CN102718121B - Construction method of lifting device for large cement pipe - Google Patents

Construction method of lifting device for large cement pipe Download PDF

Info

Publication number
CN102718121B
CN102718121B CN201210216668.0A CN201210216668A CN102718121B CN 102718121 B CN102718121 B CN 102718121B CN 201210216668 A CN201210216668 A CN 201210216668A CN 102718121 B CN102718121 B CN 102718121B
Authority
CN
China
Prior art keywords
lifting
cement pipe
tube coupling
round pin
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210216668.0A
Other languages
Chinese (zh)
Other versions
CN102718121A (en
Inventor
孙焕斌
张立新
潘留生
王靖
李波
王文顺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Civil Engineering Co Ltd of CREC
Municipal Environmental Construction Co Ltd of CREC
Original Assignee
Shanghai Civil Engineering Co Ltd of CREC
Municipal Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Civil Engineering Co Ltd of CREC, Municipal Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC filed Critical Shanghai Civil Engineering Co Ltd of CREC
Priority to CN201210216668.0A priority Critical patent/CN102718121B/en
Publication of CN102718121A publication Critical patent/CN102718121A/en
Application granted granted Critical
Publication of CN102718121B publication Critical patent/CN102718121B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Load-Engaging Elements For Cranes (AREA)

Abstract

The invention relates to the technical field of engineering lifting operations and specifically relates to a lifting device for a large cement pipe and a construction method thereof. The lifting device for the large cement pipe comprises a transverse hanging beam, two plumbing arms, a rotary shaft, a pair of round plug pins, round pin sleeves, a ball seat, a safety pin and a wing-shaped blocking plate. The device for the large cement pipe is characterized in that a lifting hook hole is arranged in the middle of the transverse hanging beam, hanging ring holes are arranged at two ends of the transverse hanging beam, the hanging ring holes are used for suspending the two plumbing arms respectively through the rotary shaft, the round pin sleeves are embedded on the lower portions of the two plumbing arms respectively, and the pair of round plug pins is inserted into lifting holes which are embedded on the outer wall of the cement pipe through round pin sleeve inner holes. By means of the lifting device for the large cement pipe and the construction method thereof, the problems and hidden dangers that the large cement pipe lifting in prior art is difficult to overturn, low in efficiency and large in risk are solved. According to the lifting device for the large cement pipe and the construction method thereof, a stable lifting can be achieved during a construction process, the large cement pipe can be overturned, the application is wide, the device can be used for lifting, loading, unloading and overturning of the large cement pipe, construction safety is simultaneously guaranteed on the basis of a guarantee for construction efficiency, besides, stable and smooth operation can be maintained during processes of lifting, shifting, inserting and drawing, and the lifting device for the large cement pipe and the construction method thereof are safe, reliable, convenient and rapid.

Description

A kind of construction method that adopts suspender hoisting large-size cement pipe
[technical field]
The present invention relates to engineering lifting operation technical field, specifically a kind of suspender for large-scale cement pipe and construction method thereof.
[background technology]
In the lifting operation of cement pipe, large-scale cement pipe is used for lifting at pre-buried two circular holes of pipe outer wall conventionally, during lifting, in hole for hoist, insert the cylindrical hanger of a pair of plug-in type, the rope sling at steel rope two ends is hung on hanger, the centre that suspension hook the hangs over steel rope tube coupling of slinging.In prior art, the structural principle of this suspender is simple, but exists hanger from the risk of slippage in hole for hoist, has larger potential safety hazard.Secondly, cement pipe producing, deposit, need frequently to overturn operation in transportation and installation process, during tube coupling upset easily and steel rope generation interfere with each other, to operation, bring certain difficulty.In addition, in operation process, when tube coupling center of gravity changes, because of suspender, tumble very easily suddenly built on the sand, cause the accident, therefore this device and technology are prone to accidents in work progress, safe and reliable not.
[summary of the invention]
Object of the present invention is exactly in order to solve upset difficulty in prior art, low, the dangerous large deficiency of efficiency, a kind of novel structure, safe and reliable, the broad-spectrum suspender for large-scale cement pipe and construction method thereof to be provided.
For achieving the above object, a kind of suspender for large-scale cement pipe is provided, comprise horizontal hanging beam (1), plumbing arm (2), rotating shaft (3), round pin (4), round pin cover (5), ball seat (6), safety plug (7) and wing baffle plate (8), it is characterized in that described horizontal hanging beam (1) middle part is provided with hook on hole, the two ends of horizontal hanging beam (1) are provided with link hole, link hole is suspended respectively two plumbing arms (2) in midair by rotating shaft (3), two plumbing arms (2) bottom is inlaid with respectively round pin cover (5), a pair of round pin (4) is inserted and is embedded in the hole for hoist on cement pipe outer wall by round pin cover (5) endoporus.
Described plumbing arm (2) bottom is provided with ball seat (6), and round pin cover (5) outside face is spherical, is embedded in ball seat (6), and round pin cover (5) is made universal rotational along ball seat (6).
Described horizontal hanging beam (1) middle part vertical direction is provided with two fixing wing baffle plates (8).
Described round pin cover (5) outside is provided with the pin-and-hole of vertical direction, and safety plug (7) is inserted in round pin cover (5) and round pin (4) outside through pin-and-hole.
Above or below described round pin cover (5), also inlay pin hole and ball seat are installed.
The present invention also comprises a kind of construction method of suspender hoisting large-size cement pipe, this construction method is as follows: cement pipe keeps flat, horizontal hanging beam (1) winches to tube coupling top, two plumbing arms (2) naturally droop in tube coupling both sides, round pin (4) inserts lifting tube coupling in tube coupling hole for hoist by guide (5), the upset of wing baffle plate (8) restriction tube coupling, keep tube coupling steady, guide (5) is arranged in ball seat, can universal rotational, be convenient to the insertion of round pin and extract, before lifting, insert safety plug (7), prevent that round pin is loosening, exit, tube coupling need to become while keeping flat from keeping flat to become to stand up or stand up, tube coupling center of gravity is in bottom, held stationary under Action of Gravity Field, tube coupling keeps flat, while standing up, utilize the guide (5) of differing heights position on plumbing arm, all can steadily lift by crane tube coupling.All round pins (4) plugs convenient during lifting, utilizes guide (5) the lifting tube coupling of below of plumbing arm (2), is convenient to tube coupling upset.
The present invention compared with prior art, has solved the medium-and-large-sized cement pipe lifting of prior art upset difficulty, efficiency low, dangerous large problem and hidden danger.The present invention can accomplish steady lifting in construction operation process, turning large-scale cement pipe, of many uses, can be used for lifting, handling and the upset of large-scale cement pipe, can guarantee on the basis of operating efficiency, to guarantee construction safety simultaneously, in lifting, displacement, plug process, all can keep operation steadily freely, safe and reliable, convenient and swift.
[accompanying drawing explanation]
Fig. 1 is that the present invention is for main TV structure and the flat view of hanging of tube coupling of hoisting large-size cement pipe suspender;
Fig. 2 is that the present invention is for side-looking structure and the flat view of hanging of tube coupling of hoisting large-size cement pipe suspender;
Fig. 3 is the tube coupling rollover states schematic diagram of the present invention during for hoisting large-size cement pipe;
Fig. 4 is the vertical view of hanging of the tube coupling of the present invention during for hoisting large-size cement pipe;
Fig. 5 is that the present invention is for the universal guide of hoisting large-size cement pipe suspender and the detailed structure schematic diagram of ball seat;
Fig. 6 is that the present invention is for the safety plug detailed structure lateral plan of hoisting large-size cement pipe suspender;
Fig. 7 is that the present invention is for the safety plug detailed structure front view of hoisting large-size cement pipe suspender;
As shown in the figure, in figure: 1. vertical wall 3. rotating shaft 4. round pin 5. round pins of horizontal hanging beam 2. overlap 6. ball seat 7. safety plug 8. wing baffle plates;
Specifying Fig. 1 is Figure of abstract of the present invention.
[specific embodiment]
Below in conjunction with accompanying drawing, the invention will be further described, and the structure of this device and principle are very clearly concerning this professional people.
As shown in Figure 1, 2, cement pipe keeps flat, and horizontal hanging beam (1) winches to tube coupling top, two plumbing arms (2) naturally droop in tube coupling both sides, round pin (4) inserts lifting tube coupling in tube coupling hole for hoist by guide (5), and the upset of wing baffle plate (8) restriction tube coupling, keeps tube coupling steady.As shown in Figure 5, guide (5) is arranged in ball seat, can universal rotational, and be convenient to the insertion of round pin and extract.Before lifting, insert safety plug (7), prevent that round pin from becoming flexible, exiting, and guarantees to lift by crane safety.
As shown in Figure 3, tube coupling need to become while keeping flat from keeping flat to become to stand up or stand up, and tube coupling center of gravity is in bottom, held stationary under Action of Gravity Field.
According to technical scheme of the present invention, when tube coupling keeps flat, stands up, utilize the guide (5) of differing heights position on plumbing arm, all can steadily lift by crane tube coupling.All round pins (4) plug convenient during lifting.
Utilize guide (5) the lifting tube coupling of below of plumbing arm (2), be convenient to tube coupling upset, whole lifting upset operation steadily freely, safe and reliable, convenient and swift.

Claims (1)

1. a construction method that adopts suspender hoisting large-size cement pipe, it is characterized in that described construction method is as follows: cement pipe keeps flat, horizontal hanging beam (1) winches to tube coupling top, two plumbing arms (2) naturally droop in tube coupling both sides, round pin (4) inserts lifting tube coupling in tube coupling hole for hoist by round pin cover (5), the upset of wing baffle plate (8) restriction tube coupling, keep tube coupling steady, round pin cover (5) is arranged in ball seat, can universal rotational, be convenient to the insertion of round pin and extract, before lifting, insert safety plug (7), prevent that round pin is loosening, exit, tube coupling need to become while keeping flat from keeping flat to become to stand up or stand up, tube coupling center of gravity is in bottom, held stationary under Action of Gravity Field, tube coupling keeps flat, while standing up, utilize the round pin cover (5) of differing heights position on plumbing arm, all can steadily lift by crane tube coupling, all round pins (4) plugs convenient during lifting, utilizes round pin cover (5) the lifting tube coupling of below of plumbing arm (2), is convenient to tube coupling upset.
CN201210216668.0A 2012-06-27 2012-06-27 Construction method of lifting device for large cement pipe Active CN102718121B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210216668.0A CN102718121B (en) 2012-06-27 2012-06-27 Construction method of lifting device for large cement pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210216668.0A CN102718121B (en) 2012-06-27 2012-06-27 Construction method of lifting device for large cement pipe

Publications (2)

Publication Number Publication Date
CN102718121A CN102718121A (en) 2012-10-10
CN102718121B true CN102718121B (en) 2014-04-23

Family

ID=46944034

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210216668.0A Active CN102718121B (en) 2012-06-27 2012-06-27 Construction method of lifting device for large cement pipe

Country Status (1)

Country Link
CN (1) CN102718121B (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103787188A (en) * 2012-11-02 2014-05-14 天工爱和特钢有限公司 Fast-forged steel overturning hanger
CN103935880B (en) * 2014-04-18 2017-02-01 镇平县英卓科技有限公司 Final assembly hanger for hydraulic oil cylinder
CN104058330B (en) * 2014-06-19 2015-10-14 牛永杰 Pipeline transportation is sling all-in-one
CN104310206B (en) * 2014-08-06 2016-07-06 上海隧道工程有限公司 Tube coupling handling turning device and method thereof
CN104261246A (en) * 2014-09-12 2015-01-07 上海市政建设有限公司 Hoisting tool of rectangular pipe-jacking section and use method of hoisting tool
ES2655980B2 (en) * 2017-08-07 2018-09-13 Gestion Y Actividades Secozam Sl DEVICE FOR LIFTING PREFABRICATED BEAMS
CN107311029A (en) * 2017-08-08 2017-11-03 安徽海龙建筑工业有限公司 It is a kind of for the demoulding of polygon prefabricated toilet, upset, lifting device
CN107986147B (en) * 2017-12-01 2024-04-30 天津航天瑞莱科技有限公司 Overturning lifting appliance of single-skirt engine
CN114888613B (en) * 2022-05-07 2023-04-25 福建兴腾科技有限公司 Nuclear power cock protective sleeve feeding method

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU889591A2 (en) * 1980-02-13 1981-12-15 Центральное Конструкторско-Технологическое Бюро Госкомсельхозтехники Усср Tipping gripper
DD227676A1 (en) * 1984-10-19 1985-09-25 Liebknecht Transformat TRANSPORT DEVICE FOR PIPES
DD237432A3 (en) * 1984-10-17 1986-07-16 Rohrkombinat Stahl & Walzwerk LAST RECORDING MEDIUM
DE20305090U1 (en) * 2003-03-29 2004-04-29 Halfen Gmbh & Co. Kommanditgesellschaft Anchor for lifting prefabricated concrete section has a two part construction linked by a thread to remove the coupling end after positioning the section
CN2730840Y (en) * 2004-09-29 2005-10-05 天津港第四港埠公司 Automatic clamping hauling tool for clutch casing of hydraulic speed variator
CN201236095Y (en) * 2008-06-30 2009-05-13 中国有色(沈阳)冶金机械有限公司 Backing plate of stacker crane pneumatic fixture
CN201250054Y (en) * 2008-07-17 2009-06-03 宝山钢铁股份有限公司 Hanger for stretch reducing mill
CN101723241A (en) * 2009-11-13 2010-06-09 天津市天发重型水电设备制造有限公司 Hoist balancing frame of cross-flow generator stator
CN202208595U (en) * 2011-09-09 2012-05-02 江都市建材机械厂有限公司 Special lifting appliance for PCCP (Pre-stressed Concrete Cylinder Pipe) processing
CN202272618U (en) * 2011-08-31 2012-06-13 扬州市华光双瑞实业有限公司 Inspection well lifting appliance
CN202717509U (en) * 2012-06-27 2013-02-06 中铁上海工程局有限公司 Hanger for large-sized cement pipe

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU889591A2 (en) * 1980-02-13 1981-12-15 Центральное Конструкторско-Технологическое Бюро Госкомсельхозтехники Усср Tipping gripper
DD237432A3 (en) * 1984-10-17 1986-07-16 Rohrkombinat Stahl & Walzwerk LAST RECORDING MEDIUM
DD227676A1 (en) * 1984-10-19 1985-09-25 Liebknecht Transformat TRANSPORT DEVICE FOR PIPES
DE20305090U1 (en) * 2003-03-29 2004-04-29 Halfen Gmbh & Co. Kommanditgesellschaft Anchor for lifting prefabricated concrete section has a two part construction linked by a thread to remove the coupling end after positioning the section
CN2730840Y (en) * 2004-09-29 2005-10-05 天津港第四港埠公司 Automatic clamping hauling tool for clutch casing of hydraulic speed variator
CN201236095Y (en) * 2008-06-30 2009-05-13 中国有色(沈阳)冶金机械有限公司 Backing plate of stacker crane pneumatic fixture
CN201250054Y (en) * 2008-07-17 2009-06-03 宝山钢铁股份有限公司 Hanger for stretch reducing mill
CN101723241A (en) * 2009-11-13 2010-06-09 天津市天发重型水电设备制造有限公司 Hoist balancing frame of cross-flow generator stator
CN202272618U (en) * 2011-08-31 2012-06-13 扬州市华光双瑞实业有限公司 Inspection well lifting appliance
CN202208595U (en) * 2011-09-09 2012-05-02 江都市建材机械厂有限公司 Special lifting appliance for PCCP (Pre-stressed Concrete Cylinder Pipe) processing
CN202717509U (en) * 2012-06-27 2013-02-06 中铁上海工程局有限公司 Hanger for large-sized cement pipe

Also Published As

Publication number Publication date
CN102718121A (en) 2012-10-10

Similar Documents

Publication Publication Date Title
CN102718121B (en) Construction method of lifting device for large cement pipe
CN202717509U (en) Hanger for large-sized cement pipe
CN202967866U (en) Three-chain adjustable sling
CN202296842U (en) Hanger special for universal shaft of vertical rolling mill
CN103663101A (en) Method for lifting voltage stabilizer of nuclear power station
CN202272622U (en) Balanced turning lifting hook
CN105565146B (en) Suspension hook holding structure, crane and suspension hook fixing means
CN201580891U (en) Lifting appliance for assisting overturn of centrifugal mold
CN105621231A (en) Combined lifting appliance special for large-diameter reinforced concrete drainage pipe
CN203284055U (en) H-section steel lifting tool
CN205170175U (en) Large castings's two point type hoists
CN202156870U (en) Inner expansion type lifting appliance for steel tubes
CN202116194U (en) Intra-pipe lifting appliance with main hook and auxiliary hooks
CN205772790U (en) Circular spherical tank integral hoisting specific purpose tool
CN201809037U (en) Hanger
CN205170159U (en) Can hang hoist that hangs in overhead traveling crane
CN205442379U (en) Balanced sling
CN201089694Y (en) Vehicle wheel sling
CN204508512U (en) Bottom loose-leaf cage
CN209468050U (en) A kind of turnover device of fire-resistant prefabricated member
CN107352382B (en) Suspender
CN204897153U (en) Slings for lifting loads
CN207175211U (en) A kind of oil cooler anticreep hoisting fixture
CN205341897U (en) Simple structure's gravity metal pattern fast switch over ware for casting machine
CN104495604A (en) Inner clamping type hoisting device for braking drum of automobile

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C53 Correction of patent of invention or patent application
CB03 Change of inventor or designer information

Inventor after: Sun Huanbin

Inventor after: Zhang Lixin

Inventor after: Pan Liusheng

Inventor after: Wang Jing

Inventor after: Li Bo

Inventor after: Wang Wenshun

Inventor before: Sun Huanbin

Inventor before: Li Bo

Inventor before: Wang Wenshun

Inventor before: Zhang Lixin

Inventor before: Li Minghua

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: SUN HUANBIN LI BO WANG WENSHUN ZHANG LIXIN LI MINGHUA TO: SUN HUANBIN ZHANG LIXIN PAN LIUSHENG WANG JING LI BO WANG WENSHUN

C14 Grant of patent or utility model
GR01 Patent grant
C53 Correction of patent of invention or patent application
C56 Change in the name or address of the patentee

Owner name: SHANGHAI CIVIL ENGINEERING CO., LTD. OF CREC

Free format text: FORMER NAME: SHANGHAI CIVIL ENGINEERING CO., LTD. OF CREC

CB03 Change of inventor or designer information

Inventor after: Sun Huanbin

Inventor after: Zhang Lixin

Inventor after: Hu Bin

Inventor after: Zhang Haitao

Inventor after: Wang Jing

Inventor after: Liu Xueping

Inventor after: Deng Yongchi

Inventor after: Pan Liusheng

Inventor before: Sun Huanbin

Inventor before: Zhang Lixin

Inventor before: Pan Liusheng

Inventor before: Wang Jing

Inventor before: Li Bo

Inventor before: Wang Wenshun

COR Change of bibliographic data

Free format text: CORRECT: INVENTOR; FROM: SUN HUANBIN ZHANG LIXIN PAN LIUSHENG WANG JING LI BO WANG WENSHUN TO: SUN HUANBIN ZHANG LIXIN HU BIN ZHANG HAITAO WANG JING LIU XUEPING DENG YONGCHI PAN LIUSHENG

CP03 Change of name, title or address

Address after: 200436 Shanghai Road, Zhabei District, No. three, No. 278

Patentee after: SHANGHAI CIVIL ENGINEERING Co.,Ltd. OF CREC

Patentee after: China Railway Shanghai Engineering Bureau Group Municipal Engineering Co.,Ltd.

Address before: 200436 Shanghai, Zhabei District River Road, No. 272, No. three, layer 278, 10

Patentee before: SHANGHAI CIVIL ENGINEERING Co.,Ltd. OF CREC

Patentee before: Shanghai CIVIL Engineering Municipal Engineering Co.,Ltd.

CP01 Change in the name or title of a patent holder

Address after: 200436, No. three, 278 Road, Zhabei District, Shanghai

Co-patentee after: China Railway Municipal Environmental Construction Co.,Ltd.

Patentee after: SHANGHAI CIVIL ENGINEERING Co.,Ltd. OF CREC

Address before: 200436, No. three, 278 Road, Zhabei District, Shanghai

Co-patentee before: China Railway Shanghai Engineering Bureau Group Municipal Engineering Co.,Ltd.

Patentee before: SHANGHAI CIVIL ENGINEERING Co.,Ltd. OF CREC

CP01 Change in the name or title of a patent holder
TR01 Transfer of patent right

Effective date of registration: 20200525

Address after: 200331 A District, building 88, Lane 3, Wuwei Road, Shanghai, Putuo District, China

Patentee after: China Railway Municipal Environmental Construction Co.,Ltd.

Address before: 200436, No. three, 278 Road, Zhabei District, Shanghai

Co-patentee before: China Railway Municipal Environmental Construction Co.,Ltd.

Patentee before: SHANGHAI CIVIL ENGINEERING Co.,Ltd. OF CREC

TR01 Transfer of patent right