CN102704694A - 利用滑模平台提升筒库库顶钢梁的方法 - Google Patents

利用滑模平台提升筒库库顶钢梁的方法 Download PDF

Info

Publication number
CN102704694A
CN102704694A CN2012101900573A CN201210190057A CN102704694A CN 102704694 A CN102704694 A CN 102704694A CN 2012101900573 A CN2012101900573 A CN 2012101900573A CN 201210190057 A CN201210190057 A CN 201210190057A CN 102704694 A CN102704694 A CN 102704694A
Authority
CN
China
Prior art keywords
girder steel
sliding formwork
platform
steel beam
sliding
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012101900573A
Other languages
English (en)
Inventor
梁义
王芝保
刘家宽
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC17 Group Co Ltd
Original Assignee
China MCC17 Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC17 Group Co Ltd filed Critical China MCC17 Group Co Ltd
Priority to CN2012101900573A priority Critical patent/CN102704694A/zh
Publication of CN102704694A publication Critical patent/CN102704694A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

本发明公开了一种利用滑模平台提升筒库库顶钢梁的方法,首先当滑模设备组装完后,在开始滑升库壁之前,在滑模平台上找出库顶钢梁梁端所对应的位置,将每个位置上安放一个钢梁托架,并与滑模设备焊接牢固;然后将钢梁吊放至托架上,并临时焊接稳定;同时在滑模平台上架设有钢梁的两端额外增加四套滑升装置,并由滑模设备中的液压***统一控制;钢梁安放好后,即可按照正常的滑模施工程序进行施工,当库壁施工完毕,钢梁也随着平台上升至库顶。该方法能无需大型吊车即可完成钢梁的安装,有效降低施工成本,加快工期及提高施工安全。

Description

利用滑模平台提升筒库库顶钢梁的方法
技术领域
本发明属于建筑施工领域,具体涉及一种筒库库壁滑模施工时利用其滑模设备提升库顶钢梁的方法及其装置。
背景技术
目前工业建筑领域的筒库结构,库顶屋面梁设计均采用钢梁形式,传统施工方法为当筒库库壁施工完后,利用大型吊车将制作好的钢梁吊装至库顶。筒库结构往往较高,以水泥厂的生料库为例,其库顶高度超过50m,库顶与库底间净高也达40m以上。当库壁施工完后再将重达2t的钢梁吊至50m高处,需要起重量150t以上的吊车,使用费用高,在偏远地区还不易找到此类设备,需从外地调入,耽误工期。同时在施工过程中,由于钢梁跨度大,起吊高度高,受环境、气候影响大,对施工技术和施工安全都带来更严峻的考验。
发明内容
本发明的目的是提供一种利用生料库滑模施工中的滑模设备提升库顶钢梁的方法。
本发明的目的是这样来实现的:当生料库施工完库底部分(标高约9.000m左右),开始进入库壁滑模施工,组装完滑模设备后,在滑模平台上找出梁所对应的位置,每个位置上安放一个钢梁托架,托架高度根据钢梁高度来进行计算,以保证钢梁架设在托架上不会与平台其它部件相碰触,托架须与滑模设备焊接牢固。当钢梁托架安装完后,即可将钢梁吊至托架上安放牢固,并临时焊接在托架上;同时在滑模平台上架设钢梁的两侧额外增加四套滑升装置,该装置与滑模设备自身的滑升装置相同,由液压千斤顶和预埋在库壁内的钢管组成,并由滑模设备中的液压***统一控制,以提高滑模平台的承载能力;一切准备完毕,即可按照正常的滑模施工程序进行施工,当库壁施工完毕,钢梁也随着平台上升至库顶。
本发明所提供的利用滑模平台提升钢梁的装置主要有钢梁托架、千斤顶和钢管,钢梁托架可由槽钢现场制作完成。千斤顶与滑模设备所使用的一致,钢管为φ48×3.5mm普通建筑脚手架用钢管。
较以往的施工方法比较,本方法能在生料库库壁底部将钢梁放置于滑模平台设备上,随着平台上升至库顶,由于钢梁的起吊高度由原来的约50m左右降至10m左右,无需大型吊车即可完成钢梁的安装,有效降低施工成本,加快工期及提高施工安全。
附图说明
下面结合附图和实施例对本发明进一步说明。
图1是利用滑模设备提升钢梁平面示意图。
图2是利用滑模设备提升钢梁立面示意图。
图中:1.滑模设备,2.钢梁,3.钢梁托架,4.千斤顶,5.φ48×3.5mm钢管,6.砼库壁。
具体实施方式
下面结合附图详细说明本发明滑模设备提升库顶钢梁的方法。
当生料库滑模设备组装完毕,准备库壁滑模施工。先在滑模设备(1)上按设计图纸找到钢梁(2)两端所对应的位置,在每一个对应的位置上安放一个钢梁托架(3),该托架可在现场利用[50槽钢制作。钢梁托架(3)须与滑模设备(1)焊接牢靠,避免滑升过程中托架位移或倾翻。当钢梁托架(3)就位完毕,即可将钢梁(2)起吊至钢梁托架(3)上,并焊接牢固。
在滑模设备上架有钢梁的两端新增四套滑升装置,该装置由千斤顶(4)和φ48×3.5mm钢管(5)组成,与滑模设备上的滑升装置相同,并统一由滑模设备(1)的液压***控制。提高滑模设备的承载力。钢管(5)随着滑模的提升将逐段埋入库壁砼(6)中。
此钢梁提升法已在多个生料库施工中成功实施,较大的节约了施工成本,简化施工程序。施工进度、质量均得到了提高。

Claims (2)

1.一种利用滑模平台提升筒库库顶钢梁的方法,其特征在于:首先当滑模设备(1)组装完后,在开始滑升库壁之前,在滑模平台上找出库顶钢梁(2)梁端所对应的位置,将每个位置上安放一个钢梁托架(3),并与滑模设备(1)焊接牢固,托架(3)高度根据钢梁(2)高度来进行计算,以保证钢梁(2)架设在托架(3)上不会与平台其它部件相碰触;然后将钢梁(2)吊放至托架(3)上,并临时焊接稳定;同时在滑模平台(1)上架设有钢梁(2)的两端额外增加四套滑升装置,并由滑模设备(1)中的液压***统一控制,以提高滑模平台的承载能力;钢梁(2)安放好后,即可按照正常的滑模施工程序进行施工,当库壁(6)施工完毕,钢梁也随着平台上升至库顶。
2.根据权利要求1所述的利用滑模平台提升筒库库顶钢梁的方法,其特征在于:在滑模平台(1)上架设有钢梁(2)的两端额外增加四套滑升装置与滑模设备(1)自身的滑升装置相同,由液压千斤顶(4)和预埋在库壁(6)内的φ48×3.5mm钢管(5)组成。
CN2012101900573A 2012-06-11 2012-06-11 利用滑模平台提升筒库库顶钢梁的方法 Pending CN102704694A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012101900573A CN102704694A (zh) 2012-06-11 2012-06-11 利用滑模平台提升筒库库顶钢梁的方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012101900573A CN102704694A (zh) 2012-06-11 2012-06-11 利用滑模平台提升筒库库顶钢梁的方法

Publications (1)

Publication Number Publication Date
CN102704694A true CN102704694A (zh) 2012-10-03

Family

ID=46897723

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012101900573A Pending CN102704694A (zh) 2012-06-11 2012-06-11 利用滑模平台提升筒库库顶钢梁的方法

Country Status (1)

Country Link
CN (1) CN102704694A (zh)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104989114A (zh) * 2015-07-15 2015-10-21 上海绿地建设(集团)有限公司 大跨度圆弧形屋盖滑移施工装置及工法
CN107337125A (zh) * 2017-05-31 2017-11-10 中国化学工程第十三建设有限公司 柔性滑膜平台钢梁吊运装置及钢梁吊运方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2500859A1 (de) * 1974-07-24 1976-02-05 Shimizu Construction Co Ltd Hydraulische hubvorrichtung
CN2184041Y (zh) * 1994-01-25 1994-11-30 王爱民 建筑物整体迁移装置
CN101250855A (zh) * 2008-03-28 2008-08-27 山东省路桥集团有限公司 多点整体顶推钢箱梁施工工法
CN101566010A (zh) * 2009-03-25 2009-10-28 江苏建华建设有限公司 结构底部浇筑混凝土的挤密成型施工方法和装置
WO2011066163A1 (en) * 2009-11-25 2011-06-03 Jack Perry Rebar installation system and method of securing rebar

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2500859A1 (de) * 1974-07-24 1976-02-05 Shimizu Construction Co Ltd Hydraulische hubvorrichtung
CN2184041Y (zh) * 1994-01-25 1994-11-30 王爱民 建筑物整体迁移装置
CN101250855A (zh) * 2008-03-28 2008-08-27 山东省路桥集团有限公司 多点整体顶推钢箱梁施工工法
CN101566010A (zh) * 2009-03-25 2009-10-28 江苏建华建设有限公司 结构底部浇筑混凝土的挤密成型施工方法和装置
WO2011066163A1 (en) * 2009-11-25 2011-06-03 Jack Perry Rebar installation system and method of securing rebar

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
大直径筒仓滑模及仓顶钢结构整体提升关键施工技术: "《天津大学硕士学位论文》", 1 April 2012 *
王立伟: "大直径筒仓库壁与库顶钢梁整体提升施工技术", 《建筑工人》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104989114A (zh) * 2015-07-15 2015-10-21 上海绿地建设(集团)有限公司 大跨度圆弧形屋盖滑移施工装置及工法
CN107337125A (zh) * 2017-05-31 2017-11-10 中国化学工程第十三建设有限公司 柔性滑膜平台钢梁吊运装置及钢梁吊运方法
CN107337125B (zh) * 2017-05-31 2019-08-06 中国化学工程第十三建设有限公司 柔性滑模平台钢梁吊运装置及钢梁吊运方法

Similar Documents

Publication Publication Date Title
CN100557168C (zh) 一种大跨度钢桁架高空安装方法
CN103603504B (zh) 超高层建筑机电大口径立管随主体进度吊装施工的方法
CN108019076A (zh) 大直径钢筋混凝土筒仓施工方法及用于锥壳施工的装置
CN104358336A (zh) 单元式幕墙安装***及其安装方法
CN103485574B (zh) 一种造粒塔塔顶钢筋混凝土结构施工方法
CN103122691A (zh) 塔吊标准节支承高空支模钢平台结构及施工方法
US10829927B2 (en) Vertical slip form construction system with multi-function platform, and method of constructing a building therewith
CN107288352A (zh) 超大面积封闭式三角形天窗屋面板的运输及安装方法
CN106567542A (zh) 一种超高层双塔楼钢结构连廊组装方法
CN102677907A (zh) 人工安装筒库库顶钢梁的方法
CN109457814B (zh) 基于贝雷架结构的高耸及大直径建筑物顶盖施工方法
CN205296197U (zh) 抗腐蚀工业厂房混凝土杯口式预制承台
CN204280974U (zh) 一种模板提升装置
CN205348761U (zh) 地下室无梁顶板上安装无基础升降机的加固结构
CN105621304A (zh) 一种建筑物料提升机
CN102704694A (zh) 利用滑模平台提升筒库库顶钢梁的方法
CN203213019U (zh) 长悬臂盖梁现浇施工支架体系
CN205421988U (zh) 混凝土独立柱加固用plc智能同步顶升卸荷施工装置
CN109057309B (zh) 一种悬挂式操作平台及其装拆方法
CN105625732A (zh) 超高悬挑钢结构桁架无支撑施工方法
CN102787717B (zh) 自承式组合钢模板施工方法
CN107165421A (zh) 一种混凝土装配式建筑的施工方法
CN203684275U (zh) 悬臂式挡墙简易支架
CN208733919U (zh) 用于文物保护区的钢梁架设装置
JP6391134B2 (ja) 解体方法および解体システム

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20121003