CN102632078A - 抗冲击载荷j55钢级油套管生产方法 - Google Patents

抗冲击载荷j55钢级油套管生产方法 Download PDF

Info

Publication number
CN102632078A
CN102632078A CN2012101347462A CN201210134746A CN102632078A CN 102632078 A CN102632078 A CN 102632078A CN 2012101347462 A CN2012101347462 A CN 2012101347462A CN 201210134746 A CN201210134746 A CN 201210134746A CN 102632078 A CN102632078 A CN 102632078A
Authority
CN
China
Prior art keywords
pipe
production method
grade oil
sizing
steel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012101347462A
Other languages
English (en)
Inventor
黄飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuxi Seamless Oil Pipe Co Ltd
Original Assignee
Wuxi Seamless Oil Pipe Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuxi Seamless Oil Pipe Co Ltd filed Critical Wuxi Seamless Oil Pipe Co Ltd
Priority to CN2012101347462A priority Critical patent/CN102632078A/zh
Publication of CN102632078A publication Critical patent/CN102632078A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Heat Treatment Of Articles (AREA)

Abstract

本发明的目的是提供一种抗冲击载荷J55钢级油套管生产方法,具体涉及一种用以提高井下作业安全系数的钢级油套管生产方法。本发明轧制工艺路线为:管坯加热、穿孔、连轧、定张减、定尺锯切和精整。通过提高张力减径工序的减径量,可大幅提高油套管材质的冲击功。本发明在不增加生产成本的情况下,提高产能达50%,性能得到优化。且避免了产生开裂的淬火过程,氧化皮严重的正火处理方法;避免了能源消耗和中间生产过程废、次品的产生,大幅度提高了管料抗冲击载荷,避免了因完全按照API要求生产所致的产品质量争端。

Description

抗冲击载荷J55钢级油套管生产方法
技术领域
本发明的目的是提供一种抗冲击载荷J55钢级油套管生产方法,具体涉及一种用以提高井下作业安全系数的钢级油套管生产方法。
背景技术
目前,油套管生产按照API-5CT要求进行生产和验收。J55钢级对冲击性能和无损检测都没有作相应的要求,而冲击韧性又是评价金属材料冶金质量最敏感的技术指标;井下作业时易因此类缺陷造成断裂、开裂、掉井等事故。此类缺陷因为生产厂家完全根据API要求生产,但不顾油田实际使用情况,形成“合法”但使用不合理的理念所致,结果给油田和油套管生产厂家造成损失。
在高寒地区和射孔完井作业时,低钢级无冲击性能要求的油套管因韧脆转变温度提高更容易发生脆性断裂,因此必须正视抗冲击载荷低钢级油套管生产技术的研制与改进。
发明内容
本发明的目的在于克服上述不足之处,提供用以提高井下作业安全系数的钢级油套管生产方法。
按照发明提供的技术方案,一种抗冲击载荷J55钢级油套管生产方法,步骤如下:取直径240~280mm的低合金钢管坯加热,温度1200~1280℃,时间3~3.5h;加热后的管坯根据规格中间穿孔,继续加热至1200~1280℃,时间2~3h,使得管坯直径为规格直径正负1~5mm内,经过241孔型连轧降温至830~880℃进行定径张减,定张减过程中相对压下量≥35%(定径机组能力所限,不超过48%),使光管直径为成品
Figure BDA0000160017720000011
定径张减后的光管定尺锯切长度为9~12.5m,最后对光管进行精整,以六辊矫直机矫直,全长直度偏差≤10mm,再进行表面修磨,深度不超过壁厚的8%(最大深度不超过12.5%壁厚),即得产品高抗冲击载荷J55钢级油套管。
取直径为200mm的低合金钢管坯加热,温度1200~1280℃,环形炉中加热时间为2~2.5h,采用192孔连轧;定径张减,定径张减后管材进入回火炉710~730℃加热1~1.5h,进行球化处理,最后对光管进行精整,即得产品高抗冲击载荷J55钢级油套管。
所述低合金钢成分按重量百分比计如下:C 0.26~0.32,Si 0.2~0.5,Mn,1.25~1.65,P 0.001~0.015,S 0.001~0.015,其余为Fe。
本发明的有益效果:本发明在不增加生产成本的情况下,提高产能达50%,性能得到优化。且避免了产生开裂的淬火过程,氧化皮严重的正火处理方法;避免了能源消耗和中间生产过程废、次品的产生,大幅度提高了管料抗冲击载荷,避免了因完全按照API要求生产所致的产品质量争端。
具体实施方式
实施例1
选用成分如表1且直径280mm管坯进行轧制。轧制工艺路线为:管坯加热→穿孔→连轧→定张减→定尺锯切→精整。通过提高张力减径工序的减径量,可大幅提高油套管材质的冲击功。
表1低合金管中元素含量成分表,按质量百分数计
  C   Si   Mn   P   S
  0.26~0.32   0.2~0.5   1.25~1.65   ≤0.015   ≤0.015
取直径280mm的低合金钢管坯加热,温度1200℃,时间3.5h;加热后的管坯根据规格中间穿孔,继续加热至1280℃,时间2h,使得管坯直径为规格直径正负1~5mm内,经过241孔型连轧降温至830℃进行定径张减,定径张减过程中相对压下量35%,使光管直径为成品
Figure BDA0000160017720000021
定径张减后的光管定尺锯切长度为9~12.5m,最后对光管进行精整,以六辊矫直机矫直,全长直度≤10mm,再进行表面修磨,深度不超过壁厚的8%,即得产品高抗冲击载荷J55钢级油套管。
冷床冷速≥2℃/s;取样冲击功达50J以上。
实施例2
采用与表1相同成分的直径240mm管坯进行轧制。
取直径240~280mm的低合金钢管坯加热,温度1280℃,时间3h;加热后的管坯根据规格中间穿孔,继续加热至1280℃,时间2h,使得管坯直径为规格直径正负1~5mm内,经过241孔型连轧降温至830~880℃进行定径张减,定径张减过程中相对压下量48%,使光管直径为成品
Figure BDA0000160017720000022
定径张减后的光管定尺锯切长度为12.5m,最后对光管进行精整,以六辊矫直机矫直,全长直度≤10mm,再进行表面修磨,深度不超过壁厚的8%,即得产品高抗冲击载荷J55钢级油套管。
实施例3
采用与表1相同成分的直径200mm管坯轧制,轧制工艺路径一致。
取直径为200mm的低合金钢管坯加热,温度1280℃,环形炉中加热时间为2h,采用192孔连轧;定径张减,定径张减后管材进入回火炉730℃加热1h,进行球化处理,最后对光管进行精整,即得产品高抗冲击载荷J55钢级油套管。
传统的生产方法采用直径200mm管坯轧制,冷床空冷,钢管实物冲击功为23~26J。
实施例4
采用与表1相同成分的直径200mm管坯轧制,轧制工艺路径一致。
取直径为200mm的低合金钢管坯加热,温度1200℃,环形炉中加热时间为2.5h,采用192孔连轧;定径张减,定径张减后管材进入回火炉710℃加热1.5h,进行球化处理,最后对光管进行精整,即得产品高抗冲击载荷J55钢级油套管。
实施例5
采用与表1相同成分的直径240mm管坯进行轧制。
取直径260mm的低合金钢管坯加热,温度1250℃,时间3.5h;加热后的管坯根据规格中间穿孔,继续加热至1250℃,时间2.5h,使得管坯直径为规格直径正负1~5mm内,经过241孔型连轧降温至830~880℃进行定径张减,定径张减过程中相对压下量45%,使光管直径为成品
Figure BDA0000160017720000031
定径张减后的光管定尺锯切长度为9~12.5m,最后对光管进行精整,以六辊矫直机矫直,全长直度≤10mm,再进行表面修磨,深度不超过壁厚的8%,即得产品高抗冲击载荷J55钢级油套管。

Claims (3)

1.一种抗冲击载荷J55钢级油套管生产方法,其特征是步骤如下:取直径240~280mm的低合金钢管坯加热,温度1200~1280℃,时间3~3.5h;加热后的管坯根据规格中间穿孔,继续加热至1200~1280℃,时间2~3h,使得管坯直径为规格直径正负1~5mm内,经过241孔型连轧降温至830~880℃进行定径张减,定径张减过程中相对压下量35%~48%,使光管直径为成品
Figure FDA0000160017710000011
定径张减后的光管定尺锯切长度为9~12.5m,最后对光管进行精整,以六辊矫直机矫直,全长直度≤10mm,再进行表面修磨,深度不超过壁厚的8%,即得产品高抗冲击载荷J55钢级油套管。
2.如权利要求1所示抗冲击载荷J55钢级油套管生产方法,其特征是:取直径为200mm的低合金钢管坯加热,温度1200~1280℃,环形炉中加热时间为2~2.5h,采用192孔连轧;定径张减,定径张减后管材进入回火炉710~730℃加热1~1.5h,进行球化处理,最后对光管进行精整,即得产品高抗冲击载荷J55钢级油套管。
3.如权利要求1~2之一所述抗冲击载荷J55钢级油套管生产方法,其特征是:所述低合金钢成分按重量百分比计如下:C 0.26~0.32,Si 0.2~0.5,Mn,1.25~1.65,P 0.001~0.015,S 0.001~0.015,其余为Fe。
CN2012101347462A 2012-05-03 2012-05-03 抗冲击载荷j55钢级油套管生产方法 Pending CN102632078A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012101347462A CN102632078A (zh) 2012-05-03 2012-05-03 抗冲击载荷j55钢级油套管生产方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012101347462A CN102632078A (zh) 2012-05-03 2012-05-03 抗冲击载荷j55钢级油套管生产方法

Publications (1)

Publication Number Publication Date
CN102632078A true CN102632078A (zh) 2012-08-15

Family

ID=46616761

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012101347462A Pending CN102632078A (zh) 2012-05-03 2012-05-03 抗冲击载荷j55钢级油套管生产方法

Country Status (1)

Country Link
CN (1) CN102632078A (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105710147A (zh) * 2016-02-05 2016-06-29 攀钢集团成都钢钒有限公司 拉拔式扩制特大口径j55套管的生产方法

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01123026A (ja) * 1987-11-09 1989-05-16 Kawasaki Steel Corp 二相ステンレス継目無鋼管の製造方法
JP2000219915A (ja) * 1999-01-29 2000-08-08 Sumitomo Metal Ind Ltd 高強度高靱性継目無鋼管の製造方法
CN1361303A (zh) * 2000-12-29 2002-07-31 天津钢管公司 Tp65钢级石油套管及其制造方法
JP2002239612A (ja) * 2001-02-21 2002-08-27 Nkk Corp 継目無管の製造方法
CN1940369A (zh) * 2005-09-30 2007-04-04 宝山钢铁股份有限公司 一种低强度外加厚油管及其制造方法
CN101210299A (zh) * 2007-12-25 2008-07-02 莱芜钢铁集团有限公司 高强韧性j55石油套管用钢带及其制造方法
US20090038358A1 (en) * 2006-03-28 2009-02-12 Hajime Osako Method of manufacturing seamless pipe and tube
CN102199729A (zh) * 2010-03-23 2011-09-28 宝山钢铁股份有限公司 经济型55Ksi钢级抗CO2腐蚀油井管及其制造方法
CN102284486A (zh) * 2011-08-24 2011-12-21 无锡华冶钢铁有限公司 一种热轧无缝钢管制造工艺

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01123026A (ja) * 1987-11-09 1989-05-16 Kawasaki Steel Corp 二相ステンレス継目無鋼管の製造方法
JP2000219915A (ja) * 1999-01-29 2000-08-08 Sumitomo Metal Ind Ltd 高強度高靱性継目無鋼管の製造方法
CN1361303A (zh) * 2000-12-29 2002-07-31 天津钢管公司 Tp65钢级石油套管及其制造方法
JP2002239612A (ja) * 2001-02-21 2002-08-27 Nkk Corp 継目無管の製造方法
CN1940369A (zh) * 2005-09-30 2007-04-04 宝山钢铁股份有限公司 一种低强度外加厚油管及其制造方法
US20090038358A1 (en) * 2006-03-28 2009-02-12 Hajime Osako Method of manufacturing seamless pipe and tube
CN101210299A (zh) * 2007-12-25 2008-07-02 莱芜钢铁集团有限公司 高强韧性j55石油套管用钢带及其制造方法
CN102199729A (zh) * 2010-03-23 2011-09-28 宝山钢铁股份有限公司 经济型55Ksi钢级抗CO2腐蚀油井管及其制造方法
CN102284486A (zh) * 2011-08-24 2011-12-21 无锡华冶钢铁有限公司 一种热轧无缝钢管制造工艺

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105710147A (zh) * 2016-02-05 2016-06-29 攀钢集团成都钢钒有限公司 拉拔式扩制特大口径j55套管的生产方法
CN105710147B (zh) * 2016-02-05 2017-11-10 攀钢集团成都钢钒有限公司 拉拔式扩制特大口径j55套管的生产方法

Similar Documents

Publication Publication Date Title
JP6574307B2 (ja) 高強靭性継目無鋼管及びその製造方法
CN105002445B (zh) 一种用于制造车载高压气瓶的4130x无缝钢管及其制备方法
JP4894855B2 (ja) 継目無管の製造方法
JPWO2013133076A1 (ja) 耐硫化物応力割れ性に優れた高強度鋼材の製造方法
CN106011638B (zh) 一种稠油热采井用膨胀套管及其制造方法
CN104438334A (zh) 中口径9Ni低温用无缝钢管及生产方法
CN101700533A (zh) 一种提高中厚板除鳞效果的方法
CN102953019A (zh) 一种地质钻探用合金钢无缝钢管及其加工方法
CN104894485A (zh) 耐高温抗脆断Φ508mm以上核电站用无缝钢管的生产方法
CN102191437B (zh) 石油裂化用无缝钢管及其热处理方法
CN104073701B (zh) 一种增强镁合金及其制作方法
CN103938098A (zh) 一种超高强度钢管及其连续生产方法
JP2007260705A (ja) 継目無鋼管の製造方法
CN103741028A (zh) 低屈强比低温无缝钢管及其生产方法
CN104451394A (zh) CPE机组生产的150ksi以下抗CO2腐蚀油井管及其制造方法
CN104593696A (zh) 一种电站锅炉用耐热钢板及其制造方法
CN109161788B (zh) 一种注热蒸汽稠油热采井用耐高温石油套管及其制造方法
CN104789878A (zh) 一种高淬透性油套管接箍料用无缝钢管及制备方法
CN104117550A (zh) 一种热作模具用无缝钢管及其生产方法
CN106498139A (zh) 一种生产if钢的工艺方法及装置
CN103469085A (zh) 一种含稀土稠油热采井专用石油套管及其生产方法
CN103121034B (zh) 超级双相不锈钢钢锭热加工开坯的生产方法
CN102632078A (zh) 抗冲击载荷j55钢级油套管生产方法
JP6202010B2 (ja) 高強度2相ステンレス継目無鋼管の製造方法
CN102703838B (zh) Psl-2等级非调质n80钢级油套管生产工艺

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
AD01 Patent right deemed abandoned

Effective date of abandoning: 20120815