CN102556683A - 一种铝土矿原料堆场的综合布置方法 - Google Patents

一种铝土矿原料堆场的综合布置方法 Download PDF

Info

Publication number
CN102556683A
CN102556683A CN2010106050561A CN201010605056A CN102556683A CN 102556683 A CN102556683 A CN 102556683A CN 2010106050561 A CN2010106050561 A CN 2010106050561A CN 201010605056 A CN201010605056 A CN 201010605056A CN 102556683 A CN102556683 A CN 102556683A
Authority
CN
China
Prior art keywords
ore
rear end
arrangement method
comprehensive arrangement
transfer point
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2010106050561A
Other languages
English (en)
Inventor
肖宁超
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Original Assignee
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guiyang Aluminum Magnesium Design and Research Institute Co Ltd filed Critical Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority to CN2010106050561A priority Critical patent/CN102556683A/zh
Publication of CN102556683A publication Critical patent/CN102556683A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Manufacture And Refinement Of Metals (AREA)

Abstract

本发明公开了一种铝土矿原料堆场的综合布置方式,包括矿石卸矿***(1),矿石卸矿***(1)和矿石破碎***(2)通过皮带传输连接起来设置在矿石露天堆场(4)的一侧,矿石均化库(5)设置在矿石露天堆场(4)的另一侧;矿石破碎***(2)的后端连接有第一转运站(31),矿石露天堆场(4)的后端连接有第二转运站(32),矿石均化库(5)的后端连接有第三转运站(33),三个转运站通过皮带传输相互连接在一起。本发明的布局紧凑,使得用地面积、道路铺砌面积、管网铺设长度比分开布局要节约10%以上,可大幅降低工程基建投资。

Description

一种铝土矿原料堆场的综合布置方法
技术领域
本发明涉及一种铝土矿的布置方法。
背景技术
在氧化铝的生产中,铝土矿原料通过运输设备从矿山运输到工厂,一般会堆放到原料堆场中,并对块状的矿石进行破碎,达到磨矿生产设施容许的粒度,满足生产要求的矿石还要堆放在均化仓库内进行混合均化,使一定时间段的矿石的含矿品位波动在一定的允许范围内,从而保证生产的正常进行。
在通常的原料堆场布局中,矿石卸矿***、矿石破碎***、矿石露天堆场和矿石均化库被分散布置在厂区不同位置,再通过输送皮带及转运站依次连接起来,这种布置方法使得厂区用地面积加大,道路铺砌面积和管线铺设长度相应增加,工厂基建投资和生产运营成本上升。
发明内容
本发明所要解决的技术问题是,提供一种更为合理的铝土矿原料堆场的综合布置方式,可以节约工厂用地,减少道路铺砌面积和管线铺设长度,降低工程基建投资和生产运营成本,以克服现有技术中的不足,。
本发明的技术方案:包括矿石卸矿***,矿石卸矿***和矿石破碎***通过皮带传输连接起来设置在矿石露天堆场的一侧,矿石均化库设置在矿石露天堆场的另一侧;矿石破碎***的后端连接有第一转运站,矿石露天堆场的后端连接有第二转运站,矿石均化库的后端连接有第三转运站,三个转运站通过皮带传输相互连接在一起。
矿石卸矿***、矿石露天堆场和矿石均化库相互平行布置。
与现有技术相比,本发明的布局紧凑,使得用地面积、道路铺砌面积、管网铺设长度比分开布局要节约10%以上,可大幅降低工程基建投资。使用时,将矿石在矿石卸矿***卸载,再通过皮带传输到矿石破碎***进行破碎,达到磨矿生产设施容许的粒度后通过第一、第三转运站直接进入矿石均化库堆放或均化,无须像常规的原料堆场那样经由矿石露天堆场中转,从而降低了生产运营成本。当矿石均化库的库容已满时,后来的破碎后的矿石将通过第二转运站输送到矿石露天堆场堆放;在生产需要时,再通过第二、第三转运站将矿石输送到矿石均化库内进行均化。
附图说明
附图1为本发明的布置示意图。
具体实施方式
本发明的实施例:先建制矿石露天堆场4,再在其两侧分别平行建制矿石卸矿***1、矿石破碎***2和矿石均化库5。在矿石破碎***2的后端建制第一转运站31,矿石露天堆场4的后端建制第二转运站32,矿石均化库5的后端建制第三转运站33,***与库及三个转运站通过皮带传输相互连接在一起。

Claims (2)

1.一种铝土矿原料堆场的综合布置方式,包括矿石卸矿***(1),其特征在于:矿石卸矿***(1)和矿石破碎***(2)通过皮带传输连接起来设置在矿石露天堆场(4)的一侧,矿石均化库(5)设置在矿石露天堆场(4)的另一侧;矿石破碎***(2)的后端连接有第一转运站(31),矿石露天堆场(4)的后端连接有第二转运站(32),矿石均化库(5)的后端连接有第三转运站(33),三个转运站通过皮带传输相互连接在一起。
2.根据权利要求1所述的原料堆场的综合布置方式,其特征在于:矿石卸矿***(1)、矿石露天堆场(4)和矿石均化库(5)相互平行布置。
CN2010106050561A 2010-12-26 2010-12-26 一种铝土矿原料堆场的综合布置方法 Pending CN102556683A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010106050561A CN102556683A (zh) 2010-12-26 2010-12-26 一种铝土矿原料堆场的综合布置方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010106050561A CN102556683A (zh) 2010-12-26 2010-12-26 一种铝土矿原料堆场的综合布置方法

Publications (1)

Publication Number Publication Date
CN102556683A true CN102556683A (zh) 2012-07-11

Family

ID=46403580

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010106050561A Pending CN102556683A (zh) 2010-12-26 2010-12-26 一种铝土矿原料堆场的综合布置方法

Country Status (1)

Country Link
CN (1) CN102556683A (zh)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4973219A (en) * 1986-04-30 1990-11-27 Sea-Land Corporation Grid rail container transport and storage system
JPH11278616A (ja) * 1998-03-27 1999-10-12 Nippon Steel Corp 自動荷繰りシステム及びこれに適用する自動荷繰り計画プログラムを記録したコンピュータ読み取り可能な記録媒体
CN2801723Y (zh) * 2005-03-30 2006-08-02 贵阳铝镁设计研究院 大跨度高台阶输送装置
CN101450809A (zh) * 2007-11-29 2009-06-10 贵阳铝镁设计研究院 一种原料堆场的布置方式
DE102008036067A1 (de) * 2008-08-04 2010-02-18 Heinz Buse Logistiksystem

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4973219A (en) * 1986-04-30 1990-11-27 Sea-Land Corporation Grid rail container transport and storage system
JPH11278616A (ja) * 1998-03-27 1999-10-12 Nippon Steel Corp 自動荷繰りシステム及びこれに適用する自動荷繰り計画プログラムを記録したコンピュータ読み取り可能な記録媒体
CN2801723Y (zh) * 2005-03-30 2006-08-02 贵阳铝镁设计研究院 大跨度高台阶输送装置
CN101450809A (zh) * 2007-11-29 2009-06-10 贵阳铝镁设计研究院 一种原料堆场的布置方式
DE102008036067A1 (de) * 2008-08-04 2010-02-18 Heinz Buse Logistiksystem

Similar Documents

Publication Publication Date Title
CN103625936B (zh) 一种散料堆场的堆取料作业线布置结构及堆取工艺
CN205771846U (zh) 一种红土镍矿原料皮带输送***结构
CN105502029A (zh) 散装物料输送、转运和装载的方法及***
Mohammadi et al. Review of in-pit crushing and conveying (IPCC) system and its case study in Copper Industry
CN201419932Y (zh) 一种料仓贯通式卸料装置
CN101450809B (zh) 一种原料堆场的布置方式
CN205204183U (zh) 反向双皮带卸料***
CN106429487B (zh) 一种最优路径输送***及其原料储存与混匀并联生产工艺
CN102556683A (zh) 一种铝土矿原料堆场的综合布置方法
CN106608510B (zh) 一种双向输送设备及其使用方法
CN202439120U (zh) 搅拌主楼及混凝土搅拌站
CN102826391A (zh) 一种用于钢铁厂混匀料堆的堆料***
CN102518943A (zh) 原矿矿浆的管道输送工艺
CN201603597U (zh) 一种移动破碎站
CN203667459U (zh) 混凝土骨料皮带输送分拣装置
CN204847413U (zh) 一种大型铝土矿堆存及输送场
CN206395489U (zh) 一种最优路径输送***
CN204453859U (zh) 一种全封闭环保型输煤装置
CN101757970A (zh) 一种移动破碎站
CN204728283U (zh) 拌合砂砾石料车
CN210084037U (zh) 一种兼顾卸料与上料的料斗布置结构
CN210884305U (zh) 一种堆场布料***
CN204777502U (zh) 一种原料运输装置
CN202807635U (zh) 一种多用自动运输线
CN202985790U (zh) 添加料***及包括该***的建筑材料制备设备

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20120711