CN102721604A - Device and method for physical simulation test of stability of deep tunnel surrounding rock - Google Patents

Device and method for physical simulation test of stability of deep tunnel surrounding rock Download PDF

Info

Publication number
CN102721604A
CN102721604A CN2012102244849A CN201210224484A CN102721604A CN 102721604 A CN102721604 A CN 102721604A CN 2012102244849 A CN2012102244849 A CN 2012102244849A CN 201210224484 A CN201210224484 A CN 201210224484A CN 102721604 A CN102721604 A CN 102721604A
Authority
CN
China
Prior art keywords
sample
deep tunnel
rock
tunnel
stress
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012102244849A
Other languages
Chinese (zh)
Other versions
CN102721604B (en
Inventor
张永双
郭长宝
张瑞端
蒋良文
周能娟
杜宇本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
INSTITUTE OF GEOMECHANICS CHINESE ACADEMY OF GEOLOGICAL SCIENCES
Original Assignee
INSTITUTE OF GEOMECHANICS CHINESE ACADEMY OF GEOLOGICAL SCIENCES
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by INSTITUTE OF GEOMECHANICS CHINESE ACADEMY OF GEOLOGICAL SCIENCES filed Critical INSTITUTE OF GEOMECHANICS CHINESE ACADEMY OF GEOLOGICAL SCIENCES
Priority to CN2012102244849A priority Critical patent/CN102721604B/en
Publication of CN102721604A publication Critical patent/CN102721604A/en
Application granted granted Critical
Publication of CN102721604B publication Critical patent/CN102721604B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention discloses a device and a method for a physical simulation test of the stability of a deep tunnel surrounding rock and relates to a rock-soil mechanic technology. A structure of the device is that a pressure plate is covered on a sample in a deep tunnel rock body model instrument, and a vertical pressure system is arranged on the pressure plate and used for loading so as to simulate and exert gravity stress. A miniature shield machine drills into the sample from a drilling surface, and the miniature shield machine, a stepless speed changing box and a motor are sequentially connected to achieve drilling. Eight optical fibers and six strain gauges are distributed in the sample, the optical fibers are connected with a distributed optical fiber monitoring system, and the distributed optical fiber monitoring system and the strain gauges are respectively connected with a data acquiring system so as to achieve detection and recording. By means of the device and the method for the physical simulation test of the stability of the deep tunnel surrounding rock, a development and change law of stress strain when a deep tunnel rock body is excavated in tunnel construction can reappear accurately, and a novel solving path for researching the stability of the grotto surrounding rock and forming mechanism of rock burst in the tunnel construction.

Description

Deep tunnel stability of surrounding rock physical simulation simulation test device and method thereof
Technical field
The present invention relates to the rock-soil mechanics experimental technique, relate in particular to a kind of deep tunnel stability of surrounding rock physical simulation simulation test device and method thereof.
Background technology
In deep tunnel project planning process of construction, surrounding rock of chamber stability is the problem that Geotechnical Engineering and Geological Engineering worker must pay much attention to.Surrounding rock of chamber generally is meant around the underground chamber; Cause the interior rock soil mass of certain limit of distortion and stress redistribution owing to underground local excavation; Because the difference of geologic condition; Important Project geological problems such as rock burst and soft rock large deformation take place easily, are directly connected to safety, progress and the quality of underground chamber construction.Rock burst is that sliver (piece) that country rock is produced under the high-ground stress field condition flies to throw and looses, and hole wall power destruction phenomenon such as scale off.Rock burst is a big geologic hazard of underground engineering construction, because its destructiveness is very big, brings a lot of problems usually for the stability of construction safety, rock mass and buildings, even can cause the Important Project accident.And the Changing Pattern of the stress of deep tunnel rock mass, displacement is significant undoubtedly for the generation of analyzing surrounding rock of chamber stability and prevention rock burst in the understanding tunnel construction process.
At present; Focus mostly in theoretic analysis to rock mass in tunnel ess-strain Study of Monitoring in the deep tunnel construction; Laboratory simulation for deep tunnel rock mass surrouding rock stress strain monitoring is the blank of this research field; And surrounding rock of chamber stability and rock burst form one of important means of mechanism when being the research constructing tunnel to the analogue experiment installation of tunnel surrounding rock mass stress strain monitoring in the deep tunnel construction, have important theory and practical significance.
Through retrieval, still none overlaps ripe accurately simulation deep tunnel stability of surrounding rock physical simulation simulation test device and method thereof at present.
Summary of the invention
The object of the invention just is to overcome the shortcoming and defect that prior art exists, and a kind of deep tunnel stability of surrounding rock physical simulation simulation test device and method thereof are provided.
This test unit of the first can accurately be simulated in deep tunnel is built; Along with tunnel excavation; Displacement, stress and strain in the tunnel surrounding rock mass also will be along with variations, and the formation mechanism research of surrounding rock of chamber stability and rock burst during for constructing tunnel provides a kind of new research technique.
It two is that this test method can be implemented in when taking different construction array modes to construct in the constructing tunnel; The deep tunnel Rock Mass is with the difference of excavation speed; Detect the Changing Pattern of its displacement, stress, strain, this helps inspiring us to find the safest, constructing tunnel speed efficiently.
The objective of the invention is to realize like this:
Lithology, architectural feature and engineering geomechanics character according to tunnel surrounding rock mass in the actual tunnel construction are set up geologic model, and are generalized as the laboratory mathematical model, and set up physical model with analogous similarity material; Apply the self-weight stress field of its deep tunnel position of certain uniform load simulation at the sample top, so can make sample accurately simulate actual tunnel country rock distribution characteristics and mechanical characteristic; Digging process when adopting test to build with the miniature shield machine simulation tunnel uses infinitely variable transmission control to creep into speed, and lays the Changing Pattern that monitoring system accurately records tunnel surrounding internal displacement, stress and strain, for the late time data analysis.Its principle meets the analog simulation pattern of field geology body and working-yard, and test unit is simple relatively, and is cheap, can be equipped by most of teaching and scientific research units.
1, deep tunnel stability of surrounding rock physical simulation simulation test device (abbreviation test unit)
This test unit comprises sample, deep tunnel strata model appearance, face, lateral pressure system, pressure plare, distribution type fiber-optic monitoring system, optical fiber, foil gauge, miniature shield machine, infinitely variable transmission and data acquisition system (DAS);
Its annexation is:
Add a cover pressure plare on the sample in deep tunnel strata model appearance, the lateral pressure system is set on pressure plare, carry out loading and apply gravity stress with simulation;
Miniature shield machine pierces in the sample from face, and miniature shield machine, infinitely variable transmission and motor are connected successively, realizes creeping into;
In sample, lay 8 optical fiber and 6 pieces of foil gauges, optical fiber links to each other with the distribution type fiber-optic monitoring system, and the distribution type fiber-optic monitoring system is connected with data acquisition system (DAS) respectively with foil gauge, realizes detecting and record.
2, deep tunnel stability of surrounding rock physical simulation simulation experiment method (abbreviation test method)
This test method is based on above-mentioned deep tunnel stability of surrounding rock physical simulation simulation test device, specifically comprises the following steps:
1. the preparation of sample
A, sample adopt the deep tunnel rock mass in the equivalent material simulating reality tunnel construction, and density is 2.0~3.0g/cm 3, water percentage is 10~20%, and (soil: sand: schohartite=1:2:7) allotment forms with the constant weight ratio to adopt soil, sand, schohartite in the actual rock mass structure character and the situation of breaking;
B, at sample assigned address laying optical fiber and foil gauge;
C, adding pressure plare, and, calculate its self-weight stress field according to the actual buried depth of deep tunnel, apply the relevant pressure value by the lateral pressure system at the sample top, the fixed 48h of compacting;
2. check the initial value of sample
Start distribution type fiber-optic monitoring system and data acquisition system (DAS), the strain initial value that sample stress initial value that observation optical fiber is derived and foil gauge test out;
Must guarantee initial value within the effective range of design in advance,, should consider to prepare again sample or change respective element if certain initial value deviation average is excessive;
3. check the degree of consolidation of sample
If sample its stress, strain in 12h remain unchanged basically, show that then sample is fixed good, can carry out next step operation;
4. start miniature shield machine, begin to pierce in the sample with given pace along horizontal linear from deep tunnel strata model appearance face, it creeps into speed to use infinitely variable transmission control, pierces sample to certain depth, stops to creep into; Near observation face and stopping the STRESS VARIATION situation in a period of time of back of creeping into is analyzed the generation whether situation such as rock burst and soft rock large deformation are arranged simultaneously; As not having the generation of correlation engineering geological problem, row starts miniature shield machine again, keeps constant rate of speed to creep into;
5. use the situation of change of sample internal stress, displacement in the fiber-optic monitoring systematic observation entire test; The strain variation rule of observing foil gauge simultaneously and being reflected; And gather stress, displacement, strain variation data; And in the input database, the various Monitoring Data that again test obtained are analyzed, thus the related law of deep tunnel rock mass stress strain variation and the formation mechanism of rock burst when obtaining the simulation tunnel excavation.
Principle of work:
Adopt the lateral pressure system to the sample load application, the self-weight stress field of simulation deep tunnel position; Utilize miniature shield machine that sample is excavated; And use infinitely variable transmission control to excavate speed; Utilize the Changing Pattern of distribution type fiber-optic monitoring system and foil gauge monitoring sample internal displacement, stress, strain; According to the related data of data acquisition system (DAS) record, the various Monitoring Data that test obtains are analyzed, thus the related law of deep tunnel rock mass stress strain variation and the formation mechanism of rock burst when obtaining the simulation tunnel excavation.
The present invention has advantage and good effect:
1. can reproduce the development and change rule of deep tunnel rock mass ess-strain the time in the tunnel construction exactly by excavation; For the formation mechanism research of surrounding rock of chamber stability and rock burst in the tunnel construction process provides a new solution route, filled up the blank in the present the research;
2. adopt the lateral pressure system, under can the sunykatuib analysis different edpth of tunnel conditions, the formation mechanism of the rock burst of deep tunnel and soft rock large deformation;
3. infinitely variable transmission and miniature shield machine have been adopted; Can accurately control excavation speed; Thereby in contrast test; Can realize simulation tunnel when constructing with difference construction array mode, the difference of deep tunnel rock mass stress strain variation rule, thus the security and the high efficiency analysis of excavating for tunnel construction provide foundation.
Description of drawings
Fig. 1 is the block diagram of this test unit;
Fig. 2 is the structural representation of this test unit.
Wherein:
00-sample;
10-deep tunnel strata model appearance;
20-face;
30-lateral pressure system;
40-pressure plare;
50-distribution type fiber-optic monitoring system;
60-optical fiber;
70-foil gauge;
80-miniature shield machine;
90-infinitely variable transmission;
100-data acquisition system (DAS).
Embodiment
Specify below in conjunction with accompanying drawing and embodiment:
One, experimental provision
1, overall
Like Fig. 1,2, this test unit comprises sample 00, deep tunnel strata model appearance 10, face 20, lateral pressure system 30, pressure plare 40, distribution type fiber-optic monitoring system 50, optical fiber 60, foil gauge 70, miniature shield machine 80, infinitely variable transmission 90 and data acquisition system (DAS) 100;
Its annexation is:
Add a cover pressure plare 40 on the sample 00 in deep tunnel strata model appearance 10, lateral pressure system 30 is set on pressure plare 40, carry out loading and apply gravity stress with simulation;
Miniature shield machine 80 pierces in the sample 00 from face 20, and miniature shield machine 80, infinitely variable transmission 90 are connected with motor successively, realize creeping into;
In sample 00, lay 8 optical fiber 60 and 6 pieces of foil gauges 70, optical fiber 60 links to each other with distribution type fiber-optic monitoring system 50, and distribution type fiber-optic monitoring system 50 is connected with data acquisition system (DAS) 100 respectively with foil gauge 70, realizes detecting and record.
Its course of work is:
Add a cover pressure plare 40 on the sample 00 in deep tunnel strata model appearance 10, lateral pressure system 30 is set on pressure plare 40 carries out loading and apply gravity stress with simulation;
In the process of the test, miniature shield machine 80 pierces with given pace in the sample 00 along horizontal linear from face 20 beginnings, and it creeps into speed to use infinitely variable transmission 90 controls, and miniature shield machine 80 adopts electric energy to drive;
After arriving certain depth, stop to creep into; Near observation face and stopping the STRESS VARIATION situation in a period of time of back of creeping into is analyzed the generation whether situation such as rock burst and soft rock large deformation are arranged simultaneously; As not having the generation of correlation engineering geological problem, row starts miniature shield machine 80 again, keeps constant rate of speed to creep into;
In sample 00, lay 8 optical fiber 60 and 6 pieces of foil gauges 70; Optical fiber 60 links to each other with distribution type fiber-optic monitoring system 50; Distribution type fiber-optic monitoring system 50 is connected with data acquisition system (DAS) 100 respectively with foil gauge 70, observes the lasting Changing Pattern of sample 00 ess-strain during test, the record related data.
2, functional part
1) deep tunnel strata model appearance 10
Deep tunnel strata model appearance 10 is a kind of rectangle cavity (length * wide * height=2m * 1m * 1.5m); The tyre graduated scale, the scale precision is 1mm, periphery is set up stationary installation; Adopt special tempering glass to become; MWP is 5Mpa, and sample 00 is housed in it, and has dome 11 supporting with it at face 20 tappings.
These parts are provided by sea, Jinan City, Shandong Province Weir instrument Ltd.
2) face 20
Face 20 is the circular openings (diameter 10cm) on deep tunnel strata model appearance 10 sides, and its size is to confirm according to the relative scale size of actual tunnel construction excavation face and The model.The dome 11 supporting with face 20 arranged in the making of deep tunnel strata model appearance 10, and dome 11 adopts screw thread closely to be connected with deep tunnel strata model appearance 10 face 20 places.
3) lateral pressure system 30
The load bringing device that lateral pressure system 30 is made up of the hydraulic pump, lifting jack and the structure connecting link that connect successively; In order to sample 00 load application is simulated its gravity pressure, lateral pressure system 30 applied pressure values need to control according to the self-weight stress field at actual tunnel buried depth place.
4) pressure plare 40
Pressure plare 40 is the square sheet material of processing with pressboard of a block length; Its length * wide length * wide size that is slightly less than deep tunnel strata model appearance 10 end faces; Place sample 00 the top and with its tight contact, its effect is that the load that the lateral pressure system is applied is evenly distributed on the sample 00.
5) the distribution type fiber-optic monitoring system 50
Distribution type fiber-optic monitoring system 50 is optical fiber sensing systems that a kind of general distribution is modulated, and is made up of the LC-DTS11 type distribution type fiber-optic monitoring system of specifically selecting for use Dacca, Beijing Science and Technology Ltd. to produce LASER Light Source, sensor fibre and detecting unit.
Its function is displacement, the STRESS VARIATION situation that is used for monitoring sample 00.
Its principle of work is exactly in some way the light wave in the optical fiber constantly to be modulated (sensing) along the outer signals on the optical fiber transmission path; In optical fiber, form the modulation intelligence bands of a spectrum; And pass through detection technique; Demodulation modulation signal bands of a spectrum, thereby the size and the space distribution of acquisition extraneous field signal.
6) optical fiber 60
Optical fiber 60 is conductive mediums of distribution type fiber-optic monitoring system 50, links to each other with distribution type fiber-optic monitoring system 50 and is laid among the sample 00.
The fiber-optic monitoring system is formed in parallel by 8 optical fiber, is parallel and perpendicular to each 4 in sample excavation direction, and diameter length place of distance excavation axial plane has higher effective property to guarantee data.
7) foil gauge 70
Foil gauge 70 is a kind of general purpose transducers of processing with conductor or semiconductor material, the KFG paper tinsel metal strain plate of specifically selecting for use Beijing Beetech Technology Inc. to produce.
Its principle is conductor or semiconductor material when under extraneous power effect, producing physical deformation, and its resistance value produces corresponding the variation, can obtain the size of tested sample strain according to its changes in resistance.
Lay 6 foil gauges 70 in the sample in deep tunnel strata model appearance; Foil gauge 70 is positioned at radius length place of distance excavation axial plane, equidistantly arranges according to excavation length, and adjacent foil gauge angle at interval is roughly 137 ° of golden section angles, has higher effective property to guarantee data.
8) miniature shield machine 80
Miniature shield machine 80 is simulation tunnel construction shield machines and the sample excavation mechinery made is connected to realize creeping into the control of speed with infinitely variable transmission 90.
9) infinitely variable transmission 90
Infinitely variable transmission 90 is a kind of varying-speed machineries of being made up of MB series stepless speed changer and related accessory, and the inner bottom surface range of speeds is 0~2000 rev/min, and is stepless adjustable.
10) data acquisition system (DAS) 100
Data acquisition system (DAS) 100 is a kind of general functional blocks, adopts multifunctional data acquiring integrated circuit board, PC computing machine and data acquisition software to carry out data acquisition, transmission and record.
Concrete BF2010CJ02 module and the software kit that adopts Beijing North world Science and Technology Ltd..

Claims (4)

1. deep tunnel stability of surrounding rock physical simulation simulation test device is characterized in that:
This test unit comprises sample (00), deep tunnel strata model appearance (10), face (20), lateral pressure system (30), pressure plare (40), distribution type fiber-optic monitoring system (50), optical fiber (60), foil gauge (70), miniature shield machine (80), infinitely variable transmission (90) and data acquisition system (DAS) (100);
Its annexation is:
Add a cover pressure plare (40) on the sample (00) in deep tunnel strata model appearance (10), lateral pressure system (30) is set on pressure plare (40), carry out loading and apply gravity stress with simulation;
Miniature shield machine (80) pierces in the sample (00) from face (20), and miniature shield machine (80), infinitely variable transmission (90) are connected with motor successively, realize creeping into;
In sample (00), lay 8 optical fiber (60) and 6 pieces of foil gauges (70); Optical fiber (60) links to each other with distribution type fiber-optic monitoring system (50); Distribution type fiber-optic monitoring system (50) is connected with data acquisition system (DAS) (100) respectively with foil gauge (70), realizes detecting and record.
2. by the described a kind of deep tunnel stability of surrounding rock physical simulation simulation test device of claim 1, it is characterized in that:
Said optical fiber (60) is formed in parallel by 8, is parallel and perpendicular to each 4 in sample excavation direction, and diameter length place of distance excavation axial plane has higher effective property to guarantee data.
3. by the described a kind of deep tunnel stability of surrounding rock physical simulation simulation test device of claim 1, it is characterized in that:
Described 6 foil gauges (70) are positioned at radius length place of distance excavation axial plane, equidistantly arrange according to excavation length, and adjacent foil gauge angle at interval is 137 ° of golden section angles, has higher effective property to guarantee data.
4. based on the test method of the described a kind of deep tunnel stability of surrounding rock physical simulation simulation test device of claim 1, it is characterized in that comprising the following steps:
1. the preparation of sample
A, sample adopt the deep tunnel rock mass in the equivalent material simulating reality tunnel construction, and density is 2.0~3.0g/cm 3, water percentage is 10~20%, and adopts soil, sand, schohartite to form soil with the allotment of constant weight ratio in the actual rock mass structure character and the situation of breaking: sand: schohartite=1:2:7;
B, at sample assigned address laying optical fiber and foil gauge;
C, adding pressure plare, and, calculate its self-weight stress field according to the actual buried depth of deep tunnel, apply the relevant pressure value by the lateral pressure system at the sample top, the fixed 48h of compacting;
2. check the initial value of sample
Start distribution type fiber-optic monitoring system and data acquisition system (DAS), the strain initial value that sample stress initial value that observation optical fiber is derived and foil gauge test out;
Must guarantee initial value within the effective range of design in advance,, should consider to prepare again sample or change respective element if certain initial value deviation average is excessive;
3. check the degree of consolidation of sample
If sample its stress, strain in 12h remain unchanged basically, show that then sample is fixed good, can carry out next step operation;
4. start miniature shield machine, begin to pierce in the sample with given pace along horizontal linear from deep tunnel strata model appearance face, it creeps into speed to use infinitely variable transmission control, pierces sample to certain depth, stops to creep into; Near observation face and stopping the STRESS VARIATION situation in a period of time of back of creeping into is analyzed the generation whether situation such as rock burst and soft rock large deformation are arranged simultaneously; As not having the generation of correlation engineering geological problem, row starts miniature shield machine again, keeps constant rate of speed to creep into;
5. use the situation of change of sample internal stress, displacement in the fiber-optic monitoring systematic observation entire test; The strain variation rule of observing foil gauge simultaneously and being reflected; And gather stress, displacement, strain variation data; And in the input database, the various Monitoring Data that again test obtained are analyzed, thus the related law of deep tunnel rock mass stress strain variation and the formation mechanism of rock burst when obtaining the simulation tunnel excavation.
CN2012102244849A 2012-06-28 2012-06-28 Method for physical simulation test of stability of deep tunnel surrounding rock Expired - Fee Related CN102721604B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012102244849A CN102721604B (en) 2012-06-28 2012-06-28 Method for physical simulation test of stability of deep tunnel surrounding rock

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012102244849A CN102721604B (en) 2012-06-28 2012-06-28 Method for physical simulation test of stability of deep tunnel surrounding rock

Publications (2)

Publication Number Publication Date
CN102721604A true CN102721604A (en) 2012-10-10
CN102721604B CN102721604B (en) 2013-12-11

Family

ID=46947429

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012102244849A Expired - Fee Related CN102721604B (en) 2012-06-28 2012-06-28 Method for physical simulation test of stability of deep tunnel surrounding rock

Country Status (1)

Country Link
CN (1) CN102721604B (en)

Cited By (34)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102928883A (en) * 2012-11-07 2013-02-13 山东大学 Vertical full-space transient electromagnetic tunnel model experimental device
CN103017822A (en) * 2012-11-29 2013-04-03 长江水利委员会长江科学院 Surrounding rock deformation fracture evolution test method and structure for underground powerhouse in high ground stress region
CN103471915A (en) * 2013-09-18 2013-12-25 山东科技大学 Deeply buried tunnel simple model testing apparatus
CN103616287A (en) * 2013-11-28 2014-03-05 湖南大学 Laboratory model testing device for tunnel excavation
CN103674539A (en) * 2013-12-24 2014-03-26 重庆大学 Simulated drilling and testing device for rock and use method thereof
CN103711480A (en) * 2013-12-27 2014-04-09 中国地质大学(北京) Horizontal drilling testing device
CN103728673A (en) * 2014-01-07 2014-04-16 山东大学 Tunnel model test device for achieving advanced detection of multiple geophysical fields
CN103743885A (en) * 2013-12-31 2014-04-23 北京工业大学 Experimental method for verifying bearing capacity of foundation of heavy machine tool
CN103915030A (en) * 2014-04-24 2014-07-09 湖南大学 Underground engineering tunneling model test device with expanding and contracting function
CN104330297A (en) * 2014-10-13 2015-02-04 安徽理工大学 Deep-vertical-well ingate three-dimensional physical model experiment apparatus and method
CN104634646A (en) * 2015-01-13 2015-05-20 哈尔滨工业大学 Testing method for simulating mechanical behaviors of surrounding underground pipelines in construction of shield tunnel
CN104898609A (en) * 2015-04-10 2015-09-09 华北电力大学(保定) Distributed sleet jump control system
CN105277673A (en) * 2015-11-11 2016-01-27 华北理工大学 Achieving method for simulating situation that straining-type rock bursting of roadway is caused by excavating unloading effect
CN105424515A (en) * 2015-12-03 2016-03-23 山东科技大学 Dynamic load applying device of similar material model and testing method of dynamic load applying device
CN105606456A (en) * 2016-01-28 2016-05-25 中国矿业大学 Test device and test method for simulating mechanics characteristic of surrounding rock on top plate of deep repository
CN105675363A (en) * 2016-01-11 2016-06-15 中国人民解放军理工大学 Method for simulating deep rock mass excavation work
CN105823683A (en) * 2015-01-09 2016-08-03 河南工业大学 Device for visually observing deformation features of EPS sludge mixed light-weight soil
CN106289835A (en) * 2016-07-29 2017-01-04 安徽理工大学 Simulation tunnel off-load controllable type experimental provision and using method thereof
CN106323745A (en) * 2016-08-17 2017-01-11 中铁隧道集团有限公司 Simulation method for conducting TBM rock burst test indoors
CN106442941A (en) * 2016-11-11 2017-02-22 浙江科技学院(浙江中德科技促进中心) Testing apparatus and method for shield crossing liquefiable top and hard bottom stratum
CN106908315A (en) * 2017-05-01 2017-06-30 刘华 The principal stress deflection experimental rig and application method of trapezoidal cheuch
CN107192602A (en) * 2017-07-11 2017-09-22 兰州交通大学 A kind of high ground stress soft rock stress tunnel indoor model test equipment and system
CN107764628A (en) * 2017-11-23 2018-03-06 中南大学 Simulate the experimental rig and test method that off-load is excavated under the three-dimensional loading environment of deep
CN108225929A (en) * 2017-12-15 2018-06-29 山东大学 Block splits rock excavation disturbance and development machine shield load-bearing monitor model assay systems and method
CN108278118A (en) * 2018-01-25 2018-07-13 山东大学 Geomechanical model test labyrinth cavity group excavates positioning device and method
CN108956180A (en) * 2018-07-17 2018-12-07 中铁十二局集团第二工程有限公司 Tunnel excavation is simulated to the experimental rig and method for above covering effect on building
CN109709307A (en) * 2019-01-07 2019-05-03 河海大学 A kind of irregular obstacle body condition Equivalent Materials Testing device and method
CN109724865A (en) * 2019-02-26 2019-05-07 中铁二院工程集团有限责任公司 Tunnel-liner water pressure monitoring STS system test set and test method
CN110196036A (en) * 2019-06-05 2019-09-03 石家庄铁道大学 A kind of pipe jacking tunnel construction model test monitoring acquisition system
CN112800530A (en) * 2021-03-29 2021-05-14 中国科学院武汉岩土力学研究所 Digital data processing method for reinforcing stress strain of broken soft surrounding rock face
CN113252457A (en) * 2021-04-13 2021-08-13 中煤科工开采研究院有限公司 Local mine rigidity test device and method
CN113758919A (en) * 2021-07-09 2021-12-07 广东粤海珠三角供水有限公司 Tunnel bottom grouting model test device and test method
CN115389286A (en) * 2022-08-23 2022-11-25 东北大学 Deep rock mass closed stress construction method for physical model test
CN115899013A (en) * 2023-03-09 2023-04-04 江苏恒立液压股份有限公司 Center-penetrating oil cylinder and using method thereof

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101363824A (en) * 2008-05-12 2009-02-11 西安西科测控设备有限责任公司 Device for real time monitoring mine roof rock formation or concrete structure stability
CN101403306A (en) * 2008-11-10 2009-04-08 西南交通大学 Soil pressure balancing type tunnel shielding simulation experiment system
CN102102537A (en) * 2010-12-20 2011-06-22 中铁隧道集团有限公司 Tunnel surrounding rock radial stress strain distributed monitoring technology
CN102221474A (en) * 2011-02-28 2011-10-19 西南交通大学 Muddy water balance type shield simulation testing system
CN202693398U (en) * 2012-06-28 2013-01-23 中国地质科学院地质力学研究所 Stability monitoring and simulating test device for deep tunnel surrounding rock

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101363824A (en) * 2008-05-12 2009-02-11 西安西科测控设备有限责任公司 Device for real time monitoring mine roof rock formation or concrete structure stability
CN101403306A (en) * 2008-11-10 2009-04-08 西南交通大学 Soil pressure balancing type tunnel shielding simulation experiment system
CN102102537A (en) * 2010-12-20 2011-06-22 中铁隧道集团有限公司 Tunnel surrounding rock radial stress strain distributed monitoring technology
CN102221474A (en) * 2011-02-28 2011-10-19 西南交通大学 Muddy water balance type shield simulation testing system
CN202693398U (en) * 2012-06-28 2013-01-23 中国地质科学院地质力学研究所 Stability monitoring and simulating test device for deep tunnel surrounding rock

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
汪宏等: "半岩半土隧道结构稳定数值分析", 《江苏科技大学学报(自然科学版)》 *
陈冬红: "江门隧道富地表水浅埋段施工围岩稳定与变形监测的分析", 《产业与科技论坛》 *

Cited By (48)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102928883B (en) * 2012-11-07 2016-08-10 山东大学 Vertical full-space transient electromagnetic tunnel model experimental device
CN102928883A (en) * 2012-11-07 2013-02-13 山东大学 Vertical full-space transient electromagnetic tunnel model experimental device
CN103017822B (en) * 2012-11-29 2015-08-12 长江水利委员会长江科学院 High Ground Stress Areas underground power house surrouding rock deformation failure evolvement method of testing and structure
CN103017822A (en) * 2012-11-29 2013-04-03 长江水利委员会长江科学院 Surrounding rock deformation fracture evolution test method and structure for underground powerhouse in high ground stress region
CN103471915A (en) * 2013-09-18 2013-12-25 山东科技大学 Deeply buried tunnel simple model testing apparatus
CN103471915B (en) * 2013-09-18 2015-09-16 山东科技大学 Deep-lying tunnel simple model test unit
CN103616287B (en) * 2013-11-28 2015-09-02 湖南大学 A kind of tunnel excavation indoor model test device
CN103616287A (en) * 2013-11-28 2014-03-05 湖南大学 Laboratory model testing device for tunnel excavation
CN103674539A (en) * 2013-12-24 2014-03-26 重庆大学 Simulated drilling and testing device for rock and use method thereof
CN103674539B (en) * 2013-12-24 2016-03-09 重庆大学 A kind of rock analogic drilling and proving installation and using method
CN103711480A (en) * 2013-12-27 2014-04-09 中国地质大学(北京) Horizontal drilling testing device
CN103711480B (en) * 2013-12-27 2016-07-06 中国地质大学(北京) Horizontal drilling assay device
CN103743885A (en) * 2013-12-31 2014-04-23 北京工业大学 Experimental method for verifying bearing capacity of foundation of heavy machine tool
CN103743885B (en) * 2013-12-31 2015-12-09 北京工业大学 A kind of checking heavy machine tool foundation bearing capacity experimental technique
CN103728673A (en) * 2014-01-07 2014-04-16 山东大学 Tunnel model test device for achieving advanced detection of multiple geophysical fields
CN103915030B (en) * 2014-04-24 2016-06-01 湖南大学 The underground works driving model test apparatus of the scalable function of a kind of tool
CN103915030A (en) * 2014-04-24 2014-07-09 湖南大学 Underground engineering tunneling model test device with expanding and contracting function
CN104330297A (en) * 2014-10-13 2015-02-04 安徽理工大学 Deep-vertical-well ingate three-dimensional physical model experiment apparatus and method
CN105823683A (en) * 2015-01-09 2016-08-03 河南工业大学 Device for visually observing deformation features of EPS sludge mixed light-weight soil
CN104634646A (en) * 2015-01-13 2015-05-20 哈尔滨工业大学 Testing method for simulating mechanical behaviors of surrounding underground pipelines in construction of shield tunnel
CN104898609A (en) * 2015-04-10 2015-09-09 华北电力大学(保定) Distributed sleet jump control system
CN104898609B (en) * 2015-04-10 2018-02-27 华北电力大学(保定) Distributed ice-shedding control system
CN105277673A (en) * 2015-11-11 2016-01-27 华北理工大学 Achieving method for simulating situation that straining-type rock bursting of roadway is caused by excavating unloading effect
CN105424515A (en) * 2015-12-03 2016-03-23 山东科技大学 Dynamic load applying device of similar material model and testing method of dynamic load applying device
CN105424515B (en) * 2015-12-03 2018-02-27 山东科技大学 A kind of similar material model dynamic load bringing device and its test method
CN105675363A (en) * 2016-01-11 2016-06-15 中国人民解放军理工大学 Method for simulating deep rock mass excavation work
CN105675363B (en) * 2016-01-11 2018-03-27 中国人民解放军理工大学 A kind of method simulated deep rock mass and excavate operation
CN105606456A (en) * 2016-01-28 2016-05-25 中国矿业大学 Test device and test method for simulating mechanics characteristic of surrounding rock on top plate of deep repository
CN106289835A (en) * 2016-07-29 2017-01-04 安徽理工大学 Simulation tunnel off-load controllable type experimental provision and using method thereof
CN106323745A (en) * 2016-08-17 2017-01-11 中铁隧道集团有限公司 Simulation method for conducting TBM rock burst test indoors
CN106442941A (en) * 2016-11-11 2017-02-22 浙江科技学院(浙江中德科技促进中心) Testing apparatus and method for shield crossing liquefiable top and hard bottom stratum
CN106908315A (en) * 2017-05-01 2017-06-30 刘华 The principal stress deflection experimental rig and application method of trapezoidal cheuch
CN106908315B (en) * 2017-05-01 2019-04-26 新昌县品顺机械有限公司 The principal stress deflection experimental rig and application method of trapezoidal cheuch
CN107192602A (en) * 2017-07-11 2017-09-22 兰州交通大学 A kind of high ground stress soft rock stress tunnel indoor model test equipment and system
CN107764628A (en) * 2017-11-23 2018-03-06 中南大学 Simulate the experimental rig and test method that off-load is excavated under the three-dimensional loading environment of deep
CN108225929A (en) * 2017-12-15 2018-06-29 山东大学 Block splits rock excavation disturbance and development machine shield load-bearing monitor model assay systems and method
CN108278118A (en) * 2018-01-25 2018-07-13 山东大学 Geomechanical model test labyrinth cavity group excavates positioning device and method
CN108956180B (en) * 2018-07-17 2020-09-15 中铁十二局集团第二工程有限公司 Test device and method for simulating influence of tunnel excavation on overlying buildings
CN108956180A (en) * 2018-07-17 2018-12-07 中铁十二局集团第二工程有限公司 Tunnel excavation is simulated to the experimental rig and method for above covering effect on building
CN109709307A (en) * 2019-01-07 2019-05-03 河海大学 A kind of irregular obstacle body condition Equivalent Materials Testing device and method
CN109724865A (en) * 2019-02-26 2019-05-07 中铁二院工程集团有限责任公司 Tunnel-liner water pressure monitoring STS system test set and test method
CN109724865B (en) * 2019-02-26 2023-09-22 中铁二院工程集团有限责任公司 Tunnel lining water pressure monitoring system test device and test method
CN110196036A (en) * 2019-06-05 2019-09-03 石家庄铁道大学 A kind of pipe jacking tunnel construction model test monitoring acquisition system
CN112800530A (en) * 2021-03-29 2021-05-14 中国科学院武汉岩土力学研究所 Digital data processing method for reinforcing stress strain of broken soft surrounding rock face
CN113252457A (en) * 2021-04-13 2021-08-13 中煤科工开采研究院有限公司 Local mine rigidity test device and method
CN113758919A (en) * 2021-07-09 2021-12-07 广东粤海珠三角供水有限公司 Tunnel bottom grouting model test device and test method
CN115389286A (en) * 2022-08-23 2022-11-25 东北大学 Deep rock mass closed stress construction method for physical model test
CN115899013A (en) * 2023-03-09 2023-04-04 江苏恒立液压股份有限公司 Center-penetrating oil cylinder and using method thereof

Also Published As

Publication number Publication date
CN102721604B (en) 2013-12-11

Similar Documents

Publication Publication Date Title
CN102721604B (en) Method for physical simulation test of stability of deep tunnel surrounding rock
CN202693398U (en) Stability monitoring and simulating test device for deep tunnel surrounding rock
CN106592655B (en) Pile pile pile sinking simulation test device and method under a kind of gradient confining pressure
CN201843152U (en) Simulation tester for construction and monitoring of deep foundation pit engineering
CN105527389A (en) Jack-based experiment model and method for simulating uneven settlement of foundation
CN104142388B (en) Original position static(al) press-in test method in boring
CN110554169A (en) tunnel excavation process simulation test device and method
CN105181199B (en) A kind of side hole stress relief method of detecting earth stress
CN103866736B (en) The shake of a kind of ore deposit is on the physical simulation experiment system and method for coal mine underground reservoir impact
CN104614242A (en) Excavation and surrounding rock stress and strain monitoring model testing device for rock-soil chamber under complicated conditions, and method thereof
CN103487563A (en) Testing apparatus used for simulating foundation pit three-dimensional seepage caused by combined effects of separating-lowering-pouring and ground deformation mechanism
CN105604066A (en) Application of resistivity profiling method to detection of building foundation pit support structure water leakage
CN210154614U (en) Foundation pit and settlement monitoring device of peripheral stratum thereof based on BIM
CN102278948B (en) Compound optical fiber sensing monitoring system and method based on optical fiber compound sensing module
CN106769501A (en) A kind of measuring method of the Deformation Module of Rock Mass of different depth
CN105604104A (en) Experiment model and method for simulating differential settlement of foundation based on air bag method
CN110805076A (en) Test device and method for simulating reinforcement of passive area of foundation pit
CN104655036A (en) Deformation quasi-distributed fiber optic sensing system in geotechnical centrifuge model body
CN109405880A (en) A kind of superficial part goaf earth's surface combines monitoring and pre-warning system and method with underground
CN105386474A (en) Method for determining influences of leakage of waterproof curtain above foundation pit excavation face on surrounding environment
CN113960695A (en) Fine exploration method for water-rich karst in complex urban environment
Adushkin et al. From the alternating-sign explosion response of rocks to the pendulum waves in stressed geomedia. Part II
CN111125872A (en) Rock burst prediction method for TBM tunneling tunnel
CN211571804U (en) Test device for simulating reinforcement of passive zone of foundation pit
CN210720389U (en) Tunnel excavation process analogue test device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131211

Termination date: 20210628

CF01 Termination of patent right due to non-payment of annual fee