CN102612072A - MDT (minimization drive test) measuring method, MDT measuring equipment and MDT measuring system - Google Patents

MDT (minimization drive test) measuring method, MDT measuring equipment and MDT measuring system Download PDF

Info

Publication number
CN102612072A
CN102612072A CN201210071780XA CN201210071780A CN102612072A CN 102612072 A CN102612072 A CN 102612072A CN 201210071780X A CN201210071780X A CN 201210071780XA CN 201210071780 A CN201210071780 A CN 201210071780A CN 102612072 A CN102612072 A CN 102612072A
Authority
CN
China
Prior art keywords
mdt
base station
configuration information
measurement configuration
target
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201210071780XA
Other languages
Chinese (zh)
Other versions
CN102612072B (en
Inventor
梁靖
彦楠
全海洋
傅婧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Academy of Telecommunications Technology CATT
Datang Mobile Communications Equipment Co Ltd
Original Assignee
China Academy of Telecommunications Technology CATT
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Academy of Telecommunications Technology CATT filed Critical China Academy of Telecommunications Technology CATT
Priority to CN201210071780.XA priority Critical patent/CN102612072B/en
Publication of CN102612072A publication Critical patent/CN102612072A/en
Application granted granted Critical
Publication of CN102612072B publication Critical patent/CN102612072B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Mobile Radio Communication Systems (AREA)

Abstract

The invention discloses an MDT (minimization drive test) measuring method, MDT measuring equipment and an MDT measuring system. The MDT measuring method includes: a source base station stops MDT measuring of UE (user equipment) when determining that the user equipment UE switches to a target base station; and the target base station starts MDT measuring of the UE after determining that the UE switches successfully. The invention provides another MDT measuring method, which includes that the UE stops MDT measuring and stops reporting MDT measuring value to the source base station when being determined to switch from the source base station to the target station; the UE restarts MDT measuring and reporting the MDT value to the target base station after being determined to switch to the target base station successfully. During switching of the UE, the MDT measuring is stopped so as to avoid the problem of poor network optimizing effect due to inaccurate MDT measuring value during switching of the UE.

Description

A kind of minimum road test MDT method of measurement, equipment and system
Technical field
The present invention relates to wireless communication field, relate in particular to a kind of minimum road test MDT method of measurement, equipment and system.
Background technology
In the GSM in future, hope to reduce the manual work of the network planning and Operation and Maintenance and participate in through introducing the mechanism of network self-organization, by network based statistic Automatic Optimal parameter, reduce the construction and the operation cost of network.In order to reduce the O&M cost of network, hope can take network configuration UE (User Equipment, the subscriber equipment) method that reports to reduce the work of artificial drive test, i.e. MDT (Minimization Drive Test, minimum road test) scheme.In addition, also hope to measure the wireless measurement information that common drive test can't arrive the zone that obtains through MDT.
In order to reach the purpose of optimization, the MDT measurement needs the multiple information relevant with UE of statistics, obtains statistics.During MDT measures; The base station according to the upper layer network side (like OAM (Operation Administration and Maintenance; Operations,Administration And Maintenance)) the base station side MDT measurement configuration information that issues; The information type that definite needs are added up (the MDT measuring amount that promptly need obtain), UE side MDT measurement configuration information is made according to the concrete condition of UE in the base station then, and is handed down to concrete UE.Wherein, said UE side MDT measurement configuration information has defined in MDT measures, and whether UE need participate in measuring and reporting the MDT measuring amount, has specifically defined the MDT measuring amount type that UE need measure and report simultaneously.Therefore; According to said base station side MDT measurement configuration information and UE side MDT measurement configuration information; Just clearly in all information types that need add up, which MDT measuring amount is initiatively obtained by the base station in the base station, and which reports the base station after being measured by the UE side again.
In MDT measures; The base station is carried out related with the MDT measuring amount that reception UE reports the MDT measuring amount of initiatively obtaining; Generate the MDT measurement result; And give upper layer network side (like OAM or TCE (Trace Collection Entity follows the tracks of and collects entity)) with this MDT reporting measuring result, be used to carry out the network optimization.
MDT measures and can be divided into following two types among LTE (Long Term Evolution, the Long Term Evolution) Rel-10 (version 10):
Immediate MDT (instant MDT): the MDT that connected state carries out measures and reports.
Logged MDT (non-instant MDT): the MDT that Idle state carries out measures, and reports at follow-up connected state.
It all is the enhancing to coverage optimization that these two types of MDT measure.
At present LTE Rel-11 (version 11) to MDT measurements optimize, on the one hand, optimized the obtain manner of UE geographical location information in the MDT measurement; Make the base station can initiatively obtain the UE geographical location information; Also can ask UE to open the located in connection function, report geographical location information, in other words; The geographical location information of UE both can be that the base station initiatively obtains, and also can be that UE reports; On the other hand, in the MDT measuring amount, introduced the relevant measuring amount (hereinafter to be referred as the QoS measuring amount) of QoS (Quality of Service, service quality), like UE up-downgoing throughput, UE up-downgoing data amount transmitted, UE uplink business data time delay etc.
In LTE Rel-11, some QoS measuring amount (like UE up-downgoing throughput, UE up-downgoing data amount transmitted etc.) can only be in connected state at UE to be measured, yet in real network; If UE has switched the sub-district; Because UE produces service disconnection in handoff procedure, this type QoS measuring amount that will cause the base station to obtain is inaccurate, that is to say that MDT measuring amount that the base station obtains can't react the truth of UE veritably; Just can not obtain MDT measurement result accurately; In follow-up processing procedure, network carries out the network optimization based on inaccurate MDT measurement result, will reach corresponding optimization effect; Even also possibly run counter to desire, cause serious consequence.
Summary of the invention
The present invention provides a kind of minimum road test MDT method of measurement, equipment and system, in order to solving in the prior art, because the UE when switching produces service disconnection, causes the MDT measuring amount of acquisition inaccurate, and then causes reducing the problem of network optimization effect.
The inventive method comprises:
A kind of minimum road test MDT method of measurement comprises:
Source base station is confirmed user equipment (UE) when target BS switches, and the MDT that stops said UE measures;
After target BS was confirmed said UE successful switch, the MDT that begins said UE measured.
A kind of minimum road test MDT method of measurement comprises:
User equipment (UE) is confirmed from source base station when target BS switches, to stop to carry out MDT and measure, and stop the MDT measuring amount is reported said source base station;
After said UE confirms successfully to switch to said target BS, restart to carry out MDT and measure, and begin the MDT measuring amount is reported said target BS.
A kind of base station comprises:
Measure stopping modular, when being used for confirming that user equipment (UE) switches, the MDT that stops said UE measures;
Measure the beginning module, after being used for confirming the UE successful switch, the MDT that begins said UE measures.
A kind of user equipment (UE) comprises:
Stopping modular is used for confirming from source base station when target BS switches, stopping to carry out MDT and measuring, and stop the MDT measuring amount is reported said source base station;
Restart module, after being used for confirming successfully switching to said target BS, restart to carry out MDT and measure, and begin the MDT measuring amount is reported said target BS.
Among the present invention; When UE switched, the MDT that source base station stops said UE measured, and at the UE successful switch to target BS; The MDT that is begun said UE by target BS again measures; Measure owing to stop that in the process that UE switches it is carried out MDT, avoided when UE is in service disconnection, obtaining inaccurate MDT measuring amount, and then avoided producing thus the problem of bad network optimization effect.
Description of drawings
A kind of MDT method of measurement flow chart that Fig. 1 provides for the embodiment of the invention;
The another kind of MDT method of measurement flow chart that Fig. 2 provides for the embodiment of the invention;
A kind of architecture of base station sketch map that Fig. 3 provides for the embodiment of the invention;
A kind of UE structural representation that Fig. 4 provides for the embodiment of the invention;
A kind of MDT measuring system sketch map that Fig. 5 provides for the embodiment of the invention.
Embodiment
Below in conjunction with accompanying drawing and specific embodiment, the embodiment of minimum road test MDT method of measurement of the present invention, equipment and system is described in further detail.
The present invention provides a kind of minimum road test MDT method of measurement, is used for the MDT measurement that base station side is carried out, and is as shown in Figure 1, comprising:
Step 101, source base station are confirmed user equipment (UE) when target BS switches, and the MDT that stops said UE measures;
After step 102, target BS were confirmed said UE successful switch, the MDT that begins said UE measured.
In the inventive method; When UE switched, the MDT that source base station stops UE measuring, and at the UE successful switch to target BS; The MDT that begins UE again measures; Owing in the process that switches, stop to carry out the MDT measurement of UE, avoided when UE is in service disconnection, obtaining inaccurate MDT measuring amount, and then avoided producing thus the problem of bad network optimization effect.
Preferably; In the above-mentioned steps 101, said source base station is confirmed UE when target BS switches, and the MDT that stops said UE measures; Specifically comprise: said source base station confirms that UE is when target BS switches; Stop initiatively to obtain the MDT measuring amount of said UE, and/or, stop to receive the MDT measuring amount that said UE reports.
It is pointed out that among the present invention program that the MDT measuring amount that source base station stops initiatively to obtain said UE is meant: source base station stops to measure and getting access to the MDT measuring amount relevant with said UE through said UE being carried out corresponding MDT.
Concrete, the MDT of UE measures can be divided into following three kinds of situation: the MDT measuring amount of only initiatively obtaining said UE through the base station is accomplished, is only obtained through UE and reports the MDT measuring amount to accomplish, initiatively obtains the MDT measuring amount of said UE and UE obtains and report the MDT measuring amount to accomplish jointly through the base station.According to above three kinds of situation, for fear of when UE switches, the base station initiatively obtains insecure MDT measuring amount because of continuing that UE is carried out the MDT measurement, or receives the unreliable MDT measuring amount that UE sends, and the practical implementation process is in this step:
When the MDT of said UE measurement was only initiatively obtained the MDT measuring amount completion of said UE through the base station, said source base station stopped initiatively to obtain the MDT measuring amount of said UE immediately;
When the MDT of said UE measurement was only obtained through UE and reported the MDT measuring amount to accomplish, said source base station stopped to receive the MDT measuring amount that said UE reports immediately;
When measuring through the base station, the MDT of said UE initiatively obtains the MDT measuring amount of said UE and UE obtains and when reporting the MDT measuring amount to accomplish jointly; Said source base station stops initiatively to obtain the MDT measuring amount of said UE immediately, and stops to receive the MDT measuring amount that said UE reports immediately.
Preferably; In the above-mentioned steps 102, after said target BS was confirmed said UE successful switch, the MDT that begins said UE measured; Specifically comprise: after said target BS is confirmed said UE successful switch; The MDT measuring amount of said UE is initiatively obtained in beginning, and/or, begin to receive the MDT measuring amount that said UE reports.
It is pointed out that among the present invention program that the MDT measuring amount that target BS begins initiatively to obtain said UE is meant: target BS begins to measure and get access to the MDT measuring amount relevant with said UE through said UE being carried out corresponding MDT.
Concrete, similar with step 101, the practical implementation process of this step is:
When the MDT of said UE measurement was only initiatively obtained the MDT measuring amount completion of said UE through the base station, said source base station began initiatively to obtain the MDT measuring amount of said UE immediately;
When the MDT of said UE measurement was only obtained through UE and reported the MDT measuring amount to accomplish, said source base station began to receive the MDT measuring amount that said UE reports immediately;
When measuring through the base station, the MDT of said UE initiatively obtains the MDT measuring amount of said UE and UE obtains and when reporting the MDT measuring amount to accomplish jointly; Said target BS begins initiatively to obtain the MDT measuring amount of said UE immediately, and begins to receive the MDT measuring amount that said UE reports immediately.
Preferably, in the inventive method, also comprise: the MDT measurement configuration information that said source base station will be relevant with said UE sends to said target BS; Said target BS receives said MDT measurement configuration relevant information and preserves.
Preferably, relevant with said UE MDT measurement configuration information comprises base station side MDT measurement configuration information and UE side MDT measurement configuration information.Said base station side MDT measurement configuration information is carried out the configuration information that MDT measures for the said base station that is used for that the upper layer network side issues, and said UE side MDT measurement configuration information is that the said UE that is used for that formulate said base station carries out the configuration information that MDT measures and reports the MDT measuring amount;
Concrete, upper layer network side apparatus (like OAM) is handed down to source base station with base station side MDT measurement configuration information when confirming that need carry out MDT measures; Said base station side MDT measurement configuration information has specifically defined the MDT measuring amount that need obtain; Source base station is made UE side MDT measurement configuration information according to the concrete condition of UE then, and is handed down to concrete UE, and said UE side MDT measurement configuration information has defined in MDT measures; Whether UE need participate in measuring and reporting the MDT measuring amount; Simultaneously specifically defined the MDT measuring amount type that UE need measure and report, like this, according to said base station side MDT measurement configuration information and said UE side MDT measurement configuration information; Said source base station can specifically be determined the MDT measuring amount of which type and initiatively obtained by self, and the MDT measuring amount of which type is obtained then by UE and reported; When UE switches, have continuity for making the MDT measurement of before and after the switching said UE being carried out, source base station sends to said target BS with said base station side MDT measurement configuration information and UE side MDT measurement configuration information, and is preserved by said target BS.
It is pointed out that in the inventive method, specifically defined UE in the UE side MDT measurement configuration information and whether need participate in measuring and reporting the MDT measuring amount; Promptly according to said UE side MDT measurement configuration information; Can set UE and carry out the MDT measurement and report the MDT measuring amount, also can set the UE side and not carry out the MDT measurement and report the MDT measuring amount, in other words; When UE side MDT measurement configuration information was preserved in UE this locality, said UE may not just need carry out MDT and measure and report the MDT measuring amount.
There are following two kinds of situation in UE in carrying out the process of switching: delete former UE side MDT measurement configuration information, or, keep former UE side MDT measurement configuration information, no matter which kind of situation occurs, source base station and target BS all can be known according to communication protocol.
Preferably; In the inventive method; When said target BS confirms that said UE deletes from UE side MDT measurement configuration information that source base station receives in handoff procedure, judge that after switching the UE side MDT measurement configuration information of whether preserving according to said target BS carries out MDT and measure; If target BS sends to said UE with the UE side MDT measurement configuration information of self preserving; If not, target BS regenerates UE side MDT measurement configuration information and sends to said UE.The UE side MDT measurement configuration information that regenerates is different from the said UE side MDT measurement configuration information that receives from source base station.
Preferably; Said target BS confirms that said UE keeps the UE side MDT measurement configuration information that receives from source base station in handoff procedure; And confirm after switching to carry out MDT when measuring not according to the UE side MDT measurement configuration information that said target BS is preserved, regenerate UE side MDT measurement configuration information and send to UE.
Wherein, the UE side MDT measurement configuration information that regenerates of target BS is different from the said UE side MDT measurement configuration information that receives from source base station.
As UE when deletion is from UE side MDT measurement configuration information that source base station receives in the process of carry out switching; Measure in order after UE switches to target BS, still to carry out MDT smoothly; Target BS need resend UE side MDT measurement configuration information and give said UE; At this moment, whether the target BS judgement still carries out the MDT measurement according to receive UE side MDT measurement configuration information from source base station, i.e. whether judgement needs said UE still to carry out MDT according to the UE side MDT measurement configuration information that receives from source base station is measured; If; Then target BS will send to said UE from the UE side MDT measurement configuration information that source base station receives, otherwise the UE side MDT measurement configuration information that target BS will be confirmed again sends to said UE.
When UE keeps from UE side MDT measurement configuration information that source base station receives in the process of carry out switching; Whether the target BS judgement carries out MDT according to the said UE side MDT measurement configuration information that receives from source base station after switching measures; If then target BS need not be for further processing, otherwise; Target BS will be confirmed UE side MDT measurement configuration information again and send to said UE, so that said UE upgrades UE side MDT measurement configuration information.
Preferably, before target BS sent switching command, the MDT measurement configuration information that said source base station will be relevant with said UE sent to said target BS; Said target BS specifically with UE side MDT measurement configuration information, is included in the switching command and sends to said UE through said source base station.
Perhaps, before UE accomplished switching, the MDT measurement configuration relevant information that said source base station is relevant with said UE sent to said target BS; Said target BS specifically after UE switches, directly sends to said UE with UE side MDT measurement configuration information.
Concrete, when UE was carrying out deletion in the process of switching from UE side MDT measurement configuration information that source base station receives, target BS sent UE side MDT measurement configuration information to said UE, has following two kinds of situation:
1) target BS sends before the switching command, and the MDT measurement configuration information that said source base station will be relevant with said UE sends to said target BS
Because this moment, UE did not also switch; Said target BS can not be directly and UE communicate, for this reason, target BS can comprise UE side MDT measurement configuration information in the switching command that generates; Then switching command is sent to said source base station, by source base station switching command is transmitted to UE again.
2) before UE accomplished and switches, the MDT measurement configuration relevant information that source base station is relevant with said UE sent to said target BS
After UE switches, target BS can be directly and UE communicate, therefore, target BS directly sends to UE with UE side MDT measurement configuration information.
Preferably, in the inventive method, said source base station stops said UE is carried out after MDT measures, and also comprise: said source base station is with the MDT measuring amount of the said UE that initiatively obtains, and/or the MDT measuring amount that the said UE of reception reports reports.
Concrete; In the inventive method; When UE switches; Source base station stops initiatively to obtain the MDT measuring amount of said UE and/or stops to receive the MDT measuring amount that said UE reports, and its purpose mainly is for fear of in the process that UE switches, carrying out MDT measurements and obtain inaccurate MDT measuring amount because of continuing UE to service disconnection, still in order to guarantee that upper layer network side (like OAM) still can get access to enough comprehensive and accurate MDT measuring amount; Source base station is stopping said UE carried out after MDT measures, and the MDT measuring amount of the said UE that has got access to (comprise initiatively obtain and/or receive that UE reports) is reported the upper layer network side.
Preferably, said MDT measurement includes but not limited to the measurement to QoS measuring amount and/or UE geographical location information.
Concrete, Rel-11 to MDT measurement optimize, on the one hand; Mode to obtaining the UE geographical location information in the MDT measurement is optimized; Make the base station both can initiatively obtain the geographical location information of UE, also can ask UE to open the located in connection function, report its geographical location information; On the other hand, in the MDT measuring amount, introduced the QoS measuring amount, like UE up-downgoing throughput, UE up-downgoing data amount transmitted, UE uplink business data time delay etc.In the above-mentioned QoS measuring amount; Needing is had by what the base station initiatively obtained: UE up-downgoing throughput, UE up-downgoing data amount transmitted; Needing is had by what UE obtained and reported: UE uplink business data time delay; In addition, the UE geographical location information in the MDT measuring amount both can initiatively be obtained by the base station, also can obtain and report the base station by UE.In the practical implementation, the base station can confirm as the case may be that various MDT measuring amount are initiatively to be obtained by the base station, reports the base station again after still being obtained by UE.
Accordingly, the present invention provides another kind of minimum road test MDT method of measurement, is used for the MDT measurement that the UE side is carried out, and is as shown in Figure 2, comprising:
Step 201, user equipment (UE) are confirmed from source base station when target BS switches, to stop to carry out MDT and measure, and stop the MDT measuring amount is reported said source base station;
Step 202 after said UE confirms successfully to switch to said target BS, is restarted to carry out MDT and is measured, and begin the MDT measuring amount is reported said target BS.
Preferably, in the above-mentioned steps 201, the UE UE side MDT measurement configuration information that deletion receives from source base station when switching, this method further comprises: the UE side MDT measurement configuration information that send UE receiving target base station is also preserved.The said UE side MDT measurement configuration information that receives from source base station is that the UE that is used for that source base station is formulated carries out the configuration information that MDT measures and reports the MDT measuring amount.
Concrete; UE will delete from the UE side MDT measurement configuration information that source base station receives; Make UE needn't in the process that difference is switched, safeguard the UE side MDT measurement configuration information that receives from source base station, simplified the processing procedure of UE when switching, improved the switching efficiency of UE.
Preferably; The MDT measurement configuration information that UE receives from target BS; The UE side MDT measurement configuration information of obtaining from source base station for target BS; Perhaps be the UE side MDT measurement configuration information that target BS is confirmed again, the UE side MDT measurement configuration information that target BS is confirmed again is different from the UE side MDT measurement configuration information of obtaining from source base station.
After then said UE confirms successfully to switch to said target BS,, restart and carry out the MDT measurement, and begin the MDT measuring amount is reported said target BS according to current local said UE side MDT measurement configuration information of preserving.Wherein, current local UE side MDT measurement configuration information of preserving receives from target BS.
If what receive is the UE side MDT measurement configuration information that target BS obtains from source base station; Then UE is after switching to target BS; The MDT that still is correlated with according to former UE side MDT measurement configuration information measures; If what receive is the UE side MDT measurement configuration information that target BS is confirmed again, then UE will measure according to the MDT that the UE side MDT measurement configuration information of confirming again is correlated with after switching to target BS.
Preferably, in the said method, UE specifically before switching from the switching command that said source base station sends, obtain the UE side MDT measurement configuration information that said target BS sends.
Concrete; If target BS is before UE switches; Just will send to UE from UE side MDT measurement configuration information or the definite again UE side MDT measurement configuration information that source base station receives; Then since this moment UE can't with the target BS direct communication, in the switching command that said UE forwards through the reception sources base station, get access to the UE side MDT measurement configuration information that said target BS sends.
Perhaps, UE after switching, the UE side MDT measurement configuration information that send the receiving target base station.
Concrete, if target BS after said UE switches, just sends to UE with said UE side MDT measurement configuration information, then since this moment UE can with the target BS direct communication, therefore, UE receives said UE side MDT measurement configuration information from said target BS.
Preferably, in the above-mentioned steps 201, said UE keeps the UE side MDT measurement configuration information that receives from source base station when switching, and this method further comprises:
If said UE receives the UE side MDT measurement configuration information that target BS sends, then will be updated to the UE side MDT measurement configuration information that receives from target BS from the UE side MDT measurement configuration information that source base station receives.
Concrete; UE still protects the UE side MDT measurement configuration information that receives from source base station in handoff procedure; Then when target BS confirms that UE can still carry out relevant MDT measurement according to former UE side MDT measurement configuration information after switching, just can send UE side MDT measurement configuration information to UE again, like this; Target BS just can save unnecessary operation, has simplified the treatment mechanism of target BS.
After then said UE confirms successfully to switch to said target BS, restart according to current local UE side MDT measurement configuration information of preserving and to carry out MDT and measure, and begin the MDT measuring amount is reported said target BS.
Concrete; Because UE has kept the UE side MDT measurement configuration information that receives from source base station when switching; When the MDT that then after target BS is being confirmed the UE switching, can still be correlated with according to former UE side MDT measurement configuration information measures; Just no longer sent UE side MDT measurement configuration information to said UE, then UE is after switching, and the MDT that the UE side MDT measurement configuration information from the source base station reception of still preserving according to this locality is correlated with measures; When the MDT that after target BS is being confirmed the UE switching, can not be correlated with according to former UE side MDT measurement configuration information again measures; Will generate the UE side MDT measurement configuration information that is different from former UE side MDT measurement configuration information; And send to said UE; Then UE receives after the said UE side MDT measurement configuration information, and the UE side MDT measurement configuration information from the source base station reception with preserve this locality is updated to the UE side MDT measurement configuration information that receives from target BS; And after switching completion, the MDT that is correlated with according to the UE side MDT measurement configuration information after upgrading measures.
Preferably, in the said method, before switching, said UE obtains said UE side MDT measurement configuration information from the switching command that said source base station sends.
Concrete; If target BS is before UE switches; When the UE side MDT measurement configuration information that just will confirm again sends to UE; Then since this moment UE can't with the target BS direct communication, in the switching command that said UE forwards through the source base station that receives, get access to target BS and confirm UE side MDT measurement configuration information again.
Perhaps, UE after switching, the UE side MDT measurement configuration information of confirming again that send the receiving target base station.
Concrete; If target BS is after said UE switches, the UE side MDT measurement configuration information that just will confirm again sends to UE, then since at this moment UE can with the target BS direct communication; Therefore, UE receives the said UE side MDT measurement configuration information of confirming again from said target BS.
Preferably, said MDT measurement includes but not limited to the measurement to QoS measuring amount and/or UE geographical location information, as comprises the measurement to UE uplink business data time delay.
With embodiment minimum road test MDT method of measurement provided by the invention is described below.
Embodiment one
In the present embodiment; Initiatively obtain QoS measuring amount (being specially UE up-downgoing throughput in the present embodiment) and UE geographical location information by source base station; UE deletes local former UE side MDT measurement configuration information of preserving when switching, and target BS sent to said UE through switching command with newly-generated UE side MDT measurement configuration information (indication UE need locate geographical location information and report the base station) before switching.
The idiographic flow of the embodiment of the invention comprises:
Steps A 1; When source base station received the base station side MDT measurement configuration information (indication need add up UE up-downgoing throughput and UE geographical location information in the cell covered scope of base station) that OAM issues, source base station was formulated former UE side MDT measurement configuration information (indicating UE need not do the MDT measurement) and is sent to concrete UE, then; Source base station is selected the UE of connected state; Initiatively obtain its up-downgoing throughput, simultaneously, 3GPP (the The 3rd Generation Partnership Project that the source base station utilization strengthens; Third generation partner program) localization method; TA+AoA (Timing Advance+Angle of Arrival, Timing Advance and arrival bearing) method is for example initiatively obtained the geographical location information of said connected state UE;
Steps A 2; Source base station confirms that the signal condition of certain UE is very poor; And adjudicate this UE can switch the time, base station side MDT measurement configuration information (indication is statistics UE up-downgoing throughput and UE geographical location information in the cell covered scope of base station) and former UE side MDT measurement configuration information (indicating UE need not do the MDT measurement) are sent to target BS;
Steps A 3, target BS receives and preserves said base station side MDT measurement configuration information and former UE side MDT measurement configuration information;
Steps A 4; Target BS is adjudicated said UE and can be switched; And adjudicating this UE switches when no longer carrying out the MDT measurement according to said former UE side MDT measurement configuration information afterwards; Generation comprises the switching command of newly-generated UE side MDT measurement configuration information (indication UE need locate geographical location information and report the base station), and sends to source base station;
Steps A 5, source base station receive said switching command, and it is transmitted to said UE; Source base station stops initiatively to obtain up-downgoing throughput and the geographical location information of said UE then; And, the said UE up-downgoing throughput and the UE geographical location information that have obtained are associated, report TCE;
Steps A 6, UE switches in the minizone after receiving said switching command, and simultaneously, UE deletes local former UE side MDT measurement configuration information of preserving, and the newly-generated UE side MDT measurement configuration information in the said switching command is kept at this locality;
Steps A 7; The UE successful switch is to target BS; Target BS is according to said base station side MDT measurement configuration information; Statistics UE up-downgoing throughput and UE geographical location information in self cell covered scope, said UE then locatees geographical location information according to said newly-generated UE side MDT measurement configuration information, and reports said target BS.
Embodiment two
In the present embodiment; Initiatively obtain QoS measuring amount (being specially UE up-downgoing throughput in the present embodiment) by source base station; Obtain the UE geographical location information and report source base station by UE; UE deletes local former UE side MDT measurement configuration information of preserving when switching, target BS directly sends to the UE that switches with former UE side MDT measurement configuration information after switching.
The idiographic flow of the embodiment of the invention comprises:
Step B1; During the base station side MDT measurement configuration information that source base station reception OAM issues (UE up-downgoing throughput and UE geographical location information are added up in indication in the cell covered scope of base station), source base station is formulated former UE side MDT measurement configuration information (indication UE need obtain and report the UE geographical location information) and is sent to concrete UE, then; Source base station is selected the UE of connected state; Initiatively obtain its up-downgoing throughput, simultaneously, source base station receives the geographical location information that said connected state UE reports;
Step B2; Source base station confirms that the signal condition of certain UE is very poor; And adjudicate this UE can switch the time, base station side MDT measurement configuration information (indication is statistics UE up-downgoing throughput and UE geographical location information in the cell covered scope of base station) and former UE side MDT measurement configuration information (indicating UE need obtain and report the UE geographical location information) are sent to target BS;
Step B3, target BS receives and preserves said base station side MDT measurement configuration information and former UE side MDT measurement configuration information;
Step B4, target BS adjudicate said UE can switch the time, generate switching command, and send to source base station;
Step B5; Source base station receives said switching command, and it is transmitted to said UE, and source base station stops initiatively to obtain the up-downgoing throughput of said UE then; And stop to receive the geographical location information that said UE reports; And, up-downgoing throughput and the geographical location information of the said UE that has obtained is associated in together, report TCE;
Step B6, UE switch in the minizone after receiving said switching command, simultaneously, and the local former UE side MDT measurement configuration information of preserving of UE deletion;
Step B7, UE successful switch are to target BS, and the target BS judgement is still carried out the MDT measurement according to said former UE side MDT measurement configuration information after switching, then said former UE side MDT measurement configuration information is directly sent to said UE;
Step B8; Target BS is according to said base station side MDT measurement configuration information; Statistics UE up-downgoing throughput and UE geographical location information in the cell covered scope of base station; Said UE then proceeds the location according to said former UE side MDT measurement configuration information, and self geographical location information is reported said target BS.
Embodiment three
In the present embodiment; Obtain and report QoS measuring amount (being specially UE uplink business data time delay in the present embodiment) and UE geographical location information by UE; UE deletes local former UE side MDT measurement configuration information of preserving when switching, and target BS sent to said UE through switching command with newly-generated UE side MDT measurement configuration information before switching.
The embodiment of present embodiment specifically repeats no more with reference to the foregoing description one and embodiment two.
Embodiment four
In the present embodiment; Initiatively obtain the UE geographical location information by the base station; And obtain and report QoS measuring amount (being specially UE uplink business data time delay in the present embodiment) by UE; UE deletes local former UE side MDT measurement configuration information of preserving when switching, and target BS directly sends to the UE that switches with former UE side MDT measurement configuration information after switching.
The embodiment of present embodiment specifically repeats no more with reference to the foregoing description one and embodiment two.
Embodiment five
In the present embodiment; Initiatively obtain QoS measuring amount (being specially UE up-downgoing data amount transmitted in the present embodiment) by source base station; Obtained the UE geographical location information and reported source base station by UE, UE keeps local former UE side MDT measurement configuration information of preserving when switching.
The idiographic flow of the embodiment of the invention comprises:
Step C1; During the base station side MDT measurement configuration information that source base station issues according to OAM (indication need be added up UE up-downgoing data amount transmitted and UE geographical location information in the cell covered scope of base station), source base station is formulated former UE side MDT measurement configuration information (indication UE need obtain and report geographical location information) and is sent to concrete UE, then; Source base station is selected the UE of connected state; Initiatively obtain its up-downgoing data amount transmitted, simultaneously, receive the geographical location information that the UE of said connected state reports;
Step C2; Source base station confirms that the signal condition of certain UE is very poor; And adjudicate this UE can switch the time, base station side MDT measurement configuration information (indication need be added up UE up-downgoing data amount transmitted and UE geographical location information in the cell covered scope of base station) and former UE side MDT measurement configuration information (indication UE need obtain and report geographical location information) are sent to target BS;
Step C3, target BS receives and preserves said base station side MDT measurement configuration information and former UE side MDT measurement configuration information;
Step C4, target BS adjudicate said UE can switch the time, generate switching command, and send to source base station;
Step C5; Source base station receives said switching command, and it is transmitted to said UE, and source base station stops initiatively to obtain the up-downgoing data amount transmitted of said UE then; And stop to receive the geographical location information that said UE reports; And, up-downgoing data amount transmitted and the geographical location information of the said UE that has obtained is associated in together, report TCE;
Step C6, UE switch in the minizone after receiving said switching command, and simultaneously, UE keeps local former UE side MDT measurement configuration information of preserving;
Step C7; The UE successful switch is to target BS; Target BS is according to said base station side MDT measurement configuration information; Statistics UE up-downgoing data amount transmitted and UE geographical location information in the cell covered scope of base station, the said former UE side MDT measurement configuration information that said UE then keeps according to this locality is proceeded the location, and the UE geographical location information is reported said target BS.
Embodiment six
In the present embodiment; Obtain QoS measuring amount (being specially UE uplink business data time delay in the present embodiment) and UE geographical location information and report source base station by UE; UE keeps local former UE side MDT measurement configuration information of preserving when switching, and target BS sent to said UE through switching command with newly-generated UE side MDT measurement configuration information (indication UE need obtain and report UE uplink business data time delay) before switching.
The idiographic flow of the embodiment of the invention comprises:
Step D1; During the base station side MDT measurement configuration information that source base station issues according to OAM (indication is statistics UE uplink business data time delay and UE geographical location information in the cell covered scope of base station); Source base station is formulated former UE side MDT measurement configuration information (indication UE need obtain and report UE uplink business data time delay and UE geographical location information) and is sent to concrete UE; Then; Source base station is selected the UE of connected state, receives UE uplink business data time delay and UE geographical location information that said connected state UE reports;
Step D2; Source base station confirms that the signal condition of certain UE is very poor; And adjudicate this UE can switch the time, base station side MDT measurement configuration information (indication is statistics UE uplink business data time delay and UE geographical location information in the cell covered scope of base station) and former UE side MDT measurement configuration information (indicating UE need obtain and report UE uplink business data time delay and UE geographical location information) are sent to target BS;
Step D3, target BS receives and preserves said base station side MDT measurement configuration information and former UE side MDT measurement configuration information;
Step D4; Target BS is adjudicated said UE and can be switched; And adjudicating this UE switches when no longer carrying out the MDT measurement according to said former UE side MDT measurement configuration information afterwards; Newly-generated UE side MDT measurement configuration information (indication UE need obtain and report UE uplink business data time delay) is included in the switching command, and sends to source base station;
Step D5; Source base station receives said switching command; It is transmitted to said UE, and source base station stops to receive UE uplink business data time delay and the UE geographical location information that said UE reports then, and; The said UE uplink business data time delay and the UE geographical location information that have obtained are associated, report TCE;
Step D6; UE switches in the minizone after receiving said switching command, simultaneously; UE keeps local former UE side MDT measurement configuration information of preserving, and according to the newly-generated UE side MDT measurement configuration information in the said switching command said former UE side MDT measurement configuration information is upgraded;
Step D7; The UE successful switch is to target BS; Target BS is according to said base station side MDT measurement configuration information; Statistics UE uplink business data time delay and UE geographical location information in the cell covered scope of base station, said UE then obtains UE uplink business data time delay according to said newly-generated UE side MDT measurement configuration information, and reports said target BS.
Embodiment seven
In the present embodiment; Initiatively obtain the UE geographical location information by source base station; Obtained QoS measuring amount (being specially UE uplink business data time delay in the present embodiment) and reported source base station by UE, UE keeps local former UE side MDT measurement configuration information of preserving when switching.
The embodiment of present embodiment specifically repeats no more with reference to the foregoing description five and embodiment six.
Accordingly, the present invention also provides a kind of base station, and is as shown in Figure 3, comprising:
Measure stopping modular 301, when being used for confirming that user equipment (UE) switches, the MDT that stops said UE measures;
Measure beginning module 302, after being used for confirming the UE successful switch, the MDT that begins said UE measures.
Preferably, said measurement stopping modular 301 specifically is used for: when confirming that UE switches, stop initiatively to obtain the MDT measuring amount of said UE, and/or, stop to receive the MDT measuring amount that said UE reports.
Preferably, said measurement begins module 302 and specifically is used for: after confirming the UE successful switch, the MDT measuring amount of said UE is initiatively obtained in beginning, and/or, begin to receive the MDT measuring amount that said UE reports.
Preferably, said base station also comprises:
Configuration sending module 303 is used for the MDT measurement configuration information relevant with said UE sent to the base station after the switching;
Configuration receiver module 304 is used to receive the MDT measurement configuration information relevant with said UE of sending the base station before switching and also preserves.
Preferably, the MDT measurement configuration information relevant with said UE comprises UE side MDT measurement configuration information, and said base station also comprises:
The first configuration sending module 305; Be used for confirming that said UE is when the UE side MDT measurement configuration information that the base station of handoff procedure deletion before switching receives; Whether judgement carries out MDT according to the UE side MDT measurement configuration information of said configuration receiver module 304 preservations after switching measures, if the UE side MDT measurement configuration information of then said configuration receiver module being preserved sends to said UE; If not, then regenerate UE side MDT measurement configuration information and send to said UE.
Preferably, the MDT measurement configuration information relevant with said UE comprises UE side MDT measurement configuration information, and said base station also comprises:
The second configuration sending module 306; Be used for confirming that said UE keeps the UE side MDT measurement configuration information of the base station reception before switch at handoff procedure; And confirm after switching to carry out MDT when measuring not according to the UE side MDT measurement configuration information that said configuration receiver module 304 is preserved, regenerate UE side MDT measurement configuration information and send to UE.
Preferably, said configuration sending module 303 specifically is used for: before the switching command that send the base station after receiving switching, MDT measurement configuration information that will be relevant with said UE sends to the base station after the switching;
The said first configuration sending module 305 or the second configuration sending module 306 specifically are used for: said UE side MDT measurement configuration information is included in switching command sends to said UE through the base station before switching.
Preferably, said configuration sending module 303 specifically is used for: before UE accomplished switching, MDT measurement configuration information that will be relevant with said UE sent to the base station after the switching;
The said first configuration sending module 305 or the second configuration sending module 306 specifically are used for: said UE side MDT measurement configuration information is directly sent to said UE.
Preferably, said base station also comprises reporting module 307, be used for the MDT measuring amount of initiatively obtaining, and/or the MDT measuring amount that the said UE of reception reports reports.
The concrete realization function of each module repeats no more at this referring to the concrete implementation procedure of MDT method of measurement as shown in Figure 1 in the said base station.
Accordingly, the present invention also provides a kind of user equipment (UE), and is as shown in Figure 4, comprising:
Stopping modular 401 is used for confirming from source base station when target BS switches, stopping to carry out MDT and measuring, and stop the MDT measuring amount is reported said source base station;
Restart module 402, after being used for confirming successfully switching to said target BS, restart to carry out MDT and measure, and begin the MDT measuring amount is reported said target BS.
Preferably, the said UE UE side MDT measurement configuration information that deletion receives from source base station when switching, then said UE also comprises: first receiver module 403, the UE side MDT measurement configuration information that is used for sending the receiving target base station is also preserved.
Preferably; Said UE keeps the UE side MDT measurement configuration information that receives from source base station when switching; Then said UE also comprises: second receiver module 404; Be used for the UE side MDT measurement configuration information that send the receiving target base station, and will be updated to the UE side MDT measurement configuration information that receives from target BS from the UE side MDT measurement configuration information that source base station receives.
Preferably, said first receiver module 403 or second receiver module 404 specifically are used for: before switching, from the switching command that said source base station sends, obtain the UE side MDT measurement configuration information that said target BS sends; Perhaps, after switching, receive the UE side MDT measurement configuration information that said target BS sends.
Preferably; Saidly restart module 402 and specifically be used for: after confirming successfully to switch to said target BS; Said UE side MDT measurement configuration information according to said first receiver module 403 or 404 receptions of second receiver module; Restart to carry out MDT and measure, and begin the MDT measuring amount is reported said target BS.
The concrete realization function of each module repeats no more at this referring to the concrete implementation procedure of MDT method of measurement as shown in Figure 2 among the said UE.
Accordingly, the present invention also provides a kind of minimum road test MDT measuring system, and is as shown in Figure 5, comprises base station 501 and user equipment (UE) 502, and said base station 501 comprises:
Measure stopping modular, when being used for confirming that UE switches, the MDT that stops said UE measures;
Measure the beginning module, after being used for confirming the UE successful switch, the MDT that begins said UE measures;
Said UE502 comprises:
Stopping modular is used for confirming from source base station when target BS switches, stopping to carry out MDT and measuring, and stop the MDT measuring amount is reported said source base station;
Restart module, after being used for confirming successfully switching to said target BS, restart to carry out MDT and measure, and begin the MDT measuring amount is reported said target BS.
The concrete realization function of each module repeats no more at this referring to the concrete implementation procedure like Fig. 1, the MDT method of measurement shown in 2 in the said MDT measuring system.
The present invention proposes a kind of MDT method of measurement, equipment and system; The MDT that in the process that UE switches, stops said UE measures, and has avoided obtaining inaccurate MDT measuring amount because of the UE that is in service disconnection is carried out the MDT measurement, produces service disconnection when having solved owing to switching; Cause the not statistical uncertainty true of MDT measuring amount; And then causing producing the problem of bad network optimization effect, the present invention program can carry out the more accurate and rational network optimization by auxiliary network, has strengthened systematic function.
Obviously, those skilled in the art can carry out various changes and modification to the present invention and not break away from the spirit and scope of the present invention.Like this, belong within the scope of claim of the present invention and equivalent technologies thereof if of the present invention these are revised with modification, then the present invention also is intended to comprise these changes and modification interior.

Claims (31)

1. a minimum road test MDT method of measurement is characterized in that, comprising:
Source base station is confirmed user equipment (UE) when target BS switches, and the MDT that stops said UE measures;
After target BS was confirmed said UE successful switch, the MDT that begins said UE measured.
2. the method for claim 1 is characterized in that, said source base station is confirmed UE when target BS switches, and the MDT that stops said UE measures, and specifically comprises:
Said source base station is confirmed UE when target BS switches, and stops initiatively to obtain the MDT measuring amount of said UE, and/or, stop to receive the MDT measuring amount that said UE reports.
3. method as claimed in claim 2 is characterized in that, after said target BS was confirmed said UE successful switch, the MDT that begins said UE measured, and specifically comprises:
After said target BS was confirmed said UE successful switch, the MDT measuring amount of said UE was initiatively obtained in beginning, and/or, begin to receive the MDT measuring amount that said UE reports.
4. method as claimed in claim 2 is characterized in that, also comprises:
Said source base station will be relevant with said UE the MDT measurement configuration information send to said target BS;
Said target BS receives the relevant MDT measurement configuration information of said and said UE and preserves.
5. method as claimed in claim 4 is characterized in that, the MDT measurement configuration information relevant with said UE comprises UE side MDT measurement configuration information, and said method also comprises:
When target BS confirms that said UE deletes from UE side MDT measurement configuration information that source base station receives in handoff procedure, judge that after switching the UE side MDT measurement configuration information of whether preserving according to said target BS carries out MDT and measure;
If target BS sends to said UE with the UE side MDT measurement configuration information of self preserving;
If not, target BS regenerates UE side MDT measurement configuration information and sends to said UE.
6. method as claimed in claim 4 is characterized in that, the MDT measurement configuration information relevant with said UE comprises UE side MDT measurement configuration information, and said method also comprises:
Target BS confirms that said UE keeps the UE side MDT measurement configuration information that receives from source base station in handoff procedure; And confirm after switching to carry out MDT when measuring not according to the UE side MDT measurement configuration information that said target BS is preserved, regenerate UE side MDT measurement configuration information and send to said UE.
7. like claim 5 or 6 described methods, it is characterized in that,
Before target BS sent switching command, the MDT measurement configuration information that said source base station will be relevant with said UE sent to said target BS;
Said target BS specifically with UE side MDT measurement configuration information, is included in the switching command and sends to said UE through said source base station.
8. like claim 5 or 6 described methods, it is characterized in that,
Before UE accomplished switching, the MDT measurement configuration information that said source base station will be relevant with said UE sent to said target BS;
Said target BS specifically after UE switches, directly sends to said UE with UE side MDT measurement configuration information.
9. method as claimed in claim 2 is characterized in that, said source base station stops also to comprise after the MDT measurement of said UE:
Said source base station is with the MDT measuring amount of the said UE that initiatively obtains, and/or the MDT measuring amount that the said UE of reception reports reports.
10. the method for claim 1 is characterized in that, said MDT measurement comprises the measurement to QoS measuring amount and/or UE geographical location information.
11. a minimum road test MDT method of measurement is characterized in that, comprising:
User equipment (UE) is confirmed from source base station when target BS switches, to stop to carry out MDT and measure, and stop the MDT measuring amount is reported said source base station;
After said UE confirms successfully to switch to said target BS, restart to carry out MDT and measure, and begin the MDT measuring amount is reported said target BS.
12. method as claimed in claim 11 is characterized in that, the said UE UE side MDT measurement configuration information that deletion receives from source base station when switching, and this method further comprises:
The UE side MDT measurement configuration information that send said UE receiving target base station is also preserved.
13. method as claimed in claim 11 is characterized in that, said UE keeps the UE side MDT measurement configuration information that receives from source base station when switching, and this method further comprises:
If said UE receives the UE side MDT measurement configuration information that target BS sends, then will be updated to the UE side MDT measurement configuration information that receives from target BS from the UE side MDT measurement configuration information that source base station receives.
14. like claim 12 or 13 described methods, it is characterized in that,
Said UE specifically before switching from the switching command that said source base station sends, obtain the UE side MDT measurement configuration information that said target BS sends; Perhaps
Said UE specifically after switching, the UE side MDT measurement configuration information that send the receiving target base station.
15. like claim 12 or 13 described methods, it is characterized in that,
After said UE confirms successfully to switch to said target BS,, restart and carry out the MDT measurement, and begin the MDT measuring amount is reported said target BS according to current local said UE side MDT measurement configuration information of preserving.
16. method as claimed in claim 11 is characterized in that, said MDT measurement comprises the measurement to QoS measuring amount and/or UE geographical location information.
17. a base station is characterized in that, comprising:
Measure stopping modular, when being used for confirming that user equipment (UE) switches, the MDT that stops said UE measures;
Measure the beginning module, after being used for confirming the UE successful switch, the MDT that begins said UE measures.
18. base station as claimed in claim 17 is characterized in that, said measurement stopping modular specifically is used for:
When confirming that UE switches, stop initiatively to obtain the MDT measuring amount of said UE, and/or, stop to receive the MDT measuring amount that said UE reports.
19. base station as claimed in claim 18 is characterized in that, said measurement begins module and specifically is used for:
After confirming the UE successful switch, the MDT measuring amount of said UE is initiatively obtained in beginning, and/or, begin to receive the MDT measuring amount that said UE reports.
20. base station as claimed in claim 18 is characterized in that, also comprises:
The configuration sending module is used for the MDT measurement configuration information relevant with said UE sent to the base station after the switching;
The configuration receiver module is used to receive the MDT measurement configuration information relevant with said UE of sending the base station before switching and also preserves.
21. base station as claimed in claim 20 is characterized in that, the MDT measurement configuration information relevant with said UE comprises UE side MDT measurement configuration information, and said base station also comprises:
The first configuration sending module; Be used for confirming that said UE is when the UE side MDT measurement configuration information that the base station of handoff procedure deletion before switching receives; Whether judgement carries out MDT according to the UE side MDT measurement configuration information of said configuration receiver module preservation after switching measures, if the UE side MDT measurement configuration information of then said configuration receiver module being preserved sends to said UE; If not, then regenerate UE side MDT measurement configuration information and send to said UE.
22. base station as claimed in claim 20 is characterized in that, the MDT measurement configuration information relevant with said UE comprises UE side MDT measurement configuration information, and said base station also comprises:
The second configuration sending module; Be used for confirming that said UE keeps the UE side MDT measurement configuration information of the base station reception before switch at handoff procedure; And confirm after switching to carry out MDT when measuring not according to the UE side MDT measurement configuration information that said configuration receiver module is preserved, regenerate UE side MDT measurement configuration information and send to UE.
23. like claim 21 or 22 described base stations, it is characterized in that,
Said configuration sending module specifically is used for: before the switching command that send the base station after receiving switching, MDT measurement configuration information that will be relevant with said UE sends to the base station after the switching;
The said first configuration sending module or the second configuration sending module specifically are used for: said UE side MDT measurement configuration information is included in switching command sends to said UE through the base station before switching.
24. like claim 21 or 22 described base stations, it is characterized in that,
Said configuration sending module specifically is used for: before UE accomplished switching, MDT measurement configuration information that will be relevant with said UE sent to the base station after the switching;
The said first configuration sending module or the second configuration sending module specifically are used for: said UE side MDT measurement configuration information is directly sent to said UE.
25. base station as claimed in claim 18 is characterized in that, also comprises:
Reporting module be used for the MDT measuring amount with the said UE that initiatively obtains, and/or the MDT measuring amount that the said UE of reception reports reports.
26. a user equipment (UE) is characterized in that, comprising:
Stopping modular is used for confirming from source base station when target BS switches, stopping to carry out MDT and measuring, and stop the MDT measuring amount is reported said source base station;
Restart module, after being used for confirming successfully switching to said target BS, restart to carry out MDT and measure, and begin the MDT measuring amount is reported said target BS.
27. UE as claimed in claim 26 is characterized in that, the UE side MDT measurement configuration information that deletion receives from source base station when switching, and said UE also comprises:
First receiver module is used for the UE side MDT measurement configuration information and the preservation of sending the receiving target base station.
28. UE as claimed in claim 26 is characterized in that, when switching, keeps the UE side MDT measurement configuration information that receives from source base station, said UE also comprises:
Second receiver module is used for the UE side MDT measurement configuration information that send the receiving target base station, and will be updated to the UE side MDT measurement configuration information that receives from target BS from the UE side MDT measurement configuration information that source base station receives.
29. like claim 27 or 28 described UE, it is characterized in that,
Said first receiver module or second receiver module specifically are used for: before switching, from the switching command that said source base station sends, obtain the UE side MDT measurement configuration information that said target BS sends; Perhaps, after switching, receive the UE side MDT measurement configuration information that said target BS sends.
30. like claim 27 or 28 described UE, it is characterized in that,
Saidly restart module and specifically be used for: after confirming successfully to switch to said target BS; Said UE side MDT measurement configuration information according to said first receiver module or the reception of second receiver module; Restart to carry out MDT and measure, and begin the MDT measuring amount is reported said target BS.
31. a minimum road test MDT measuring system comprises base station and user equipment (UE), it is characterized in that said base station comprises:
Measure stopping modular, when being used for confirming that UE switches, the MDT that stops said UE measures;
Measure the beginning module, after being used for confirming the UE successful switch, the MDT that begins said UE measures;
Said UE comprises:
Stopping modular is used for confirming from source base station when target BS switches, stopping to carry out MDT and measuring, and stop the MDT measuring amount is reported said source base station;
Restart module, after being used for confirming successfully switching to said target BS, restart to carry out MDT and measure, and begin the MDT measuring amount is reported said target BS.
CN201210071780.XA 2012-03-16 2012-03-16 MDT (minimization drive test) measuring method, MDT measuring equipment and MDT measuring system Active CN102612072B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210071780.XA CN102612072B (en) 2012-03-16 2012-03-16 MDT (minimization drive test) measuring method, MDT measuring equipment and MDT measuring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210071780.XA CN102612072B (en) 2012-03-16 2012-03-16 MDT (minimization drive test) measuring method, MDT measuring equipment and MDT measuring system

Publications (2)

Publication Number Publication Date
CN102612072A true CN102612072A (en) 2012-07-25
CN102612072B CN102612072B (en) 2014-08-27

Family

ID=46529163

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210071780.XA Active CN102612072B (en) 2012-03-16 2012-03-16 MDT (minimization drive test) measuring method, MDT measuring equipment and MDT measuring system

Country Status (1)

Country Link
CN (1) CN102612072B (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014177003A1 (en) * 2013-08-08 2014-11-06 中兴通讯股份有限公司 Measurement configuration processing method and device
WO2014190912A1 (en) * 2013-05-31 2014-12-04 电信科学技术研究院 Minimization of drive test (mdt) measurement method and device
EP3065446A4 (en) * 2013-10-29 2016-10-26 Zte Corp Minimization of drive test method and device
CN108713328A (en) * 2018-06-01 2018-10-26 北京小米移动软件有限公司 Measurement method, device, system and storage medium
CN111886890A (en) * 2018-03-12 2020-11-03 中兴通讯股份有限公司 Method, device and system for configuring minimization of drive tests under multi-connection architecture

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102014445A (en) * 2009-09-07 2011-04-13 ***通信集团公司 Method, device and system for processing terminal measurement report in switching process
CN102075983A (en) * 2010-12-29 2011-05-25 大唐移动通信设备有限公司 Measurement restriction information processing method and equipment
CN102215511A (en) * 2010-04-02 2011-10-12 电信科学技术研究院 Method, system and equipment for reporting MDT (Mean Down Time) measuring result

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102014445A (en) * 2009-09-07 2011-04-13 ***通信集团公司 Method, device and system for processing terminal measurement report in switching process
CN102215511A (en) * 2010-04-02 2011-10-12 电信科学技术研究院 Method, system and equipment for reporting MDT (Mean Down Time) measuring result
CN102075983A (en) * 2010-12-29 2011-05-25 大唐移动通信设备有限公司 Measurement restriction information processing method and equipment

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014190912A1 (en) * 2013-05-31 2014-12-04 电信科学技术研究院 Minimization of drive test (mdt) measurement method and device
CN104219695A (en) * 2013-05-31 2014-12-17 电信科学技术研究院 Minimization of drive test (MDT) measurement method and device
CN104219695B (en) * 2013-05-31 2018-04-17 电信科学技术研究院 One kind minimizes drive test MDT measuring methods and device
WO2014177003A1 (en) * 2013-08-08 2014-11-06 中兴通讯股份有限公司 Measurement configuration processing method and device
US10021607B2 (en) 2013-08-08 2018-07-10 Zte Corporation Measurement configuration processing method and device
EP3065446A4 (en) * 2013-10-29 2016-10-26 Zte Corp Minimization of drive test method and device
CN111886890A (en) * 2018-03-12 2020-11-03 中兴通讯股份有限公司 Method, device and system for configuring minimization of drive tests under multi-connection architecture
CN111886890B (en) * 2018-03-12 2022-04-12 中兴通讯股份有限公司 Method, device and system for configuring minimization of drive tests under multi-connection architecture
US11445398B2 (en) 2018-03-12 2022-09-13 Zte Corporation Methods, apparatus and systems for configuring minimization of drive test under a multi-connectivity architecture
CN108713328A (en) * 2018-06-01 2018-10-26 北京小米移动软件有限公司 Measurement method, device, system and storage medium
WO2019227486A1 (en) * 2018-06-01 2019-12-05 北京小米移动软件有限公司 Measurement method, device, system, and storage medium
CN108713328B (en) * 2018-06-01 2022-07-08 北京小米移动软件有限公司 Measuring method, device, system and storage medium

Also Published As

Publication number Publication date
CN102612072B (en) 2014-08-27

Similar Documents

Publication Publication Date Title
US10986546B2 (en) Method, apparatus, and system for detecting a radio network problem
US10517135B2 (en) Method and apparatus for transmitting a handover report and an RLF report
US20220182902A1 (en) Communication connection control procedure for supporting and conducting handover
CN102685671B (en) Minimization drive test (MDT) result reporting and reporting instruction methods and devices
US8971294B2 (en) Method, apparatus and system for reporting MDT log result
US10034189B2 (en) Method and system for controlling radio parameter, network operation management apparatus, and radio station
US9554289B2 (en) Management method, apparatus, and system for coverage optimization
US8570981B2 (en) Handover method between a preferred base station and alternatives base stations
US9894542B2 (en) Method, system and device for delivering minimization of drive-tests measurement configuration parameters
EP2153683B1 (en) Automatic handling of neighbour cells
KR20150036584A (en) Terminal access method and system, and terminal
CN103945469A (en) Target cell determining method and device
CN102045749A (en) Method, device and system for realizing optimization of neighbor cell
CN102612072B (en) MDT (minimization drive test) measuring method, MDT measuring equipment and MDT measuring system
EP3205169A1 (en) Connection establishment robustness optimization
EP3216198B1 (en) Improving voice call performance testing
CN107801220B (en) Method for automatically switching cell types and computer readable storage medium
KR20120133879A (en) Method for providing wireless environmet information using mdt information at mobile station in the wireless communication system and apparatus therefor
WO2016074421A1 (en) Lte communication system, cell measurement method thereof, ue, base station and storage medium
KR101535129B1 (en) method for collecting log data of automatic call test
CN118042482A (en) Communication method, electronic device, communication system, medium, chip, and program product

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 100191 No. 40, Haidian District, Beijing, Xueyuan Road

Patentee after: CHINA ACADEMY OF TELECOMMUNICATIONS TECHNOLOGY

Address before: 100191 No. 40, Haidian District, Beijing, Xueyuan Road

Patentee before: CHINA ACADEMY OF TELECOMMUNICATIONS TECHNOLOGY

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210602

Address after: 100085 1st floor, building 1, yard 5, Shangdi East Road, Haidian District, Beijing

Patentee after: DATANG MOBILE COMMUNICATIONS EQUIPMENT Co.,Ltd.

Address before: 100191 No. 40, Haidian District, Beijing, Xueyuan Road

Patentee before: CHINA ACADEMY OF TELECOMMUNICATIONS TECHNOLOGY