CN102704970A - 一种地下工程模型试验用预应力锚杆及施作方法 - Google Patents

一种地下工程模型试验用预应力锚杆及施作方法 Download PDF

Info

Publication number
CN102704970A
CN102704970A CN2012102210471A CN201210221047A CN102704970A CN 102704970 A CN102704970 A CN 102704970A CN 2012102210471 A CN2012102210471 A CN 2012102210471A CN 201210221047 A CN201210221047 A CN 201210221047A CN 102704970 A CN102704970 A CN 102704970A
Authority
CN
China
Prior art keywords
rod
nut
spring
anchor rod
anchor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012102210471A
Other languages
English (en)
Other versions
CN102704970B (zh
Inventor
李为腾
李智
王德超
李术才
王�琦
王洪涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong University
Original Assignee
Shandong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong University filed Critical Shandong University
Priority to CN201210221047.1A priority Critical patent/CN102704970B/zh
Publication of CN102704970A publication Critical patent/CN102704970A/zh
Application granted granted Critical
Publication of CN102704970B publication Critical patent/CN102704970B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

本发明公开了一种地下工程模型试验用预应力锚杆,包括杆体、托盘、弹簧、螺母;所述托盘为两个,托盘和螺母依次套在杆体上,弹簧也套在杆体上,处于两个托盘之间。本发明同时公开了地下工程模型试验用预应力锚杆的施作方法,包括钻孔、安装锚杆以及施加预应力3个步骤。本发明解决了模型试验中预应力锚杆模拟的问题,具有以下优点:(1)制作简单,成本低;(2)锚杆尺寸和预应力可调,可满足模型试验各种相似比的要求;(3)可广泛应用于水利、交通、矿山等地下工程领域的地质力学模型试验研究。

Description

一种地下工程模型试验用预应力锚杆及施作方法
技术领域
本发明涉及一种地质力学模型试验技术,尤其涉及一种地下工程模型试验用预应力锚杆及施作方法。
背景技术
地质力学模型试验是根据相似理论将实际工程转换为室内模型进行试验模拟,其有利于在复杂的试验过程中突出主要矛盾,便于把握、发现现象的内在联系,其中,地下工程模型试验是对隧道、煤巷等地下工程进行仿真模拟,指导地下工程设计和施工的一种有效方法和手段。在地下工程模型试验中,洞室开挖后,需要模拟洞室的支护如模拟锚杆支护,但目前模型试验用锚杆的制作和施作技术尚未成熟,特别对于模拟实际工程中的预应力锚杆还缺乏有效手段,模型试验中难以真实反映实际工程中预应力锚杆的支护作用,降低了模型试验的准确性。
发明内容
本发明的目的在于克服上述现有技术的不足,提供一种有效的地下工程模型试验用预应力锚杆及施作方法,以解决模型试验中预应力锚杆的模拟问题。
为实现上述目的,本发明采用下述技术方案:
一种地下工程模型试验用预应力锚杆,包括杆体、托盘、弹簧、螺母;所述托盘为两个,托盘和螺母依次套在杆体上,弹簧也套在杆体上,处于两个托盘之间。
所述杆体为金属杆体,其根据模型试验相似比尺确定尺寸和比选材料。
杆体一端设置有与螺母相对应的螺纹,在杆体另一端涂有粘结剂,所述粘结剂能够粘结杆体和模型体。
一种地下工程模型试验用预应力锚杆的施作方法,包括以下步骤:
(1)钻孔。定位锚杆位置,然后根据锚杆孔设计深度,利用微型气钻在模型体上钻孔;
(2)安装锚杆。将预制好的锚杆置入钻孔内,并保持锚杆静止不动,直至锚杆锚固端与模型体粘结产生锚固力;
(3)施加预应力。锚杆安装完成后,根据弹簧弹力与螺母旋转圈数的关系旋转n圈螺母,从而推动托盘挤压弹簧,此时弹簧由于压缩产生弹力,从而张拉锚杆使其产生预应力并达到设计值。其中,锚杆设计预应力大小等于弹簧产生的弹力大小,其与螺母旋转圈数的关系为:
F=K×L;
式中,F为锚杆设计预应力,K为弹簧刚度,L为螺母旋转n圈时在锚杆上的移动距离,n≥0。
本发明解决了模型试验中预应力锚杆模拟的问题,具有以下有益效果:
(1)制作简单,成本低,能满足模型试验批量生产使用的要求;
(2)通过改变杆体材料以及其长度和直径,可以任意调节模型预应力锚杆尺寸,可满足模型试验各种相似比的要求,从而使模型试验锚杆和实际工程锚杆一一对应。
(3)通过选择弹簧刚度与长度,可以控制模型预应力锚杆的预应力大小范围,能够满足模型试验各种相似比的要求,真实反映实际工程锚杆的预应力作用。
(4)该发明可广泛应用于水利、交通、矿山等地下工程领域的地质力学模型试验研究。
附图说明
图1为本发明的整体结构示意图。
图2为本发明的使用示意图。
图例说明:1—杆体;2—托盘;3—弹簧;4—螺母;5—粘结剂;6—钻孔;7—模型体。
具体实施方式
下面结合附图与实施例对本发明做进一步详细说明。
图1中,本实施例的地下工程模型试验用预应力锚杆,包括杆体1、托盘2、弹簧3、螺母4;所述托盘2为两个,托盘2和螺母4依次套在杆体1上,弹簧3也套在杆体1上,处于两个托盘2之间;所述杆体1为金属杆体,其根据模型试验相似比尺确定尺寸和比选材料;所述杆体1一端设置有与螺母4相对应的螺纹,在杆体1另一端涂有粘结剂5,所述粘结剂5能够快速粘结杆体1和模型体7。
一种地下工程模型试验用预应力锚杆的施作方法,包括以下步骤:
(1)钻孔。定位锚杆位置,然后根据锚杆孔设计深度,利用微型气钻在模型体7上钻孔;
(2)安装锚杆。将预制好的锚杆置入钻孔6内,并保持锚杆静止不动,直至锚杆锚固端与模型体7粘结产生锚固力;
(3)施加预应力。锚杆安装完成后,根据弹簧3弹力与螺母4旋转圈数的关系旋转n圈螺母4,从而推动托盘2挤压弹簧3,此时弹簧3由于压缩产生弹力,从而张拉锚杆使其产生预应力并达到设计值。其中,锚杆设计预应力大小等于弹簧3产生的弹力大小,其与螺母4旋转圈数的关系为:F=K×L;
式中,F为锚杆设计预应力,K为弹簧3的刚度,L为螺母4旋转n圈时在锚杆上的移动距离,n≥0。
由技术常识可知,本发明可以通过其它的不脱离其精神实质或必要特征的实施方案来实现。因此,就各方面而言,都只是举例说明,并不是仅有的。所有在本发明范围内或在等同于本发明的范围内的改变均被本发明包含。

Claims (4)

1.一种地下工程模型试验用预应力锚杆,其特征是,包括杆体、托盘、弹簧、螺母;所述托盘为两个,托盘和螺母依次套在杆体上,弹簧也套在杆体上,处于两个托盘之间。
2.如权利要求1所述的地下工程模型试验用预应力锚杆,其特征是,所述杆体为金属杆体,其根据模型试验相似比尺确定尺寸和比选材料。
3.如权利要求1所述的地下工程模型试验用预应力锚杆,其特征是,所述杆体一端设置有与螺母相对应的螺纹,在杆体另一端涂有粘结剂,所述粘结剂能够粘结杆体和模型体。
4.如权利要求1所述的地下工程模型试验用预应力锚杆的施作方法,包括以下步骤:
(1)钻孔;先定位锚杆位置,然后根据锚杆孔设计深度,利用微型气钻在模型体上钻孔;
(2)安装锚杆;将预制好的锚杆置入钻孔内,并保持锚杆静止不动,直至锚杆锚固端与模型体粘结产生锚固力;
(3)施加预应力;锚杆安装完成后,根据弹簧弹力与螺母旋转圈数的关系旋转n圈螺母,从而推动托盘挤压弹簧,此时弹簧由于压缩产生弹力,从而张拉锚杆使其产生预应力并达到设计值;其中,锚杆设计预应力大小等于弹簧产生的弹力大小,其与螺母旋转圈数的关系为:
F=K×L;
式中,F为锚杆设计预应力,K为弹簧刚度,L为螺母旋转n圈时在锚杆上的移动距离,n≥0。
CN201210221047.1A 2012-06-29 2012-06-29 一种地下工程模型试验用预应力锚杆及施作方法 Expired - Fee Related CN102704970B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210221047.1A CN102704970B (zh) 2012-06-29 2012-06-29 一种地下工程模型试验用预应力锚杆及施作方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210221047.1A CN102704970B (zh) 2012-06-29 2012-06-29 一种地下工程模型试验用预应力锚杆及施作方法

Publications (2)

Publication Number Publication Date
CN102704970A true CN102704970A (zh) 2012-10-03
CN102704970B CN102704970B (zh) 2014-10-15

Family

ID=46897995

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210221047.1A Expired - Fee Related CN102704970B (zh) 2012-06-29 2012-06-29 一种地下工程模型试验用预应力锚杆及施作方法

Country Status (1)

Country Link
CN (1) CN102704970B (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105021421A (zh) * 2015-08-06 2015-11-04 中国矿业大学(北京) 一种能定位导向的煤巷支护物理模型实验方法
CN108037012A (zh) * 2017-12-04 2018-05-15 兰州空间技术物理研究所 一种适用于空间电场探测的传感器电缆力学试验模拟装置
CN109632483A (zh) * 2018-12-24 2019-04-16 长安大学 用于模型试验锚索预应力施加及实时监测的装置及方法
CN110925000A (zh) * 2019-11-25 2020-03-27 绍兴文理学院 具有预应力自施加功能的多级让压大变形托盘及使用方法
CN111535843A (zh) * 2020-04-25 2020-08-14 青岛科技大学 一种用于模型试验的蜡融式联合支护一次成型装置
CN114934795A (zh) * 2022-06-17 2022-08-23 中国矿业大学 一种可自注锚固剂和施加预紧力的相似模型试验锚杆

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB950552A (en) * 1961-08-22 1964-02-26 William George Burton Mcclean Improvements in or relating to visual warning devices for indicating loss of tensionin bolts
US4062229A (en) * 1977-02-22 1977-12-13 General Electric Company Method of testing the integrity of installed rock bolts
CN2338489Y (zh) * 1998-10-12 1999-09-15 张德稳 测力显示锚杆
CN2830644Y (zh) * 2004-06-03 2006-10-25 中国科学院武汉岩土力学研究所 可控预应力超高强锚杆
CN201981537U (zh) * 2010-12-28 2011-09-21 中国科学院武汉岩土力学研究所 水胀式弹性抗岩爆锚杆
CN202690095U (zh) * 2012-06-29 2013-01-23 山东大学 一种地下工程模型试验用预应力锚杆

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB950552A (en) * 1961-08-22 1964-02-26 William George Burton Mcclean Improvements in or relating to visual warning devices for indicating loss of tensionin bolts
US4062229A (en) * 1977-02-22 1977-12-13 General Electric Company Method of testing the integrity of installed rock bolts
CN2338489Y (zh) * 1998-10-12 1999-09-15 张德稳 测力显示锚杆
CN2830644Y (zh) * 2004-06-03 2006-10-25 中国科学院武汉岩土力学研究所 可控预应力超高强锚杆
CN201981537U (zh) * 2010-12-28 2011-09-21 中国科学院武汉岩土力学研究所 水胀式弹性抗岩爆锚杆
CN202690095U (zh) * 2012-06-29 2013-01-23 山东大学 一种地下工程模型试验用预应力锚杆

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105021421A (zh) * 2015-08-06 2015-11-04 中国矿业大学(北京) 一种能定位导向的煤巷支护物理模型实验方法
CN105021421B (zh) * 2015-08-06 2018-04-03 中国矿业大学(北京) 一种能定位导向的煤巷支护物理模型实验方法
CN108037012A (zh) * 2017-12-04 2018-05-15 兰州空间技术物理研究所 一种适用于空间电场探测的传感器电缆力学试验模拟装置
CN109632483A (zh) * 2018-12-24 2019-04-16 长安大学 用于模型试验锚索预应力施加及实时监测的装置及方法
CN110925000A (zh) * 2019-11-25 2020-03-27 绍兴文理学院 具有预应力自施加功能的多级让压大变形托盘及使用方法
CN110925000B (zh) * 2019-11-25 2021-03-16 绍兴文理学院 具有预应力自施加功能的多级让压大变形托盘及使用方法
CN111535843A (zh) * 2020-04-25 2020-08-14 青岛科技大学 一种用于模型试验的蜡融式联合支护一次成型装置
CN114934795A (zh) * 2022-06-17 2022-08-23 中国矿业大学 一种可自注锚固剂和施加预紧力的相似模型试验锚杆
CN114934795B (zh) * 2022-06-17 2023-12-12 中国矿业大学 一种可自注锚固剂和施加预紧力的相似模型试验锚杆

Also Published As

Publication number Publication date
CN102704970B (zh) 2014-10-15

Similar Documents

Publication Publication Date Title
CN102704970B (zh) 一种地下工程模型试验用预应力锚杆及施作方法
CN203452813U (zh) 一种锚杆预紧力检测装置
CN202596760U (zh) 多级分段免注浆自锚固棘刺式锚杆
CN202690095U (zh) 一种地下工程模型试验用预应力锚杆
CN206990339U (zh) 一种岩土试验用试件径向位移测量装置
CN107023005B (zh) 一种带有吸水膨胀环的串式扩体锚杆及其施工方法
CN202441404U (zh) 锚杆支护柔性锁紧结构
CN205483778U (zh) 一种锚杆室内模型试验预应力施加装置
CN204370418U (zh) 一种液压膨胀锚杆
CN204113316U (zh) 一种间隔螺旋杆体式大变形锚杆
CN102706492A (zh) 一种地下工程模型试验用锚杆测力计及测力方法
CN205400775U (zh) 一种预应力注浆锚杆
CN203430543U (zh) 膨胀锚杆
CN205138436U (zh) 膨胀式l形变形监测棱镜支架
CN102943473A (zh) 一种可回收充液式拉力锚杆及其使用方法
CN203891020U (zh) 捆绑式浆囊袋注浆锚杆
CN202954360U (zh) 一种可回收充液式拉力锚杆
CN203668967U (zh) 一种用于变电站中电流互感器的支架与管桩的安装连接装置
CN202900298U (zh) 锚杆
CN203546917U (zh) 一种缓冲耗能防震建筑连接结构
CN206769935U (zh) 一种顶端膨胀注浆锚杆
CN204085345U (zh) 一种新型炮孔装药分隔器
CN205719784U (zh) 锚杆支护承载力简易评估装置
CN103291337A (zh) 具有外置膨胀装置的锚杆
CN204299191U (zh) 锚固板快速安装工具

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20141015

Termination date: 20190629

CF01 Termination of patent right due to non-payment of annual fee