CN102538098B - Tbab浆水分离式动态蓄冰*** - Google Patents

Tbab浆水分离式动态蓄冰*** Download PDF

Info

Publication number
CN102538098B
CN102538098B CN201210031698.4A CN201210031698A CN102538098B CN 102538098 B CN102538098 B CN 102538098B CN 201210031698 A CN201210031698 A CN 201210031698A CN 102538098 B CN102538098 B CN 102538098B
Authority
CN
China
Prior art keywords
water
slurry
ice
pipe
pump
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201210031698.4A
Other languages
English (en)
Other versions
CN102538098A (zh
Inventor
高日新
冯自平
宋文吉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Institute of Energy Conversion of CAS
Original Assignee
Guangzhou Institute of Energy Conversion of CAS
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Institute of Energy Conversion of CAS filed Critical Guangzhou Institute of Energy Conversion of CAS
Priority to CN201210031698.4A priority Critical patent/CN102538098B/zh
Publication of CN102538098A publication Critical patent/CN102538098A/zh
Application granted granted Critical
Publication of CN102538098B publication Critical patent/CN102538098B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Other Air-Conditioning Systems (AREA)

Abstract

本发明公开了TBAB浆水分离式动态蓄冰***,包括有制冷主机与第一动态制冰机组,两者通过不冻液送连接道构成冷源循环,其中不冻液送连接道串联不冻液泵,第一动态制冰机组与蓄冰槽通过第一浆水混合物输送管、第一连接水管、第一水泵、第一连接水管构成制冰循环;所述第一动态制冰机组包括板式换热器,第一浆水混合物输送管上依次安装有过冷却解除器和浆水分离器,浆水分离器另一侧接第二浆水混合物输送管道后连接到蓄冰槽,浆水分离器下部一侧与第一连接水管连接,浆水分离器下部另一侧依次通过第五连接水管18、第四连接水管、止回阀、第二水泵、第三连接水管连接到蓄冰槽。相当封闭***内的流量和扬程可以确定,出厂前配置水泵;相当封闭***内管道短,扬程小,所以水泵功耗低。补水量少,补水泵功耗低。

Description

TBAB浆水分离式动态蓄冰***
技术领域
本发明涉及TBAB包络化合物浆蓄冷技术领域,尤其涉及动态蓄冷***。 
背景技术
四丁基溴化铵(TBAB)包络化合物浆是一种高密度的储能及潜热输送材料,其相变温度为5-12℃,可以广泛应用于工商业的大型中央空调蓄冷***。 
动态蓄冷是指TBAB水溶液在板式换热器中,被降温至过冷状态,然后进入过冷却解除器,解除过冷状态成为浆水混合物。因为TBAB水溶液在板式换热器表面不结冰不凝固,不会出现传统静态蓄冰***冰层厚度不断增加的现象,换热效果非常好,所以动态制冰的效率优于静态制冰。 
但是,TBAB水溶液在板式换热器中,被降温至过冷状态的过冷度比较小。因而,需要很大的冷水循环量,才能保证一定的蓄冷量要求。也就是说,相应泵的功耗也比较大,而且该泵的扬程要根据现场管道管径、长度和弯头等来确定,无法实现出厂前配置。 
发明内容
本发明的目的在于设计一种冷水循环***,使大流量循环流程更短,其它流程采用小流量。 
为实现以上目的,本发明采取了以下的技术方案:TBAB浆水分离式动态蓄冰***,包括有制冷主机与第一动态制冰机组,两者通过不冻液送连接道构成冷源循环,其中不冻液送连接道串联不冻液泵,第一动态制冰机组与蓄冰槽通过第一浆水混合物输送管、第一连接水管、第一水泵、第一连接水管构成制冰循环;所述第一动态制冰机组包括板式换热器,第一浆水混合物输送管、过冷却解除器和浆水分离器,浆水分离器另一侧接第二浆水混合物输送管道后连接到蓄冰槽,浆水分离器下部一侧与第一连接水管连接,浆水分离器下部另一侧依次通过第五连接水管、第四连接水管、止回阀、第二水泵、第三连接水管连接到蓄冰槽。 
板式换热器、浆水分离器及第一水泵构成相对封闭***,被浓缩的TBAB浆水混合物输送回蓄冰槽,用补水泵从蓄冰槽补充相应水量进入上述相对封闭***。 
本发明与现有技术相比,具有如下优点:优点是相当封闭***内的流量和扬程可以确定,出厂前配置水泵;相当封闭***内管道短,扬程小,所以水泵功耗低。补水量少,补水泵功耗低。例如原***循环量Q=500m3/h,过冷板换阻力0.8bar,管道阻力2.0bar,总扬程H=30m,功率N=55KW;采用本发明***相对封闭***循环量Q=500m3/h,阻力1bar,总扬程H=10m,功率N=22KW,补水流量Q=62.5m3/h,管道阻力2.0bar,总扬程H=22m,功率N=5KW。若1年运行2240小时,则节省(55-22-5)x2240=62720kw.h,节省50.9%。 
附图说明
图1:现有技术的动态制冰***; 
图2:为图1中的第二动态制冰机组简化后的***; 
图3:本发明TBAB浆水分离式动态蓄冰***; 
图4:图3中的第一动态制冰机组; 
附图标记说明:1-制冷主机;2-不冻液送连接道;3-第二动态制冰机组;4-第一浆水混合物输送管道;5-蓄冰槽;6-第一连接水管;7-第一水泵;8-第二连接水管;9-不冻液泵;10-板式换热器;11-过冷却解除器;12-浆水分离器;13-第二浆水混合物输送管道;14-第三连接水管;15-第二水泵;16-第四连接水管;17-止回阀;18-第五连接水管;19-第一动态制冰机组。 
具体实施方式
下面结合附图和具体实施方式对本发明的内容做进一步详细说明。 
实施例: 
图1是现有技术动态制冰***,制冷主机1与第二动态制冰机组3通过不冻液送连接道2构成冷源循环,其中不冻液送连接道2串联不冻液泵9作为该循环的驱动力。第二动态制冰机组3与蓄冰槽5通过第一浆水混合物输送管4、第一连接水管6、第一水泵7、第一连接水管8构成制冰循环,其第一水泵7作为该循环动力。 
参阅图2所示,为了进一步说明***阻力构成,将第二动态制冰机组3简化板式换热器、浆水分离器及第一水泵构成相对封闭***,被浓缩的TBAB浆 为板式换热器10,由TBAB水溶液变成浆水混合物的循环流程:TBAB水溶液从蓄冰槽5流经第一连接水管6,经过第一水泵7加压经第二连接水管8进入换热器10被过冷,过冷后的溶液在过冷却解除器11解除过冷状态,成为TBAB的浆水混合物,通过第一输送管4流回蓄冰槽5。
根据***的设计流量,考虑要求板式换热器10、过冷却解除器11、第一浆水混合物输送管4、第一连接水管6、第二连接水管8阻力,选择第一水泵7扬程,第一浆水混合物输送管4、第一连接水管6、第二连接水管8为同一管径,第一浆水混合物输送管4、第一连接水管6、第二连接水管8的长度与现场设备安装位置有关,通常为30-300米,该部分管道是***主要流动阻力源。 
参阅图3所示,包括有制冷主机1与第一动态制冰机组19,两者通过不冻液送连接道2构成冷源循环,其中不冻液送连接道2串联不冻液泵9,第一动态制冰机组19与蓄冰槽5通过第一浆水混合物输送管4、第一连接水管6、第一水泵7、第一连接水管8构成制冰循环;第一动态制冰机组19包括板式换热器10,第一浆水混合物输送管4上依次安装有过冷却解除器11和浆水分离器12,浆水分离器12另一侧接第二浆水混合物输送管道13后连接到蓄冰槽5,浆水分离器12下部一侧与第一连接水管6连接,浆水分离器12下部另一侧依次通过第五连接水管18、第四连接水管16、止回阀17、第二水泵15、第三连接水管14连接到蓄冰槽5,第四连接水管16在第一动态制冰机组19的外部,第五连接水管18在内部,两者需要用法兰连接。工作过程是低浓度的浆水混合物(冰质量含量约2.5%)通过第一浆水混合物输送管4进入浆水分离器12,水被分离从下部流向第一连接水管6,经第一水泵7加压经第二连接水管8进入换热器10被过冷,过***液在过冷却解除器11解除过冷状态,成为TBAB的浆水混合物。通过第一浆水混合物输送管4流入浆水分离器12,构成相对封闭循环***。 
TBAB水溶液从蓄冰槽5流经第三连接水管14,经过第二水泵15加压经第四连接水管16进入第一连接水管6,浓缩后的浆水混合物经第二浆水混合物输送管道13流回蓄冰槽5。第二水泵15出水口安装止回阀17,防止水倒流。 
浓缩后的浆水混合物的质量含量决定第二水泵15流量设计,也决定第三连接水管14、第四连接水管16、第二浆水混合物输送管道13的管径,这三个连接管管径是相同的。若管道内水流速按照1.5m/s设计,浓缩后的浆水混合物不同浓度与15流量及第三连接水管14、第四连接水管16、第二浆水混合物输送管道13管径的变化关系: 
定义A=浓缩后的浆水混合物冰的含量 
定义B=水泵b流量/水泵a流量 
定义C=连接水管d的管径/连接水管a的管径 
  A   B   C
  5%   50%   70.7%
  10%   25%   50%
  15%   16.7%   40.8%
  20%   12.5%   35.4%
  25%   10%   31.6%
若浓缩后的浆水混合物冰的含量占20%,则连接水管d的管径是原连接水管a的管径的35.4%,水泵b流量是水泵a流量的12.5%。连接管径减小后,材料费用、安装费用和安装空间均减小。 
这样设计使相对封闭循环***内管道很短,弯头较少,管道和弯头的阻力很小,该***水泵a流量Q1、扬程H1;对封闭循环***外的连接水管c14、连接水管d16、浆水混合物输送管道b13可能较长,配合安装也可能较多弯头,流动阻力不小,该部分水泵b流量Q2、扬程H2。图2***水泵a的流量为Q、扬程为H。 
离心泵功率=流量×扬程×9.81×介质比重÷3600÷泵效率,降低流量、扬程中的任一个或两个同时降低,均能降低离心泵功率。一般情况对于一个实际***可认为介质比重、泵效率是固定的,令K=9.81×介质比重÷3600÷泵效率,则离心泵功率=K×流量×扬程。 
若浓缩后的浆水混合物冰的含量占20%,假设Q=500m3/h,则Q1=500m3/h,Q1=62.5m3/h,不同扬程的泵的功率情况: 
原***水泵a的功率定义为D,D=(K×Q×H) 
本发明***水泵a及水泵b的功率定义E,E=(K×Q1×H1+K×Q2×H2) 
本发明***水泵功耗节省率定义F,F=(D-E)/D 
  序列   H(米)   H1(米)   H2(米)   D   E   F
  1   25   10   17   12500K   6062.5K   51.5%
  2   30   10   22   15000K   6375K   57.5%
  3   35   10   27   17500K   6687.5K   61.8%
  4   40   10   32   20000K   7000K   65.0%
  5   45   10   37   22500K   7312.5K   67.5%
说明采用本发明***,能够大幅度减低***水泵能耗,尤其对于长距离的输送更为明显。 
如下是一个实际例子的测试情况,原***循环量Q=500m3/h,过冷板换阻力0.8bar,管道阻力2.0bar,总扬程H=30m,功率N=55KW;采用本发明***相对封闭***循环量Q=500m3/h,阻力1bar,总扬程H=10m,功率N=22KW,浓缩后的浆水混合物冰的含量占20%,补水流量Q=62.5m3/h,管道阻力2.0bar,总扬程H=22m,功率N=5KW。若1年运行2240小时,则节省(55-22-5)x2240=62720kw.h,节省50.9%。 
参阅图4所示,把板式换热器10、过冷却解除器11、浆水分离器12、第一水泵7集合在一起构成相对封闭循环***,成为新的第一动态制冰机组19。该***的流量和***阻力特性是确定的,所以可以选择常用规格的水泵,为规模化选型和生产提供了便利! 
上列详细说明是针对本发明可行实施例的具体说明,该实施例并非用以限制本发明的专利范围,凡未脱离本发明所为的等效实施或变更,均应包含于本案的专利范围中。 

Claims (2)

1.TBAB浆水分离式动态蓄冰***,包括有制冷主机(1)与第一动态制冰机组(19),两者通过不冻液送连接道(2)构成冷源循环,其中不冻液送连接道(2)串联不冻液泵(9),第一动态制冰机组(19)与蓄冰槽(5)通过第一浆水混合物输送管(4)、第一连接水管(6)、第一水泵(7)、第一连接水管(8)构成制冰循环;
其特征在于:所述第一动态制冰机组(19)包括板式换热器(10),第一浆水混合物输送管(4)上依次安装有过冷却解除器(11)和浆水分离器(12),浆水分离器(12)另一侧接第二浆水混合物输送管道(13)后连接到蓄冰槽(5),浆水分离器(12)下部一侧与第一连接水管(6)连接,浆水分离器(12)下部另一侧依次通过第五连接水管(18)、第四连接水管(16)、止回阀(17)、第二水泵(15)、第三连接水管(14)连接到蓄冰槽(5)。
2.如权利要求1所述的TBAB浆水分离式动态蓄冰***,其特征在于:所述板式换热器(10)、浆水分离器(12)及第一水泵(7)构成封闭***。
CN201210031698.4A 2012-02-13 2012-02-13 Tbab浆水分离式动态蓄冰*** Active CN102538098B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201210031698.4A CN102538098B (zh) 2012-02-13 2012-02-13 Tbab浆水分离式动态蓄冰***

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201210031698.4A CN102538098B (zh) 2012-02-13 2012-02-13 Tbab浆水分离式动态蓄冰***

Publications (2)

Publication Number Publication Date
CN102538098A CN102538098A (zh) 2012-07-04
CN102538098B true CN102538098B (zh) 2014-03-26

Family

ID=46345645

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201210031698.4A Active CN102538098B (zh) 2012-02-13 2012-02-13 Tbab浆水分离式动态蓄冰***

Country Status (1)

Country Link
CN (1) CN102538098B (zh)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105180543A (zh) * 2015-08-12 2015-12-23 广州高菱机电工程有限公司 一种具有冷量回收机构的过冷水式动态制冰***
CN106052234A (zh) * 2016-07-08 2016-10-26 天津科技大学 电解产气冰晶剥落方法及冰蓄冷***

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005003208A (ja) * 2003-06-09 2005-01-06 Ishikawajima Harima Heavy Ind Co Ltd 氷蓄熱方法及び氷蓄熱装置
CN101377371A (zh) * 2007-08-29 2009-03-04 上海海事大学 动态过冷水循环制冰***
CN101629748A (zh) * 2009-07-03 2010-01-20 深圳力合节能技术有限公司 冰浆蓄冷中央空调***
CN201547899U (zh) * 2009-07-03 2010-08-11 深圳力合节能技术有限公司 冰浆蓄冷中央空调***
CN102331052A (zh) * 2011-10-11 2012-01-25 东南大学 一种基于蒸发冷却的冰-水复合型蓄冷装置

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3854675B2 (ja) * 1996-12-25 2006-12-06 高砂熱学工業株式会社 氷蓄熱装置

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005003208A (ja) * 2003-06-09 2005-01-06 Ishikawajima Harima Heavy Ind Co Ltd 氷蓄熱方法及び氷蓄熱装置
CN101377371A (zh) * 2007-08-29 2009-03-04 上海海事大学 动态过冷水循环制冰***
CN101629748A (zh) * 2009-07-03 2010-01-20 深圳力合节能技术有限公司 冰浆蓄冷中央空调***
CN201547899U (zh) * 2009-07-03 2010-08-11 深圳力合节能技术有限公司 冰浆蓄冷中央空调***
CN102331052A (zh) * 2011-10-11 2012-01-25 东南大学 一种基于蒸发冷却的冰-水复合型蓄冷装置

Also Published As

Publication number Publication date
CN102538098A (zh) 2012-07-04

Similar Documents

Publication Publication Date Title
CN104859404B (zh) 重型商用车用lng冷能综合回收利用***
CN104075477A (zh) 一种复叠式高温热泵
CN201697394U (zh) 一种带热水机的热回收型多联热泵空调器
CN103507598B (zh) 利用lng冷能的冷暖空调***及工程机械
CN102538098B (zh) Tbab浆水分离式动态蓄冰***
CN204555461U (zh) 吸射式油分离装置及应用该装置的制冷***
CN201897350U (zh) 一种新型管壳式换热器
CN204853767U (zh) 环境风洞试验室空调***
CN204478610U (zh) 自动加药装置及能源塔热泵***
CN201206917Y (zh) 多级循环式冷热水设备
CN201954691U (zh) 一种串联式制冷空调及末端蓄冷水***
CN204605455U (zh) 重型商用车用lng冷能综合回收利用***
CN105299944A (zh) 一种满液式中央空调***
CN102072542A (zh) 一种串联式制冷空调及末端蓄冷水***
CN113739294A (zh) 一种三级串联内外融冰超低温供冷设备及使用方法
CN204084956U (zh) 一种复杂流程蒸发器及冰箱
CN202254514U (zh) 汽车空调蒸发器芯体
CN204438359U (zh) 空调室外机
CN204786903U (zh) 中央空调蓄能水池布水器结构
CN202832620U (zh) 矿井空调输冷***
CN203940648U (zh) 一种复叠式高温热泵
CN201973958U (zh) 省水式水源热泵
CN204513847U (zh) 一种空调热水连供装置
CN206531313U (zh) 一种多路泵出及多路回油型油冷***
CN204184166U (zh) 工程车用空调***

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant