advantage of pile tube and side's stake preferably, and outer cross section is square, and interior cross section be a circle, can improve a side-friction force comparatively speaking, but its cross section concrete thickness differs, and the frictional force of unit volume material also is not fully exerted.
The existing concrete prefabricated units, after pile sinking was accomplished, pile body itself contact with the soil body and very fits, and often needed the supporting capacity of the stop time competence exertion stake of length itself, and with between be connected relatively poor.
Summary of the invention
To the problems referred to above, main purpose of the present invention is to provide that loss in a kind of building is few, material-saving, from the grouting behind shaft or drift lining concrete hollow fillet triangle stake of heavy and light.
The present invention solves above-mentioned technical problem through following technical proposals: the stake of a kind of grouting behind shaft or drift lining concrete hollow fillet triangle; Said grouting behind shaft or drift lining concrete hollow fillet triangle stake y direction is provided with the central through hole that runs through the stake of whole grouting behind shaft or drift lining concrete hollow fillet triangle; Interior all cross sections of said grouting behind shaft or drift lining concrete hollow fillet triangle stake are circular; The periphery cross section of said grouting behind shaft or drift lining concrete hollow fillet triangle stake is the fillet triangle; The stake of said grouting behind shaft or drift lining concrete hollow fillet triangle is identical in interior all cross section geometry of whole y direction, and the peripheral cross-section physical dimension is also identical, and said grouting behind shaft or drift lining concrete hollow fillet triangle pile length direction is extended with main muscle and the spiral stirrup around said main muscle; Said main muscle has three; Described three main muscle are positioned on three limits of fillet triangle hollow pile, and said main muscle is non-prestressed main muscle, are embedded with Grouting Pipe on three angles of fillet triangle hollow pile.
In a practical implementation example of the present invention, said main muscle is positioned on the mid point on three limits of triangle stake.
Positive progressive effect of the present invention is: grouting behind shaft or drift lining concrete hollow fillet triangle provided by the invention stake has the following advantages:
(1), grouting behind shaft or drift lining concrete pre-stress hollow fillet triangle provided by the invention stake, pre-buried Grouting Pipe in the pile body forming process behind pile foundation construction, is carried out grouting process, from but the soil body fully contact with pile body.On the one hand the soil body is fully contacted with pile body, before the soil body stops, higher pile body bearing capacity is provided, simultaneously, slip casting makes the soil body obtain reinforcing, and also can increase pile body bearing capacity, strengthen simultaneously stake with between be connected.
(2), grouting behind shaft or drift lining concrete pre-stress hollow fillet triangle provided by the invention stake; Week is circular in its cross section; Interior week is the fillet triangle; Effectively raise the specific area of material, can make unit materials have bigger surface area, thereby the stake side-friction force of raising preformed pile is to improve bearing capacity of single pile.
(3), grouting behind shaft or drift lining concrete pre-stress hollow fillet triangle provided by the invention stake; Week is circular in its cross section, and interior week is the fillet triangle, and its corner is stress and eliminates circular arc; So the present invention's corner in the pile body moulding is easy to moulding, can effectively improve the pile rate.
(4), grouting behind shaft or drift lining concrete pre-stress hollow fillet triangle provided by the invention stake; Week is circular in its cross section; Interior week is the fillet triangle; Its corner is stress and eliminates circular arc, so that the present invention can effectively eliminate stress in the pile foundation construction process is concentrated, can effectively improve construction pile rate.
(5), grouting behind shaft or drift lining concrete pre-stress hollow fillet triangle provided by the invention stake, week be a circle in its cross section, interior week is the fillet triangle, its corner is stress elimination circular arc; Main muscle layout triangular in shape is said from structure, master's muscle of the present invention is rationally distributed, reinforcing cage in the shape of a spiral the shape stirrup to be welded, make in the production pile body ductility good, become that pile capacity is big, the bending resistance shear behavior is good, shock resistance is strong.
(6), grouting behind shaft or drift lining concrete pre-stress hollow fillet triangle provided by the invention stake, week be a circle in its cross section, interior week is the fillet triangle, its corner is stress elimination circular arc; Main muscle layout triangular in shape is said from structure, master's muscle of the present invention is rationally distributed, reinforcing cage in the shape of a spiral the shape stirrup effectively raise the globality of pile body to be welded, bearing capacity of single pile is big behind the construction pile, the bending resistance shear behavior is good, shock resistance is strong.
Description of drawings
Fig. 1 is a stereogram of the present invention;
Fig. 2 is a vertical view of the present invention.
The specific embodiment
Provide preferred embodiment of the present invention below in conjunction with accompanying drawing, to specify technical scheme of the present invention.
Fig. 1 is a stereogram of the present invention; Fig. 2 is a vertical view of the present invention; As illustrated in fig. 1 and 2: grouting behind shaft or drift lining concrete hollow fillet triangle stake y direction is provided with the central through hole 5 that runs through the stake of whole grouting behind shaft or drift lining concrete hollow fillet triangle; Interior all cross sections of said grouting behind shaft or drift lining concrete hollow fillet triangle stake are circular, and the periphery cross section of said grouting behind shaft or drift lining concrete hollow fillet triangle stake is the fillet triangle, and the stake of said grouting behind shaft or drift lining concrete hollow fillet triangle is identical in interior all cross section geometry of whole y direction; The peripheral cross-section physical dimension is also identical; Said grouting behind shaft or drift lining concrete hollow fillet triangle pile length direction is extended with main muscle 1 ' and the spiral stirrup 3 around said main muscle 1 ', and said main muscle 1 ' has three, and described three main muscle 1 ' are positioned on three limits of fillet triangle hollow pile; Said main muscle 1 ' is non-prestressed main muscle, is embedded with Grouting Pipe 1 on three angles of fillet triangle hollow pile.
In a practical implementation example of the present invention, said main muscle 1 ' is positioned on the mid point on three limits of triangle stake.
The cross section of grouting behind shaft or drift lining concrete pre-stress hollow fillet triangle stake is the fillet triangle, and the big I of indication fillet 4 suitably changes, and all belongs to protection domain of the present invention.
In hollow fillet triangle of the present invention stake, outside concrete 2 protective layer thickness in the indication member, the big I of m and n shown in the accompanying drawing 1 is suitably changing, and the size of stirrup spacing a also can suitably change simultaneously, all belongs to protection domain of the present invention.
Grouting behind shaft or drift lining concrete pre-stress hollow fillet triangle provided by the invention stake, pre-buried Grouting Pipe in the pile body forming process behind pile foundation construction, is carried out grouting process, from but the soil body fully contact with pile body.On the one hand the soil body is fully contacted with pile body, before the soil body stops, higher pile body bearing capacity is provided, simultaneously, slip casting makes the soil body obtain reinforcing, and also can increase pile body bearing capacity, strengthen simultaneously stake with between be connected.
Grouting behind shaft or drift lining concrete pre-stress hollow fillet triangle provided by the invention stake; Week is circular in its cross section; Interior week is the fillet triangle; Effectively raise the specific area of material, can make unit materials have bigger surface area, thereby the stake side-friction force of raising preformed pile is to improve bearing capacity of single pile.
Grouting behind shaft or drift lining concrete pre-stress hollow fillet triangle provided by the invention stake; Week is circular in its cross section, and interior week is the fillet triangle, and its corner is stress and eliminates circular arc; So the present invention's corner in the pile body moulding is easy to moulding, can effectively improve the pile rate.
Grouting behind shaft or drift lining concrete pre-stress hollow fillet triangle provided by the invention stake; Week is circular in its cross section, and interior week is the fillet triangle, and its corner is stress and eliminates circular arc; So it is concentrated that the present invention can effectively eliminate stress, can effectively improve construction pile rate in the pile foundation construction process.
Week is circular in the grouting behind shaft or drift lining concrete pre-stress hollow fillet triangle provided by the invention stake, its cross section, and interior week is the fillet triangle, and its corner is stress and eliminates circular arc; Main muscle layout triangular in shape is said from structure, master's muscle of the present invention is rationally distributed, reinforcing cage in the shape of a spiral the shape stirrup to be welded, make in the production pile body ductility good, become that pile capacity is big, the bending resistance shear behavior is good, shock resistance is strong.
Week is circular in the grouting behind shaft or drift lining concrete pre-stress hollow fillet triangle provided by the invention stake, its cross section, and interior week is the fillet triangle, and its corner is stress and eliminates circular arc; Main muscle layout triangular in shape is said from structure, master's muscle of the present invention is rationally distributed, reinforcing cage in the shape of a spiral the shape stirrup effectively raise the globality of pile body to be welded, bearing capacity of single pile is big behind the construction pile, the bending resistance shear behavior is good, shock resistance is strong.
More than show and described basic principle of the present invention and principal character and advantage of the present invention.The technician of the industry should understand; The present invention is not restricted to the described embodiments; That describes in the foregoing description and the manual just explains principle of the present invention, and under the prerequisite that does not break away from spirit and scope of the invention, the present invention also has various changes and modifications; These variations and improvement all fall in the scope of the invention that requires protection, and the present invention requires protection domain to be defined by appending claims and equivalent thereof.

Claims (2)

1. grouting behind shaft or drift lining concrete hollow fillet triangle stake; It is characterized in that: said grouting behind shaft or drift lining concrete hollow fillet triangle stake y direction is provided with the central through hole that runs through the stake of whole grouting behind shaft or drift lining concrete hollow fillet triangle; Interior all cross sections of said grouting behind shaft or drift lining concrete hollow fillet triangle stake are circular; The periphery cross section of said grouting behind shaft or drift lining concrete hollow fillet triangle stake is the fillet triangle; The stake of said grouting behind shaft or drift lining concrete hollow fillet triangle is identical in interior all cross section geometry of whole y direction, and the peripheral cross-section physical dimension is also identical, and said grouting behind shaft or drift lining concrete hollow fillet triangle pile length direction is extended with main muscle and the spiral stirrup around said main muscle; Said main muscle has three; Described three main muscle are positioned on three limits of fillet triangle hollow pile, and said main muscle is non-prestressed main muscle, are embedded with Grouting Pipe on three angles of fillet triangle hollow pile.
2. grouting behind shaft or drift lining concrete hollow fillet triangle according to claim 1 stake is characterized in that: said main muscle is positioned on the mid point on three limits of triangle stake.
CN2012102015727A 2012-06-18 2012-06-18 Post grouting concrete hollow circular corner triangular pile Pending CN102733373A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012102015727A CN102733373A (en) 2012-06-18 2012-06-18 Post grouting concrete hollow circular corner triangular pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012102015727A CN102733373A (en) 2012-06-18 2012-06-18 Post grouting concrete hollow circular corner triangular pile

Publications (1)

Publication Number Publication Date
CN102733373A true CN102733373A (en) 2012-10-17

Family

ID=46989630

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012102015727A Pending CN102733373A (en) 2012-06-18 2012-06-18 Post grouting concrete hollow circular corner triangular pile

Country Status (1)

Country Link
CN (1) CN102733373A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103114582A (en) * 2013-02-01 2013-05-22 江苏东浦管桩有限公司 Pre-tensioning method prestressed concrete chamfered pillar
CN103147439A (en) * 2013-02-07 2013-06-12 江苏东浦管桩有限公司 Pretensioned prestressing solid concrete pile
CN103774647A (en) * 2013-02-01 2014-05-07 江苏东浦管桩有限公司 Pre-tensioning method prestress concrete cut-corner pile

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1054031A (en) * 1996-08-09 1998-02-24 Maeda Seikan Kk Pre-stress concrete pile and its positioning method of pile
CN2370066Y (en) * 1998-08-10 2000-03-22 叶长生 Channel slip casting steel bar concrete hollow prefabricated pile
CN2418163Y (en) * 2000-04-19 2001-02-07 于陵 Prestressed concrete triangular foundation pile
CN2546498Y (en) * 2001-12-18 2003-04-23 杜新智 Angle hollow precast pile
CN201560424U (en) * 2009-11-20 2010-08-25 上海强劲基础工程有限公司 Triangular concrete pile
CN101914914A (en) * 2010-08-19 2010-12-15 上海中技桩业股份有限公司 Concrete pre-stress hollow square pile and molding method thereof

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1054031A (en) * 1996-08-09 1998-02-24 Maeda Seikan Kk Pre-stress concrete pile and its positioning method of pile
CN2370066Y (en) * 1998-08-10 2000-03-22 叶长生 Channel slip casting steel bar concrete hollow prefabricated pile
CN2418163Y (en) * 2000-04-19 2001-02-07 于陵 Prestressed concrete triangular foundation pile
CN2546498Y (en) * 2001-12-18 2003-04-23 杜新智 Angle hollow precast pile
CN201560424U (en) * 2009-11-20 2010-08-25 上海强劲基础工程有限公司 Triangular concrete pile
CN101914914A (en) * 2010-08-19 2010-12-15 上海中技桩业股份有限公司 Concrete pre-stress hollow square pile and molding method thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103114582A (en) * 2013-02-01 2013-05-22 江苏东浦管桩有限公司 Pre-tensioning method prestressed concrete chamfered pillar
CN103774647A (en) * 2013-02-01 2014-05-07 江苏东浦管桩有限公司 Pre-tensioning method prestress concrete cut-corner pile
CN103774647B (en) * 2013-02-01 2016-06-29 江苏东浦管桩有限公司 The hollow corner cut square pile of pretensioning prestressed concrete
CN103147439A (en) * 2013-02-07 2013-06-12 江苏东浦管桩有限公司 Pretensioned prestressing solid concrete pile
CN103147439B (en) * 2013-02-07 2016-06-29 江苏东浦管桩有限公司 Pretensioning prestressed concrete solid square pile

Similar Documents

Publication Publication Date Title
CN102733373A (en) Post grouting concrete hollow circular corner triangular pile
CN202718087U (en) Post-grouting hollow rounded triangular pile
CN202718089U (en) Post-grouting concrete hollow rounded triangular pile
CN201835278U (en) Prestressed high-strength concrete square pile
CN202787252U (en) Partially prestressed concrete hollow triangular pile
CN202718088U (en) Post-grouted hollow fillet triangular concrete pile
CN202718098U (en) Post grouting concrete triangular pile with filleted corners
CN202718097U (en) Rounded-triangular and solid post-grouted concrete pile
CN202718090U (en) Concrete hollow rounded triangular pile
CN202718093U (en) Hollow fillet triangular pile
CN202718094U (en) Rounded-triangular hollow pile
CN202718091U (en) Hollow and rounded-triangular concrete pile
CN204023561U (en) The recessed bent cross-section hollow stake of prestressing force
CN103572753B (en) A kind of partially prestressed concrete hollow triangular pile
CN202718092U (en) Hollow and rounded-triangular concrete pile
CN202718110U (en) Rounded-triangular and solid post-grouted and pretensioned pile
CN202718095U (en) Hollow and chamfered-triangular concrete pile
CN202989908U (en) Reinforced concrete pile
CN202787250U (en) Pre-tensioning method prestress solid pile
CN202718100U (en) Post grouting concrete hollow triangular pile with filleted corners
CN102733383A (en) Post-grouting pretensioning prestressed concrete hollow fillet triangular pile
CN102733382A (en) Post-grouting pre-tensioning method prestressed concrete hollow round-corner triangular pile
CN202672145U (en) Prestressed triangular pile
CN202718099U (en) Improved hollow and rounded-triangular post-grouted concrete pile
CN202718109U (en) Hollow and rounded-triangular pretensioned prestressing concrete pile

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20121017