CN1025799C - Displacement grouting process for aven shaft sinking through quick sand layer - Google Patents

Displacement grouting process for aven shaft sinking through quick sand layer Download PDF

Info

Publication number
CN1025799C
CN1025799C CN 90109990 CN90109990A CN1025799C CN 1025799 C CN1025799 C CN 1025799C CN 90109990 CN90109990 CN 90109990 CN 90109990 A CN90109990 A CN 90109990A CN 1025799 C CN1025799 C CN 1025799C
Authority
CN
China
Prior art keywords
hole
boring
shaft
sand
sand layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 90109990
Other languages
Chinese (zh)
Other versions
CN1051226A (en
Inventor
原振德
郭廷瑞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CONSTRUCTION DEPARTMENT OF HEBI COAL MINE ADMINISTRATION
Original Assignee
CONSTRUCTION DEPARTMENT OF HEBI COAL MINE ADMINISTRATION
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CONSTRUCTION DEPARTMENT OF HEBI COAL MINE ADMINISTRATION filed Critical CONSTRUCTION DEPARTMENT OF HEBI COAL MINE ADMINISTRATION
Priority to CN 90109990 priority Critical patent/CN1025799C/en
Publication of CN1051226A publication Critical patent/CN1051226A/en
Application granted granted Critical
Publication of CN1025799C publication Critical patent/CN1025799C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The present invention relates to a displacement grouting process which makes water-bearing running sand extruded from the lower part of a shaft during the constructing progress by a drilling method. Space capable of supporting for certain time, and prepared slurry is grouted under pressure. The space of quick sand layers is quickly filled to make the space gradually formed into cement curtain shielding rock body by artificially built to prevent the water and quick sand from invading when the shafts are dug. No water shaft digging construction is carried out in the displacing section of quick sand layers to ensure the construction quality of a vertical shaft. The shaft forming cost is only about 50% of special shaft digging methods, such as freezing method, boring method, etc. The engineering average advance is improved.

Description

Displacement grouting process for aven shaft sinking through quick sand layer
The invention belongs to a kind of mine job practices, be applicable to the construction of shaft of vertical well table soil drifting sand layer.
Shaft of vertical well is the key project in the mine construction, and its speed of application and construction costs have appreciable impact to the technical economic benefit of whole mine construction.At present, in shaft mineshaft construction, the construction problem of ubiquity thick surface soil drifting sand layer, the existence of drifting sand layer has had a strong impact on shaft mineshaft construction, and the group's phenomenon of collapsing often occurs, for this reason, need to adopt the jus singular construction, at present general special sinking has freezing process, boring method, drop shaft sinking, but that these methods all exist is long in time limit, problems such as equipment complexity, cost height.
The principle of the displacement grouting process for aven shaft sinking through quick sand layer that the present invention proposes is: adopt common shaft mineshaft construction method, near pit shaft is dug drifting sand layer, drill with press water or to utilize confined flow layer of sand self pressure that quicksand is gone out layer of sand with water external, vacate certain space, again cement paste is pressed into, solidifies calculus rapidly.Drifting sand layer is replaced as artificial cement calculus body curtain gradually around the pit shaft, to occur quicksand and water intrusion pit shaft and the borehole wall group of collapsing in the quicksand interval sinking shaft construction dangerous thereby eliminated, and guaranteed normal pit shaft driving and masonry construction.
The objective of the invention is to design a kind of shaft mineshaft construction method that adopts common grouting method to cross the aqueous stream layer of sand.
The concrete grammar step of the displacement grouting process for aven shaft sinking through quick sand layer that the present invention proposes is:
1. in the shaft mineshaft construction process, build grout cover on the coagulation in the wellbore bottom of shaft excavation during to distance aqueous stream layer of sand 2-6m.
2. around the pit shaft of grout cover upper edge, arrange replacement grouting boring, boring is radially outward tilted 0-20 ° along pit shaft, the boring optimum incline angle is 10 °-12 °, bore diameter is preferably 30-50mm, each all orifice tube of mounting strap valve of holing, orifice tube can be embedded in the grout cover when the building grout cover, or directly installs when boring.The symmetric arrangement in batches of holing, first four holes are arranged at interval by 90 °, insert in the middle of the neutral gear in first hole by 30 ° of intervals in second batch of eight hole, and the like cloth hole in batches, till the drifting sand layer in borehole wall scope is by displacement and consolidation.
3. under the situation of meeting non-pressure-bearing aqueous stream layer of sand, adopt diplopore or porous to bore injecting method, two borings of subdrilling or a plurality of boring in the boring of each batch layout, after boring arrives drifting sand layer or a little and enters drifting sand layer, drilling tool in the boring is proposed, water under high pressure is injected in one of them boring, a certain amount of quicksand is gone out from another boring or other several borings, each replacement amount is preferably 1.5-2m 3, close the orifice tube valve that sediment outflow is holed then, connect Grouting Pipe and inject cement grout to water injecting drilling, grouting amount is no less than boring sediment outflow amount.After finishing, slip casting closes the orifice tube valve of injected hole, after treating that cement paste is fixed, this injected hole and another or in addition several clearance holes are continued to creep into downwards, pass artificial calculus body and pierce drifting sand layer, carry out the brill of next same step that circulates and annotate construction, Using such method is replaced layer of sand piecemeal downwards, until this inlet well no longer till the water outlet.Under the situation that runs into the pressure-bearing aquifer sand layer, adopt single hole to bore injecting method, the notes construction is bored in the boring of each batch layout one by one, when boring is got into drifting sand layer or a little and is entered drifting sand layer, drilling tool in the hole is proposed, allow a certain amount of quicksand from this boring, spray voluntarily after, connect the high-pressure slip-casting sebific duct and carry out the slip casting first time, grouting amount is no less than this boring sediment outflow amount, and each replacement amount is preferably 1.5-2m 3Close the orifice tube valve of boring then, when treating the fixed back of cement grout or opening valve not return slurry, continue to creep into downwards, pass artificial calculus body, pierce in the drifting sand layer, begin to carry out the brill notes construction of next same step that circulates, Using such method is replaced quicksand downwards piecemeal till this holes no longer water outlet.
4. after treating that whole injected holes are rendered as dry hole, can be in the direction of the clock one by one the hole carry out packer permeability test, its force value generally equals or a little hydrostatic pressure greater than this stratomere, if this hole water-tight and close on the hole do not have go here and there not phenomenon be qualified, if there is the water outlet phenomenon to need the after-teeming slurries, after treating that injected hole is checked one time one by one, promptly finish the replacement grouting of this drifting sand layer, make a call to the slip casting effect that this section checked in core drill hole, a large aperture in wellbore centre then, and prolong hole depth to next quicksand interval, grope next section stratum occurrence condition.
The displacement grouting process for aven shaft sinking through quick sand layer that the present invention proposes is that shaft construction has increased a kind of new method again, solved shaft of vertical well effectively and adopted the technical barrier of slip casting method by drifting sand layer, adopt this replacement grouting method can make pit shaft estimate downwards to excavate the position and all around 80% quicksand in the drifting sand layer replaced by cement paste calculus body, some part forms the alternation of bed body of cement and dry sand, even the soil layer of layer of sand top board makes whole slip casting section form a firm integral body also by crisscross cement paste intrusion.Quicksand and phreatic intrusion have not only thoroughly been stopped, and improved the intensity of country rock around the pit shaft, in the displacement section of drifting sand layer, realized anhydrous sinking shaft construction, guaranteed the shaft mineshaft construction quality, and becoming the well cost is 50% of freezing process, boring method, and the engineering average advance also increases.
Accompanying drawing 1 non-pressure-bearing aqueous stream layer of sand replacement grouting method schematic diagram
Accompanying drawing 2 pressure-bearing aqueous stream layer of sand replacement grouting method schematic diagrames
Accompanying drawing 3 injected holes are arranged and the replacement grouting plan view
Accompanying drawing 4 shaft of vertical well tables soil section replacement grouting driving and masonry construction sectional drawing
The present invention will be further described with embodiment below in conjunction with accompanying drawing:
Replacement grouting is to use press water will construct loose in the pit shaft understratum, it is external to meet the promptly mobile stratification sand grains extruding discharge layer of sand of water, if when running into pressure-bearing aqueous stream layer of sand, then need not setting-out, lean on the pressure of drifting sand layer self to make the quicksand ejection, thereby vacate the space that to support certain hour, again the cement grout pressurization for preparing is injected, be full of the space of drifting sand layer as early as possible, form the artificial cement curtain protection rock mass of building gradually, quicksand and phreatic intrusion when preventing wellbore excavation.
For safety and prevention slurries spray in the pit shaft, at shaft mineshaft construction during near drifting sand layer, build a concrete grout cover 2 in wellbore bottom, the position of grout cover 2 preferably is chosen in apart from layer of sand top 1.5-2m, adopt plain concrete construction, as shown in Figure 1, all around a little more than the pit shaft middle part, be convenient to gather trickle among the central water nest above it.The arrow degree height of bottom generally has 0.3-0.5m to get final product, and is convenient to make pressure to be delivered on the borehole wall 1, alleviates grout cover 2 and directly accepts pressure load, lean outward 10 ° of gradients of grout cover 2; Maximum ga(u)ge is 1.5m, is 0.5m in the borehole wall wherein.
The grout cover building is finished and is closed, around the pit shaft of grout cover upper edge, arrange inlet well, in order to make slurries around the pit shaft borehole wall, form effective firm curtain protection body together as far as possible, as close as possible borehole wall when injected hole is arranged, the boring gradient that leans outward is 10 °-12 °, the waste outer 0.5-2m in footpath of the borehole wall is dropped in the position at the bottom of the hole, makes the artificial calculus body 7 after the displacement be truncated cone shape, as shown in Figure 4.In the construction in order to grasp slurries range of scatter and each slip casting effect in layer of sand, inlet well is symmetric arrangement in batches, second batch of eight hole arranged in first four holes at interval by 90 °, insert in the middle of the neutral gear in first hole by 30 ° of intervals, the rest may be inferred divides gradually and pulls on the hole, dwindles pitch-row, till the drifting sand layer in borehole wall scope is by displacement and consolidation, general pitch-row is preferably 0.3-0.5m, and bore arrangement mode as shown in Figure 3.
In boring the notes construction, should select optimal displacement sand amount according to the maximum unsettled condition of quicksand top board soil layer.If a replacement amount is too small, then increase back and forth to bore and annotate number of times, prolonged the engineering time, if a replacement amount is excessive, then the outstanding ability in layer of sand top board place is not enough, in the not i.e. slump of slip casting as yet, certainly will increase the difficulty of slip casting, each replacement amount is preferably 1.5-2m 3, each hole from start to end, general reciprocal brill is annotated number of times and can be reached 6-20 time.During the construction of brill notes, under the situation that runs into non-pressure-bearing aqueous stream layer of sand 6, adopt diplopore or porous to bore the notes method, one of them hole is individual to be setting-out and injected hole, and another boring or other several borings are clearance hole, as shown in Figure 1.Under the situation that runs into pressure-bearing aqueous stream layer of sand 8, adopt single hole to bore the notes method, when drill bit contact layer of sand or a little enter in the layer of sand, present artesian condition in the layer, drilling tool 5 is proposed, allow the water sand blasting go out 1-2m 3After close valve 4 on the orifice tube 3 again, pressure injection cement paste in the hole then, after the end of brill notes waits 2-4 hour cement paste to solidify for the first time, or open valve and do not return when starching, can carry out boring the second time and annotate, back and forth bore so again and again and annotate, as shown in Figure 2, deepening is to the layer of sand base plate always, and no longer till the water outlet sand, the hole of having finished should occur with emptying aperture in this hole, when etc. late water when string slurry phenomenon appears in local pressure break when infiltration occurring or closing on boring slip casting, again cleaning bottom of hole slip casting has water sand person must sweep out multiple notes in all injected holes, can finish until whole injected hole presents the dry hole shape.
The orifice tube 3 of boring and valve 4 can be pre-buried when the building grout cover, also can install when drilling.Being separated by nearer quicksand for multilayer can the construction of shared grout cover brill notes.
Final grouting pressure determine to depend on the condition of being annotated the space because replacement grouting transposition mutually basically, pressure does not need excessive can achieving the goal.Sand grains is very wide with the water institute's formation scope that flows under hydraulic action, if it is reverse and the diffusion slurries can reach several kilometers far away to move direction along waterpower, each final grouting pressure is controlled at 1.5-20MP Q, no matter whether final pressure reaches, and promptly should stop to annotate as long as whole volume index reaches standard, its objective is that controlling slurries piles up thickening gradually in the not far place of distance pit shaft, forms effectively desirable artificial cement calculus body 7, thereby replaces drifting sand layer.
After treating that whole injected holes are rendered as dry hole, promptly in the direction of the clock one by one the hole carry out packer permeability test, its force value generally equals or a little hydrostatic pressure greater than this stratomere, if this hole water-tight or close on the hole do not have string water phenomenon be qualified, otherwise still need after-teeming, after treating that injected hole is checked one time one by one, promptly finish this section slip casting.Make a call to an aperture 90mm boring and coring in wellbore centre then and check this section slip casting effect, and prolong hole depth, grope next section stratum occurrence condition, be the replacement grouting construction proposition geologic data of next drifting sand layer to next slip casting section.

Claims (8)

1, a kind of displacement grouting process for aven shaft sinking through quick sand layer is characterized in that:
(1) in the shaft mineshaft construction process, builds a concrete in the wellbore bottom of shaft excavation to the time and only starch gesture 2 apart from aqueous stream layer of sand 2-6m;
(2) around the pit shaft of grout cover upper edge, arrange inlet well, the relative pit shaft of holing radially outward tilts 0-20 °, the symmetric arrangement in batches of holing, second batch of eight hole arranged in first four holes at interval by 90 °, insert in the middle of the neutral gear in first hole by 30 ° of intervals, and the like cloth hole in batches, dwindle pitch-row gradually, till the drifting sand layer in the borehole wall 1 scope is by displacement and consolidation;
(3) under the situation of non-pressure-bearing aqueous stream layer of sand 6, adopt diplopore or porous to bore injecting method, two borings of subdrilling or a plurality of boring in the boring of each batch layout, when boring arrives drifting sand layer or a little and enters drifting sand layer, drilling tool 5 is proposed, in one of them boring, annotate water under high pressure, a certain amount of sulphur sand is rushed out from another hole or in addition several outer boring, close the valve 4 on the orifice tube 3 of sediment outflow boring then, inject cement paste in water injection hole, grouting amount is no less than boring sediment outflow amount, closes the orifice tube valve of injected hole behind the intact silk of slip casting, treat that cement grout is fixed and close, this injected hole and another or in addition several clearance holes are continued to creep into downwards, pass cement calculus body 7 and pierce drifting sand layer, carry out the brill of next same step that circulates and annotate construction, Using such method is replaced quicksand piecemeal downwards, until this inlet well no longer till the water outlet sand;
(4) under the situation of pressure-bearing aqueous stream layer of sand 8, adopt single hole to bore injecting method, the notes construction is bored in the boring of each batch layout one by one, when boring is got into drifting sand layer or a little and is entered drifting sand layer, drilling tool 5 is proposed, after allowing the quicksand of some spray from this boring, connect Grouting Pipe and carry out injecting the first time cement paste, grouting amount is no less than boring sediment outflow amount, close the drilling orifice tube valve then, treat that cement grout solidifies the back or opens valve when not returning slurry, continue to creep into downwards, pass cement calculus body 7, pierce in the drifting sand layer, carry out the brill of next same step that circulates and annotate construction, Using such method is replaced quicksand piecemeal downwards, till this holes no longer water outlet sand;
(5) treat that whole injected holes are rendered as dry hole after, promptly in the direction of the clock one by one the hole carry out packer permeability test, its force value generally equals or a little hydrostatic pressure greater than this stratomere, if this hole water-tight or close on the hole do not have string water phenomenon be qualified, annotate otherwise still need replenish to bore, after treating that injected hole is checked one time one by one, promptly finish the replacement grouting work of this drifting sand layer.
2, a kind of displacement grouting process for aven shaft sinking through quick sand layer as claimed in claim 1 is characterized in that bore diameter is 30-50mm, and dip angle of hole is 10 °-12 °, and pitch-row is 0.3-0.5m.
3, a kind of as claim 1 and 2 described displacement grouting process for aven shaft sinking through quick sand layer, it is characterized in that each each quicksand replacement amount of holing is 1.5-2m 3
CN 90109990 1990-12-18 1990-12-18 Displacement grouting process for aven shaft sinking through quick sand layer Expired - Fee Related CN1025799C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 90109990 CN1025799C (en) 1990-12-18 1990-12-18 Displacement grouting process for aven shaft sinking through quick sand layer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 90109990 CN1025799C (en) 1990-12-18 1990-12-18 Displacement grouting process for aven shaft sinking through quick sand layer

Publications (2)

Publication Number Publication Date
CN1051226A CN1051226A (en) 1991-05-08
CN1025799C true CN1025799C (en) 1994-08-31

Family

ID=4881706

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 90109990 Expired - Fee Related CN1025799C (en) 1990-12-18 1990-12-18 Displacement grouting process for aven shaft sinking through quick sand layer

Country Status (1)

Country Link
CN (1) CN1025799C (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101818644A (en) * 2010-05-14 2010-09-01 北京中煤矿山工程有限公司 Well digging process of mining vertical shaft by adopting one-drilling well completion and well drilling method

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1043483C (en) * 1994-07-30 1999-05-26 海勃湾矿务局基本建设第一工程处 Open caisson method of inclined shaft
CN100363560C (en) * 2005-11-15 2008-01-23 陈玉恒 Method for treating collapsed road surface around inspection-pit for underground lines
CN102108869B (en) * 2010-12-30 2012-09-05 山东科技大学 Grout stop pad construction method for kilometer vertical shaft grouting for water control
CN102536247B (en) * 2010-12-30 2014-07-30 中国华冶科工集团有限公司 Construction method of still-water cement grout pad
CN104060992B (en) * 2014-06-18 2016-03-09 天地科技股份有限公司 Extended slurry displacement mud device in construction freezing method
CN105927231B (en) * 2016-05-24 2018-06-29 中国矿业大学 Circulating induction curtain grouting method for inclined shaft to pass through water-rich compact quicksand layer
CN108506020A (en) * 2017-07-06 2018-09-07 中铁十八局集团有限公司 A kind of huge loose U-shaped curtain concretion method of talus earth's surface foam slip casting of tunnel entrance
CN109611098A (en) * 2019-01-18 2019-04-12 马钢集团矿业有限公司 A kind of shaft of vertical well quick freezing method under the conditions of deep layer runoff water is larger
CN110847911A (en) * 2019-10-16 2020-02-28 河北钢铁集团矿业有限公司 Vertical shaft tunneling construction method for passing through thin quicksand layer
CN113027462B (en) * 2021-05-06 2023-11-24 万宝矿产有限公司 Reinforcing method for shaft penetrating through weak surrounding rock
CN114108639B (en) * 2021-11-17 2023-06-20 上海市机械施工集团有限公司 Construction method for foundation pit bottom sealing

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101818644A (en) * 2010-05-14 2010-09-01 北京中煤矿山工程有限公司 Well digging process of mining vertical shaft by adopting one-drilling well completion and well drilling method

Also Published As

Publication number Publication date
CN1051226A (en) 1991-05-08

Similar Documents

Publication Publication Date Title
CN108999634B (en) Surface drilling realizes that a hole of water damage prevention and treatment and surface settlement control is mostly used method
CN100591866C (en) Drifting sand layer and gravel stratum water-moving double-liquid high pressure slip-casting water-blocking construction method
CN101962949B (en) Long spiral double-pipe high-pressure stir-jet grouting pile construction method and device
CN101260669B (en) Drilling, spraying, injection integral enlarging anchor rod construction method
CN1025799C (en) Displacement grouting process for aven shaft sinking through quick sand layer
CN108999195B (en) It is a kind of block the larger water burst of deep-foundation side wall stratum in the safe grouting construction process of step heap weir formula
CN107816051B (en) Pressure-bearing property phreatic aquifer deep basal pit combination well dewatering construction method
CN1657711A (en) Rotary spray anchoring pile construction process
CN112324337A (en) Whole-process gas extraction method for through-layer top comb-shaped drilling of bottom plate of soft coal seam
CN114233385B (en) Treatment method for mud-bursting water of inclined shaft
CN100387790C (en) Ground caisson construction technology and ground caisson
CN111119128B (en) Danger-removing, reinforcing and seepage-proofing method for natural rock-fill dam of barrier lake
CN103233469A (en) Process and device for rotating and extending pile and slurry feed device
CN1236146C (en) Method and apparatus for forming shaped pile by drilling, high-pressure letting to enlarge hole and pressure pouring of concrete
CN106677166A (en) Flow construction method for forming cast-in-place bored pile for gravel-decomposed rock stratum in double-machine combined mode
CN104711973A (en) Construction method for small-diameter pile composite foundation
CN108867673A (en) A kind of underwater prevention method in the foundation pit based on the curtain that draws water
CN108049397A (en) The construction method of Karst Geological Landscape drilled pile
CN213233469U (en) Triaxial down-the-hole impact high-pressure jet grouting equipment
CN111042820B (en) Construction method for sand layer with oversized pilot hole by vertical shaft raise-shaft method
CN201649093U (en) Long spiral dual-pipe high-pressure stirring-spraying pile construction device
CN111411639B (en) Shallow foundation pit dewatering construction method for water-rich pebble layer
CN100485132C (en) Formative method for row-pile style water-proof wall underground
CN1142344C (en) Grouting equipment and pile making process of pump-grouting concrete
CN1042158C (en) Injecting method for steel rod concrete prefabricated pile end

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee