CN102644562A - Process for installing impeller assembly elephant foot balance bracket of offshore wind power field - Google Patents
Process for installing impeller assembly elephant foot balance bracket of offshore wind power field Download PDFInfo
- Publication number
- CN102644562A CN102644562A CN2012101469883A CN201210146988A CN102644562A CN 102644562 A CN102644562 A CN 102644562A CN 2012101469883 A CN2012101469883 A CN 2012101469883A CN 201210146988 A CN201210146988 A CN 201210146988A CN 102644562 A CN102644562 A CN 102644562A
- Authority
- CN
- China
- Prior art keywords
- balance
- leg
- assembling
- resembles
- blade
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/72—Wind turbines with rotation axis in wind direction
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/727—Offshore wind turbines
Landscapes
- Wind Motors (AREA)
Abstract
The invention discloses a process for installing an impeller assembly elephant foot balance bracket of an offshore wind power field. The process comprises the following steps of: putting a base at first: then, installing balance elephant feet: respectively inserting a first balance elephant foot 3, a second balance elephant foot 4 and a third balance elephant foot 5 in the base 1, wherein the depth is not less than 2 m; after installing the balance elephant feet, assembling impellers, and, in the event of assembling the impellers, connecting a hub 2 to the base 1 by using a bolt; and finally, assembling blades: respectively assembling a first blade 6 on the first balance elephant foot 3 and assembling a third blade 8 right above the third balance elephant foot 5 in turn, and finally, assembling a second blade 7 on the second balance elephant foot 4. The process disclosed by the invention has the advantages of being high in working efficiency, smart in structure, low in requirement of operation platform space, simple for operation and strong in bearing capability.
Description
Technical field:
The present invention discloses a kind of mounting process of balance bracket, and particularly a kind of marine wind electric field impeller assembling resembles the mounting process of leg balance bracket.
Background technique:
Marine intertidal belt wind electric field blower equipment is installed at present, and feasible scheme is the lifting that distributes.Wherein wheel hub and three blades are in the assembling of operating platform deck plane level, and basic order is first positioning and fixing wheel hub, and three blades are installed then one by one.But because blade is elongated, when mounting blades, have serious eccentric moment, the way of taking usually is a bed hedgehopping intensity foam plate below the position of the inclined to one side afterbody of blade center of gravity.This method is brought following two difficult problems: 1) the operating platform area is enough big, places the high tenacity foam plate to guarantee enough spatial position; 2) along with the quick increase of offshore wind farm type, blade dimensions, weight are increasing, and present existing high tenacity foam can't carry the weight of big type blade.
Summary of the invention:
The objective of the invention is in order to overcome above deficiency; A kind of balance blade deadweight that is used for is provided; Thereby reduce requirement, and a kind of marine wind electric field impeller assembling that adapts to the growth requirement of big type gradually resembles the mounting process of leg balance bracket to the operating platform area.
The object of the invention is realized through following technological scheme: a kind of marine wind electric field impeller assembling resembles the mounting process of leg balance bracket; May further comprise the steps: at first lay pedestal: at first as requested pedestal is placed on specified position, and is welded in the construction equipment deck plane; Balance is installed then resembles leg: respectively first balance is resembled leg 3, second balance and resemble leg 4 and the 3rd balance and resemble leg 5 and insert pedestals 1, and the degree of depth is not less than 2 meters; Balance resembles leg and installs back assembling impeller, during the impeller assembling, earlier wheel hub 2 usefulness bolts is connected on the pedestal 1, guarantees during the location that two blades are positioned at that first balance resembles leg 3 and the 3rd balance resembles directly over the leg 5; Assemble blade at last: respectively first blade 6 is assembled in first balance successively and resembles on the leg 3, the 3rd blade 8 the 3rd balance is resembled directly over the leg 5, at last second blade 7 is assembled in second balance and resembles on the leg 4.
The advantage that the present invention compared with prior art has is: adopt Design Of Steel Structure to make, boundary dimension is little, and is little to the operating platform spatial requirement; Simple to operate; After only need pedestal being placed on specified position, respectively three balances being resembled leg and insert pedestal, can carry out the impeller assembly operation; Bearing capacity is strong, can satisfy the existing various type demands of wind energy turbine set.
Description of drawings:
Fig. 1 is a use schematic representation of the present invention;
Label among the figure: 1-pedestal, 2-wheel hub, 3-first balance resemble that leg, 4-second balance resemble leg, 5-the 3rd balance resembles leg, 6-first blade, 7-second blade, 8-the 3rd blade.
Embodiment:
In order to deepen to understanding of the present invention, will combine embodiment and accompanying drawing that the present invention is made further detailed description below, this embodiment only is used to explain the present invention, does not constitute the qualification to protection domain of the present invention.
Show the mounting process that a kind of marine wind electric field impeller assembling of the present invention resembles the leg balance bracket like Fig. 1, may further comprise the steps: at first lay pedestal: at first as requested pedestal is placed on specified position, and is welded in the construction equipment deck plane; Balance is installed then resembles leg: respectively first balance is resembled leg 3, second balance and resemble leg 4 and the 3rd balance and resemble leg 5 and insert pedestals 1, and the degree of depth is not less than 2 meters; Balance resembles leg and installs back assembling impeller, during the impeller assembling, earlier wheel hub 2 usefulness bolts is connected on the pedestal 1, guarantees during the location that two blades are positioned at that first balance resembles leg 3 and the 3rd balance resembles directly over the leg 5; Assemble blade at last: respectively first blade 6 is assembled in first balance successively and resembles on the leg 3, the 3rd blade 8 the 3rd balance is resembled directly over the leg 5, at last second blade 7 is assembled in second balance and resembles on the leg 4.
The present invention resembles the design and use of leg frock through balance; Having now under the marine intertidal belt wind electric field construction equipment situation in short supply; Solve Fan Equipment the harsh demand to large space, shallow draft construction equipment has been installed, also adapted to the fast-developing demand of offshore wind turbine type.
Claims (1)
1. a marine wind electric field impeller is assembled the mounting process that resembles the leg balance bracket, it is characterized in that: may further comprise the steps:
A, lay pedestal: at first as requested pedestal is placed on specified position, and is welded in the construction equipment deck plane;
B, balance is installed resembles leg: respectively first balance is resembled leg 3, second balance and resemble leg 4 and the 3rd balance and resemble leg 5 and insert pedestals 1, and the degree of depth is not less than 2 meters;
C, assembling impeller: impeller when assembling, earlier wheel hub 2 usefulness bolts are connected on the pedestal 1, guarantee during the location that two blades are positioned at that first balance resembles leg 3 and the 3rd balance resembles directly over the leg 5;
D, assembling blade: respectively first blade 6 is assembled in first balance successively and resembles on the leg 3, the 3rd blade 8 the 3rd balance is resembled directly over the leg 5, at last second blade 7 is assembled in second balance and resembles on the leg 4.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012101469883A CN102644562A (en) | 2012-05-14 | 2012-05-14 | Process for installing impeller assembly elephant foot balance bracket of offshore wind power field |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2012101469883A CN102644562A (en) | 2012-05-14 | 2012-05-14 | Process for installing impeller assembly elephant foot balance bracket of offshore wind power field |
Publications (1)
Publication Number | Publication Date |
---|---|
CN102644562A true CN102644562A (en) | 2012-08-22 |
Family
ID=46657598
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN2012101469883A Pending CN102644562A (en) | 2012-05-14 | 2012-05-14 | Process for installing impeller assembly elephant foot balance bracket of offshore wind power field |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102644562A (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102979685A (en) * | 2012-11-29 | 2013-03-20 | 北京金风科创风电设备有限公司 | Installation equipment and installation method for impeller in offshore wind generating set |
CN103423105A (en) * | 2012-05-21 | 2013-12-04 | 华锐风电科技(集团)股份有限公司 | Wind generation set impeller assembling device and impeller assembling method |
CN106677994A (en) * | 2016-12-30 | 2017-05-17 | 北京金风科创风电设备有限公司 | Impeller assembling device and impeller assembling method |
CN108757337A (en) * | 2018-07-16 | 2018-11-06 | 中国能源建设集团安徽省电力设计院有限公司 | A kind of high low platform for assembling is as leg tooling |
CN112879232A (en) * | 2021-01-26 | 2021-06-01 | 中国一冶集团有限公司 | Fan impeller assembling platform and construction method |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101133245A (en) * | 2005-01-18 | 2008-02-27 | 欧威克高塔公司 | Support for elevated mass |
CN102011714A (en) * | 2010-10-08 | 2011-04-13 | 中交第一航务工程局有限公司 | Construction method and equipment for integrally mounting offshore wind generating set |
CN201827022U (en) * | 2010-11-02 | 2011-05-11 | 贵州大学 | Autorotation type miniature wind power generation device |
CN102192111A (en) * | 2010-03-11 | 2011-09-21 | 中交上海三航科学研究院有限公司 | Installation method of blades of offshore wind turbine |
CN102312794A (en) * | 2010-06-29 | 2012-01-11 | 通用电气公司 | The pylon sections and the method that are used for the offshore wind turbine |
-
2012
- 2012-05-14 CN CN2012101469883A patent/CN102644562A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101133245A (en) * | 2005-01-18 | 2008-02-27 | 欧威克高塔公司 | Support for elevated mass |
CN102192111A (en) * | 2010-03-11 | 2011-09-21 | 中交上海三航科学研究院有限公司 | Installation method of blades of offshore wind turbine |
CN102312794A (en) * | 2010-06-29 | 2012-01-11 | 通用电气公司 | The pylon sections and the method that are used for the offshore wind turbine |
CN102011714A (en) * | 2010-10-08 | 2011-04-13 | 中交第一航务工程局有限公司 | Construction method and equipment for integrally mounting offshore wind generating set |
CN201827022U (en) * | 2010-11-02 | 2011-05-11 | 贵州大学 | Autorotation type miniature wind power generation device |
Cited By (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103423105A (en) * | 2012-05-21 | 2013-12-04 | 华锐风电科技(集团)股份有限公司 | Wind generation set impeller assembling device and impeller assembling method |
CN103423105B (en) * | 2012-05-21 | 2015-11-25 | 华锐风电科技(集团)股份有限公司 | A kind of impeller of wind turbine set assembling device and impeller assembling method |
CN102979685A (en) * | 2012-11-29 | 2013-03-20 | 北京金风科创风电设备有限公司 | Installation equipment and installation method for impeller in offshore wind generating set |
CN102979685B (en) * | 2012-11-29 | 2015-05-20 | 北京金风科创风电设备有限公司 | Installation equipment and installation method for impeller in offshore wind generating set |
CN106677994A (en) * | 2016-12-30 | 2017-05-17 | 北京金风科创风电设备有限公司 | Impeller assembling device and impeller assembling method |
CN106677994B (en) * | 2016-12-30 | 2019-05-03 | 北京金风科创风电设备有限公司 | Impeller assembling device and impeller assembling method |
CN108757337A (en) * | 2018-07-16 | 2018-11-06 | 中国能源建设集团安徽省电力设计院有限公司 | A kind of high low platform for assembling is as leg tooling |
CN108757337B (en) * | 2018-07-16 | 2023-06-23 | 中国能源建设集团安徽省电力设计院有限公司 | A high-low platform elephant leg frock for fan installation |
CN112879232A (en) * | 2021-01-26 | 2021-06-01 | 中国一冶集团有限公司 | Fan impeller assembling platform and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102644562A (en) | Process for installing impeller assembly elephant foot balance bracket of offshore wind power field | |
CN201568230U (en) | Main frame of wind turbine generator system | |
CN102536688A (en) | Rabbit ear type assembling and mounting process for offshore wind driven generation units | |
CN102412669B (en) | Assembling and positioning method based on rotor transmission shaft structure of permanent magnet wind-driven generator | |
KR101635181B1 (en) | Foundation structure for offshore wind turbine tower and offshore wind turbine installation vessel | |
CN201697785U (en) | Complete high-power wind generating set experiment table | |
CN205260226U (en) | Wind power tower water damping device | |
CN203404015U (en) | Non-dam hydroelectric power generating equipment | |
CN201474874U (en) | Detachable lifting wind-driven generator tower frame | |
CN201714582U (en) | Vertical shaft wind power generation device | |
CN211038908U (en) | Become oar cabinet support | |
CN203067176U (en) | X-shaped wind machine | |
CN202203154U (en) | Fan coupling for generator | |
SE533146C2 (en) | Method of installing a top module on an offshore support structure | |
CN204935533U (en) | Disc erecting tools under the shaftless inland waters guide bearing of a kind of franc turbine | |
CN216241088U (en) | Universal type offshore wind turbine hub shipboard fixing device | |
CN203383995U (en) | Assembling base device of wind turbine generator system | |
KR101635177B1 (en) | Foundation structure for offshore wind turbine tower and offshore wind turbine installation vessel | |
CN105736244A (en) | Movable-fixed vane type lifting resistance compound type wind turbine | |
CN204993193U (en) | Solar cell panel fixing device and including its aerogenerator pylon | |
CN207772451U (en) | A kind of mounting bracket of blade of MW class wind turbine pre-embedded bolt set plug | |
CN204493453U (en) | Double-bearing direct drive aerogenerator | |
CN208650976U (en) | A kind of diesel-driven generator chassis | |
CN212563528U (en) | Connecting device for small unit and supporting structure in multi-impeller wind power generation system | |
CN202732412U (en) | Fan impeller load testboard |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |