CN102684174B - 一种提升风电场低电压穿越能力的继电保护方法 - Google Patents

一种提升风电场低电压穿越能力的继电保护方法 Download PDF

Info

Publication number
CN102684174B
CN102684174B CN201210164061.2A CN201210164061A CN102684174B CN 102684174 B CN102684174 B CN 102684174B CN 201210164061 A CN201210164061 A CN 201210164061A CN 102684174 B CN102684174 B CN 102684174B
Authority
CN
China
Prior art keywords
voltage
capacity
electric field
wind electric
wind
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210164061.2A
Other languages
English (en)
Other versions
CN102684174A (zh
Inventor
张艳霞
屈正
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JIANGSU YIDUOLI NEW ENERGY TECHNOLOGY Co.,Ltd.
Original Assignee
Tianjin University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin University filed Critical Tianjin University
Priority to CN201210164061.2A priority Critical patent/CN102684174B/zh
Publication of CN102684174A publication Critical patent/CN102684174A/zh
Application granted granted Critical
Publication of CN102684174B publication Critical patent/CN102684174B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Control Of Eletrric Generators (AREA)

Abstract

本发明属于电力***的继电保护领域,涉及一种提升风电场低电压穿越能力的继电保护方法,包括下列步骤:在风电场各集电线路的本地负荷支路上分别装设反时限低电压保护装置;通过风电场高压母线上的电压互感器采集并网点的电压数据,并计算得到三相电压的幅值,进而计算采样时的电压跌落数值;根据故障导致电压的跌落幅度和集电线路上负荷的容量占风电场总容量的比重设置各个保护装置的动作时间,分时分级动作跳开断路器,容量较小的集电线路的负荷支路上的保护装置先动作。本发明在电网侧故障导致的风电场低电压期间,能够分时分级切除风电场所带负荷,可以充分利用机组容量,提升风电场低电压穿越能力。

Description

一种提升风电场低电压穿越能力的继电保护方法
技术领域
本发明涉及电力***的继电保护领域,特别涉及风电场低电压穿越期间的继电保护方案。
背景技术
风力发电充分利用了风能的可再生性和清洁性,具有良好的环境友好性,已成为重要的电力能源形式。随着风电并网的规模和容量不断增大,电网对并网风电场的运行要求不断提高。为保证在电网侧故障导致***电压下降的情况下,风机能够不脱网并支持电网的稳定运行,越来越多的国家明确要求并网风电机组必须具备低电压穿越(LVRT)能力[1-3]。因此,在分析上述要求的基础上,进行保护方案的研究,有利于提高风电场的低电压穿越能力和并网***运行的稳定性,具有重要的理论意义和经济价值。目前,对风电机组低电压穿越能力的研究主要集中在改变控制策略和增加硬件电路方面。文献[4,5]分析了采用无功补偿装置实现风电场的低电压穿越功能的方法。文献[6,7]提出了通过改变电网故障时定子电流的控制策略实现低电压穿越的方案。文献[8-10]讨论了采用转子撬棒电路Crowbar实现风机低电压穿越的方法。由以上分析可知,目前风电场低电压穿越方法多集中于风电机组本身,有必要发明新的保护方案,在风电场低电压期间进行有效动作,从而帮助风电机组更好地穿越这一低电压时期,以确保风电并网***的稳定运行。
参考文献
[1]Morren J,Sjoerd W H. Ride through of wind turbines with doubly-fed induction generator during avoltage dip[J].IEEE Transactions on Energy Conversion,2005,20(1):435-441.
[2]Abbey C,Joos G.Effect of low voltage ride through(LVRT)characteristic on voltage stability[J].IEEETransacitons on Industry Applications,2005,41(3):1-7.
[3]Lopez D,Sanchis J,Roboam P,et al. Dynamic behavior of the doubly fed induction generator duringthree-phase voltage dips.IEEE Trans on Energy Conversion,2007,22(3):709-717.
[4]李明东.风电场实现低电压穿越技术改造方案[J].中国电力,2011,44(6):48-51.
[5]魏宏芬,邱晓燕,徐建,等.通过SVC和TCSC联合改善异步机风电场暂态电压稳定性研究[J].可再生能源,2011,29(4):20-27.
[6]姚骏,廖勇,唐建平.电网短路故障时交流励磁风力发电机不脱网运行的励磁控制策略[J].中国电机工程学报,2007,27(30):64-71.
[7]向大卫,杨顺昌,冉丽.电网对称故障时双馈感应发电机不脱网运行的励磁控制策略[J].中国电机工程学报,2006(3):164-170.
[8]李建林,许洪华,等.风力发电***低电压运行技术[M].北京:机械工业出版社,2008.
[9]姚骏,廖勇.基于crowbar保护控制的交流励磁风电***运行分析[J].电力***自动化,2007,31(23):79-83.
[10]张学广,徐殿国.电网对称故障下基于active crowbar双馈发电机控制[J].电机与控制学报,2009,13(1):99-103.
发明内容
本发明的目的是提出一种提升风电场低电压穿越能力的新方法。该方法从继电保护角度出发,在电网侧故障导致的风电场低电压期间,分时分级切除风电场所带负荷,达到充分利用机组容量,提升风电场低电压穿越能力的目的。本发明的技术方案如下:
一种提升风电场低电压穿越能力的继电保护方法,包括下列步骤:
1)在风电场各集电线路的本地负荷支路上分别装设反时限低电压保护装置;
2)通过风电场高压母线上的电压互感器采集并网点的电压数据,并计算得到三相电压的幅值,进而计算采样时的电压跌落数值;
3)根据故障导致电压的跌落幅度和集电线路上负荷的容量占风电场总容量的比重设置各个保护装置的动作时间,分时分级动作跳开断路器,容量较小的集电线路的负荷支路上的保护装置先动作。
作为优选实施方式,步骤3)中的动作时间的设置公式为:t=Kzs(-1.9643Δu+2.1964),式中,Kzs=2.5SDGi/S为自适应系数;SDGi为第i条集电线路上所带风电机组的容量;S为风电场的总容量;Δu为电压跌落数值。
本发明的有益效果如下:
1.风电场中各集电线路上的反时限低电压保护特性均低于标准反时限特性,可减少Crowbar的投入次数;
2.电网侧故障期间,风电场的大部分本地负荷仍保持与电网连接,不会出现故障切除后大规模负荷重新并网的现象;
3.本文提出的反时限低电压保护具有自适应性,只需设置好特性,无需整定。
附图说明
图1风电并网***示意图。
图2风电场低电压穿越要求。
图3集电线路所装设的反时限保护特性。
图4低电压反时限保护的动作特性。
具体实施方式
下面结合附图和实施例对本发明进行说明。
在图1所示的风电并网***中,当电网侧发生故障将导致风电场母线M电压下降,使得风电场的风电机组进入低电压穿越时段。若母线M处电压不满足图2所示的国家电网公司风电场低电压穿越要求时,风电机组将被切除,对***的稳定运行造成不利影响。
本发明根据图2所示的国家电网公司对并网风电场低电压穿越能力的要求,推导出风电机组并网时间与并网点电压跌落百分比的标准反时限特性关系;以此为依据设置保护特性,从而达到提升风电场低电压穿越能力的目的。
选取图2中并网点电压标么值为0.2~0.9区间的线段,设其方程为:
au+b=t    (1)
式中,u为并网点电压标么值,t为规定要求的风电机组并网运行时间,a,b为常数。将点(0.2,0.625),(0.9,2)代入式(1),得a=1.9643,b=0.2321,则
t=1.9643u+0.2321       (2)
取Δu=1-u为电压跌落百分比,代入式(2),得
t=-1.9643Δu+2.1964    (3)
上式表达了风电机组并网时间与并网点电压跌落百分比之间的关系,即为风电机组所需具备的标准反时限低电压特性,如图3中曲线1所示。
为了充分利用风电场的容量,本发明在图1所示风电场并网***的各集电线路本地负荷上分别装设反时限低电压保护,各保护的反时限特性按下列方程设置。
t=Kzs(-1.9643Δu+2.1964)    (4)
式中,Kzs=2.5SDGi/S为自适应系数;SDGi为第i条集电线路上所带风电机组的容量;S为风电场的总容量。
公式(4)的反时限特性具有自适应性,依据机组容量在标准反时限特性的基础上有不同程度的下降,从而达到分级分时切除本地负荷支撑母线电压的作用。为了避免过早动作,反时限低电压保护在***电压跌落程度较低时需躲开集电线路上所装设的反应短路的后备保护动作时限tIII。因此,式(4)动作特性的下限是一条与标准反时限特性斜率相同且保证电压跌落百分比为0.3(即电压降至0.7)时在tIII上方的直线,如图3中曲线2所示。
每条集电线路容量与风电场容量比值通常在0.3~0.4范围内,自适应系数Kzs在机组容量比上乘以2.5,则Kzs在0.75~1的范围内,能满足躲开短路后备保护的要求。这样自适应反时限特性不会下降太严重,充分利用机组承受短路电流的能力,避免不必要的动作。例如当SDGi/S=0.3时,该集电线路的保护特性为:
t=-1.4732Δu+1.6473    (5)
此特性为图4中的曲线2。
设SDG1、SDG2、SDG3依次增大,对应画出的三个反时限低电压保护特性如图3所示。当电网侧故障导致母线M电压降低至u1时,安装在各集电线路上的低电压反时限保护将分别计算出相应的动作时间,并由安装在集电线路1上的保护以较短的延时t1首先动作,将本地负荷1与电网断开;若切除线路后母线电压提升至u2仍然能够触发下一级低电压保护,集电线路2上的保护将以t2的延时动作,使母线电压上升至u3,依此类推。

Claims (1)

1.一种提升风电场低电压穿越能力的继电保护方法,包括下列步骤: 
1)在风电场各集电线路的本地负荷支路上分别装设反时限低电压保护装置; 
2)通过风电场高压母线上的电压互感器采集并网点的电压数据,并计算得到三相电压的幅值,进而计算采样时的电压跌落数值; 
3)根据故障导致电压的跌落幅度和集电线路上负荷的容量占风电场总容量的比重设置各个保护装置的动作时间,分时分级动作跳开断路器,容量较小的集电线路的负荷支路上的保护装置先动作,其中的动作时间的设置公式为:t=Kzs(-1.9643Δu+2.1964),式中,Kzs=2.5SDGi/SΣ为自适应系数;SDGi为第i条集电线路上所带风电机组的容量;SΣ为风电场的总容量;Δu为电压跌落数值。 
CN201210164061.2A 2012-05-23 2012-05-23 一种提升风电场低电压穿越能力的继电保护方法 Active CN102684174B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210164061.2A CN102684174B (zh) 2012-05-23 2012-05-23 一种提升风电场低电压穿越能力的继电保护方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210164061.2A CN102684174B (zh) 2012-05-23 2012-05-23 一种提升风电场低电压穿越能力的继电保护方法

Publications (2)

Publication Number Publication Date
CN102684174A CN102684174A (zh) 2012-09-19
CN102684174B true CN102684174B (zh) 2014-11-26

Family

ID=46815716

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210164061.2A Active CN102684174B (zh) 2012-05-23 2012-05-23 一种提升风电场低电压穿越能力的继电保护方法

Country Status (1)

Country Link
CN (1) CN102684174B (zh)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104201706A (zh) * 2014-09-04 2014-12-10 北京艾科迈新能源科技有限公司 一种兼顾故障穿越与并离网无缝切换的储能协调控制方法
EP3034561B1 (en) * 2014-12-19 2019-02-06 NKT HV Cables GmbH A method of manufacturing a high-voltage DC cable joint, and a high-voltage DC cable joint.
CN116316488B (zh) * 2023-02-10 2023-11-14 国网浙江省电力有限公司嘉兴供电公司 一种风电场风机汇集***保护配置及参数整定方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201821115U (zh) * 2010-08-10 2011-05-04 龙源电力集团股份有限公司 一种风电场整体低电压穿越***
CN201887484U (zh) * 2010-12-29 2011-06-29 张伟 一种提升风电机组低电压穿越能力的无功补偿成套装置
CN102222930A (zh) * 2010-04-19 2011-10-19 严本信 智能高效风力发电场
CN202190083U (zh) * 2011-08-03 2012-04-11 北京光耀麦斯韦风电技术有限公司 一种集中式风电场低电压穿越***装置

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102222930A (zh) * 2010-04-19 2011-10-19 严本信 智能高效风力发电场
CN201821115U (zh) * 2010-08-10 2011-05-04 龙源电力集团股份有限公司 一种风电场整体低电压穿越***
CN201887484U (zh) * 2010-12-29 2011-06-29 张伟 一种提升风电机组低电压穿越能力的无功补偿成套装置
CN202190083U (zh) * 2011-08-03 2012-04-11 北京光耀麦斯韦风电技术有限公司 一种集中式风电场低电压穿越***装置

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
刘会勇.探讨含有风电场线路的海岛电网继电保护配置.《广东科技》.2011,(第24期),第151-152页. *
探讨含有风电场线路的海岛电网继电保护配置;刘会勇;《广东科技》;20111231(第24期);第151-152页 *

Also Published As

Publication number Publication date
CN102684174A (zh) 2012-09-19

Similar Documents

Publication Publication Date Title
Blaabjerg et al. Distributed power-generation systems and protection
Akhmatov et al. Large penetration of wind and dispersed generation into Danish power grid
Gashi et al. Simulation the wind grid code requirements for wind farms connection in Kosovo transmission grid
CN104242344A (zh) 一种分布式发电并网控制保护方法
CN105186559A (zh) 一种双馈风力发电机组低电压穿越电路及其控制方法
CN101877488A (zh) 一种用于实现风电机组低电压穿越能力的装置
CN202172281U (zh) 一种并网的风力发电机组
Wang et al. A study on critical clearing time (CCT) of micro-grids under fault conditions
CN102684174B (zh) 一种提升风电场低电压穿越能力的继电保护方法
CN101902052B (zh) 一种风电场整体低电压穿越***
Karystianos et al. Operation of the electrical system of Crete in interconnection with the mainland grid: A stability study
CN104362643A (zh) 风电场无功补偿配置容量计算方法
CN201821115U (zh) 一种风电场整体低电压穿越***
Enrique Generation capability curves for wind farms
Turiman et al. Analysis of high penetration level of distributed generation at medium voltage levels of distribution networks
CN109256798A (zh) 一种电压对称故障下dfig***的穿越运行方法
Pengxin et al. A new lvrt method applied on the integration of distributed wind power generation
Zeng et al. Fault ride-through capability enhancement by ADAPATIVE Voltage Support Control for inverter interfaced distributed generation
Wu et al. Impact of new-type synchronous condenser on voltage stability of jarud sending-end system
Alayande et al. Power quality considerations for distributed generation integration in the nigerian distribution network using neplan software
Teixeira et al. Stability analysis of power system in cape verde with wind power under wind gust and short circuit fault
Zhang et al. Configuration, cooperation and existing problems of wind farm relay protection
Xu et al. Dynamic modeling and simulation of distributed static compensators in system impact studies
Xiang et al. Study on cascading trip-off failure of large-scale wind farm in China
Zhang et al. Study on emergency control of reactive power after hvdc blocking fault with large-scale renewable energy

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210112

Address after: 224053 Yongxing new energy equipment Industrial Park, Sanli village, Xinxing Town, Tinghu District, Yancheng City, Jiangsu Province (10)

Patentee after: JIANGSU YIDUOLI NEW ENERGY TECHNOLOGY Co.,Ltd.

Address before: 300072 Tianjin City, Nankai District Wei Jin Road No. 92

Patentee before: Tianjin University