CN102545369A - Double-power supply device for large control system - Google Patents

Double-power supply device for large control system Download PDF

Info

Publication number
CN102545369A
CN102545369A CN2010106027137A CN201010602713A CN102545369A CN 102545369 A CN102545369 A CN 102545369A CN 2010106027137 A CN2010106027137 A CN 2010106027137A CN 201010602713 A CN201010602713 A CN 201010602713A CN 102545369 A CN102545369 A CN 102545369A
Authority
CN
China
Prior art keywords
power
power supply
inserts
pas
circuit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2010106027137A
Other languages
Chinese (zh)
Inventor
沈家明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Original Assignee
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guiyang Aluminum Magnesium Design and Research Institute Co Ltd filed Critical Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority to CN2010106027137A priority Critical patent/CN102545369A/en
Publication of CN102545369A publication Critical patent/CN102545369A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Stand-By Power Supply Arrangements (AREA)

Abstract

The invention discloses a double-power supply device for a large control system. In a circuit of a main power supply device, a lightning protection system (3) is connected with a power automation system PAS (5) through an uninterruptible power supply (UPS) (1) with a battery pack (4); the power automation system PAS (5) is connected with a main power supply circuit of electric equipment; and in a circuit of a secondary power supply device, the lightning protection system (3) is connected with the power automation system PAS (5) through a variable voltage stabilization system (2) comprising a transformer and a voltage stabilizer; the power automation system PAS (5) is connected with a secondary power supply circuit of the electric equipment; and the main power supply device and the secondary power supply device are connected or disconnected through the power automation system PAS (5). When a power supply system fails, another power supply system can normally supply power to the control system; and therefore, the operation is simple, the manpower and material resources are reduced, the labor cost is saved, the working efficiency is improved, and the probability of safety accidents is greatly reduced.

Description

A kind of large-scale control system dual power supply device
Technical field
The present invention relates to a kind of large-scale control system electric supply installation.
Background technology
Along with the development of suitability for industrialized production, various large-scale control systems are widely used, and can stablize healthy operation for guaranteeing control system; Prevent to cause loss of data because of power failure; Just must provide uninterrupted power supply to supply with to control system, conventional uninterrupted power supply always has such-and-such defective, makes The whole control system healthyly fully not move; According to design experiences and field practice for many years; Invent distributing rationally of a kind of duplicate supply uninterrupted power supply, see, be worth greatly developing and promoting from the result of use at scene.
Traditional large-scale control system electric power system is shown in accompanying drawing 1, and the electric 380VAC power supply of sending here is earlier through fuse F 1 and F2 (F1 and F2 are parallel connection), through inserting lightning protection device behind the F2; Through inserting master switch DK1 behind the F1; Insert uninterrupted power supply UPS then, parallel connection inserts three-phase voltage transducer SW1 between DK1 and UPS, (in three-phase (the A1 phase among the figure of 380VAC; The B1 phase; The C1 phase) insert electric pressure converter SW1 respectively, the termination that goes out of SW1 is gone into voltmeter V1, and purpose is to detect whether voltage between phases is 220VAC).UPS is two sections outlets, and one section is inserted battery pack, fuse F 3 of string on the L line of battery pack; Shunt voltage Table V 3 on L line and the N line; Another section outlet series connection access ammeter A1 and parallel connection insert voltmeter V2, insert double-pole cut-out DK2 then, and DK2 comes out, and ((n representes several circuit breakers to S101 ~ S1nn to the direct access power supply in back circuit breaker; The capacity of circuit breaker is the rated capacity of each power supply unit)); S101 ~ S1nn connects respectively, and (HL101 ~ HL1nn), signal lamp is installed on the power supply machine cabinet panel signal lamp, and S101 ~ S1nn is the power supply circuit breaker of each power consumption equipment of control system.
Traditional control system powering mode can only provide one road power supply to the control system power consumption equipment, and any one equipment in electric power system breaks down, and all can't guarantee the control system continuous firing, causes the control system loss of data, thereby influence is produced.
To the defective of traditional control system powering mode, invent out a kind of novel control system powering mode.
Summary of the invention
Technical problem to be solved by this invention is; A kind of large-scale control system dual power supply device is provided, and this device can also prevent that except power supply being provided to control system thunder and lightning from destroying electric power system and control system; Break down to overcome any one equipment in electric power system that prior art exists; All can't guarantee the control system continuous firing, cause the control system loss of data, thus deficiencies such as influence production.
The technical scheme that the present invention adopts is following: it comprises uninterrupted power supply UPS, lightning-protection system and battery pack; The circuit of main power source electric supply installation is the uninterrupted power supply UPS connection power transfer device PAS that lightning-protection system passes through the charged pool group, and power transfer device PAS connects the main power source circuit of power consumption equipment; The circuit of auxiliary power electric supply installation is that lightning-protection system is connected power transfer device PAS through the transformation voltage-stabilizing system that comprises transformer and pressurizer, and power transfer device PAS connects the auxiliary power circuit of power consumption equipment; The main power source electric supply installation is communicated with through power transfer device PAS with the auxiliary power electric supply installation or breaks off.
The circuit of main power source electric supply installation is: supply line inserts lightning protection device through fuse F 2, through inserting master switch DK1 behind the F1, inserts uninterrupted power supply UPS then; Parallel connection inserts three-phase voltage transducer SW1 between DK1 and UPS, and the termination that goes out of SW1 is gone into voltmeter V1, and UPS is two sections outlets; One section is inserted battery pack; Fuse F 3 of string on the L line of battery pack, shunt voltage Table V 3 on L line and the N line, another section outlet series connection inserts ammeter A1 and inserts voltmeter V2 with parallel connection; Insert double-pole cut-out DK2 then, insert automatic power switch PAS after DK2 comes out; The circuit of auxiliary power electric supply installation is: supply line inserts lightning protection device through fuse F 4; Insert master switch DK3 through F5; Master switch DK3 connects the transformation voltage-stabilizing system; Parallel connection inserts three-phase voltage transducer SW2 between master switch DK3 and transformer, and the termination that goes out of three-phase voltage transducer SW2 is gone into voltmeter V5; Pressurizer outlet series connection inserts ammeter A2 and inserts voltmeter V4 with parallel connection, and inserts double-pole cut-out DK4, and double-pole cut-out DK4 connects power transfer device PAS.
The present invention can make the duplex feeding system can switch (switching time is less than 30 milliseconds) each other; When one tunnel electric power system wherein breaks down; Can both guarantee that other one the tunnel can normally supply power to control system, thereby reduce power supply trouble, protect the positive control system to greatest extent and can normally move.
Description of drawings:
Fig. 1 is traditional control system power supply the principle figure;
Fig. 2 is main power source power supply the principle figure of the present invention;
Fig. 3 is auxiliary power power supply the principle figure of the present invention.
Embodiment
Embodiments of the invention: the present invention is integrated into an electric power system; Comprise uninterrupted power supply UPS1, isolation transformation voltage-stabilizing system 2, lightning-protection system 3, battery pack 4, power transfer device PAS5 are installed; The circuit of main power source electric supply installation is the uninterrupted power supply UPS1 connection power transfer device PAS5 of lightning-protection system 3 through charged pool group 4, and power transfer device PAS5 connects the main power source circuit of power consumption equipment; The circuit of auxiliary power electric supply installation is that lightning-protection system 3 is connected power transfer device PAS5 through the transformation voltage-stabilizing system 2 that comprises transformer and pressurizer, and power transfer device PAS5 connects the auxiliary power circuit of power consumption equipment; The main power source electric supply installation is communicated with through power transfer device PAS5 with the auxiliary power electric supply installation or breaks off.
Come two-way 380VAC power supply from electric, existing each road power configuration described:
One the road earlier through fuse F 1 and F2 (F1 and F2 are parallel connection), through inserting lightning protection device 3 behind the F2, through inserting master switch DK1 behind the F1; Insert uninterrupted power supply UPS1 then, parallel connection inserts three-phase voltage transducer SW1 between DK1 and UPS1, (in three-phase (the A1 phase among the figure of 380VAC; The B1 phase; The C1 phase) insert electric pressure converter SW1 respectively, the termination that goes out of SW1 is gone into voltmeter V1, and purpose is to detect whether voltage between phases is 220VAC).Uninterrupted power supply UPS1 is two sections outlets, and one section is inserted battery pack 4, fuse F 3 of string on the L line of battery pack 4; Shunt voltage Table V 3 on L line and the N line; Another section outlet is connected and is inserted ammeter A1 and parallel connection access voltmeter V2, inserts double-pole cut-out DK2 then, inserts power transfer device PAS5 after DK2 comes out; Power transfer device PAS5 goes out line parallel and inserts some power supply circuit breakers ((n representes several circuit breakers to S101 ~ S1nn; The capacity of circuit breaker is the rated capacity of each power supply unit)), S101 ~ S1nn connects respectively, and (HL101 ~ HL1nn), signal lamp is installed on the power supply machine cabinet panel signal lamp; S101 ~ S1nn is the main power supply circuit breaker of each power consumption equipment of control system, shown in accompanying drawing 2.
Another road is earlier through fuse F 4 and F5 (F4 and F5 are parallel connection), through inserting lightning protection device 3 behind the F4, through inserting master switch DK3 behind the F5; Insert transformer TF then, insert pressurizer VS after transformer comes out again, parallel connection inserts three-phase voltage transducer SW2 between DK3 and transformer TF; (three-phase (A1 phase among the figure, B1 phase, C1 phase) at 380VAC inserts electric pressure converter SW2 respectively; The termination that goes out of SW2 is gone into voltmeter V5, and purpose is to detect whether voltage between phases is 220VAC).Pressurizer VS outlet series connection inserts ammeter A2 and inserts voltmeter V4 with parallel connection; Insert double-pole cut-out DK4 then, after DK4 comes out, insert power transfer device PAS5; Power transfer device PAS5 goes out the some power supply circuit breakers of line parallel, and ((n representes several circuit breakers to S201 ~ S2nn; The capacity of circuit breaker is the rated capacity of each power supply unit)), S201 ~ S2nn connects respectively, and (HL201 ~ HL2nn), signal lamp is installed on the power supply machine cabinet panel signal lamp; S201 ~ S2nn is the pair power supply circuit breaker of each power consumption equipment of control system, shown in accompanying drawing 3.

Claims (2)

1. large-scale control system dual power supply device; It comprises uninterrupted power supply UPS (1), lightning-protection system (3) and battery pack (4); It is characterized in that: the circuit of main power source electric supply installation is uninterrupted power supply UPS (1) the connection power transfer device PAS (5) of lightning-protection system (3) through charged pool group (4), and power transfer device PAS (5) connects the main power source circuit of power consumption equipment; The circuit of auxiliary power electric supply installation is that lightning-protection system (3) is connected power transfer device PAS (5) through the transformation voltage-stabilizing system (2) that comprises transformer and pressurizer, and power transfer device PAS (5) connects the auxiliary power circuit of power consumption equipment; The main power source electric supply installation is communicated with through power transfer device PAS (5) with the auxiliary power electric supply installation or breaks off.
2. large-scale control system dual power supply device according to claim 1, it is characterized in that: the circuit of main power source electric supply installation is: supply line inserts lightning protection device (3) through fuse F 2, through inserting master switch DK1 behind the F1; Insert uninterrupted power supply UPS (1) then; Parallel connection inserts three-phase voltage transducer SW1 between DK1 and UPS (1), and the termination that goes out of SW1 is gone into voltmeter V1, and UPS (1) is two sections outlets; One section is inserted battery pack (4); Fuse F 3 of string on the L line of battery pack, shunt voltage Table V 3 on L line and the N line, another section outlet series connection inserts ammeter A1 and inserts voltmeter V2 with parallel connection; Insert double-pole cut-out DK2 then, insert automatic power switch PAS (5) after DK2 comes out; The circuit of auxiliary power electric supply installation is: supply line inserts lightning protection device (3) through fuse F 4; Insert master switch DK3 through F5; Master switch DK3 connects transformation voltage-stabilizing system (2); Parallel connection inserts three-phase voltage transducer SW2 between master switch DK3 and transformer, and the termination that goes out of three-phase voltage transducer SW2 is gone into voltmeter V5; Pressurizer outlet series connection inserts ammeter A2 and inserts voltmeter V4 with parallel connection, and inserts double-pole cut-out DK4, and double-pole cut-out DK4 connects power transfer device PAS (5).
CN2010106027137A 2010-12-23 2010-12-23 Double-power supply device for large control system Pending CN102545369A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010106027137A CN102545369A (en) 2010-12-23 2010-12-23 Double-power supply device for large control system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010106027137A CN102545369A (en) 2010-12-23 2010-12-23 Double-power supply device for large control system

Publications (1)

Publication Number Publication Date
CN102545369A true CN102545369A (en) 2012-07-04

Family

ID=46351561

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010106027137A Pending CN102545369A (en) 2010-12-23 2010-12-23 Double-power supply device for large control system

Country Status (1)

Country Link
CN (1) CN102545369A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104009490A (en) * 2014-06-13 2014-08-27 国网上海市电力公司 Mobile energy storage system for dual power supply

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6051893A (en) * 1998-10-29 2000-04-18 Mitsubishi Denki Kabushiki Kaisha Electric power supply system for load
CN2648681Y (en) * 2001-12-20 2004-10-13 艾默生网络能源有限公司 Auxiliary power supply device for large power uninterruption power source equipment
US20080197706A1 (en) * 2007-02-21 2008-08-21 Henning Roar Nielsen 3-Phase High Power UPS
CN201466790U (en) * 2009-08-31 2010-05-12 河北实华科技有限公司 Integrated power distribution system of modularized UPS
CN201877879U (en) * 2010-12-23 2011-06-22 贵阳铝镁设计研究院 Dual-power supply device for large-scale control system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6051893A (en) * 1998-10-29 2000-04-18 Mitsubishi Denki Kabushiki Kaisha Electric power supply system for load
CN2648681Y (en) * 2001-12-20 2004-10-13 艾默生网络能源有限公司 Auxiliary power supply device for large power uninterruption power source equipment
US20080197706A1 (en) * 2007-02-21 2008-08-21 Henning Roar Nielsen 3-Phase High Power UPS
CN201466790U (en) * 2009-08-31 2010-05-12 河北实华科技有限公司 Integrated power distribution system of modularized UPS
CN201877879U (en) * 2010-12-23 2011-06-22 贵阳铝镁设计研究院 Dual-power supply device for large-scale control system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李焦明: "大型UPS***应用技术要点", 《电力自动化设备》, vol. 25, no. 4, 30 April 2005 (2005-04-30), pages 86 - 89 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104009490A (en) * 2014-06-13 2014-08-27 国网上海市电力公司 Mobile energy storage system for dual power supply

Similar Documents

Publication Publication Date Title
CN104037929A (en) Power supply method and device
CN102684087A (en) Bypass operation vehicle capable of enabling users to change distribution transformer without power cutting
CN202586124U (en) Bypass operation trolley capable of being used to replace distribution transformer without cutting off power
CN101710728A (en) Method and device for supplying power to chassis equipment of communication machine room
CN205489794U (en) General switch board of double -H groove weld PS
CN101969227B (en) Self-powered automatic switching and closing high-voltage control system
CN110690755A (en) Communication power supply system
CN201877879U (en) Dual-power supply device for large-scale control system
CN112310874B (en) 220V double-charging four-feed direct current system uninterrupted safe replacement method
CN210074867U (en) Control circuit of standby power supply
CN202076690U (en) Mobile feed cabinet
CN102545369A (en) Double-power supply device for large control system
CN207782141U (en) A kind of secondary voltage circuit and high-tension switch cabinet of PT
CN202206125U (en) Portable protection device for electrification process after distribution system protection device failure
CN104319867A (en) Battery supply circuit of high-power emergency power supply
CN204886390U (en) High pressure dual power supply's wiring circuit
CN104467157B (en) Multi-voltage-class standby direct-current operating power source
CN209544829U (en) Distribution system
CN203800387U (en) Integrated discrete power distribution module
CN207459723U (en) Spare phase transformer quickly puts into arrangement
CN203491768U (en) A DC power supply cabinet
CN103457340B (en) Direct current power source screen cabinet
CN110233479A (en) A kind of transformer substation system control method with micro-grid system
CN219717938U (en) Secondary power supply system in flameproof and intrinsically safe low-voltage combined feed equipment
CN221202219U (en) Uninterrupted power double-switching direct-current power supply device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120704