CN102620615A - 一种采煤工作面***装药方法 - Google Patents

一种采煤工作面***装药方法 Download PDF

Info

Publication number
CN102620615A
CN102620615A CN2012101190131A CN201210119013A CN102620615A CN 102620615 A CN102620615 A CN 102620615A CN 2012101190131 A CN2012101190131 A CN 2012101190131A CN 201210119013 A CN201210119013 A CN 201210119013A CN 102620615 A CN102620615 A CN 102620615A
Authority
CN
China
Prior art keywords
coal
blasting
borehole
face
sealing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2012101190131A
Other languages
English (en)
Inventor
任传伟
张玉龙
张小奇
孔文
贾瑞祥
贾斌
姬振华
吕磊
孙小强
贾祖波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiaozuo Coal Mine (group) Co Ltd Fangzhuang No 1 Mine
Original Assignee
Jiaozuo Coal Mine (group) Co Ltd Fangzhuang No 1 Mine
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiaozuo Coal Mine (group) Co Ltd Fangzhuang No 1 Mine filed Critical Jiaozuo Coal Mine (group) Co Ltd Fangzhuang No 1 Mine
Priority to CN2012101190131A priority Critical patent/CN102620615A/zh
Publication of CN102620615A publication Critical patent/CN102620615A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

本发明公开了一种采煤工作面***装药方法,依次按如下操作步骤进行:a.顺着采煤工作面在煤壁内部施工钻孔,然后封孔注水进行压裂;b.按照设计在采煤工作面***眼,炮眼布置为五花眼;c.在炮眼内依次填入水泡带、药卷、***、水泡带;d.引出***电线并用炮泥封闭剩余炮眼;e.相互连接***电线将总线连接到***器上。***后,块炭率可达到45%左右,煤壁片帮点减少,不易崩倒支架,保证了安全生产。

Description

一种采煤工作面***装药方法
技术领域
本发明属于煤矿炮采工作面打眼***装药技术领域。
背景技术
煤矿井下采煤工作面采煤方式一般分为机械开采和放炮***开采两种,炮采工作面一直采用***落煤方式。具体过程是:按照设计在采煤工作面***眼;在炮眼内依次填入药卷、***、炮泥、引出***电线;用炮泥封闭炮眼;相互连接***电线;总线连接到***器上。炮眼布置为五花眼,一般情况一次***长度为3米,这样的***装药工艺,实际生产中原煤块炭率不高,保持在28%左右,影响原煤的销售价格;另一方面,工作面经常发生片帮而造成安全隐患。
发明内容
本发明的目的是提供一种生产原煤块炭率较高、片帮较少的采煤工作面***装药方法。
为了实现上述目的,本发明依次按如下操作步骤进行:
a. 顺着采煤工作面在煤壁内部施工钻孔,然后封孔注水进行压裂;
b. 按照设计在采煤工作面***眼,炮眼布置为五花眼;
c.在炮眼内依次填入水泡带、药卷、***、水泡带;
d.引出***电线并用炮泥封闭剩余炮眼;
e. 相互连接***电线并将总线连接到***器上。
本发明与以往的***装药方法相比,有以下优点:
由于先注水压裂煤层,使煤层产生裂隙,再加上内外水泡带的相互作用减少了***时产生的压力,实际***后,块炭率可达到45%左右,提高了煤炭的整体售价和效益。煤壁片帮点减少,不易崩倒支架,保证了安全生产。
具体实施方式
顺着采煤工作面在煤壁内部施工钻孔,然后采用封孔器进行封孔,封孔长度15m,注入10MP水压进行压裂,压裂时间控制为25分钟;按照设计在采煤工作面***眼,炮眼布置为五花眼,共计9个炮眼,炮眼深度1.3m;在炮眼内依次填入0.2m内水泡带层、2.4kg药卷、******、填入0.2m外水泡带层;引出***电线并用炮泥封闭剩余炮眼;相互连接炮眼***电线并将总线连接到***器上。一次***长度为2.3米,***后,块炭率达到44%;没有发生煤壁片帮和支架崩倒现象。

Claims (1)

1. 一种采煤工作面***装药方法,其特征是依次按如下操作步骤进行:
a. 顺着采煤工作面在煤壁内部施工钻孔,然后封孔注水进行压裂;
b. 按照设计在采煤工作面***眼,炮眼布置为五花眼;
c.在炮眼内依次填入水泡带、药卷、***、水泡带;
d.引出***电线并用炮泥封闭剩余炮眼;
e. 相互连接***电线并将总线连接到***器上。
CN2012101190131A 2012-04-23 2012-04-23 一种采煤工作面***装药方法 Pending CN102620615A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2012101190131A CN102620615A (zh) 2012-04-23 2012-04-23 一种采煤工作面***装药方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2012101190131A CN102620615A (zh) 2012-04-23 2012-04-23 一种采煤工作面***装药方法

Publications (1)

Publication Number Publication Date
CN102620615A true CN102620615A (zh) 2012-08-01

Family

ID=46560691

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2012101190131A Pending CN102620615A (zh) 2012-04-23 2012-04-23 一种采煤工作面***装药方法

Country Status (1)

Country Link
CN (1) CN102620615A (zh)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001021299A (ja) * 1999-07-06 2001-01-26 Nishimatsu Constr Co Ltd 発破掘削工法
US20070272110A1 (en) * 2003-11-28 2007-11-29 Orica Explosives Technology Pty Ltd. Method of Blasting Multiple Layers or Levels of Rock
CN101413774A (zh) * 2008-11-10 2009-04-22 长沙有色冶金设计研究院 大跨度空区顶板硐室***最佳厚度的确定方法及***方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001021299A (ja) * 1999-07-06 2001-01-26 Nishimatsu Constr Co Ltd 発破掘削工法
US20070272110A1 (en) * 2003-11-28 2007-11-29 Orica Explosives Technology Pty Ltd. Method of Blasting Multiple Layers or Levels of Rock
CN101413774A (zh) * 2008-11-10 2009-04-22 长沙有色冶金设计研究院 大跨度空区顶板硐室***最佳厚度的确定方法及***方法

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
王运生: "炮放开采的顶煤弱化技术", 《煤矿现代化》 *

Similar Documents

Publication Publication Date Title
CN101644156B (zh) 煤岩体水力***致裂弱化方法
CN102878876B (zh) 一种矿井平巷掘进掏槽方法及***主要参数
CN102678117B (zh) 基于聚能***的定向水力致裂方法
CN103161493B (zh) 气液固三相耦合***弱化冲击地压及增透方法
CN103244180B (zh) 一种留小煤柱沿空掘巷围岩控制方法
CN106930744A (zh) 一种毫秒多级定向***干冰致裂方法及***管
CN101864961B (zh) 一种岩爆的主动防治方法
CN105674816A (zh) 用于非煤矿山的中深孔***一次成井方法
MX339889B (es) Mineria de explotacion subterranea.
CN104819670B (zh) 预钻中孔竖井开挖***方法
CN102997766B (zh) 一种深孔卸压***方法
CN107339920B (zh) 超深孔预裂***的方法
CN104048570A (zh) 一种深孔***填塞方法
CN104453898A (zh) 一种深孔***与静压注水相结合的煤层弱化方法
CN112943279A (zh) 一种采用水压致裂及定向***掘进硬岩巷道的施工方法
CN105222660A (zh) 一种高地温隧道降温预裂***方法
CN102878875A (zh) 一种大块岩石二次破碎***方法
CN104296609A (zh) 深孔梯段***中含不同坚硬程度岩层的控制***方法
CN206801542U (zh) 一种用于毫秒多级定向***干冰致裂的***管
CN103307941B (zh) 一种提高矿山平巷掘进掏槽***效果的方法
CN102787843A (zh) 一种夹矸煤层工作面采煤工艺
CN102620615A (zh) 一种采煤工作面***装药方法
CN102927863B (zh) 一种全岩巷道***施工的新方法
CN108798670A (zh) 一种提高特厚煤层综放工作面初采煤炭回收率的方法
CN112611276A (zh) 一种深孔分段***的方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120801