10KV transformer pallet
Technical field
10KV transformer pallet of the present invention belongs to the power transmission and distribution field of engineering technology.
Background technology
At present; The 10KV---380/220V transformer is widely used in the electrical power distribution system, and mounting means is the most common on its post, and national grid 10KV transformer pallet modular design scheme ZA-1 is typical at present mounting means; 10KV side inlet wire partly passes through fuse switch; Direct transformer high-voltage binding post, 0.4KV side are selected band air circuit or the molten formula switch of cutter for use, and are installed in the comprehensive distribution box under the transformer; During maintenance,, there is the 10KV electricity to get into transformer, can produces very big potential safety hazard service work if transformer 10KV side is advanced and leaked electricity in addition after fuse switch breaks off or break off insufficiently; Simultaneously, the 0.4KV low-pressure side is if any work of user's house generator or double circuit power supply, and fuse switch breaks off back maintenance transformer, also can form potential safety hazard to service work.
Summary of the invention
The present invention overcomes the deficiency that prior art exists, and technical problem to be solved is: provide a kind of safe class high, practical 10KV transformer pallet.
For solving the problems of the technologies described above, the technical scheme that the present invention adopted is: 10KV transformer pallet comprises: fuse switch, fault detector, test ground ground loop, transformer, low pressure isolating switch, comprehensive distribution box; The end of incoming cables of fuse switch is connected with the 10KV high tension power main wires with T shape head through the insulation high-voltage conducting wires; Link to each other with the input of transformer after the leading-out terminal of fuse switch is connected in series fault detector successively and tests the ground ground loop, link to each other with the end of incoming cables of comprehensive distribution box behind the output serial connection low pressure isolating switch of said transformer.
Said 10KV transformer pallet is installed on three concrete bars; Said concrete bar comprises mobile jib, the first secondary bar and the second secondary bar; Said 10KV high tension power main wires is arranged on the mobile jib; Said fuse switch is installed on the mobile jib, said fault detector and test ground ground loop be serially connected on the high-voltage conducting wires between the mobile jib and the first secondary bar; Said transformer is installed between the first secondary bar and the second secondary bar; Said comprehensive distribution box is installed in the below of transformer; Said low pressure isolating switch is installed on the second secondary bar, and the two-way output cable of comprehensive distribution box is connected with the transmission line wire of both direction through the first secondary bar.
Said test ground ground loop and the first secondary bar between horizontal range be 400mm, said fault detector and test the horizontal range between the ground loop be 300mm.
Said fault detector is board turning indicating device or radio alarming indicating device.
The beneficial effect that the present invention compared with prior art has is: the present invention has increased and has tested ground ground loop, fault detector and low pressure isolating switch; Fail safe is greatly improved during maintenance, and overall structure is reliable, safety, maintenance is convenient, faulty indication is obvious, practical, cost is low.
Description of drawings
Do further detailed explanation below in conjunction with the accompanying drawing specific embodiments of the invention:
Fig. 1 is an electrical block diagram of the present invention;
Fig. 2 is a mounting structure sketch map of the present invention;
Fig. 3 is the A-A view of Fig. 2;
Fig. 4 is that the B of Fig. 2 is to view;
Among the figure: 1 is that fuse switch, 2 is that fault detector, 3 is that transformer, 5 is that low pressure isolating switch, 6 is that comprehensive distribution box, 7 is that mobile jib, 8 is that the first secondary bar, 9 is that the second secondary bar, 10 is the 10KV high tension power main wires for testing ground ground loop, 4.
Embodiment
As shown in Figure 1,10KV transformer pallet of the present invention comprises: fuse switch 1, fault detector 2, test ground ground loop 3, transformer 4, low pressure isolating switch 5, comprehensive distribution box 6; The end of incoming cables of fuse switch 1 is connected with 10KV high tension power main wires 10 with T shape head through the insulation high-voltage conducting wires; Link to each other with the input of transformer 4 after the leading-out terminal of fuse switch 1 is connected in series fault detector 2 successively and tests ground ground loop 3, output serial connection low pressure isolating switch 5 backs of said transformer 4 link to each other with the end of incoming cables of comprehensive distribution box 6.
Extremely shown in Figure 4 like Fig. 2; Said 10KV transformer pallet is installed on three concrete bars; Said concrete bar comprises mobile jib 7, the first secondary bar 8 and the second secondary bar 9; Said 10KV high tension power main wires 10 is arranged on the mobile jib 7, and said fuse switch 1 is installed on the mobile jib 7, said fault detector 2 and test ground ground loop 3 be serially connected on the high-voltage conducting wires between the mobile jib 7 and the first secondary bar 8; Transformer 4 is installed between the first secondary bar 8 and the second secondary bar 9; Comprehensive distribution box 6 is installed in the below of transformer 4; Said low pressure isolating switch 5 is installed on the second secondary bar 9, and the two-way output cable of comprehensive distribution box 6 is connected with the transmission line wire of both direction through the first secondary bar 8.
Said test ground ground loop 3 and the first secondary bar 8 between horizontal range be 400mm, said fault detector 2 is 300mm with the horizontal range of testing between the ground ground loop 3, other part of above-mentioned transformer platform is pressed the installation requirement installation of standard pole type transformer.
Said fault detector 2 is board turning indicating device or radio alarming indicating device, during transformer 4 operations, as faults such as overcurrent, short circuit take place; Fault detector 2 sends indication; If the board turning indicating device, green originally becomes redness, if the radio alarming indicating device; Then send alarm signal through alarm, main frame receives.
When needs overhaul; Draw back fuse switch 1; Break off low pressure isolating switch 5, three metal hooks of earth lead one end catch on three and test ground ground loop 3, and the ground connection steel pipe of the earth lead other end is driven underground; Guarantee reliable ground, overall structure is reliable, safety, maintenance is convenient, faulty indication is obvious, practical, cost is low.