CN102704486A - Riprapping elephant trunk system for immersed tube foundation construction - Google Patents

Riprapping elephant trunk system for immersed tube foundation construction Download PDF

Info

Publication number
CN102704486A
CN102704486A CN2012101793637A CN201210179363A CN102704486A CN 102704486 A CN102704486 A CN 102704486A CN 2012101793637 A CN2012101793637 A CN 2012101793637A CN 201210179363 A CN201210179363 A CN 201210179363A CN 102704486 A CN102704486 A CN 102704486A
Authority
CN
China
Prior art keywords
tube
elephant trunk
jackstone
shaped tube
elephant
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012101793637A
Other languages
Chinese (zh)
Inventor
孟凡利
孔令磊
丰贯凌
张怡戈
沈家海
徐文华
郭宝华
吴致宏
张宝奇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TIANJIN GANGHANG INSTALLATION ENGINEERING Co Ltd
No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Original Assignee
TIANJIN GANGHANG INSTALLATION ENGINEERING Co Ltd
No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TIANJIN GANGHANG INSTALLATION ENGINEERING Co Ltd, No 1 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd filed Critical TIANJIN GANGHANG INSTALLATION ENGINEERING Co Ltd
Priority to CN2012101793637A priority Critical patent/CN102704486A/en
Publication of CN102704486A publication Critical patent/CN102704486A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The invention relates to a riprapping elephant trunk system for an immersed tube foundation construction. The riprapping elephant trunk system is characterized by comprising elephant trunks which are movably sleeved; a lifting part is arranged at the upper end of one elephant trunk; a lifting part is also arranged at the lower end of another elephant trunk; and limiting parts are arranged both at upper and lower ends of various elephant trunk. The riprapping elephant trunk system for the immersed tube foundation construction disclosed by the invention is capable of satisfying requirements of high efficiency and location riprapping and has the advantages of rational design and simple, convenient and rapid operation; precise location of riprapping places and depths can be realized through the elephant trunks movably sleeved; meanwhile, simple retracting and releasing of the elephant trunks can be realized; and the construction efficiency and the construction quality requirements can be ensured.

Description

The jackstone elephant trunk system of immersed tube foundation construction
Technical field
The invention belongs to immersed tube foundation construction equipment in the waters, concrete relate to a kind of waters employed jackstone elephant trunk of immersed tube basis jackstone operation system that is used for.
Background technology
Along with domestic and international coastal development upsurge, corresponding coastal engineering construction increases, and need carry out the construction of island, cofferdam when carrying out the tunnel construction of island, cofferdam in the marine site; Adopt steel pipe pile to make up island, cofferdam wall; Carry out the jackstone operation of rockfilling then, ram flatly again, form firm island wall cofferdam structure.The important step of immersed tube Foundation Design when jackstone is filled out extra large operation because the water depth and the environment in the marine site of jackstone operation have very big-difference, also can cause bigger influence to the precision of jackstone operation.Jettisoning if directly carry out building stones from rotating device, then jackstone precision poor efficiency is not high yet, and this has influenced the jackstone safety to a great extent.How can carry out the jackstone operation effectively and to improve the jackstone operating efficiency becoming present major issue to be solved.
Summary of the invention
The invention provides a kind of jackstone elephant trunk system that can satisfy the immersed tube foundation construction of efficient and location jackstone requirement; It is reasonable in design; Simple and efficient to handle; Through the accurate location that the elephant trunk of movable set setting has been realized the jackstone place and the degree of depth, can realize the simple and direct first folding and unfolding of elephant trunk simultaneously, guaranteed efficiency of construction and construction quality requirement.
The technical scheme that the present invention adopted is following:
A kind of jackstone elephant trunk system of immersed tube foundation construction is characterized in that said jackstone elephant trunk system comprises the elephant trunk that movable set is provided with, and the upper end of a said elephant trunk is provided with lifting portion, and the lower end of another elephant trunk also is provided with lifting portion; The upper and lower side of each elephant trunk is provided with limiting section.
In the specific embodiment, said elephant trunk is a tube-shaped tube, and a plurality of tube-shaped tube partner movable sets are provided with, and the outside, upper end of said the most inboard tube-shaped tube is symmetrical set otic placode, and the lower end of said the most inboard tube-shaped tube is provided with the limiting section of evagination.
In one embodiment, elephant trunk comprises an outermost tube-shaped tube, and the lower outside of outermost tube-shaped tube is symmetrical set otic placode, and the upper end of said outermost tube-shaped tube is provided with the limiting section of convex.
In one embodiment, the upper end of the adjacent tube-shaped tube of said outermost tube-shaped tube also is provided with the up limiting section of outermost tube-shaped tube.
In one embodiment, the lower end sidepiece of said outermost tube-shaped tube also is provided with hauling block, and this hauling block is symmetrically arranged two groups.
In another embodiment, the sidepiece of said elephant trunk offers through hole, and said through hole is distributed in the middle and upper part sidewall of each elephant trunk.
In one embodiment, the lateral wall of said elephant trunk is fixed with a floor, and said floor is along the outer wall setting perpendicular to elephant trunk of the bearing of trend of elephant trunk.
In the another embodiment, said elephant trunk has an outermost tube-shaped tube, and the inwall of this outermost tube-shaped tube offers the groove that the floor of the tube-shaped tube that is adjacent matches.
The elephant trunk that the jackstone elephant trunk system of this immersed tube foundation construction adopts the more piece suit to be provided with is formed; Elephant trunk is a tube-shaped tube; Limiting section through the setting of tube-shaped tube upper and lower side can suit shrinks also can extend to be opened, and the most inboard elephant trunk is positioned at topmost, this upper end of inboard elephant trunk be jackstone funnel connector; This on the upper end outer wall of inboard elephant trunk welding otic placode is set, this jackstone elephant trunk system can realize fixing or articulates through this otic placode.Otic placode is symmetrically arranged two groups, and the outside, lower end of corresponding outermost elephant trunk is also welded otic placode is set, the traction end when this otic placode is perhaps packed up as fixed end.Outer wall also is provided with the two symmetrical groups pulley in the lower end of this outermost elephant trunk, can be through drag cable by this pulley, and the downward telescopic movable of control elephant trunk is realized carrying out the control of elephant trunk length according to the jackstone condition of construction.Building stones move caused pressure variation in the jackstone process in elephant trunk in order to eliminate, and can on the sidewall of elephant trunk, offer through hole, to realize permeable or ventilative compensation.
Beneficial effect of the present invention is; The jackstone elephant trunk system of this immersed tube foundation construction can satisfy efficient and location jackstone requirement; It is reasonable in design, and is simple and efficient to handle, has realized the accurate location of the jackstone place and the degree of depth through the elephant trunk of movable set setting; The simple and direct first folding and unfolding of elephant trunk be can realize simultaneously, efficiency of construction and construction quality requirement guaranteed.
Below in conjunction with the accompanying drawing and the specific embodiment the present invention is done further elaboration.
Description of drawings
Fig. 1 is the cut-away section structural representation of the specific embodiment of the invention;
Fig. 2 is a cross-sectional view of jackstone elephant trunk among Fig. 1;
Fig. 3 is the structure for amplifying sketch map of I portion among Fig. 2.
The specific embodiment
Like Fig. 1, Fig. 2 and shown in Figure 3; The jackstone elephant trunk system of this immersed tube foundation construction mainly contains elephant trunk 10,20,30 and 40 compositions that four joint movable sets are provided with; Elephant trunk is tube-shaped tube; The upper end lateral wall symmetry welding of the most inboard tube-shaped tube 10 is provided with two otic placodes 11, can realize the fixed installation of this jackstone elephant trunk system by this two otic placode.The lower end of the most inboard tube-shaped tube 10 is provided with the limiting section 12 of evagination, and this limiting section 12 can be tubular body or the metal welding contact pin of external diameter greater than the most inboard tube-shaped tube 10.The top and bottom outer wall of the tube-shaped tube 20 that this most inboard tube-shaped tube 10 is adjacent is provided with limiting section, and the upper end outer wall of this tube-shaped tube 20 is provided with the limiting section 21 of convex, this limiting section 21 can with spacing cooperation the between the limiting section 12 of the most inboard tube-shaped tube 10 lower ends.The upper end outer wall of this tube-shaped tube 20 also is provided with the urceolus limiting section 22 of an evagination, and the tube-shaped tube 30 that is positioned at these tube-shaped tube 20 outside suits is positioned at the lower end of this urceolus limiting section 22 under the effect of this urceolus limiting section 22.Tube-shaped tube 20 has identical structure with tube-shaped tube 30.The upper end of tube-shaped tube 30 is provided with the limiting section 32 and urceolus limiting section 31 of convex; The lower end of tube-shaped tube 30 also is provided with the urceolus limiting section 33 of an evagination.The lower outside of outermost tube-shaped tube 4 is symmetrical set otic placode 44, is used to realize that the lifting of jackstone elephant trunk system fixes, and the upper end of outermost tube-shaped tube 40 is provided with the limiting section 41 of convex, and the lower end is provided with the limiting section 43 of evagination.In concrete the application, the lower end sidepiece of this outermost tube-shaped tube 40 also can be provided with hauling block, and this hauling block is symmetrically arranged two groups.Can control the collapsing length of elephant trunk by drag cable through this hauling block.The sidepiece of each elephant trunk all offers through hole 42, and through hole is distributed in the middle and upper part sidewall of each elephant trunk.As shown in Figures 2 and 3, the lateral wall of three inboard elephant trunks is fixed with floor 13,24 and 34, and each floor is along the outer wall setting perpendicular to elephant trunk of the bearing of trend of elephant trunk.The inwall of outermost tube-shaped tube 40 offers the groove 45 that the floor of the tube-shaped tube that is adjacent matches.This floor can effectively reduce the force of sliding friction between each elephant trunk and play positioning action.

Claims (8)

1. the jackstone elephant trunk system of an immersed tube foundation construction is characterized in that said jackstone elephant trunk system comprises the elephant trunk that movable set is provided with, and the upper end of a said elephant trunk is provided with lifting portion, and the lower end of another elephant trunk also is provided with lifting portion; The upper and lower side of each elephant trunk is provided with limiting section.
2. the jackstone elephant trunk system of immersed tube foundation construction according to claim 1; It is characterized in that said elephant trunk is a tube-shaped tube; A plurality of tube-shaped tube partner movable sets are provided with; The outside, upper end of said the most inboard tube-shaped tube is symmetrical set otic placode, and the lower end of said the most inboard tube-shaped tube is provided with the limiting section of evagination.
3. want the jackstone elephant trunk system of 2 described immersed tube foundation constructions according to right, it is characterized in that elephant trunk comprises an outermost tube-shaped tube, the lower outside of outermost tube-shaped tube is symmetrical set otic placode, and the upper end of said outermost tube-shaped tube is provided with the limiting section of convex.
4. the jackstone elephant trunk system of immersed tube foundation construction according to claim 3 is characterized in that the upper end of the adjacent tube-shaped tube of said outermost tube-shaped tube also is provided with the up limiting section of outermost tube-shaped tube.
5. the jackstone elephant trunk system of immersed tube foundation construction according to claim 3 is characterized in that the lower end sidepiece of said outermost tube-shaped tube also is provided with hauling block, and this hauling block is symmetrically arranged two groups.
6. the jackstone elephant trunk system of immersed tube foundation construction according to claim 1 is characterized in that the sidepiece of said elephant trunk offers through hole, and said through hole is distributed in the middle and upper part sidewall of each elephant trunk.
7. the jackstone elephant trunk system of immersed tube foundation construction according to claim 1 is characterized in that the lateral wall of said elephant trunk is fixed with a floor, and said floor is along the outer wall setting perpendicular to elephant trunk of the bearing of trend of elephant trunk.
8. the jackstone elephant trunk system of immersed tube foundation construction according to claim 7 is characterized in that said elephant trunk has an outermost tube-shaped tube, and the inwall of this outermost tube-shaped tube offers the groove that the floor of the tube-shaped tube that is adjacent matches.
CN2012101793637A 2012-06-04 2012-06-04 Riprapping elephant trunk system for immersed tube foundation construction Pending CN102704486A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012101793637A CN102704486A (en) 2012-06-04 2012-06-04 Riprapping elephant trunk system for immersed tube foundation construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012101793637A CN102704486A (en) 2012-06-04 2012-06-04 Riprapping elephant trunk system for immersed tube foundation construction

Publications (1)

Publication Number Publication Date
CN102704486A true CN102704486A (en) 2012-10-03

Family

ID=46897518

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012101793637A Pending CN102704486A (en) 2012-06-04 2012-06-04 Riprapping elephant trunk system for immersed tube foundation construction

Country Status (1)

Country Link
CN (1) CN102704486A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107829433A (en) * 2017-11-03 2018-03-23 中交第二航务工程局有限公司 Integrate the multi-functional leveling ship of chute jackstone and base bed flattening
CN108411921A (en) * 2018-05-11 2018-08-17 上海振华重工(集团)股份有限公司 A kind of jackstone pipe and jackstone system
CN113859446A (en) * 2021-10-09 2021-12-31 中船黄埔文冲船舶有限公司 Retractable elephant trunk structure of boats and ships
CN114108638A (en) * 2021-11-08 2022-03-01 中船华南船舶机械有限公司 Working method of superposed chute device

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107829433A (en) * 2017-11-03 2018-03-23 中交第二航务工程局有限公司 Integrate the multi-functional leveling ship of chute jackstone and base bed flattening
CN108411921A (en) * 2018-05-11 2018-08-17 上海振华重工(集团)股份有限公司 A kind of jackstone pipe and jackstone system
CN113859446A (en) * 2021-10-09 2021-12-31 中船黄埔文冲船舶有限公司 Retractable elephant trunk structure of boats and ships
CN113859446B (en) * 2021-10-09 2023-12-26 中船黄埔文冲船舶有限公司 Telescopic chute structure of ship
CN114108638A (en) * 2021-11-08 2022-03-01 中船华南船舶机械有限公司 Working method of superposed chute device

Similar Documents

Publication Publication Date Title
CN102704486A (en) Riprapping elephant trunk system for immersed tube foundation construction
CN102392450A (en) Special device for offshore wind power sunk pile righting guide frame
CN205399429U (en) Can change and adjust straightness's that hangs down leading truck
CN109024562B (en) Graded-propulsion large-diameter long prefabricated pipe pile and construction method thereof
CN103161154A (en) Distribution and application of pile foundation well squeezed bearing disk steel bars
CN203200771U (en) Connection structure for pile extension top and bearing platform
CN205089345U (en) Anchor rope is put by pressure equipment
CN103485333B (en) Waveform hollow steel pipe friction pile and construction method
CN202969401U (en) Truss self-lifting platform pile leg
CN110685253B (en) Flood prevention box for hydraulic engineering
CN205260049U (en) Deep roadway support uses novel concrete support
CN203114158U (en) Fully-revolving casing pipe drilling machine
CN204690734U (en) A kind of pile body enlarged footing preformed pile
CN217760891U (en) Fixing device for deep sea oil drilling
CN205116154U (en) Steel pipe concrete pile is strutted to side slope
CN210507386U (en) Auxiliary device is buried underground to open type pore water pressure gauge
CN204098024U (en) A kind of secondary grouting concrete pipe pile construction device
CN203403413U (en) Tension and compression dispersing-type pre-stressed anchor cable
CN207362864U (en) A kind of basis for electric power pylon
CN203310663U (en) Automatic undisturbed sampler of underwater sediment
CN203559793U (en) Drill rod and drilling machine
CN106544995A (en) Sleeve drilling spud-can
CN202658618U (en) Jacket fan foundation connecting piece
CN201747260U (en) Double-drill pipe well drill rig
CN205400773U (en) Protecting against shock power prestressed anchorage cable

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20121003