CN102540021B - High frequency office is placed on the method for wire system monitoring GIS - Google Patents

High frequency office is placed on the method for wire system monitoring GIS Download PDF

Info

Publication number
CN102540021B
CN102540021B CN201010596314.4A CN201010596314A CN102540021B CN 102540021 B CN102540021 B CN 102540021B CN 201010596314 A CN201010596314 A CN 201010596314A CN 102540021 B CN102540021 B CN 102540021B
Authority
CN
China
Prior art keywords
high frequency
office
monitoring system
line monitoring
frequency office
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201010596314.4A
Other languages
Chinese (zh)
Other versions
CN102540021A (en
Inventor
倪镭
姚明
王怡风
房岭锋
马骏
陈平
杨明
钱纲
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHANGHAI ELECTRIC POWER COMMUNICATION CO Ltd
State Grid Corp of China SGCC
Shanghai Municipal Electric Power Co
Original Assignee
SHANGHAI ELECTRIC POWER COMMUNICATION CO Ltd
State Grid Corp of China SGCC
Shanghai Municipal Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHANGHAI ELECTRIC POWER COMMUNICATION CO Ltd, State Grid Corp of China SGCC, Shanghai Municipal Electric Power Co filed Critical SHANGHAI ELECTRIC POWER COMMUNICATION CO Ltd
Priority to CN201010596314.4A priority Critical patent/CN102540021B/en
Publication of CN102540021A publication Critical patent/CN102540021A/en
Application granted granted Critical
Publication of CN102540021B publication Critical patent/CN102540021B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Testing Relating To Insulation (AREA)
  • Alarm Systems (AREA)

Abstract

High frequency office is placed on the method for wire system monitoring GIS, comprises the following steps; 1) high frequency office is placed on line monitoring system and uses superfrequency method, carries out independent detecting to multiple GIS monitoring point simultaneously; 2) high frequency office is placed on the arrangenent diagram that probe identity and distribution are put in the line monitoring system office of listing; 3) high frequency office is placed on line monitoring system and arranges filter, 4) high frequency office is placed on line monitoring system and arranges realtime curve function; 5) expert system that high frequency office is placed on line monitoring system can realize the automatic qualitative judgement of ultrahigh-frequency signal, and on human-computer interaction interface, show its type; 6) high frequency office is placed on line monitoring system and provides electric discharge historical record and Data Trend Monitor; 7) high frequency office is placed on line monitoring system and carries out automatic self; 8) high frequency office is placed on line monitoring system and carries out remote monitoring.Compared with prior art, the present invention is detected GIS timely and effectively by a series of means, has effectively ensured the normal operation of system equipment.

Description

High frequency office is placed on the method for wire system monitoring GIS
Technical field
The present invention relates to a kind of method of monitoring GIS, especially relate to a kind of method that high frequency office is placed on wire system monitoring GIS.
Background technology
Along with the development of society, the demand of electric power is constantly increased, also more and more higher to the requirement of the quality of power supply, simultaneously to the requirement also corresponding raising of equipment safety operation.GIS (Gas Insulated Switchgear, gas insulated switchgear) is little with its volume, element all seals and not be more and more applied in the middle of electric system by the many merits such as environmental interference, easy for installation, operational reliability is high, the time between overhauls(TBO) is long, maintenance workload is little.Along with electric system is to the development of UHV (ultra-high voltage), high reliability and compact, GIS has become main development direction from now on.Due to the restriction of designing and manufacturing level, the Insulation Problems of current GIS happens occasionally, and GIS still has certain gap apart from non-maintaining target.Installation, the operative practice experience of domestic and international GIS transformer station show, most of GIS accident is caused by insulation defect, this kind of defect mainly comprises: exist in air chamber and exceed the free metal particulate of certain size, the protrusion of electrode surface or floating potential etc., these defects may cause insulation fault in GIS operational process, even can cause serious accident.Due to GIS device maintenance relative difficulty, once GIS breaks down, repair time is long, power failure influence area is large, consequence is very serious, and therefore, the insulation fault of early warning GIS inside is very important early.
Summary of the invention
Object of the present invention be exactly in order to overcome above-mentioned prior art exist defect and provide a kind of high frequency office be placed on wire system monitoring GIS method.
Object of the present invention can be achieved through the following technical solutions:
High frequency office is placed on the method for wire system monitoring GIS, comprises the following steps; 1) high frequency office is placed on line monitoring system and uses superfrequency method, carries out independent detecting to multiple GIS monitoring point simultaneously; 2) high frequency office is placed on the arrangenent diagram that probe identity and distribution are put in the line monitoring system office of listing, and facilitates user to read information; 3) high frequency office is placed on line monitoring system and arranges filter, and each probe possesses independently filter, to distinguish Partial discharge signal and inside and outside boundary undesired signal; 4) high frequency office is placed on line monitoring system and arranges realtime curve function, directly shows the signal of popping one's head in and detecting; 5) expert system that high frequency office is placed on line monitoring system can realize the automatic qualitative judgement of ultrahigh-frequency signal, and on human-computer interaction interface, show its type; 6) high frequency office is placed on line monitoring system and provides electric discharge historical record and Data Trend Monitor; 7) high frequency office is placed on line monitoring system and carries out automatic self; 8) high frequency office is placed on line monitoring system and carries out remote monitoring.
Compared with prior art, the present invention is detected GIS timely and effectively by a series of means, and the very first time finds fault and reports to the police, and has effectively ensured the normal operation of system equipment.
Embodiment
High frequency office is placed on the method for wire system monitoring GIS, comprises the following steps; 1) high frequency office is placed on line monitoring system and uses superfrequency method, carries out independent detecting to multiple GIS monitoring point simultaneously; 2) high frequency office is placed on the arrangenent diagram that probe identity and distribution are put in the line monitoring system office of listing, and facilitates user to read information; 3) high frequency office is placed on line monitoring system and arranges filter, and each probe possesses independently filter, to distinguish Partial discharge signal and inside and outside boundary undesired signal; 4) high frequency office is placed on line monitoring system and possesses realtime curve function, and directly display is popped one's head in the signal detected; 5) expert system that high frequency office is placed on line monitoring system can realize the automatic qualitative judgement of ultrahigh-frequency signal, and on human-computer interaction interface, show its type; 6) high frequency office is placed on line monitoring system and provides electric discharge historical record and Data Trend Monitor; 7) high frequency office is placed on line monitoring system and carries out automatic self; 8) high frequency office is placed on line monitoring system and carries out remote monitoring.
High frequency office is placed on line monitoring system and uses superfrequency method, carries out independent detecting simultaneously, has sensitive response to the Partial discharge signal of frequency range 500-1200MHz, can detect the signal being not more than 65dBm to multiple GIS monitoring point.Office is placed on line monitoring system and has the arrangenent diagram that probe identity and distribution are put in the office of listing, and facilitates user to read information.The distribution of the photoelectric conversion unit (OCU) that this system is equipped with the form display power station GIS of linear schematic diagram, and for each photoelectric conversion unit (OCU), use red, yellow, blue monochromatic round dot identifies the office respectively accessed mutually from GIS and puts probe.When with these round dots of mouse-pointing, the data that the identity information of selected for display photoelectric conversion unit (OCU) of popping one's head in and be connected with it and this probe gather by system.Office is placed on the probe of line monitoring system to each photoelectric conversion unit (OCU) and connection thereof and carries out single address assignment.Isolating switch uses "×" to represent usually, and disconnector uses "-" to represent.High frequency office is placed on line monitoring system and possesses filter.Each probe possesses independently filter, to distinguish Partial discharge signal and inside and outside boundary undesired signal, as opening and closing movement signal, self-test signal, radio, communication signal etc.After monitoring system installation is put in office, signal measurement is carried out to scene, to confirm existing various external interference signals, and the feature of common interference signal is recorded in filter.Filter need provide the prerequisite of the sensitivity meeting CIGIE document claims in consideration system under, by software simulating, and manually can select to open, undesired signal is filtered, make it not appear in trend analysis display.System possesses realtime curve function, directly shows the signal of popping one's head in and detecting.High frequency office is placed on line monitoring system and each cycle is divided into 64 time intervals, catches the Partial discharge signal in 50 consecutive periods (1 second), and real in real time with three dimensional pattern; Meanwhile, carry out uninterrupted recording to from the crest amplitude of signal and maximum count rate (accumulated discharge umber of pulse per second) of talking probe, and show with amplitude cumulative chart (POW) office detected and put.The sampled signal stored in system database can be called at any time, display and contrast.The expert system of system can realize the automatic qualitative judgement of ultrahigh-frequency signal, and on human-computer interaction interface, show its type.Although there be now multiple playing a game to put the method for row classification into, the classification to all defect can be realized without any a kind of method.In order to increase the accuracy that identification office puts, system is analyzed institute's image data by multiple different rule, then gather final conclusion: a comprehensive taxis system, event is put for detected office, provide all possible classification judge, and corresponding classification possibility or judge reliability: 1. suspension electrode; 2. insulation defect/surface contamination; 3. bus corona; 4. air chamber corona; 5. particulate; 6.GIS deciliter actuating signal; 7. extraneous communication signal, as phone, radar etc.; 8. general ambient noise.High frequency office is placed on line monitoring system and provides electric discharge historical record and Data Trend Monitor.The automatic file that data are put in office is spaced apart 15 minutes, and to guarantee to play a game, the event of putting is carried out the Data Trend Monitor of 24 hours and calls in the future.Data can by further record and process, the Data Trend Monitor that the event of putting of guaranteeing to play a game is carried out 12 months, with provide one clearly office let live dynamic trend record, in order to confirm whether defect worsens rapidly.Situation figure can indicate that the office detected puts the development and change of event and whether can cause the generation of breakdown accident.System lets live dynamic number of times by analyzing the office that detects, and the mean value of amplitude is put in office and discharge rate number percent is put in office, if to have exceeded warning presetting for these parameters, by automatic output alarm signal.) auto-alarm function.System can realize unattended duty, and slip-stick artist only just need get involved when detecting/warning is put in the system office of sending or System self-test is reported to the police.High frequency office is placed on line monitoring system can per hour or automatic self once a day.User can select the frequency of System self-test signal, when after System self-test failure, can send immediately to run and report to the police.When after systems scan to the Partial discharge signal exceeding pre-set threshold value, can put warning by forwarding office immediately, alerting signal is presented on the computer display screen curtain of system, until alerting signal is identified, warning message is preserved 1 year by system, comprises the date of reporting to the police, time and reason; The date of alarming determining and time; Report to the police the date and time that disappear.In the general headquarters of user, second cover computer equipment of outfit modulator-demodular unit or LAN (Local Area Network) connection can be installed to carry out the Long-distance Control of system: office is placed on the running of line monitoring system (PRM-R), control, it is consistent that every System Operation such as data receiver and control system at the scene carry out local control.The character determination data transfer rate of communication line, therefore LAN (Local Area Network) connects the connected mode for recommending.

Claims (1)

1. high frequency office is placed on the method for wire system monitoring GIS, it is characterized in that, comprises the following steps;
1) high frequency office is placed on line monitoring system and uses superfrequency method, carries out independent detecting to multiple GIS monitoring point simultaneously;
2) high frequency office is placed on the arrangenent diagram that probe identity and distribution are put in the line monitoring system office of listing, and facilitates user to read information;
The distribution of the photoelectric conversion unit that the form display power station GIS that high frequency office is placed on the linear schematic diagram of line monitoring system is equipped with, and for each photoelectric conversion unit, use red, yellow, blue monochromatic round dot identifies the office respectively accessed mutually from GIS and puts probe, and puts probe to the office of each photoelectric conversion unit and connection thereof and carry out single address assignment;
3) high frequency office is placed on line monitoring system and arranges filter, and each probe possesses independently filter, to distinguish Partial discharge signal and inside and outside boundary undesired signal;
4) high frequency office is placed on line monitoring system and arranges realtime curve function, directly shows the signal of popping one's head in and detecting;
5) expert system that high frequency office is placed on line monitoring system can realize the automatic qualitative judgement of ultrahigh-frequency signal, and on human-computer interaction interface, show its type;
6) high frequency office is placed on line monitoring system and provides electric discharge historical record and Data Trend Monitor;
7) high frequency office is placed on line monitoring system and carries out automatic self;
8) high frequency office is placed on line monitoring system and carries out remote monitoring.
CN201010596314.4A 2010-12-20 2010-12-20 High frequency office is placed on the method for wire system monitoring GIS Active CN102540021B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201010596314.4A CN102540021B (en) 2010-12-20 2010-12-20 High frequency office is placed on the method for wire system monitoring GIS

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201010596314.4A CN102540021B (en) 2010-12-20 2010-12-20 High frequency office is placed on the method for wire system monitoring GIS

Publications (2)

Publication Number Publication Date
CN102540021A CN102540021A (en) 2012-07-04
CN102540021B true CN102540021B (en) 2015-08-05

Family

ID=46347384

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201010596314.4A Active CN102540021B (en) 2010-12-20 2010-12-20 High frequency office is placed on the method for wire system monitoring GIS

Country Status (1)

Country Link
CN (1) CN102540021B (en)

Families Citing this family (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104251962A (en) * 2013-06-27 2014-12-31 国家电网公司 Gas-insulation completely-enclosed combined electrical appliance monitoring device and system
CN103617356B (en) * 2013-11-27 2016-09-07 国家电网公司 A kind of adaptive online monitoring data trend abstraction method
CN104360248A (en) * 2014-11-24 2015-02-18 国家电网公司 Partial discharging monitoring method and device
CN104655994B (en) * 2015-01-28 2017-09-12 杭州申昊科技股份有限公司 GIS partial discharge on-line monitoring systems
CN107505549A (en) * 2017-08-30 2017-12-22 国网上海市电力公司 A kind of intelligent multifunction partial discharge monitoring system
CN112578245A (en) * 2020-12-09 2021-03-30 广西电网有限责任公司电力科学研究院 GIS disconnecting link air chamber fault diagnosis method and device based on optical technology
CN113253038B (en) * 2021-06-28 2021-09-10 广东电网有限责任公司中山供电局 Online monitoring device and method for comprehensive alarm unit of GIS equipment of transformer substation

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1553207A (en) * 2003-12-18 2004-12-08 西安交通大学 High-frequency wide-band local discharging on-line monitoring method in gas insulative converting station
CN101702002A (en) * 2009-12-07 2010-05-05 上海市电力公司 Local discharge electroacoustic united detection positioning system and positioning method thereof
CN101782614A (en) * 2010-02-20 2010-07-21 中国科学院电工研究所 Device for detecting breakdown of sulfur hexafluoride gas-insulated electrical equipment
CN201576071U (en) * 2009-11-26 2010-09-08 杭州美卓自动化技术有限公司 Partial discharge monitoring device of gas insulated switchgear
CN101833060A (en) * 2010-05-26 2010-09-15 四川电力试验研究院 Positioning device for monitoring partial discharge of gas-insulater switchgear on line

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1553207A (en) * 2003-12-18 2004-12-08 西安交通大学 High-frequency wide-band local discharging on-line monitoring method in gas insulative converting station
CN201576071U (en) * 2009-11-26 2010-09-08 杭州美卓自动化技术有限公司 Partial discharge monitoring device of gas insulated switchgear
CN101702002A (en) * 2009-12-07 2010-05-05 上海市电力公司 Local discharge electroacoustic united detection positioning system and positioning method thereof
CN101782614A (en) * 2010-02-20 2010-07-21 中国科学院电工研究所 Device for detecting breakdown of sulfur hexafluoride gas-insulated electrical equipment
CN101833060A (en) * 2010-05-26 2010-09-15 四川电力试验研究院 Positioning device for monitoring partial discharge of gas-insulater switchgear on line

Also Published As

Publication number Publication date
CN102540021A (en) 2012-07-04

Similar Documents

Publication Publication Date Title
CN102540021B (en) High frequency office is placed on the method for wire system monitoring GIS
CN107272637B (en) A kind of video monitoring system fault self-checking self- recoverage control system and method
CN109839565B (en) Transformer work state monitoring method
KR100288950B1 (en) System and Method for monitoring signal equipment difficulty in train
CN202196143U (en) GIS partial discharge on-line monitoring system
CN103513139A (en) Power transformer fault intelligent diagnosis technology, method and device
CN102298107A (en) Portable ultrasonic wave and cloud detection apparatus for partial discharge
Judd et al. Power transformer monitoring using UHF sensors: installation and testing
MX2008014645A (en) User interface for monitoring a plurality of faulted circuit indicators.
KR20130060894A (en) Remote diagnosis system for transformer
CN102494737A (en) Oil level monitoring method and system of oil immersed type transformer
Steennis et al. Guarding MV cables on-line: With travelling wave based temperature monitoring, fault location, PD location and PD related remaining life aspects
CN111144782A (en) Power distribution network equipment on-line monitoring system based on GIS technology
KR102329845B1 (en) Power distributing board having system for sensing and checking deterioration of electrical equipment insulator
KR20180070208A (en) Abnormality detection system of power line and distribution facility
KR20160025068A (en) Apparatus for detecting partial discharge
CN114383652A (en) Method, system and device for identifying potential fault online risk of power distribution network
CN104849639A (en) System for online monitoring of partial discharge flashover of distribution network based on technology of ultraviolet light detection
CN114485796A (en) Online state monitoring self-diagnosis system of box-type substation
CN106404191A (en) Multipath temperature detection protection method for oil-immersed transformer
CN209043520U (en) A kind of online pressure monitor system of SF6 gas having trend alarm function
CN202662124U (en) Image and multi-waveband infrared-ultraviolet combined type fire detecting system
CN104865524A (en) Main transformer air cooling control system potential fault active processing method
CN214205090U (en) Intelligent operation maintenance system for user power distribution room
CN110261664A (en) A kind of attached wires of AC electrified railway train is by pyroelectric monitor system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
ASS Succession or assignment of patent right

Owner name: STATE GRID CORPORATION OF CHINA SHANGHAI ELECTRIC

Free format text: FORMER OWNER: SHANGHAI JIULONG ELECTRIC POWER SCIENCE + TECHNOLOGY CO., LTD.

Effective date: 20121220

C41 Transfer of patent application or patent right or utility model
TA01 Transfer of patent application right

Effective date of registration: 20121220

Address after: 200122 Shanghai City, Pudong New Area source deep road, No. 1122

Applicant after: Shanghai Electric Power Corporation

Applicant after: State Grid Corporation of China

Applicant after: Shanghai Electric Power Communication Co., Ltd.

Address before: 200122 Shanghai City, Pudong New Area source deep road, No. 1122

Applicant before: Shanghai Electric Power Corporation

Applicant before: Shanghai Jiulong Electric Power Co., Ltd.

C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant