Power assembly of construction hoist Download PDF

Info

Publication number
CN102522848A
CN102522848A CN2011104382641A CN201110438264A CN102522848A CN 102522848 A CN102522848 A CN 102522848A CN 2011104382641 A CN2011104382641 A CN 2011104382641A CN 201110438264 A CN201110438264 A CN 201110438264A CN 102522848 A CN102522848 A CN 102522848A
Authority
CN
China
Prior art keywords
motor
worm screw
worm
shaft coupling
worm gear
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN2011104382641A
Other languages
Chinese (zh)
Inventor
林振
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHEJIANG COMMINS MACHINERY CO Ltd
Original Assignee
ZHEJIANG COMMINS MACHINERY CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHEJIANG COMMINS MACHINERY CO Ltd filed Critical ZHEJIANG COMMINS MACHINERY CO Ltd
Priority to CN2011104382641A priority Critical patent/CN102522848A/en
Publication of CN102522848A publication Critical patent/CN102522848A/en
Pending legal-status Critical Current

Links

Landscapes

  • Connection Of Motors, Electrical Generators, Mechanical Devices, And The Like (AREA)

Abstract

The invention provides a power assembly of a construction hoist, which belongs to the technical field of machinery, and solves the problems of poor power transmission effect and large size of a power assembly of an existing construction hoist. The power assembly of the construction hoist comprises a brake component, a worm-gear case body and a motor with a motor front end cover, a worm gear and a worm in meshed connection with the worm gear are arranged in the worm-gear case body, the brake component is mounted at the rear end of the motor, a motor output shaft extends out of the motor front end cover, a motor-end coupler is fixedly sleeved on the motor output shaft, a worm-end coupler is fixedly sleeved on the worm, and the motor-end coupler is fixedly connected with the worm-end coupler. The power assembly of the construction hoist has the advantages of fine transmission effect, good stability, long service life and small size.

Description

The building hoist power assembly
Technical field
The invention belongs to field of mechanical technique, relate to a kind of building hoist power assembly.
Background technology
At present, the building hoist power assembly on the market generally comprises worm gear case, motor and brake three parts, and worm gear and worm screw are installed in the worm gear case; Motor rear end is connected with brake; Carry out power transmission through belt or chain between its front end output shaft and the worm screw, the problem of its existence is: its belt or chain drive weak effect, and be easy at work break; While belt or chain take up space bigger, thereby cause whole power assembly volume ratio bigger.
Summary of the invention
The objective of the invention is to have the problems referred to above, proposed the building hoist power assembly that a kind of power transmission is effective and whole volume is little to existing technology.
The object of the invention can be realized through following technical proposal: the building hoist power assembly; Comprise brake assembly, worm gear case casing and have the motor of motor front end housing; The worm screw that is provided with worm gear in the worm gear case casing and is connected with a joggle with worm gear; Above-mentioned brake assembly is installed in motor rear end, and motor output shaft stretches out the motor front end housing, it is characterized in that: fixed cover is provided with the motor side shaft coupling on the described motor output shaft; Fixed cover is provided with worm screw end shaft coupling on the described worm screw, and motor side shaft coupling and worm screw end shaft coupling are connected.
Motor output shaft directly is connected with the worm screw fixed conveyor with worm screw end shaft coupling through the motor side shaft coupling; The situation that transmission is broken off can not appear; And power transmission is efficient, speed is fast; Motor output shaft and worm screw directly are in transmission connection and make total compact simultaneously, and volume is little, and it is little to be convenient to carrying and floor space.
In above-mentioned building hoist power assembly; Be connected with the motor terminal pad through bolt on the described worm gear case casing; The other end of motor terminal pad and motor front end housing are connected, and above-mentioned motor side shaft coupling and worm screw end shaft coupling all are positioned at the motor terminal pad.
Motor terminal pad one is to have the effect of supporting that connects, the 2nd, be used for intercepting motor side shaft coupling, worm screw end shaft coupling with extraneous, and be used for protecting motor side shaft coupling and worm screw end shaft coupling.
In above-mentioned building hoist power assembly, be embedded with the radial collar elastomer block on the described motor side shaft coupling.
The shaft coupling elastomer block can transmit its cushioning effect to the power of shaft coupling, makes power be sent on the worm screw more reposefully from motor output shaft.
In above-mentioned building hoist power assembly; On the described worm screw other end heat abstractor is installed; Described heat abstractor comprises heat radiation end cap, fan blade and has the fan housing of louvre; The heat radiation end cap is set on the worm screw and through bolt and is connected on the worm gear case casing, and fan blade is set on the end of worm screw, and fan housing is fixedly mounted on the worm gear case casing and above-mentioned heat radiation end cap and fan blade all are positioned at fan housing.
Worm gear and worm screw the time can produce heat in work, and worm screw is rotated and drives fan blade and rotate, and fan blade rotates and can the heat in worm gear, the worm screw be with from louvre from going out, thus the useful life of prolongation worm gear, worm screw.
In above-mentioned building hoist power assembly; Be arranged with two taper roll bearings on the described worm screw; Described taper roll bearing is between above-mentioned heat radiation end cap and worm screw end shaft coupling, and described taper roll bearing is installed on the worm gear case cabinet wall.
Compared with prior art, this building hoist power assembly has following several advantage:
1, motor output shaft directly is connected with the worm screw fixed conveyor with worm screw end shaft coupling through the motor side shaft coupling, the situation that transmission is broken off can not occur, and power transmission is efficient, speed is fast, and total is compact simultaneously, and volume is little;
2, the heat abstractor that is installed on the worm screw other end can carry out radiating and cooling to worm gear, worm screw, prolongs the useful life of worm gear, worm screw;
3, adopt taper roll bearing to substitute general bearing, its taper roll bearing can bearing radial force, can bear axial force again, thus the more steady and high efficiency that worm screw is rotated, and be difficult for impaired.
Description of drawings
Fig. 1 is a structure cross-sectional schematic of the present invention.
Among the figure, 1, brake assembly; 2, stator; 3, rotor; 4, motor front end housing; 5, motor side shaft coupling; 6, shaft coupling elastomer block; 7, worm gear case casing; 8, worm gear; 9, worm screw; 10, worm screw end shaft coupling; 11, motor terminal pad; 12, taper roll bearing; 13, heat radiation end cap; 14, fan blade; 15, fan housing.
Embodiment
Below be specific embodiment of the present invention and combine accompanying drawing, technical scheme of the present invention is done further to describe, but the present invention is not limited to these embodiment.
As shown in Figure 1, this building hoist power assembly comprises brake assembly 1, worm gear case casing 7 and has the motor of motor front end housing 4 that motor comprises stator 2 and rotor 3; The worm screw 9 that is provided with worm gear 8 in the worm gear case casing 7 and is connected with a joggle with worm gear 8; Brake assembly 1 is installed in motor rear end, and motor output shaft stretches out motor front end housing 4, and fixed cover is provided with motor side shaft coupling 5 on the motor output shaft; Be embedded with radial collar elastomer block 6 on the motor side shaft coupling 5; Fixed cover is provided with worm screw end shaft coupling 10 on the worm screw 9, and motor side shaft coupling 5 is connected with worm screw end shaft coupling 10, is connected with motor terminal pad 11 through bolt on the worm gear case casing 7; The other end of motor terminal pad 11 and motor front end housing 4 are connected, and motor side shaft coupling 5 all is positioned at motor terminal pad 11 with worm screw end shaft coupling 10.
On worm screw 9 other ends heat abstractor is installed; Heat abstractor comprises heat radiation end cap 13, fan blade 14 and has the fan housing 15 of louvre; Heat radiation end cap 13 is set on the worm screw 9 and through bolt and is connected on the worm gear case casing 7; Fan blade 14 is set on the end of worm screw 9, and fan housing 15 is fixedly mounted on the worm gear case casing 7 and above-mentioned heat radiation end cap 13 all is positioned at fan housing 15 with fan blade 14.
Be arranged with two taper roll bearings 12 on the worm screw 9, taper roll bearing 12 is between heat radiation end cap 13 and worm screw end shaft coupling 10, and taper roll bearing 12 is installed on worm gear case casing 7 inwalls.
The operation principle of this building hoist power assembly is following:
Starter motor work; Rotor 3 rotates; Its motor output shaft is sent to power in the worm screw 9 through motor side shaft coupling 5 and worm screw end shaft coupling 10, and worm screw 9 sends power to worm gear 8 with the worm gear case speed ratio, and worm gear 8 outputs power to through rotating shaft in the mechanism such as wheel hub; Need the out-of-work words of motor, start 1 pair of motor of brake assembly and carry out brake application stoping.
The parameter of this building hoist power assembly is following: assembly output torque 1100N.m, rotating speed are 85rpm, and the worm gear case speed ratio is 16: 1, and the three-phase rated voltage is 380V, and rated power is 11KW, and the brake braking force square is 120N.m.
Specific embodiment described herein only is that the present invention's spirit is illustrated.Person of ordinary skill in the field of the present invention can make various modifications or replenishes or adopt similar mode to substitute described specific embodiment, but can't depart from spirit of the present invention or surmount the defined scope of appended claims.
Although this paper has used terms such as brake assembly 1, stator 2, rotor 3, motor front end housing 4, motor side shaft coupling 5, shaft coupling elastomer block 6, worm gear case casing 7, worm gear 8, worm screw 9, worm screw end shaft coupling 10, motor terminal pad 11, taper roll bearing 12, heat radiation end cap 13, fan blade 14, fan housing 15 morely, do not get rid of the possibility of using other term.Using these terms only is in order to describe and explain essence of the present invention more easily; It all is contrary with spirit of the present invention being construed to any additional restriction to them.

Claims (5)

1. building hoist power assembly; Comprise brake assembly (1), worm gear case casing (7) and have the motor of motor front end housing (4); The worm screw (9) that is provided with worm gear (8) in the worm gear case casing (7) and is connected with a joggle with worm gear (8); Above-mentioned brake assembly (1) is installed in motor rear end, and motor output shaft stretches out motor front end housing (4), it is characterized in that: fixed cover is provided with motor side shaft coupling (5) on the described motor output shaft; Described worm screw (9) goes up fixed cover and is provided with worm screw end shaft coupling (10), and motor side shaft coupling (5) is connected with worm screw end shaft coupling (10).
2. building hoist power assembly according to claim 1; It is characterized in that; Described worm gear case casing (7) is gone up and is connected with motor terminal pad (11) through bolt; The other end of motor terminal pad (11) and motor front end housing (4) are connected, and above-mentioned motor side shaft coupling (5) and worm screw end shaft coupling (10) all are positioned at motor terminal pad (11).
3. building hoist power assembly according to claim 2 is characterized in that, is embedded with radial collar elastomer block (6) on the described motor side shaft coupling (5).
4. according to claim 1 or 2 or 3 described building hoist power assemblies; It is characterized in that; On described worm screw (9) other end heat abstractor is installed; Described heat abstractor comprises heat radiation end cap (13), fan blade (14) and has the fan housing (15) of louvre; Heat radiation end cap (13) is set on the worm screw (9) and through bolt and is connected on the worm gear case casing (7), and fan blade (14) is set on the end of worm screw (9), and fan housing (15) is fixedly mounted on the worm gear case casing (7) and above-mentioned heat radiation end cap (13) and fan blade (14) all is positioned at fan housing (15).
5. building hoist power assembly according to claim 4; It is characterized in that; Be arranged with two taper roll bearings (12) on the described worm screw (9); Described taper roll bearing (12) is positioned between above-mentioned heat radiation end cap (13) and the worm screw end shaft coupling (10), and described taper roll bearing (12) is installed on worm gear case casing (7) inwall.
CN2011104382641A 2011-12-09 2011-12-09 Power assembly of construction hoist Pending CN102522848A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2011104382641A CN102522848A (en) 2011-12-09 2011-12-09 Power assembly of construction hoist

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2011104382641A CN102522848A (en) 2011-12-09 2011-12-09 Power assembly of construction hoist

Publications (1)

Publication Number Publication Date
CN102522848A true CN102522848A (en) 2012-06-27

Family

ID=46293670

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2011104382641A Pending CN102522848A (en) 2011-12-09 2011-12-09 Power assembly of construction hoist

Country Status (1)

Country Link
CN (1) CN102522848A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015172720A1 (en) * 2014-05-13 2015-11-19 科沃斯机器人有限公司 Worm-gear transmission device
CN105305719A (en) * 2015-11-24 2016-02-03 王琳 Worm transmission mechanism
CN110615339A (en) * 2019-09-17 2019-12-27 浙江尼邦电梯有限公司 Coupling for traction elevator

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101761641A (en) * 2008-12-12 2010-06-30 天津市正平机械新技术有限公司 Vertical planetary reducer with temperature control device
CN201801288U (en) * 2010-08-12 2011-04-20 苏州通润驱动设备股份有限公司 Novel escalator tractor
US20110185845A1 (en) * 2007-09-19 2011-08-04 Gian Paolo Manzini Reduction unit particularly of the epicyclic type comprising a fan
CN201971522U (en) * 2010-12-30 2011-09-14 天津祥和盛机电发展有限公司 Power driving device for construction elevator
CN202334135U (en) * 2011-12-09 2012-07-11 浙江康明斯机械有限公司 Power assembly for construction elevator

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20110185845A1 (en) * 2007-09-19 2011-08-04 Gian Paolo Manzini Reduction unit particularly of the epicyclic type comprising a fan
CN101761641A (en) * 2008-12-12 2010-06-30 天津市正平机械新技术有限公司 Vertical planetary reducer with temperature control device
CN201801288U (en) * 2010-08-12 2011-04-20 苏州通润驱动设备股份有限公司 Novel escalator tractor
CN201971522U (en) * 2010-12-30 2011-09-14 天津祥和盛机电发展有限公司 Power driving device for construction elevator
CN202334135U (en) * 2011-12-09 2012-07-11 浙江康明斯机械有限公司 Power assembly for construction elevator

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2015172720A1 (en) * 2014-05-13 2015-11-19 科沃斯机器人有限公司 Worm-gear transmission device
CN105305719A (en) * 2015-11-24 2016-02-03 王琳 Worm transmission mechanism
CN110615339A (en) * 2019-09-17 2019-12-27 浙江尼邦电梯有限公司 Coupling for traction elevator
CN110615339B (en) * 2019-09-17 2022-05-27 浙江尼邦电梯有限公司 Shaft coupling for traction elevator

Similar Documents

Publication Publication Date Title
CN202221929U (en) Hollow rotor shaft mechanism of motor
CN105048707A (en) Direct-current brushless in-wheel motor with power outage brake function
CN102522848A (en) Power assembly of construction hoist
CN202334135U (en) Power assembly for construction elevator
CN201971522U (en) Power driving device for construction elevator
CN101340119B (en) Bearing pretension construction of electricity driving turbo cooler
US20130285515A1 (en) External rotation type power generation device having biased power generator
CN204652135U (en) Solid rotor box hat brake motor
CN203413075U (en) Improved twin-turbo hydraulic torque converter
CN201347883Y (en) Pipeline pump independent bearing body
CN207810484U (en) A kind of built-in electric roller directly driven with permanent magnet synchronous motor
CN202327038U (en) Heat radiating structure for construction lift power assembly
CN101705916B (en) Transmission system of wind power generator
CN101075767A (en) Asynchronous electric motor with stator and rotor rotation simultaneously
CN203944458U (en) A kind of Improving Drum gold washer
CN203494552U (en) Combined cone crusher
CN206948120U (en) A kind of motor of built-in brake apparatus
CN102751808A (en) Motor bearing mechanism specially used for compressor
CN202513723U (en) Novel motor
CN202513793U (en) High stability motor
CN202327016U (en) Reducer
CN106787428B (en) Multifunctional integrated linear reciprocating motor
CN202327011U (en) Worm wheel speed reducer
CN202260831U (en) Motor transmission structure
CN201113709Y (en) Three-phase asynchronous motor for oil pumping machine

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20120627