CN102608469A - Testing device - Google Patents

Testing device Download PDF

Info

Publication number
CN102608469A
CN102608469A CN2012100889740A CN201210088974A CN102608469A CN 102608469 A CN102608469 A CN 102608469A CN 2012100889740 A CN2012100889740 A CN 2012100889740A CN 201210088974 A CN201210088974 A CN 201210088974A CN 102608469 A CN102608469 A CN 102608469A
Authority
CN
China
Prior art keywords
switch
proving installation
module
octavo
actuation sub
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN2012100889740A
Other languages
Chinese (zh)
Other versions
CN102608469B (en
Inventor
张博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Runke General Technology Co Ltd
Original Assignee
Beijing Jingwei Hirain Tech Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Jingwei Hirain Tech Co Ltd filed Critical Beijing Jingwei Hirain Tech Co Ltd
Priority to CN201210088974.0A priority Critical patent/CN102608469B/en
Publication of CN102608469A publication Critical patent/CN102608469A/en
Application granted granted Critical
Publication of CN102608469B publication Critical patent/CN102608469B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Tests Of Electronic Circuits (AREA)
  • Telephone Function (AREA)

Abstract

The invention discloses a testing device. Switches are respectively arranged for the connection between modules, in this way, a user can switch off a corresponding switch according to needs to realize different line connection modes, and further to complete various tests. According to the testing device dislcosed by the embodiment of the invention, the user can switch the testing lines conveniently, and the work for plugging and pulling a large quantity of connecting lines is saved, so that on one hand the workload is saved, and on the other hand, the accuracy of the testing lines switching is high.

Description

A kind of proving installation
Technical field
The present invention relates to technical field of measurement and test, particularly relate to a kind of proving installation.
Background technology
Along with science and technology development, it is more and more intelligent that electronic equipment also becomes.In order to guarantee the quality of production of electronic equipment, the manufacturer of electronic equipment generally all can test electronic equipment.
In test process, because test needs, the manufacturer of electronic equipment often need design and connect multiple different measurement circuit, has accomplished various test.In this test process, need the technician to plug a large amount of lines, workload is huge on the one hand, also is easy on the other hand make mistakes, and makes troubles for the test job of electronic equipment.
Therefore, how rapidly and efficiently the switching of realization measurement circuit be still pendulum in this area a technical barrier in face of the research staff.
Summary of the invention
For solving the problems of the technologies described above, the embodiment of the invention provides a kind of proving installation, and to realize the purpose of efficient switch test circuit, technical scheme is following:
A kind of proving installation comprises: first gathers submodule, second gathers submodule, first actuation sub-module, second actuation sub-module, first switch, second switch, the 3rd switch, the 4th switch, the 5th switch, the 6th switch, minion pass, octavo pass and the 9th switch;
The input end of the said first collection submodule is connected with first end of said first switch; Second end of said first switch is first signal input part of said proving installation; The output terminal of the said first collection submodule closes through said octavo and is connected with the input end of said second actuation sub-module; The output terminal of said second actuation sub-module is connected with first end of said the 5th switch, and second end of said the 5th switch is the secondary signal output terminal of said proving installation;
The input end of the said second collection submodule is connected with first end of said the 4th switch; Second end of said the 4th switch is the secondary signal input end of said proving installation; The output terminal of the said second collection submodule is connected with the input end of said first actuation sub-module through said the 9th switch; The output terminal of said first actuation sub-module is connected with first end of said second switch, and second end of said second switch is first signal output part of said proving installation;
Also be connected with said the 3rd switch between the input end of the said first collection submodule and the output terminal of said first actuation sub-module; Said first actuation sub-module and said second is gathered and also is connected with said minion pass between the submodule, also is connected with said the 6th switch between said second collection submodule and said second actuation sub-module.
Preferably; Said proving installation also comprises: first handover module; Be used for when receiving user's first control signal, making said the 3rd switch and said the 6th switch closure, and said first switch, said second switch, said the 4th switch, said the 5th switch, said minion pass, said octavo pass and said the 9th switch are broken off.
Preferably; Said proving installation also comprises: second handover module; Be used for when receiving user's second control signal, making said first switch, said second switch, said the 4th switch and said the 5th switch closure, and said the 3rd switch, said the 6th switch, said minion pass, said octavo pass and said the 9th switch are broken off.
Preferably; Said proving installation also comprises: the 3rd handover module; Be used for when receiving user's the 3rd control signal, making said first switch, said second switch, said the 4th switch, said the 5th switch, said octavo to close and said the 9th switch closure, and make said the 3rd switch, said the 6th switch and said minion close disconnection.
Preferably; Said proving installation also comprises: the 4th handover module; It is closed to be used for when receiving user's the 4th control signal, making said first switch, said second switch and said minion to close, and said the 3rd switch, said the 4th switch, said the 5th switch, said the 6th switch, said octavo are closed and the disconnection of said the 9th switch.
Preferably; Said proving installation also comprises: the 5th handover module; Be used for when receiving user's the 5th control signal, making said first switch, said second switch, said the 3rd switch, said the 4th switch, said the 5th switch and said the 6th switch closure, and said minion pass, said octavo pass and said the 9th switch are broken off.
Preferably, said octavo pass and the 9th switch are logic switch.
Through using above technical scheme; A kind of proving installation that the embodiment of the invention provides is for the connection between each module all is provided with switch, like this; The user just can let corresponding switch closure realize different line connections as required, to accomplish various tests.Therefore, the embodiment of the invention can make the user realize the switching of measurement circuit easily, has saved the work that plugs a large amount of lines, has saved workload on the one hand, and the accuracy of measurement circuit switching is also very high on the other hand.
Description of drawings
In order to be illustrated more clearly in the embodiment of the invention or technical scheme of the prior art; To do to introduce simply to the accompanying drawing of required use in embodiment or the description of the Prior Art below; Obviously, the accompanying drawing in describing below only is some embodiment that put down in writing among the present invention, for those of ordinary skills; Under the prerequisite of not paying creative work, can also obtain other accompanying drawing according to these accompanying drawings.
The structural representation of a kind of proving installation that Fig. 1 provides for the embodiment of the invention;
A kind of proving installation that Fig. 2 provides for the embodiment of the invention and the synoptic diagram that is connected of testing apparatus;
The connection line synoptic diagram of a kind of proving installation that Fig. 3 provides for the embodiment of the invention;
The concrete structure synoptic diagram of first handover module that Fig. 4 provides for the embodiment of the invention;
The connection line synoptic diagram of the another kind of proving installation that Fig. 5 provides for the embodiment of the invention;
The connection line synoptic diagram of the another kind of proving installation that Fig. 6 provides for the embodiment of the invention;
The connection line synoptic diagram of the another kind of proving installation that Fig. 7 provides for the embodiment of the invention;
The connection line synoptic diagram of the another kind of proving installation that Fig. 8 provides for the embodiment of the invention.
Embodiment
In order to make those skilled in the art person understand the technical scheme among the present invention better; To combine the accompanying drawing in the embodiment of the invention below; Technical scheme in the embodiment of the invention is carried out clear, intactly description; Obviously, described embodiment only is the present invention's part embodiment, rather than whole embodiment.Based on the embodiment among the present invention, those of ordinary skills are not making the every other embodiment that is obtained under the creative work prerequisite, all should belong to the scope of the present invention's protection.
As shown in Figure 1; A kind of proving installation that the embodiment of the invention provides can comprise: first gathers submodule 011, second gathers that submodule 021, first actuation sub-module 012, second actuation sub-module 022, first K switch 1, second switch K2, the 3rd K switch 3, the 4th K switch 4, the 5th K switch 5, the 6th K switch 6, minion are closed K7, octavo is closed K8 and the 9th K switch 9;
The input end I1 of the first collection submodule 011 is connected with first end of first K switch 1; Second end of first K switch 1 is the first signal input part IN1 of proving installation; The output terminal O1 of the first collection submodule 011 closes K8 through octavo and is connected with the input end I4 of second actuation sub-module 022; The output terminal O4 of second actuation sub-module 022 is connected with first end of the 5th K switch 5, and second end of the 5th K switch 5 is the secondary signal output terminal OUT2 of proving installation;
The input end I3 of the second collection submodule 021 is connected with first end of the 4th K switch 4; Second end of the 4th K switch 4 is the secondary signal input end IN2 of proving installation; The output terminal O3 of the second collection submodule 021 is connected through the input end I2 of the 9th K switch 9 with first actuation sub-module 012; The output terminal O2 of first actuation sub-module 012 is connected with first end of second switch K2, and second end of second switch K2 is the first signal output part OUT1 of proving installation;
Also be connected with the 3rd K switch 3 between the input end I1 of the first collection submodule 011 and the output terminal O2 of first actuation sub-module 012; First actuation sub-module 012 and second is gathered and also is connected with minion pass K7 between the submodule 021, also is connected with the 6th K switch 6 between the second collection submodule 021 and second actuation sub-module 022.
As shown in Figure 2, a kind of proving installation that the embodiment of the invention provides can be connected with 200 two equipment under tests of first equipment under test 100 and second equipment under test simultaneously.Concrete, the first signal input part IN1 can be connected with the output terminal 110 of first equipment under test 100, to receive the output signal of first equipment under test 100.The first signal output part OUT1 can be connected with the excitation input end 120 of first equipment under test 100, pumping signal is imported in first equipment under test 100.Secondary signal input end IN2 can be connected with the output terminal 210 of second equipment under test 200, to receive the output signal of second equipment under test 200.Secondary signal output terminal OUT2 can be connected with the excitation input end 220 of second equipment under test 200, pumping signal is imported in second equipment under test 200.
A kind of proving installation that the embodiment of the invention provides all is provided with switch for the connection between each module, and like this, the user just can let corresponding switch closure realize different line connections as required, to accomplish various tests.Therefore, the embodiment of the invention can make the user realize the switching of measurement circuit easily, has saved the work that plugs a large amount of lines, has saved workload on the one hand, and the accuracy of measurement circuit switching is also very high on the other hand.
Because the proving installation that provides of the embodiment of the invention can be realized multiple measurement circuit, convenient for the purpose of, inner closed loop mode, communication module, Switching Module are disclosed below, from the measurement circuit and the implementation of listen mode and five kinds of test patterns of monitoring mode.
The another kind of proving installation that the embodiment of the invention provides; Can also comprise: first handover module; Be used for when receiving user's first control signal, making the 3rd K switch 3 and the 6th K switch 3 closures, and make that first K switch 1, second switch K2, the 4th K switch 4, the 5th K switch 5, minion are closed K7, octavo closes K8 and the 9th K switch 9 is broken off.First handover module can make proving installation realize measurement circuit as shown in Figure 3.Measurement circuit shown in Figure 3 is the measurement circuit of inner closed loop mode, and under this pattern, the inner pumping signal that produces is directly exported to inner acquisition module, convenient exploitation and debugging.This pattern is mainly used in the self-checking function of the proving installation that the embodiment of the invention provides.When generation is unusual before carrying out outside signal testing or in the test process, can encourage self diagnosis with acquisition function.
Fig. 4 shows the concrete structure of first handover module in the embodiment of the invention, comprises 7 phase inverters and 9 electromagnet.The break-make of using electromagnet to come CS is used phase inverter adjustment control signal.As shown in Figure 4, switch can be normal open switch, and is concrete, and when the signal in the input electromagnet was high level, electromagnet was started working, and makes corresponding switch closure, and when the signal in the input electromagnet was low level, electromagnet was no longer worked, and respective switch is broken off.When the user imported first control signal and is high level, the 3rd electromagnet KM3 and the 6th electromagnet KM6 started working, and made the 3rd K switch 3 and the 6th K switch 6 closures.Because the existence of phase inverter; The first electromagnet KM1, the second electromagnet KM2, the 4th electromagnet KM4, the 5th electromagnet KM5, the 7th electromagnet KM7, the 8th electromagnet KM8 and the 9th electromagnet KM9 do not work; First K switch 1, second switch K2, the 4th K switch 4, the 5th K switch 5, minion are closed K7, octavo closes K8 and the 9th K switch 9 is in off-state, connect so realize test circuit shown in Figure 3.Be understood that easily other measurement circuits connections also can be used similar mode to set and get final product.Concrete implementation does not limit this scheme that the embodiment of the invention provides, owing to be technological means well-known to those skilled in the art, for the purpose of making things convenient for, repeats no more.
Certainly, in practical application, octavo is closed K8 and the 9th K switch 9 might not be the entity switch, owing to belong to a kind of proving installation switch inside provided by the present invention, therefore octavo pass K8 and the 9th K switch 9 can be logic switch.
It is understandable that above electromagnet and the pairing switch of this electromagnet can use electromagnetic relay to replace, the principle of work of electromagnetic relay and effect and above electromagnet and this electromagnet to the principle of work of inductive switch with act on similar.In addition, the present invention does not limit and only uses electromagnetic relay, and other forms of relay (like solid-state relay, optical relay) all can be implemented in the present invention.
The another kind of proving installation that the embodiment of the invention provides; Can also comprise: second handover module; Be used for when receiving user's second control signal, making first K switch 1, second switch K2, the 4th K switch 4 and the 5th K switch 5 closures, and make that the 3rd K switch 3, the 6th K switch 6, minion are closed K7, octavo closes K8 and the 9th K switch 9 is broken off.Second handover module can make proving installation realize measurement circuit as shown in Figure 5.Measurement circuit shown in Figure 5 is the measurement circuit of communication pattern, and under this pattern, acquisition module receives the output signal of equipment under test, and stimulating module sends signal to equipment under test as required.In addition, acquisition module receives the output signal of equipment under test, as required data is wherein replaced, thereby realizes the function that fault is injected, and sends signal through stimulating module to equipment under test.When stimulating module according to program setting, the cycle, the proving installation that the embodiment of the invention provides just can be accomplished the effect of signal excitation when sending signal specific.This pattern generally is used to accomplish point-to-point control, communication and fault function of injecting.Under this pattern, both can accomplish closed loop test between acquisition module and the stimulating module also can open-loop test.When under closed loop mode; The equipment under test signal gets into acquisition module; Control end can directly send to stimulating module with data as required; Also can replace and pollute, send out receiving terminal through stimulating module then, thereby the fault that realizes application layer be injected to equipment under test to the data that receive.Under open loop mode, can accomplish open-loop test to equipment under test, send pumping signal through stimulating module to equipment under test, receive response signal at acquisition module, accomplish test function for equipment under test.
The another kind of proving installation that the embodiment of the invention provides; Can also comprise: the 3rd handover module; Be used for when receiving user's the 3rd control signal, making first K switch 1, second switch K2, the 4th K switch 4, the 5th K switch 5, octavo to close K8 and the 9th K switch 9 closures, and make the 3rd K switch 3, the 6th K switch 6 and minion close K7 to break off.The 3rd handover module can make proving installation realize measurement circuit as shown in Figure 6.Measurement circuit shown in Figure 6 is the measurement circuit of switch mode; Between two equipment under tests, carry out in the process of exchanges data; The proving installation that the embodiment of the invention provides is serially connected in the link as third party's surveillance equipment, thereby realizes the supervision to exchanges data between equipment under test.Under this pattern, first gathers the output signal that submodule 11 receives first equipment under test 100, simultaneously signal is imported second equipment under test 200 through second actuation sub-module 022, thereby between equipment under test, has formed a signalling channel.For two equipment under tests that directly are communicated with originally, equipment according to the invention is fully transparent, need not carry out any modification for original topology, and two transmission paths of full duplex have guaranteed the path relation.Thereby control end can extract related data at collecting part as required and accomplish third-party data acquisition function; Equally, control end also can be operated in stimulating module as required, revise and any data that need of injection, thus the online injection of realization fault.In addition, in the process that data exchange, can replace, thereby realize the function that fault is injected the data that receive.
The another kind of proving installation that the embodiment of the invention provides; Can also comprise: the 4th handover module; It is closed to be used for when receiving user's the 4th control signal, making first K switch 1, second switch K2 and minion to close K7, and make the 3rd K switch 3, the 4th K switch 4, the 5th K switch 5, the 6th K switch 6, octavo closes K8 and the 9th K switch 9 is broken off.The 4th handover module can make proving installation realize measurement circuit as shown in Figure 7.Measurement circuit shown in Figure 7 is the measurement circuit from listen mode; Under this pattern; First gathers the output signal that submodule 011 receives first equipment under test 100, and according to the test needs, first actuation sub-module 012 sends signal to first equipment under test 100; The second collection submodule 021 will be gathered the data that first actuation sub-module 012 sends simultaneously, keep watch on the data that proving installation is sent.This pattern is on the basis of communication pattern, utilizes second to gather the inside collection of submodule 021 completion for first actuation sub-module 012, realizes the function of monitoring certainly for excited data, guarantees to send the validity of data.
The another kind of proving installation that the embodiment of the invention provides; Can also comprise: the 5th handover module; Be used for when receiving user's the 5th control signal, making first K switch 1, second switch K2, the 3rd K switch 3, the 4th K switch 4, the 5th K switch 5 and the 6th K switch 6 closures, and make that minion is closed K7, octavo closes K8 and the 9th K switch 9 is broken off.The 5th handover module can make proving installation realize measurement circuit as shown in Figure 8.Measurement circuit shown in Figure 8 is the measurement circuit of monitor module, and under this pattern, proving installation is fully operational in the pattern that the third party keeps watch on, and signal is not carried out any change.This moment, proving installation provided by the present invention was serially connected in respectively in two unidirectional signal paths, and acquisition module is gathered the signal in this path.
Each embodiment in this instructions all adopts the mode of going forward one by one to describe, and identical similar part is mutually referring to getting final product between each embodiment, and each embodiment stresses all is the difference with other embodiment.Need to prove; In this article; Relational terms such as first and second grades only is used for an entity or operation are made a distinction with another entity or operation, and not necessarily requires or hint relation or the order that has any this reality between these entities or the operation.
The above only is an embodiment of the present invention; Should be pointed out that for those skilled in the art, under the prerequisite that does not break away from the principle of the invention; Can also make some improvement and retouching, these improvement and retouching also should be regarded as protection scope of the present invention.

Claims (7)

1. proving installation; It is characterized in that, comprising: first gathers submodule, second gathers submodule, first actuation sub-module, second actuation sub-module, first switch, second switch, the 3rd switch, the 4th switch, the 5th switch, the 6th switch, minion pass, octavo pass and the 9th switch;
The input end of the said first collection submodule is connected with first end of said first switch; Second end of said first switch is first signal input part of said proving installation; The output terminal of the said first collection submodule closes through said octavo and is connected with the input end of said second actuation sub-module; The output terminal of said second actuation sub-module is connected with first end of said the 5th switch, and second end of said the 5th switch is the secondary signal output terminal of said proving installation;
The input end of the said second collection submodule is connected with first end of said the 4th switch; Second end of said the 4th switch is the secondary signal input end of said proving installation; The output terminal of the said second collection submodule is connected with the input end of said first actuation sub-module through said the 9th switch; The output terminal of said first actuation sub-module is connected with first end of said second switch, and second end of said second switch is first signal output part of said proving installation;
Also be connected with said the 3rd switch between the input end of the said first collection submodule and the output terminal of said first actuation sub-module; Said first actuation sub-module and said second is gathered and also is connected with said minion pass between the submodule, also is connected with said the 6th switch between said second collection submodule and said second actuation sub-module.
2. proving installation according to claim 1; It is characterized in that; Said proving installation also comprises: first handover module; Be used for when receiving user's first control signal, making said the 3rd switch and said the 6th switch closure, and said first switch, said second switch, said the 4th switch, said the 5th switch, said minion pass, said octavo pass and said the 9th switch are broken off.
3. proving installation according to claim 1; It is characterized in that; Said proving installation also comprises: second handover module; Be used for when receiving user's second control signal, making said first switch, said second switch, said the 4th switch and said the 5th switch closure, and said the 3rd switch, said the 6th switch, said minion pass, said octavo pass and said the 9th switch are broken off.
4. proving installation according to claim 1; It is characterized in that; Said proving installation also comprises: the 3rd handover module; Be used for when receiving user's the 3rd control signal, making said first switch, said second switch, said the 4th switch, said the 5th switch, said octavo to close and said the 9th switch closure, and make said the 3rd switch, said the 6th switch and said minion close disconnection.
5. proving installation according to claim 1; It is characterized in that; Said proving installation also comprises: the 4th handover module; It is closed to be used for when receiving user's the 4th control signal, making said first switch, said second switch and said minion to close, and said the 3rd switch, said the 4th switch, said the 5th switch, said the 6th switch, said octavo are closed and the disconnection of said the 9th switch.
6. proving installation according to claim 1; It is characterized in that; Said proving installation also comprises: the 5th handover module; Be used for when receiving user's the 5th control signal, making said first switch, said second switch, said the 3rd switch, said the 4th switch, said the 5th switch and said the 6th switch closure, and said minion pass, said octavo pass and said the 9th switch are broken off.
7. proving installation according to claim 1 is characterized in that, said octavo is closed and the 9th switch is a logic switch.
CN201210088974.0A 2012-03-29 2012-03-29 Testing device Active CN102608469B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210088974.0A CN102608469B (en) 2012-03-29 2012-03-29 Testing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210088974.0A CN102608469B (en) 2012-03-29 2012-03-29 Testing device

Publications (2)

Publication Number Publication Date
CN102608469A true CN102608469A (en) 2012-07-25
CN102608469B CN102608469B (en) 2014-08-13

Family

ID=46525990

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210088974.0A Active CN102608469B (en) 2012-03-29 2012-03-29 Testing device

Country Status (1)

Country Link
CN (1) CN102608469B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107276692A (en) * 2017-06-28 2017-10-20 东莞华贝电子科技有限公司 A kind of NFC function test device

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05264627A (en) * 1992-03-18 1993-10-12 Fujitsu Ltd Unit testing device
EP0710910A2 (en) * 1994-11-03 1996-05-08 Motorola, Inc. Integrated test and measurement means and method employing a graphical user interface
CN101089934A (en) * 2006-06-16 2007-12-19 胜华科技股份有限公司 Display module circuit capable of switching detection and drive function
CN201364376Y (en) * 2008-12-16 2009-12-16 苏州科技学院 Relay automatic testing device
CN101629979A (en) * 2008-07-15 2010-01-20 中芯国际集成电路制造(上海)有限公司 Testing device
CN102023263A (en) * 2009-09-15 2011-04-20 无锡华润矽科微电子有限公司 Detection system of piezoelectric material
CN102169150A (en) * 2010-12-30 2011-08-31 芯通科技(成都)有限公司 Parallel test system based on matrix switch
CN102175948A (en) * 2011-01-28 2011-09-07 中兴通讯股份有限公司 Physical line parameter testing device, method and single board equipment
WO2012002199A1 (en) * 2010-06-28 2012-01-05 シャープ株式会社 Active matrix substrate, display device, and method for testing the active matrix substrate or the display device

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH05264627A (en) * 1992-03-18 1993-10-12 Fujitsu Ltd Unit testing device
EP0710910A2 (en) * 1994-11-03 1996-05-08 Motorola, Inc. Integrated test and measurement means and method employing a graphical user interface
CN101089934A (en) * 2006-06-16 2007-12-19 胜华科技股份有限公司 Display module circuit capable of switching detection and drive function
CN101629979A (en) * 2008-07-15 2010-01-20 中芯国际集成电路制造(上海)有限公司 Testing device
CN201364376Y (en) * 2008-12-16 2009-12-16 苏州科技学院 Relay automatic testing device
CN102023263A (en) * 2009-09-15 2011-04-20 无锡华润矽科微电子有限公司 Detection system of piezoelectric material
WO2012002199A1 (en) * 2010-06-28 2012-01-05 シャープ株式会社 Active matrix substrate, display device, and method for testing the active matrix substrate or the display device
CN102169150A (en) * 2010-12-30 2011-08-31 芯通科技(成都)有限公司 Parallel test system based on matrix switch
CN102175948A (en) * 2011-01-28 2011-09-07 中兴通讯股份有限公司 Physical line parameter testing device, method and single board equipment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107276692A (en) * 2017-06-28 2017-10-20 东莞华贝电子科技有限公司 A kind of NFC function test device

Also Published As

Publication number Publication date
CN102608469B (en) 2014-08-13

Similar Documents

Publication Publication Date Title
CN104348673A (en) Debugging and testing method, main control board and business boards
CN208849773U (en) A kind of beam splitting system based on the control of light on-off
CN203434992U (en) Networking protocol serial port test device
CN102608469B (en) Testing device
CN206861999U (en) A kind of intelligent refrigerator for being integrated with NB IoT modules
CN202677114U (en) Industrial control main board based on MSP430 single chip microcomputer
CN203287403U (en) Signal wiring device
CN208314760U (en) A kind of communication system and conversion circuit
CN105319453B (en) A kind of environment protection digital Acquisition Instrument test device and system
CN202735421U (en) Metering automation intelligent terminal testing device
CN106410962B (en) Mechanical DC breaker controller
CN205015883U (en) Multichannel serial ports debugging device
CN207337389U (en) A kind of computer monitoring circuit and desktop computer
CN208797919U (en) A kind of circuit with multimode detection function
CN209072482U (en) Novel slave mode RS485 telecommunication circuit and its measuring instrument
CN208953913U (en) Dsp chip selection circuit, device, control system and electrical equipment
CN103346894B (en) Chip chamber interface conversion circuit and the network equipment
CN101937665B (en) Method for enhancing sharing of printed circuit board of display
CN204291011U (en) A kind of gigabit Ethernet switching device shifter
CN204304962U (en) The ON-OFF control circuit of power device
CN203812009U (en) Instrument communication serial port multiplex control device
CN203788286U (en) Distribution network switcher with function of optical fiber bypass
CN102413001A (en) Intelligent BYPASS system
CN204203665U (en) Electronic equipment
CN204302699U (en) A kind of control system being realized the control of touch-screen One screen multi-machine by short circuit port

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 4 / F, building 1, No.14 Jiuxianqiao Road, Chaoyang District, Beijing 100020

Patentee after: Beijing Jingwei Hirain Technologies Co.,Inc.

Address before: 100101 Beijing city Chaoyang District Anxiang Beili 11 B block 8 layer

Patentee before: Beijing Jingwei HiRain Technologies Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20230531

Address after: 100192 5th floor, Zhizhen building, 7 Zhichun Road, Haidian District, Beijing

Patentee after: BEIJING RUNKE GENERAL TECHNOLOGY Co.,Ltd.

Address before: 4 / F, building 1, No.14 Jiuxianqiao Road, Chaoyang District, Beijing 100020

Patentee before: Beijing Jingwei Hirain Technologies Co.,Inc.