CN102704468A - 沉管加灌注桩的施工方法 - Google Patents

沉管加灌注桩的施工方法 Download PDF

Info

Publication number
CN102704468A
CN102704468A CN201210192809XA CN201210192809A CN102704468A CN 102704468 A CN102704468 A CN 102704468A CN 201210192809X A CN201210192809X A CN 201210192809XA CN 201210192809 A CN201210192809 A CN 201210192809A CN 102704468 A CN102704468 A CN 102704468A
Authority
CN
China
Prior art keywords
pile
immersed pipe
cast
construction method
immersed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201210192809XA
Other languages
English (en)
Other versions
CN102704468B (zh
Inventor
宫能和
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201210192809.XA priority Critical patent/CN102704468B/zh
Publication of CN102704468A publication Critical patent/CN102704468A/zh
Application granted granted Critical
Publication of CN102704468B publication Critical patent/CN102704468B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

本发明涉及一种沉管加灌注桩的施工方法。本发明技术方案为先在地基中打入沉管桩,在拔出钢管后沉管桩未固结成型时,在沉管桩位置架设搅拌桩机打桩,将搅拌桩退出后形成沉管加灌注桩。本发明克服了沉管和灌注桩各自存在的缺陷,得到一种全新桩。本发明的效果在于发挥了沉管和灌注桩各自的优点,并使二者产生协同作用,得到强度更高的桩。节约了成本,方法也简单,易于推广应用,同时可利用建筑垃圾,更加环保。

Description

沉管加灌注桩的施工方法
技术领域
本发明涉及一种桩的施工方法,特别涉及一种沉管加灌注桩的施工方法。
背景技术
在本发明之前,基础打桩有许多种,其中常用的如沉管式桩和搅拌桩(又称灌注桩)。沉管桩就是桩尖底部接触连接钢管,钢管通常是圆形的,中间是空的,钢管顶端连接动力装置,开动动力装置,将桩尖打入地基,钢管就随桩尖埋入地基中,然后钢管上部一侧连接料斗,通过料斗向钢管内投入石料、砂石、水泥等,然后将钢管拔出,桩尖留在地基中,待成形后就形成桩了。沉管桩的优点是纵向上可以做到均匀可控,还可以做到根据需要在不同位置投入不同比例或者不同含水量的固结材料,强度也比较高,但缺点也是明显的,即直径太小,需要在地基中打入许多的桩,工期长,成本高。搅拌桩是动力装置驱动驱动轴,由与驱动轴上固定连接的叶片在地基中搅拌泥土,边搅拌边通入水泥,利用水泥与泥土混合在一起,形成桩。搅拌桩的优点是直径大,虽然水泥和泥土的混合本身强度不高,但大直径通常可达1米以上可以带来相当高的强度,成桩速度快,在同样面积地基中,其桩的数量可少于沉管桩,但它的缺陷是搅拌桩的固结材料只能是水泥,无法加入石料、砂石等,强度自然无法提高。
发明内容
本发明的目的就在于克服上述缺陷,研制一种沉管加灌注桩的施工方法。
本发明的技术方案是:
沉管加灌注桩的施工方法,其主要技术步骤在于:
(1)先在地基中打入沉管桩;
(2)在拔出钢管后沉管桩未固结成型时,在沉管桩位置架设搅拌桩机打桩;
(3)将搅拌桩退出后形成沉管加灌注桩。
本发明的优点和效果在于结合了沉管桩和搅拌桩各自的优点,舍去了二者各自的缺陷,使二者之间产生了协同作用,形成了一种全新成桩施工方法。易于推广应用,环保,成本低,操作方法简单。
本发明的其他优点和效果将在下面继续描述。
附图说明
图1——本发明过程示意图。
图中各标号对应部件表示如下:
地面1、桩尖2、钢管3、料斗4、动力装置5、驱动轴6、驱动装置7、叶片8。
具体实施方式
如图1所示:
先在地面1上选择打沉管桩的位置,钢管3底部卡在桩尖2上部的台阶上接触连接,动力装置5与钢管3顶部接触连接,启动动力装置5不断打击钢管3顶端,钢管3底部顶着桩尖2进入地基中,直至完全到达预定的位置,然后从料斗4中向钢管3内投入石料、砂石、水泥等,然后将钢管3拔出,桩尖2留在地基中;在沉管桩还未固结成型时,搅拌桩机架在原来沉管桩的位置架设并开始工作,驱动装置7连接驱动轴6,启动驱动装置7,搅拌桩的驱动轴6上固定连接的叶片8将未固结的沉管桩搅碎,重新与周边的泥土一起搅拌,当搅拌桩搅拌到预定位置时,搅拌桩从地基中退出地面1,从而形成搅拌桩;由于原来沉管桩中有石块等,与周边泥土混合后所形成的直径大的搅拌桩的强度大大增强,即直径大又有石块等;因此,将沉管桩和搅拌桩结合避免了它们各自存在的缺陷,同时又保留了它们各自原来存在的优点,更产生了它们各自都没有的、意想不到的效果,即产生了协同作用。
其次,正是由于本发明将二者结合,因而可以在先打沉管桩时,通过料斗4向钢管3内投入建筑垃圾等,这既符合环保要求,又保证了桩的强度,这在单独的沉管桩时是不适合的;同时,在打沉管桩时,由于必须在沉管桩未成型时即打搅拌桩,也由于搅拌桩打的过程中也需要投入水泥,因而在打沉管桩时可以减少水泥投入量或甚至不投入水泥,多投入建筑垃圾,从而在保证强度和成桩质量前提下降低成本,对于一个施工项目而言这是一个庞大的成本节约。
在含水量很大的淤泥质土中打桩,则可以先在打沉管桩时掺入一定比例的粗骨料材料(石屑,粉煤灰,矿渣粉,粉碎的建筑垃圾等等),在相同水泥掺入量的情况下可以大大提高固结强度,同时在同样水泥土强度要求下可以大大节省水泥用量。
还有,对于填海造田的地基上打桩,可以在先打沉管桩时充分利用沉管桩特点,按照不同深度放入不同的粗骨料材料,这样当打搅拌桩时,叶片8可以将不同深度放入不同的粗骨料材料在不同深度处与周边泥土及通入的水泥一起混合搅拌,使桩能够在不同深度显示出对应的强度。
经过大量的室内配合比试验结果,高含水量淤泥质土在加入一定粗骨料后在水泥作为固结材料情况下固结强度大大提高。

Claims (3)

1.沉管加灌注桩的施工方法,其步骤在于:
(1)先在地基中打入沉管桩;
(2)在拔出钢管后沉管桩未固结成型时,在沉管桩位置架设搅拌桩机打桩;
(3)将搅拌桩退出后形成沉管加灌注桩。
2.根据权利要求1所述的沉管加灌注桩的施工方法,其特征在于步骤(1)中减少水泥投入或不投入水泥。
3.根据权利要求1所述的沉管加灌注桩的施工方法,其特征在于步骤(1)中加入建筑垃圾。
CN201210192809.XA 2012-06-11 2012-06-11 沉管加灌注桩的施工方法 Active CN102704468B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210192809.XA CN102704468B (zh) 2012-06-11 2012-06-11 沉管加灌注桩的施工方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210192809.XA CN102704468B (zh) 2012-06-11 2012-06-11 沉管加灌注桩的施工方法

Publications (2)

Publication Number Publication Date
CN102704468A true CN102704468A (zh) 2012-10-03
CN102704468B CN102704468B (zh) 2015-05-20

Family

ID=46897500

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210192809.XA Active CN102704468B (zh) 2012-06-11 2012-06-11 沉管加灌注桩的施工方法

Country Status (1)

Country Link
CN (1) CN102704468B (zh)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1050421A (zh) * 1990-11-12 1991-04-03 中国建筑科学研究院珠海科研设计部 灌注-预制复合桩的成桩方法
JPH06136745A (ja) * 1992-04-28 1994-05-17 J D F:Kk 中空拡底場所打コンクリート杭の施工法
CN1272574A (zh) * 2000-04-03 2000-11-08 王光明 沉管灌注复合桩工法
CN1305040A (zh) * 2001-02-28 2001-07-25 邓亚光 复合桩的施工方法
CN2915942Y (zh) * 2006-01-04 2007-06-27 邓亚光 组合式桩机

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1050421A (zh) * 1990-11-12 1991-04-03 中国建筑科学研究院珠海科研设计部 灌注-预制复合桩的成桩方法
JPH06136745A (ja) * 1992-04-28 1994-05-17 J D F:Kk 中空拡底場所打コンクリート杭の施工法
CN1272574A (zh) * 2000-04-03 2000-11-08 王光明 沉管灌注复合桩工法
CN1305040A (zh) * 2001-02-28 2001-07-25 邓亚光 复合桩的施工方法
CN2915942Y (zh) * 2006-01-04 2007-06-27 邓亚光 组合式桩机

Also Published As

Publication number Publication date
CN102704468B (zh) 2015-05-20

Similar Documents

Publication Publication Date Title
CN203174589U (zh) 深层水泥搅拌桩机钻头叶片装置
CN105714773B (zh) 一种地基处理方法
CN205969508U (zh) 一种建筑类物料搅拌装置
CN105040683A (zh) 一种水泥土搅拌桩信息化施工方法
JP5646218B2 (ja) 深層混合処理工法および深層混合処理装置
CN205521946U (zh) 一种混凝土搅拌机
CN105297710A (zh) 一种高喷水泥土螺旋钻挤、扩孔钢筋混凝土灌注组合桩及制作方法
CN204940261U (zh) 一种岩土工程用搅拌桩
CN101831890B (zh) 一种大坝防渗心墙掺砾土掺合施工方法
CN110185025A (zh) 一种可移动封闭式固化土振动拌和设备
CN203818328U (zh) 自装料移动式混凝土拌合机
CN202123569U (zh) 一种先张法预应力混凝土管桩余浆循环利用装置
CN102704468B (zh) 沉管加灌注桩的施工方法
CN103174130B (zh) 一种冲孔灌注桩的砂层防塌方法
JP5507591B2 (ja) 硬質地盤の掘削撹拌工法
CN207484464U (zh) 一种滑坡治理用深层搅拌桩机
CN208514730U (zh) 干混砂浆生产装置
CN101408089B (zh) 不良地质条件下锚索成孔及埋深监测仪器成孔的施工方法
CN102605775B (zh) 一种柔性桩与刚性桩上下同体组合桩及成桩方法
CN206812212U (zh) 一种建筑施工混凝土浇筑搅拌器
CN106065608B (zh) 一种预拌高强度水泥土地基基础
CN101487251A (zh) 用于地基加固的预拌灌注水泥土桩的施工方法及所成桩
CN210282725U (zh) 一种石灰稳定土混合料装置
CN205100208U (zh) 一种高喷水泥土螺旋钻挤、扩孔钢筋混凝土灌注桩组合桩
JP2015105522A (ja) 地盤改良方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant