CN102708518A - Transmission and transformation project environment sensitive area comprehensive management system based on geographic information technology - Google Patents

Transmission and transformation project environment sensitive area comprehensive management system based on geographic information technology Download PDF

Info

Publication number
CN102708518A
CN102708518A CN2012101348836A CN201210134883A CN102708518A CN 102708518 A CN102708518 A CN 102708518A CN 2012101348836 A CN2012101348836 A CN 2012101348836A CN 201210134883 A CN201210134883 A CN 201210134883A CN 102708518 A CN102708518 A CN 102708518A
Authority
CN
China
Prior art keywords
project
transmitting
data
sensitizing range
converting electricity
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012101348836A
Other languages
Chinese (zh)
Other versions
CN102708518B (en
Inventor
谢连科
李勇
张永
马新刚
周灿
张兆波
王彬
臧玉魏
林爱杰
江红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Electric Power Research Institute of State Grid Shandong Electric Power Co Ltd
Original Assignee
Electric Power Research Institute of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Electric Power Research Institute of State Grid Shandong Electric Power Co Ltd filed Critical Electric Power Research Institute of State Grid Shandong Electric Power Co Ltd
Priority to CN201210134883.6A priority Critical patent/CN102708518B/en
Publication of CN102708518A publication Critical patent/CN102708518A/en
Application granted granted Critical
Publication of CN102708518B publication Critical patent/CN102708518B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention relates to a transmission and transformation project environment sensitive area comprehensive management system based on a geographic information technology. A project environment geographic information system is established, and information such as geographic location information of a transmission and transformation project in a target area, types of surrounding sensitive areas, and protection ranges is managed and inquired, thus the functions of automatic analysis and calculation and auxiliary optimization of a transmission line path are realized. The transmission and transformation project environment sensitive area comprehensive management system comprises a geographic information platform, a project environment geographic information platform and a project environment geographic information system function application layer, wherein the geographic information platform is used for acquiring sensitive area and project data and influenced pattern basic data and establishing a system database; the project environment geographic information platform is communicated with a power geographic information system through a data interface module and is used for reading, updating and analyzing project data and sensitive area data, and providing corresponding basic services aiming at different applications and opened interface services through a Web Service mode for realizing information sharing among systems; and the project environment geographic information system function application layer realizes inquiry and management of the sensitive areas and management and comprehensive analysis of a transmission and transformation project.

Description

Project of transmitting and converting electricity environment sensitive district total management system based on geographical information technology
Technical field
The present invention relates to a kind of project of transmitting and converting electricity environment sensitive district total management system based on geographical information technology.
Background technology
Along with rapid economy development; Power grid construction has also welcome the peak; In the power grid construction process, often occur not only causing delayed works, cause unnecessary loss because designed lines is crossed over the environment difficulties that house owed by a citizen, circuit and village close together etc. cause; Also have influence on the social image of company, so State Grid Corporation of China strengthens the environmental protection management to project of transmitting and converting electricity.
In electrical network environmental protection management work, the environmental impact assessment cycle is long, difficulty is big, is the key factor that influences power grid construction previous work quality and speed; The environmental protection final acceptance of construction is the deciding factor that can the electrical network project formal legal operation, has only through the project of checking and accepting and just can put into serial production operation.In environmental impact assessment work, accurately, all environment sensitive targets of relating to of comprehensively identification project, accurately judge its environmental risk, be the important factor of decision environmental impact assessment work quality.If can not accurately identify the environmental risk of project all sidedly, can cause engineering environment difficulties to occur in construction and operational process, hinder the smooth construction and the operation of engineering.After the project final acceptance of construction, how effectively to manage project of transmitting and converting electricity and the position of the environment sensitive target that relates to, photo, examination Monitoring Data, to check and accept environmental protection data such as survey report be an important process of electrical network environmental protection management.
At present domestic also do not have unit to utilize GIS to combine RS, GPS platform to realize integrated management is carried out in the project of transmitting and converting electricity efforts at environmental protection.Therefore be necessary that combining geographic information technology (GIS) is carried out vector quantization to the topomap in area, Shandong and all kinds of sensitive target data and with completion environmental protection data collating sort input database in addition; Make up project of transmitting and converting electricity environment sensitive based target integrated management system; With the remote sensing image is background, shows project of transmitting and converting electricity, the sensitizing range distribution situation on ground intuitively, realizes the identification quick and precisely in project of transmitting and converting electricity environment sensitive district; And the having access to fast of relevant environmental protection data; Avoid taking place that sensitive target does not have identification and the smooth implementation that influence engineering carries out environmental protection optimization to engineering, the shortening scientific research; In the cycle of environmental impact assessment establishment, examination, strengthen environmental protection management to project of transmitting and converting electricity.
Summary of the invention
The object of the invention is exactly for addressing the above problem; A kind of project of transmitting and converting electricity environment sensitive district total management system based on geographical information technology is provided; It sets up environment sensitive target GIS-Geographic Information System; Information such as the type of the geographical location information of objective area project of transmitting and converting electricity, peripheral sensitizing range, protection domain are managed, inquired about, realize that the sensitive spot automatic analyser calculates and optimize function such as transmission line of electricity path.
For realizing above-mentioned purpose, the present invention adopts following technical scheme:
A kind of project of transmitting and converting electricity environment sensitive district total management system based on geographical information technology, it comprises:
Geographical information platform is gathered sensitizing range, project data and is influenced the circular foundation data, sets up system database; Database is Oracle 10g; The mode that adopts C/S to combine with B/S makes up, and under the C/S mode, possesses all functions of system, under the web mode, realizes browsing and analytic function sensitizing range, project of transmitting and converting electricity; More convenient to use, also be easy to the issue of system.
The engineering-environment geographical information platform comprises data service module, basic maintenance module, figure sub-module, system management module, data interface module; Communicate by letter with the electric power GIS-Geographic Information System through data interface module; Realization is read, upgrades, is analyzed project data, sensitizing range data, to different application, corresponding infrastructure service is provided; Mode through Web Service provides open interface service, the information sharing between the realization system;
Engineering-environment GIS-Geographic Information System function application layer; Comprise that sensitizing range administration module, project of transmitting and converting electricity data management module, line module, project of transmitting and converting electricity sensitizing range analysis module, image and vector read service module, sensitizing range and project of transmitting and converting electricity data and read service module, data update module; Realize sensitizing range inquiry, management, project of transmitting and converting electricity management and analysis-by-synthesis.
Said data service module provides the reading of transformer station, circuit, shaft tower information, image and vector data of sensitizing range data, project of transmitting and converting electricity; The request of customer in response end provides attribute information, the position range information of sensitizing range to client; The request of customer in response end provides project of transmitting and converting electricity to client, comprises attribute information, the positional information of transformer station, circuit, shaft tower; The request of customer in response end provides image, map vector data to client;
The basis maintenance module provides transformer station, the circuit of sensitizing range updating data, project of transmitting and converting electricity, the renewal of shaft tower information; The request of customer in response end is added, is deleted the sensitizing range of appointment; The request of customer in response end is added, is deleted project of transmitting and converting electricity, comprises transformer station, circuit, shaft tower; The request of customer in response end, the attribute information of renewal sensitizing range, project of transmitting and converting electricity; The request of customer in response end, the positional information of renewal sensitizing range, project of transmitting and converting electricity;
Image analysis module; Advanced analysis to the project of transmitting and converting electricity environment mainly is provided; Comprise: the request of customer in response end, according to request project of transmitting and converting electricity, sensitizing range classification, alarm distance parameter the sensitizing range is analyzed, give client the sensitizing range information feedback of statistics; The request of customer in response end imports place on line or directly on map, draws, and the alarm distance according to being provided with through pattern analysis, is output as the sensitizing range Vector Message in the map of standard format;
System management module; Rational rights management mechanism mainly is provided; Comprise: system manager maintenance department, personal information; The system manager can distribute personnel's authority, can be according to the personnel's of all departments right assignment function corresponding, and the personnel of all departments can safeguard system data in the scope of authority setting;
Data interface module inserts the project of transmitting and converting electricity data, and these data comprise the attribute information and the positional information of transformer station, circuit, shaft tower, and service provides that database reads, the EXCEL file imports dual mode and inserts data.
Said sensitizing range administration module; Sensitizing range attribute, positional information are safeguarded; The sensitizing range comprises that mainly inhabitation, health care, culture and education, scientific research, administrative office etc. are the zone of major function; Cultural relics protection unit has protection ground, historical relic sight spot, wilderness area, water head site of special history, culture, science, national meaning etc.; Maintenance function to the sensitizing range classification is provided, comprises newly-built, name modifications, the deletion of sensitizing range classification; The layer management of sensitizing range according to the classification of sensitizing range, generates corresponding sensitizing range figure layer automatically, and the function that is provided with to figure layer display properties is provided; Attribute and graphical information to the sensitizing range safeguard, comprise the sensitizing range newly-built, revise, deletion, wherein the modification of figure relatively comprises the summit of line object, polygonal shape is moved, adds, deleted; Select the sensitizing range, the photo of sensitizing range is uploaded, downloaded, and display photos; The Completion Inspecting and Monitoring data of sensitizing range are uploaded, downloaded to mode with file;
The project of transmitting and converting electricity data management module is safeguarded the attribute and the positional information of project of transmitting and converting electricity, comprise newly-built, revise, deletion; The attribute and the positional information that from generalized information system, read transformer station, circuit, shaft tower are provided; Project of transmitting and converting electricity is inquired about, on map, show, and transformer station, circuit, shaft tower are positioned; Select project of transmitting and converting electricity, upload, download the photo of project of transmitting and converting electricity then, and show; The Completion Inspecting and Monitoring data of project of transmitting and converting electricity are uploaded, downloaded to mode with file.
User management module, user's login and cancellation, the login of system can have dual mode: common login and with system registry user's identity login system; If with domestic consumer's identity login; Then the active user can only be to map, and device tree is inquired about, and can't carry out business operation; User's login password is revised; The user is managed, user's authority is set, only the user with the login of system manager's identity just can carry out this management.
Project of transmitting and converting electricity sensitizing range analysis module; Advanced analysis to the project of transmitting and converting electricity environment; Comprise: the request of customer in response end, according to project of transmitting and converting electricity, sensitizing range classification, alarm distance parameter that request is selected the sensitizing range to be analyzed, automatic analyser is calculated qualified project of transmitting and converting electricity sensitizing range; And the sensitizing range that satisfies condition fed back to client with tabular form, and can further inquire about relevant photo and final acceptance of construction document; Decision Analysis can directly import place on line, or directly on map, draw, and according to the alarm distance that is provided with, through pattern analysis, checks project of transmitting and converting electricity affected sensitizing range on every side;
Image and vector read service module, and the reading of transformer station, circuit, shaft tower information, image and vector data of sensitizing range data, project of transmitting and converting electricity is provided;
Sensitizing range and project of transmitting and converting electricity data read service module, and the reading of transformer station, circuit, shaft tower information, image and vector data of sensitizing range data, project of transmitting and converting electricity mainly is provided.The request of customer in response end provides attribute information, the position range information of sensitizing range to client; The request of customer in response end provides project of transmitting and converting electricity to client, comprises transformer station, circuit (pole line, cable), the attribute information of shaft tower, positional information; The request of customer in response end provides image, map vector data to client;
Data update module provides transformer station, the circuit of sensitizing range updating data, project of transmitting and converting electricity, the renewal of shaft tower information.The request of customer in response end is added, is deleted the sensitizing range of appointment; The request of customer in response end is added, is deleted project of transmitting and converting electricity, comprises transformer station, circuit (pole line, cable), shaft tower; The request of customer in response end, the attribute information of renewal sensitizing range, project of transmitting and converting electricity; The request of customer in response end, the positional information of renewal sensitizing range, project of transmitting and converting electricity;
The concrete communication process of data interface module is:
Database reads; At first need fully to understand the database structure of project of transmitting and converting electricity data in the connecting system, retrieve data step by step then, the order of retrieval be transformer station-" circuit-" shaft tower; Thereby read the project of transmitting and converting electricity data, thereby read up-to-date data timely; The cannonical format of project of transmitting and converting electricity data is set up in the importing of EXCEL file, and presses the form of this normalized definition EXCEL file, realizes the importing of project of transmitting and converting electricity data, and as long as the system interface of need not redeveloping is the just direct import system of the format specification of data.
The present invention is the basic data that on geographical information platform, combines engineering-environment, makes up the engineering-environment geographical information platform, and on this platform, carries out the exploitation of application function; Comprise inquiry, management to project of transmitting and converting electricity environment sensitive district; To the management of project of transmitting and converting electricity, to the analysis of sensitizing range, and the decision Analysis of project of transmitting and converting electricity planning and design etc.; This system and electric power GIS-Geographic Information System have data-interface simultaneously, have ensured information sharing and data sync between system.
Native system is the new tool in a kind of quick identification environment sensitive district, utilizes this system, and the user can carry out the environment optimization design to site, the path of project of transmitting and converting electricity easily; The sensitizing range is edited, adds up, analyzed; Accomplish the accurate quick identification of project of transmitting and converting electricity environmental risk, greatly reduce the labour intensity of electrical network previous work, can carry out environmental protection optimization engineering; Avoid engineering to relocate, remove, save construction investment.This system is a kind of useful aid decision making instrument of the friendly type electrical network of built environment, and a kind of aid decision making instrument that also can be used as the intelligent grid technology is used.
Description of drawings
Fig. 1 is a system architecture diagram of the present invention.
Embodiment
Below in conjunction with accompanying drawing and embodiment the present invention is further specified.
Among Fig. 1, it comprises:
Geographical information platform is gathered sensitizing range, project data and is influenced the circular foundation data, sets up system database; Database is Oracle 10g, and the mode that adopts C/S to combine with B/S makes up;
The engineering-environment geographical information platform comprises data service module, basic maintenance module, figure sub-module, system management module, data interface module; Communicate by letter with the electric power GIS-Geographic Information System through data interface module; Realization is read, upgrades, is analyzed project data, sensitizing range data, to different application, corresponding infrastructure service is provided; Mode through Web Service provides open interface service, the information sharing between the realization system;
Engineering-environment GIS-Geographic Information System function application layer; Comprise that sensitizing range administration module, project of transmitting and converting electricity data management module, line module, project of transmitting and converting electricity sensitizing range analysis module, image and vector read service module, sensitizing range and project of transmitting and converting electricity data and read service module, data update module; Realize sensitizing range inquiry, management, project of transmitting and converting electricity management and analysis-by-synthesis.
Said data service module provides the reading of transformer station, circuit, shaft tower information, image and vector data of sensitizing range data, project of transmitting and converting electricity; The request of customer in response end provides attribute information, the position range information of sensitizing range to client; The request of customer in response end provides project of transmitting and converting electricity to client, comprises attribute information, the positional information of transformer station, circuit, shaft tower; The request of customer in response end provides image, map vector data to client;
The basis maintenance module provides transformer station, the circuit of sensitizing range updating data, project of transmitting and converting electricity, the renewal of shaft tower information; The request of customer in response end is added, is deleted the sensitizing range of appointment; The request of customer in response end is added, is deleted project of transmitting and converting electricity, comprises transformer station, circuit, shaft tower; The request of customer in response end, the attribute information of renewal sensitizing range, project of transmitting and converting electricity; The request of customer in response end, the positional information of renewal sensitizing range, project of transmitting and converting electricity;
Image analysis module; Advanced analysis to the project of transmitting and converting electricity environment mainly is provided; Comprise: the request of customer in response end, according to request project of transmitting and converting electricity, sensitizing range classification, alarm distance parameter the sensitizing range is analyzed, give client the sensitizing range information feedback of statistics; The request of customer in response end imports place on line or directly on map, draws, and the alarm distance according to being provided with through pattern analysis, is output as the sensitizing range Vector Message in the map of standard format;
System management module; Rational rights management mechanism mainly is provided; Comprise: system manager maintenance department, personal information; The system manager can distribute personnel's authority, can be according to the personnel's of all departments right assignment function corresponding, and the personnel of all departments can safeguard system data in the scope of authority setting;
Data interface module inserts the project of transmitting and converting electricity data, and these data comprise the attribute information and the positional information of transformer station, circuit, shaft tower, and service provides that database reads, the EXCEL file imports dual mode and inserts data.
Said sensitizing range administration module; Sensitizing range attribute, positional information are safeguarded; The sensitizing range comprises that mainly inhabitation, health care, culture and education, scientific research, administrative office etc. are the zone of major function; Cultural relics protection unit has protection ground, historical relic sight spot, wilderness area, water head site of special history, culture, science, national meaning etc.; Maintenance function to the sensitizing range classification is provided, comprises newly-built, name modifications, the deletion of sensitizing range classification; The layer management of sensitizing range according to the classification of sensitizing range, generates corresponding sensitizing range figure layer automatically, and the function that is provided with to figure layer display properties is provided; Attribute and graphical information to the sensitizing range safeguard, comprise the sensitizing range newly-built, revise, deletion, wherein the modification of figure relatively comprises the summit of line object, polygonal shape is moved, adds, deleted; Select the sensitizing range, the photo of sensitizing range is uploaded, downloaded, and display photos; The Completion Inspecting and Monitoring data of sensitizing range are uploaded, downloaded to mode with file;
The project of transmitting and converting electricity data management module is safeguarded the attribute and the positional information of project of transmitting and converting electricity, comprise newly-built, revise, deletion; The attribute and the positional information that from generalized information system, read transformer station, circuit, shaft tower are provided; Project of transmitting and converting electricity is inquired about, on map, show, and transformer station, circuit, shaft tower are positioned; Select project of transmitting and converting electricity, upload, download the photo of project of transmitting and converting electricity then, and show; The Completion Inspecting and Monitoring data of project of transmitting and converting electricity are uploaded, downloaded to mode with file.
Line module, user's login and cancellation, the login of system can have dual mode: common login and with system registry user's identity login system; If with domestic consumer's identity login; Then the active user can only be to map, and device tree is inquired about, and can't carry out business operation; User's login password is revised; The user is managed, user's authority is set, only the user with the login of system manager's identity just can carry out this management.
Project of transmitting and converting electricity sensitizing range analysis module; Advanced analysis to the project of transmitting and converting electricity environment; Comprise: the request of customer in response end, according to project of transmitting and converting electricity, sensitizing range classification, alarm distance parameter that request is selected the sensitizing range to be analyzed, automatic analyser is calculated qualified project of transmitting and converting electricity sensitizing range; And the sensitizing range that satisfies condition fed back to client with tabular form, and can further inquire about relevant photo and final acceptance of construction document; Decision Analysis can directly import place on line, or directly on map, draw, and according to the alarm distance that is provided with, through pattern analysis, checks project of transmitting and converting electricity affected sensitizing range on every side;
Image and vector read service module, and the reading of transformer station, circuit, shaft tower information, image and vector data of sensitizing range data, project of transmitting and converting electricity is provided;
Sensitizing range and project of transmitting and converting electricity data read service module, and the reading of transformer station, circuit, shaft tower information, image and vector data of sensitizing range data, project of transmitting and converting electricity mainly is provided.The request of customer in response end provides attribute information, the position range information of sensitizing range to client; The request of customer in response end provides project of transmitting and converting electricity to client, comprises transformer station, circuit (pole line, cable), the attribute information of shaft tower, positional information; The request of customer in response end provides image, map vector data to client;
Data update module provides transformer station, the circuit of sensitizing range updating data, project of transmitting and converting electricity, the renewal of shaft tower information.The request of customer in response end is added, is deleted the sensitizing range of appointment; The request of customer in response end is added, is deleted project of transmitting and converting electricity, comprises transformer station, circuit (pole line, cable), shaft tower; The request of customer in response end, the attribute information of renewal sensitizing range, project of transmitting and converting electricity; The request of customer in response end, the positional information of renewal sensitizing range, project of transmitting and converting electricity;
The concrete communication process of data interface module is:
Database reads; At first need fully to understand the database structure of project of transmitting and converting electricity data in the connecting system, retrieve data step by step then, the order of retrieval be transformer station-" circuit-" shaft tower; Thereby read the project of transmitting and converting electricity data, thereby read up-to-date data timely; The cannonical format of project of transmitting and converting electricity data is set up in the importing of EXCEL file, and presses the form of this normalized definition EXCEL file, realizes the importing of project of transmitting and converting electricity data, and as long as the system interface of need not redeveloping is the just direct import system of the format specification of data.

Claims (4)

1. project of transmitting and converting electricity environment sensitive district total management system based on geographical information technology is characterized in that it comprises:
Geographical information platform, it is gathered sensitizing range, project data and influences the circular foundation data, sets up system database; Database is Oracle 10g, and the mode that adopts C/S to combine with B/S makes up, and under the C/S mode, possesses all functions of system, under the web mode, realizes browsing and analytic function sensitizing range, project of transmitting and converting electricity;
The engineering-environment geographical information platform; Comprise data service module, basic maintenance module, figure sub-module, system management module, data interface module, communicate by letter with the electric power GIS-Geographic Information System, realize reading, upgrade, analyzing project data, sensitizing range data through data interface module; To different application; Corresponding infrastructure service is provided, and the mode through Web Service provides open interface service, the information sharing between the realization system;
Engineering-environment GIS-Geographic Information System function application layer; Comprise that sensitizing range administration module, project of transmitting and converting electricity data management module, line module, project of transmitting and converting electricity sensitizing range analysis module, image and vector read service module, sensitizing range and project of transmitting and converting electricity data and read service module, data update module; Realize sensitizing range inquiry, management, project of transmitting and converting electricity management and analysis-by-synthesis.
2. the project of transmitting and converting electricity environment sensitive district total management system based on geographical information technology as claimed in claim 1; It is characterized in that; Said data service module provides the reading of transformer station, circuit, shaft tower information, image and vector data of sensitizing range data, project of transmitting and converting electricity; The request of customer in response end provides attribute information, the position range information of sensitizing range to client; The request of customer in response end provides project of transmitting and converting electricity to client, comprises attribute information, the positional information of transformer station, circuit, shaft tower; The request of customer in response end provides image, map vector data to client;
The basis maintenance module provides transformer station, the circuit of sensitizing range updating data, project of transmitting and converting electricity, the renewal of shaft tower information; The request of customer in response end is added, is deleted the sensitizing range of appointment; The request of customer in response end is added, is deleted project of transmitting and converting electricity, comprises transformer station, circuit, shaft tower; The request of customer in response end, the attribute information of renewal sensitizing range, project of transmitting and converting electricity; The request of customer in response end, the positional information of renewal sensitizing range, project of transmitting and converting electricity;
Image analysis module; Advanced analysis to the project of transmitting and converting electricity environment mainly is provided; Comprise: the request of customer in response end, according to request project of transmitting and converting electricity, sensitizing range classification, alarm distance parameter the sensitizing range is analyzed, give client the sensitizing range information feedback of statistics; The request of customer in response end imports place on line or directly on map, draws, and the alarm distance according to being provided with through pattern analysis, is output as the sensitizing range Vector Message in the map of standard format;
System management module; Rational rights management mechanism mainly is provided; Comprise: system manager maintenance department, personal information; The system manager can distribute personnel's authority, and according to the personnel's of all departments right assignment function corresponding, the personnel of all departments can safeguard system data in the scope of authority setting;
Data interface module inserts the project of transmitting and converting electricity data, and these data comprise the attribute information and the positional information of transformer station, circuit, shaft tower, and service provides that database reads, the EXCEL file imports dual mode and inserts data.
3. the project of transmitting and converting electricity environment sensitive district total management system based on geographical information technology as claimed in claim 1; It is characterized in that; Said sensitizing range administration module is safeguarded sensitizing range attribute, positional information, and the sensitizing range comprises that mainly inhabitation, health care, culture and education, scientific research, administrative office are the zone of major function; Cultural relics protection unit, protection ground, historical relic sight spot, wilderness area, water head site with special history, culture, science, national meaning; Maintenance function to the sensitizing range classification is provided, comprises newly-built, name modifications, the deletion of sensitizing range classification; The layer management of sensitizing range according to the classification of sensitizing range, generates corresponding sensitizing range figure layer automatically, and the function that is provided with to figure layer display properties is provided; Attribute and graphical information to the sensitizing range safeguard, comprise the sensitizing range newly-built, revise, deletion, wherein the modification of figure relatively comprises the summit of line object, polygonal shape is moved, adds, deleted; Select the sensitizing range, the photo of sensitizing range is uploaded, downloaded, and display photos; The Completion Inspecting and Monitoring data of sensitizing range are uploaded, downloaded to mode with file;
The project of transmitting and converting electricity data management module is safeguarded the attribute and the positional information of project of transmitting and converting electricity, comprise newly-built, revise, deletion; The attribute and the positional information that from generalized information system, read transformer station, circuit, shaft tower are provided; Project of transmitting and converting electricity is inquired about, on map, show, and transformer station, circuit, shaft tower are positioned; Select project of transmitting and converting electricity, upload, download the photo of project of transmitting and converting electricity then, and show; The Completion Inspecting and Monitoring data of project of transmitting and converting electricity are uploaded, downloaded to mode with file;
User management module, user's login and cancellation, the login of system has dual mode: common login and with system registry user's identity login system; If with domestic consumer's identity login; Then the active user can only be to map, and device tree is inquired about, and can't carry out business operation; User's login password is revised; The user is managed, user's authority is set, only the user with the login of system manager's identity just allows to carry out this management;
Project of transmitting and converting electricity sensitizing range analysis module; Advanced analysis to the project of transmitting and converting electricity environment; Comprise: the request of customer in response end, according to project of transmitting and converting electricity, sensitizing range classification, alarm distance parameter that request is selected the sensitizing range to be analyzed, automatic analyser is calculated qualified project of transmitting and converting electricity sensitizing range; And the sensitizing range that satisfies condition fed back to client with tabular form, and further relevant photo and the final acceptance of construction document of inquiry; Decision Analysis directly imports place on line, or directly on map, draws, and according to the alarm distance that is provided with, through pattern analysis, checks project of transmitting and converting electricity affected sensitizing range on every side;
Image and vector read service module, and the reading of transformer station, circuit, shaft tower information, image and vector data of sensitizing range data, project of transmitting and converting electricity is provided;
Sensitizing range and project of transmitting and converting electricity data read service module, and the reading of transformer station, circuit, shaft tower information, image and vector data of sensitizing range data, project of transmitting and converting electricity mainly is provided; The request of customer in response end provides attribute information, the position range information of sensitizing range to client; The request of customer in response end provides project of transmitting and converting electricity to client, comprises attribute information, the positional information of transformer station, circuit, shaft tower; The request of customer in response end provides image, map vector data to client;
Data update module provides transformer station, the circuit of sensitizing range updating data, project of transmitting and converting electricity, the renewal of shaft tower information.The request of customer in response end is added, is deleted the sensitizing range of appointment; The request of customer in response end is added, is deleted project of transmitting and converting electricity, comprises transformer station, circuit, shaft tower; The request of customer in response end, the attribute information of renewal sensitizing range, project of transmitting and converting electricity; The request of customer in response end, the positional information of renewal sensitizing range, project of transmitting and converting electricity.
4. the project of transmitting and converting electricity environment sensitive based target integrated management system based on geographical information technology as claimed in claim 2 is characterized in that the concrete communication process of data interface module is:
Database reads, retrieve data step by step then, the order of retrieval be transformer station-" circuit-" shaft tower, thereby read the project of transmitting and converting electricity data, thereby read up-to-date data timely; The cannonical format of project of transmitting and converting electricity data is set up in the importing of EXCEL file, and presses the form of this normalized definition EXCEL file, realizes the importing of project of transmitting and converting electricity data, and as long as the system interface of need not redeveloping is the just direct import system of the format specification of data.
CN201210134883.6A 2012-05-03 2012-05-03 Transmission and transformation project environment sensitive area comprehensive management system based on geographic information technology Active CN102708518B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210134883.6A CN102708518B (en) 2012-05-03 2012-05-03 Transmission and transformation project environment sensitive area comprehensive management system based on geographic information technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210134883.6A CN102708518B (en) 2012-05-03 2012-05-03 Transmission and transformation project environment sensitive area comprehensive management system based on geographic information technology

Publications (2)

Publication Number Publication Date
CN102708518A true CN102708518A (en) 2012-10-03
CN102708518B CN102708518B (en) 2015-05-27

Family

ID=46901245

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210134883.6A Active CN102708518B (en) 2012-05-03 2012-05-03 Transmission and transformation project environment sensitive area comprehensive management system based on geographic information technology

Country Status (1)

Country Link
CN (1) CN102708518B (en)

Cited By (15)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103617507A (en) * 2013-12-10 2014-03-05 上海市城市建设设计研究总院 Engineering monitoring information management system based on web geographic information system (GIS)
CN104820889A (en) * 2015-04-24 2015-08-05 安徽四创电子股份有限公司 Engineering management system of GIS-based safe city video monitoring system
CN106096820A (en) * 2016-05-31 2016-11-09 中交第航务工程局有限公司 Engineering project management system for monitoring based on GIS
CN106779618A (en) * 2016-12-29 2017-05-31 北京恒华伟业科技股份有限公司 A kind of engineering total factor management platform
CN106777365A (en) * 2017-01-23 2017-05-31 国网山东省电力公司电力科学研究院 Project of transmitting and converting electricity environmentally sensitive areas Intelligent Recognition and Forecasting Methodology
CN106844657A (en) * 2017-01-23 2017-06-13 国网山东省电力公司电力科学研究院 Project of transmitting and converting electricity noise circumstance Forecasting Methodology based on environment sensitive Motion parameters
CN106845837A (en) * 2017-01-23 2017-06-13 国网山东省电力公司电力科学研究院 Project of transmitting and converting electricity environmentally sensitive areas monitoring system and method based on big data technology
CN106849353A (en) * 2017-01-23 2017-06-13 国网山东省电力公司电力科学研究院 Project of transmitting and converting electricity environment monitoring and sensitizing range forecasting system and method
CN106874415A (en) * 2017-01-23 2017-06-20 国网山东省电力公司电力科学研究院 Environmental sensitive area database construction method and server based on generalized information system
CN106940839A (en) * 2017-03-13 2017-07-11 中国南方电网有限责任公司超高压输电公司 A kind of project of transmitting and converting electricity qualitative data managing and control system and method
CN108595079A (en) * 2018-04-23 2018-09-28 国家电网公司 A kind of project of transmitting and converting electricity surveying method shared based on multiple terminals cloud platform
CN110569557A (en) * 2019-08-15 2019-12-13 北京京研电力工程设计有限公司 Intelligent autonomous design platform for power transmission and transformation project and working method thereof
CN110809052A (en) * 2019-11-11 2020-02-18 软通动力信息技术有限公司 Public cloud-based hydraulic engineering management system and method
CN112579564A (en) * 2020-11-23 2021-03-30 国家电网有限公司 Method for processing power engineering channel data and terminal equipment
CN113806423A (en) * 2021-09-18 2021-12-17 武汉朗迈科技有限公司 GIS-based power transmission and transformation project environment-friendly detection system and method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100106342A1 (en) * 2008-10-28 2010-04-29 Korea Electric Power Corporation Day-ahead load reduction system based on customer baseline load
CN101976248A (en) * 2010-10-15 2011-02-16 陕西电力科学研究院 Method for rapidly identifying environmental risk of power transmission and transformation project
CN102147896A (en) * 2011-05-04 2011-08-10 湖北省电力公司电力试验研究院 Management digital system for geographic information of special area of grid transmission line
CN102567859A (en) * 2012-01-20 2012-07-11 安徽省电力公司合肥供电公司 Data integrated management system of intelligentized power supply system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100106342A1 (en) * 2008-10-28 2010-04-29 Korea Electric Power Corporation Day-ahead load reduction system based on customer baseline load
CN101976248A (en) * 2010-10-15 2011-02-16 陕西电力科学研究院 Method for rapidly identifying environmental risk of power transmission and transformation project
CN102147896A (en) * 2011-05-04 2011-08-10 湖北省电力公司电力试验研究院 Management digital system for geographic information of special area of grid transmission line
CN102567859A (en) * 2012-01-20 2012-07-11 安徽省电力公司合肥供电公司 Data integrated management system of intelligentized power supply system

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
张永: "输电线路管理GPS/GIS***的建设方向", 《安徽电力》, vol. 23, no. 1, 31 March 2006 (2006-03-31), pages 62 - 65 *
杨德昌 等: "智能输电***在中国的发展", 《电网技术》, vol. 34, no. 5, 31 May 2010 (2010-05-31), pages 1 - 6 *
王彬: "石家庄供电公司10kV配电GIS信息***的设计与实现", 《中国优秀博硕士学位论文全文数据库(硕士)-工程科技II辑》, no. 04, 15 April 2007 (2007-04-15) *

Cited By (19)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103617507A (en) * 2013-12-10 2014-03-05 上海市城市建设设计研究总院 Engineering monitoring information management system based on web geographic information system (GIS)
CN104820889A (en) * 2015-04-24 2015-08-05 安徽四创电子股份有限公司 Engineering management system of GIS-based safe city video monitoring system
CN106096820A (en) * 2016-05-31 2016-11-09 中交第航务工程局有限公司 Engineering project management system for monitoring based on GIS
CN106779618A (en) * 2016-12-29 2017-05-31 北京恒华伟业科技股份有限公司 A kind of engineering total factor management platform
CN106874415A (en) * 2017-01-23 2017-06-20 国网山东省电力公司电力科学研究院 Environmental sensitive area database construction method and server based on generalized information system
CN106845837B (en) * 2017-01-23 2020-05-22 国网山东省电力公司电力科学研究院 Power transmission and transformation project environment sensitive area monitoring system and method based on big data technology
CN106845837A (en) * 2017-01-23 2017-06-13 国网山东省电力公司电力科学研究院 Project of transmitting and converting electricity environmentally sensitive areas monitoring system and method based on big data technology
CN106849353A (en) * 2017-01-23 2017-06-13 国网山东省电力公司电力科学研究院 Project of transmitting and converting electricity environment monitoring and sensitizing range forecasting system and method
CN106777365A (en) * 2017-01-23 2017-05-31 国网山东省电力公司电力科学研究院 Project of transmitting and converting electricity environmentally sensitive areas Intelligent Recognition and Forecasting Methodology
CN106849353B (en) * 2017-01-23 2018-05-04 国网山东省电力公司电力科学研究院 Project of transmitting and converting electricity environment monitoring and sensitizing range forecasting system and method
CN106844657A (en) * 2017-01-23 2017-06-13 国网山东省电力公司电力科学研究院 Project of transmitting and converting electricity noise circumstance Forecasting Methodology based on environment sensitive Motion parameters
CN106874415B (en) * 2017-01-23 2019-08-06 国网山东省电力公司电力科学研究院 Environmental sensitive area database construction method and server based on generalized information system
CN106940839A (en) * 2017-03-13 2017-07-11 中国南方电网有限责任公司超高压输电公司 A kind of project of transmitting and converting electricity qualitative data managing and control system and method
CN106940839B (en) * 2017-03-13 2020-11-24 中国南方电网有限责任公司超高压输电公司 Power transmission and transformation project quality data management and control system and method
CN108595079A (en) * 2018-04-23 2018-09-28 国家电网公司 A kind of project of transmitting and converting electricity surveying method shared based on multiple terminals cloud platform
CN110569557A (en) * 2019-08-15 2019-12-13 北京京研电力工程设计有限公司 Intelligent autonomous design platform for power transmission and transformation project and working method thereof
CN110809052A (en) * 2019-11-11 2020-02-18 软通动力信息技术有限公司 Public cloud-based hydraulic engineering management system and method
CN112579564A (en) * 2020-11-23 2021-03-30 国家电网有限公司 Method for processing power engineering channel data and terminal equipment
CN113806423A (en) * 2021-09-18 2021-12-17 武汉朗迈科技有限公司 GIS-based power transmission and transformation project environment-friendly detection system and method

Also Published As

Publication number Publication date
CN102708518B (en) 2015-05-27

Similar Documents

Publication Publication Date Title
CN102708518B (en) Transmission and transformation project environment sensitive area comprehensive management system based on geographic information technology
US11049195B2 (en) Modeling analysis method based on geographic targets
CN105260857A (en) Intelligent management system and method thereof for rural migrant workers
CN105022769A (en) Data interaction system of urban underground pipeline, and method thereof
CN103701208A (en) Intelligent mobile power patrol terminal
CN104361445A (en) Real-time labor management system and management method
CN103632198A (en) Visualized and full-life measurement asset management system based on intelligent mobile terminal
US20160231372A1 (en) Wire Diagram Tagging System
CN105574640A (en) Method for constructing unified and comprehensive management platform of application
CN107727941A (en) Environmentally sensitive areas mobile electromagnetic environment information monitoring management method and system
CN111062504A (en) AR technology-based intelligent power distribution station operation and maintenance system and method
CN103277138A (en) Auxiliary management system for coal mining gas
CN105447923A (en) Electric power circuit routing inspection system
CN103227811A (en) External network server-side management and control method for electric power working site management and control system
CN107123172A (en) A kind of intelligent cruising inspection system
Cheng-Jun Research and implementation of agricultural environment monitoring based on internet of things
Liu et al. [Retracted] Economic Benefit Evaluation and Analysis Based on Intelligent Agriculture Internet of Things
CN103701851A (en) Agricultural technology promotion cloud log management publishing system and method
CN202364640U (en) Lawn management system for landscaping
CN202798803U (en) Master station system for power distribution routing inspection geographic navigation and power distribution information management
Li et al. Design of security management system based on RFID temporary grounding wire borrowing
CN201638264U (en) Mobile system for power utilization application
CN103632233B (en) A kind of electric power enterprise electrical measurement practical management system of specialty
CN103325003A (en) Electric power ground lead managing system
Huaiyu et al. IoT-Based Operational Information Management for Built Landscape Projects: From Vacancy to Approaches.

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
ASS Succession or assignment of patent right

Owner name: STATE ELECTRIC NET CROP.

Effective date: 20121029

C10 Entry into substantive examination
C41 Transfer of patent application or patent right or utility model
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20121029

Address after: 250002 Ji'nan City Central District, Shandong, No. 2 South Road, No. 500

Applicant after: SHANDONG ELECTRIC POWER Research Institute

Applicant after: State Grid Corporation of China

Address before: 250002 Ji'nan City Central District, Shandong, No. 2 South Road, No. 500

Applicant before: SHANDONG ELECTRIC POWER Research Institute

C14 Grant of patent or utility model
GR01 Patent grant
CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder

Address after: 250003 No. 2000, Wang Yue Road, Shizhong District, Ji'nan, Shandong

Patentee after: Shandong Electric Power Research Institute

Patentee after: State Grid Corporation of China

Address before: 250002, No. 500, South Second Ring Road, Shizhong District, Shandong, Ji'nan

Patentee before: Shandong Electric Power Research Institute

Patentee before: State Grid Corporation of China

CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 250003 No. 2000, Wang Yue Road, Shizhong District, Ji'nan, Shandong

Patentee after: SHANDONG ELECTRIC POWER Research Institute

Patentee after: STATE GRID CORPORATION OF CHINA

Address before: 250003 No. 2000, Wang Yue Road, Shizhong District, Ji'nan, Shandong

Patentee before: SHANDONG ELECTRIC POWER Research Institute

Patentee before: State Grid Corporation of China

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220209

Address after: 250003 No. 2000, Wang Yue Road, Shizhong District, Ji'nan, Shandong

Patentee after: ELECTRIC POWER RESEARCH INSTITUTE OF STATE GRID SHANDONG ELECTRIC POWER Co.

Patentee after: STATE GRID CORPORATION OF CHINA

Address before: 250003 No. 2000, Wang Yue Road, Shizhong District, Ji'nan, Shandong

Patentee before: SHANDONG ELECTRIC POWER Research Institute

Patentee before: STATE GRID CORPORATION OF CHINA