CN102691509A - Trolley for roadway concrete construction and construction method - Google Patents

Trolley for roadway concrete construction and construction method Download PDF

Info

Publication number
CN102691509A
CN102691509A CN2012101744486A CN201210174448A CN102691509A CN 102691509 A CN102691509 A CN 102691509A CN 2012101744486 A CN2012101744486 A CN 2012101744486A CN 201210174448 A CN201210174448 A CN 201210174448A CN 102691509 A CN102691509 A CN 102691509A
Authority
CN
China
Prior art keywords
template
construction
chassis
concrete
longeron
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012101744486A
Other languages
Chinese (zh)
Inventor
曹月芹
李鸿亮
季正龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Coal No 5 Construction Co Ltd
Original Assignee
China Coal No 5 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Coal No 5 Construction Co Ltd filed Critical China Coal No 5 Construction Co Ltd
Priority to CN2012101744486A priority Critical patent/CN102691509A/en
Publication of CN102691509A publication Critical patent/CN102691509A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses a trolley for roadway concrete construction and a construction method. The trolley for roadway concrete construction belonging to construction equipment is used for roadway secondary-lining concrete construction of a coal mine and comprises a formwork, a formwork support, a running system and operation platforms. The formwork is designed according to the size of a roadway and consists of a top form and side forms. The formwork support in the proper length of 10 meters around comprises vertical columns, crossbeams, a lower longitudinal beam, an upper longitudinal beam, diagonal portal struts, lead screws and jacks. The running system comprises a motor and wheels. The trolley for roadway concrete construction has the advantages of fine concrete forming effect, convenience to operate and high construction speed.

Description

The tunnel concrete construction is with chassis and job practices
Technical field
The present invention relates to the concrete construction of a kind of tunnel with chassis and job practices, belong to the equipment of tunnel two lining concrete constructions.Be mainly used in coal mine roadway two lining Concrete Construction.
Background technology
The concrete conventional construction method of coal mine roadway two linings generally is " short pick is short builds " job practices." short pick is short builds " job practices is according to drawing of engineering design, the rigging support system, and the assembly unit of customization steel form, the template installation length is about 3 meters.There is following drawback in this method:
1, the template piece is many, is prone to spillage during concreting, and appearance is not attractive in appearance;
2, concrete vibrating inconvenient operation, concrete is difficult for closely knit, and speed of application is slow.
3, the concrete construction joint indwelling is many, causes infiltration easily.
Summary of the invention
The present invention provides the concrete construction of a kind of tunnel with chassis and job practices, guarantees that concreting is closely knit, smooth, have easy to operate, recycle, rapidly and efficiently wait characteristics.
The present invention realizes through following technical scheme: it comprises template, template support, running gear and operating platform; Described template supports by crossbeam and symmetry and is installed in the column below the crossbeam, the gate-type bracing frame that diagonal brace is formed; Described template is by backform and the arch gate-type template that forms with side form that backform is fixed together; Template is through being supported on the crossbeam that template supports being much of longeron; Crossbeam and longeron are formed horizontal skeleton; Template is bearing on the running gear, and described running gear comprises the following longeron that is installed on the column lower end, be installed in down wheel and the motor of wheels motion below the longeron; Described operating platform has 2, is installed on the formwork-support each one of front and back respectively.
Before construction, according to construction design drawing inter-road road size, chassis is carried out processing and fabricating, chassis will possess certain intensity and rigidity, in use must not be out of shape, and accomplish advantages of simple, and is easy to use.
A kind of job practices of utilizing above-mentioned chassis construction coal mine roadway, the concrete operations step is following:
1, lays track;
2, utilize running gear, be installed on the track chassis is in place;
3, measure the construction control line, utilize leading screw and jack adjustment template;
4, build the tunnel concrete;
5, etc. after concrete strength meets the demands, adjustment leading screw and jack disengaging template, template cleaning brush oil is for use;
6, lay next construction section track, repeat above-mentioned work progress.
The invention has the beneficial effects as follows: solved the concrete leakiness that the two lining concrete constructions of traditional tunnel cause, the presentation quality defect of bad has guaranteed concrete Forming Quality, and easy to operate.
Description of drawings
Below in conjunction with accompanying drawing and embodiment the present invention is further specified.
Fig. 1 is a chassis device sketch map;
Fig. 2 is the chassis side elevational view;
Fig. 3 is the backform sectional drawing;
Fig. 4 is the whole vertical view of chassis.
Among the figure: 1, track, 2, wheel, 3, longeron down, 4, motor, 5, column, 6, diagonal brace; 7, side form, 8, bolt, 9, go up longeron, 10, backform, 11, crossbeam, 12, longeron; 13, leading screw, 14, the 8# angle steel, 15, the 16# channel-section steel, 16, charging aperture, 17, jack, 18, operating platform.
The specific embodiment
Like Fig. 1 and Fig. 2, Fig. 3 and shown in Figure 4, it comprises template, template support, running gear and operating platform with chassis in the tunnel concrete construction; Template supports by crossbeam 11 and symmetry and is installed in the column 5 below the crossbeam 11, the gate-type bracing frame that diagonal brace 6 is formed; Template is by backform 10 and the arch gate-type template that forms with side form 7 that backform is fixed together; Template is through being supported on the crossbeam 11 that template supports being much of longeron 9; Crossbeam 11 is formed horizontal skeleton with longeron 12; Template is bearing on the running gear, and described running gear comprises the following longeron 3 that is installed on column 5 lower ends, be installed in down wheel 2 and the motor 4 of wheels motion below the longeron 3; Described operating platform 18 has 2, is installed on the formwork-support each one of front and back respectively.Template supports according to the tunnel size to be confirmed, adopts the gate-type bracing frame of H shaped steel welding.The backform 10 of template adopts bolt to be connected with side form 7.Longeron 12 two ends of supporting in template respectively are equipped with 2 jack 17; On column 5, be welded with leading screw 13.
The concrete preparation method of present embodiment chassis is:
1, template supports: make column 5, diagonal brace 6 and crossbeam 11 earlier; Column 5 adopts H shaped steel 250*180 with diagonal brace 6; Crossbeam 11 adopts H shaped steel 350*170, and length is 2.4 meters, 2 meters of spacings, totally 8; Weld through the 16# channel-section steel between crossbeam and the column.Install longeron 9 and following longeron 3 again, last longeron adopts 16# channel-section steel and H shaped steel 200*200, couples together up and down with crossbeam 11; Following longeron 3 adopts H shaped steel 350*350.After treating that template is installed, jack 17 and leading screw 13 are installed again, the QYL50 jack, is installed on the longeron 12 by 2 every; Leading screw 13 is welded on the column 5.
2, template is installed: per 1.5 meters one of template, and totally 7,10mm is thick, and backform 10 adopts bolt to be connected with side form 7.Welding 16# channel-section steel 15 on the template corresponding with leading screw 13, other positions welding 8# angle steel 14, spacing 250mm makes template have enough rigidity.
3, running gear is installed: template support with walking track 1 between adopt under longeron 3 be connected, wheel 2 is equipped with in following longeron bottom surface.The track model is 38 ㎏/m, 2.3 meters of spacings, and power set are Y100L2-4B5 motor 4, are installed in down on the longeron 3, and the power of walking is provided.
4, operating platform 18 adopts angle steel to be welded on the formwork-support, each one of front and back, and width is 2 meters, long 1.5 meters is places that the constructor operated and deposited facility, and guardrail is installed around the platform.
Utilize the job practices of above-mentioned chassis construction coal mine roadway following:
1, lays track.
2, utilize running gear, chassis is located on the track of spreading.
3, measure the construction control line, utilize leading screw and jack adjustment template.
4, build the tunnel concrete.
5, etc. after concrete strength meets the demands, the leading screw and the jack demoulding during the adjustment template supports, template cleaning brush oil is for use.
6, lay next construction section track, repeat above-mentioned work progress.
Chassis installs, and the adjustment center line makes the chassis center line overlap with the tunnel center line earlier, adjusts each position absolute altitude of chassis again, finely tunes leading screw and jack at last, and backform and side form template face absolute altitude are met design requirement.From charging aperture 14 concrete is delivered to the template face, concreting, wait concrete strength to meet the form removal condition after, adjustment jack and leading screw come off template, template face cleaning brush oil, track spreading, chassis move to next construction section, repeat above-mentioned steps.

Claims (5)

1. chassis is used in a tunnel concrete construction, it is characterized in that, it comprises template, template support, running gear and operating platform; Described template supports by crossbeam (11) and symmetry and is installed in the following column (5) of crossbeam (11), the gate-type bracing frame that diagonal brace (6) is formed; Described template is the arch gate-type template that is formed by backform (10) and the side form (7) that is fixed together with backform; Template is through being supported on the crossbeam (11) that template supports being much of longeron (9); Crossbeam (11) and longeron (12) are formed horizontal skeleton; Template is bearing on the running gear, and described running gear comprises the following longeron (3) that is installed on column (5) lower end, the motor (4) that is installed in down following wheel (2) of longeron (3) and wheels motion; Described operating platform has 2, is installed on the formwork-support each one of front and back respectively.
2. chassis is used in tunnel according to claim 1 concrete construction, it is characterized in that: template supports according to the tunnel size to be confirmed, adopts the gate-type bracing frame of H shaped steel welding.
3. chassis is used in tunnel according to claim 1 concrete construction, it is characterized in that: the backform of template adopts bolt to be connected with side form.
4. chassis is used in tunnel according to claim 1 concrete construction, it is characterized in that: longeron (12) two ends of supporting in template respectively are equipped with 2 jack (17); On column (5), be welded with leading screw (13).
5. job practices of utilizing the said chassis of claim 1 construction coal mine roadway, the concrete operations step is following:
(1) lays track;
(2) utilize running gear, be installed on the track chassis is in place;
(3) measure the construction control line, utilize leading screw and jack adjustment template;
(4) build the tunnel concrete;
(5) etc. after concrete strength meets the demands, adjustment leading screw and jack disengaging template, template cleaning brush oil is for use;
(6) lay next construction section track, repeat above-mentioned work progress.
CN2012101744486A 2012-05-31 2012-05-31 Trolley for roadway concrete construction and construction method Pending CN102691509A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012101744486A CN102691509A (en) 2012-05-31 2012-05-31 Trolley for roadway concrete construction and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012101744486A CN102691509A (en) 2012-05-31 2012-05-31 Trolley for roadway concrete construction and construction method

Publications (1)

Publication Number Publication Date
CN102691509A true CN102691509A (en) 2012-09-26

Family

ID=46857227

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012101744486A Pending CN102691509A (en) 2012-05-31 2012-05-31 Trolley for roadway concrete construction and construction method

Country Status (1)

Country Link
CN (1) CN102691509A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109854279A (en) * 2019-03-01 2019-06-07 中信国安建工集团有限公司 A kind of constructing tunnel die plate equipment and constructing operation method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2002027142A1 (en) * 2000-09-12 2002-04-04 Knut Fossum Method and apparatus for continuously forming a concrete structure
CN201546737U (en) * 2009-11-24 2010-08-11 广汉金达隧道机械有限公司 Built-out door frame type steel mould trolley
CN201730627U (en) * 2010-05-27 2011-02-02 中国水利水电第十工程局有限公司 Tunnel adit curve section and straight section full-circle hydraulic steel-form trolley
CN201835842U (en) * 2010-10-22 2011-05-18 中国石油化工集团公司 Secondary lining integral trolley with pipeline passing through small-section tunnel of mountain body
CN202628117U (en) * 2012-05-31 2012-12-26 中煤第五建设有限公司 Laneway concrete construction trolley

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2002027142A1 (en) * 2000-09-12 2002-04-04 Knut Fossum Method and apparatus for continuously forming a concrete structure
CN201546737U (en) * 2009-11-24 2010-08-11 广汉金达隧道机械有限公司 Built-out door frame type steel mould trolley
CN201730627U (en) * 2010-05-27 2011-02-02 中国水利水电第十工程局有限公司 Tunnel adit curve section and straight section full-circle hydraulic steel-form trolley
CN201835842U (en) * 2010-10-22 2011-05-18 中国石油化工集团公司 Secondary lining integral trolley with pipeline passing through small-section tunnel of mountain body
CN202628117U (en) * 2012-05-31 2012-12-26 中煤第五建设有限公司 Laneway concrete construction trolley

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109854279A (en) * 2019-03-01 2019-06-07 中信国安建工集团有限公司 A kind of constructing tunnel die plate equipment and constructing operation method

Similar Documents

Publication Publication Date Title
CN105952482B (en) Self-propelled tunnel inverted arch lining trolley
CN101215814B (en) Laying construction method and device for double-block type ballastless track sleeper
CN203007849U (en) Movable construction device for cast-in-place concrete crash barriers with hanging eaves
CN102042021A (en) Automatically walking stepped mobile trestle
CN104533460B (en) Support replacement formula formwork jumbo and the construction method of underpass concreting
CN104179090B (en) A kind of subway is laid a railway track system
CN111550270B (en) Ultra-large self-propelled tunnel multifunctional operation platform and tunnel steel bar waterproof board construction method
CN102337905A (en) Open type TBM (Tunnel Boring Machine) fullface synchronous lining trolley for hydraulictunnel
CN202544854U (en) Lining trolley for subway station
CN103924985A (en) Cast-in-situ inverted arch lining trolley and concrete curing system in synchronous construction with TBM (tunnel boring machine) tunneling
CN104727229A (en) Movable bottom formwork trolley system suitable for large concrete prefabricated component and method for prefabricating base plate of large concrete component
CN104453951B (en) Combined type subway station lining template trolley for baffle
CN202132052U (en) Fully-hydraulic tunnel inverted arch trestle-type mobile mold frame
CN203847130U (en) Cast-in-situ inverted arch lining trolley and concrete curing system capable of being synchronously constructed along with boring of TMB (tunnel boring machine)
CN203834370U (en) Arch ring steel formwork trolley for circular arch culvert
CN204492846U (en) Movable type with inverted arch lining device crosses car trestle
CN106284989B (en) The sliding form bracing system of double track and complete construction method
CN202250105U (en) Integral hydraulic steel formwork trolley
CN109356618A (en) A kind of simple integral movable type square type tunnel frame and its construction method
CN202628117U (en) Laneway concrete construction trolley
CN204608611U (en) Be applicable to the movable die block table system of large-sized concrete prefabricated units
CN102691509A (en) Trolley for roadway concrete construction and construction method
CN103615262A (en) Steel form jumbo with main structure capable of passing conventional sections, and implementation method thereof
CN202628118U (en) Formwork trolley for long and large box culvert
CN103410104B (en) The bearing replacement method and apparatus of overhead road of city

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120926