- CN102521717A CN102521717A CN2011104560329A CN201110456032A CN102521717A CN 102521717 A CN102521717 A CN 102521717A CN 2011104560329 A CN2011104560329 A CN 2011104560329A CN 201110456032 A CN201110456032 A CN 201110456032A CN 102521717 A CN102521717 A CN 102521717A
- Authority
- CN
- China
- Prior art keywords
- statistics
- information
- resources bank
- statistical condition
- condition
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Debugging And Monitoring (AREA)
Abstract
The invention provides a method and device for carrying out statistics on configuration management resource library information. The method comprises the following steps of: when the statistics needs to be carried out, analyzing a first statistics condition and a second statistics condition according to a statistics request; according to the first statistics condition, acquiring resource information according with the first statistics condition and an operating record of a resource library in a configuration management tool and converting the operating record into a log file; according to the second statistics condition, judging whether the statistics is first statistics; if the statistics is the first statistics, carrying out statistics on the resource information according to the second statistics condition and generating a first statistics result; if the statistics is not the first statistics, judging whether the corresponding resource library information in the log file is changed; and if the corresponding resource library information in the log file is changed, carrying out statistics on information according with the first statistics condition according to the second statistics condition and generating a non-first statistics result. Due to the adoption of the method and the device for carrying out statistics on the configuration management resource library information, which are provided by the invention, the resource library information can be subjected to statistics as required and the condition of a project is detailedly known.
Description
Technical field
The application relates to the resources bank field, the method and apparatus of particularly a kind of configuration management resources bank Information Statistics.
Background technology
Trustie (Trustworthy software tools and integration environment) is that a national software resource is shared and collaborative production environment, supports the production of large scale network trusted software.
The integrated software community service of Trustie integrates that software collaboration exploitation, software resource are shared, software trust is assessed, functions such as the Trustie cooperative development environment provides configuration management, defect management, project management, it is integrated to continue, dimension visitor.Wherein, configuration management provides the project resource version management function of (comprising resources such as project document, source code), and the resource collaboration between the support cross-region development teams member is with synchronously.
Along with the complicated day by day and user's request of software systems, frequentization of software upgrading, configuration management becomes the important control process in the software life-cycle gradually, in software development process, is playing the part of more and more important role.A good configuration management process can cover the various aspects of software development and maintenance, and to the macro-management of software development process, i.e. project management also has important support effect simultaneously.
The most frequently used configuration management tool is the concurrent edition system of CVS (Concurrent Versions System), SVN (Subversion) at present; They can provide all to have the submit operation record of the user of submission authority to resources bank, comprise newly-increased file, deleted file, revised file, newly-built catalogue, create historical operation such as branch, merging.But CVS, SVN can only provide the look facility to whole historical operation information, can not classify to information, in the time of need checking certain type information, and very inconvenience.
Summary of the invention
The technical matters that the application will solve provides the method and apparatus of a kind of configuration management resources bank Information Statistics, in order to resource in the resources bank is carried out statistic of classification.
For addressing the above problem, the application provides the method for a kind of configuration management resources bank Information Statistics, is applied to after configuration management tool obtains the operation note to resources bank, comprise:
Obtain statistics request to resources bank information;
Resolve said statistics request, obtain first statistical condition and second statistical condition that comprise in the said statistics request;
According to said first statistical condition, obtain the resource information that meets said first statistical condition in the said resources bank;
The operation note to said resources bank that comprises in the said resource information is converted into journal file, and stores said journal file;
According to said second statistical condition and said resources bank information, judge whether to exist the original journal file corresponding, not with said second statistical condition; The Information Statistics of this time resources bank are to add up first, according to said second statistical condition statistics is first added up and generated to said resource information, are; The Information Statistics of this time resources bank are not to add up first; Whether judge has the record that meets second statistical condition, have, description operation is crossed said resources bank in the said journal file; The information generating of said resources bank variation, non-statistics is first added up and generated to said resource information according to second statistical condition.
Above-mentioned method, preferred, according to the first corresponding statistical condition of said statistics request, obtain the resource information that meets first statistical condition in the said resources bank and also comprise afterwards: the said resource information of buffer memory.
Above-mentioned method, preferred, also comprise:
Show said statistics first or said non-statistics first.
Above-mentioned method, preferred, also comprise:
Store said statistics first or said non-statistics first.
The application also provides the device of a kind of configuration management resources bank Information Statistics, comprising:
The request receiver is used to obtain the statistics request to resources bank information;
The condition resolver is used to resolve said statistics request, obtains first statistical condition and second statistical condition that comprise in the said statistics request;
Message recipient is used for obtaining the resource information that meets said first statistical condition in the said resources bank according to said first statistical condition;
Converter is used for the operation note to said resources bank that said resource information comprises is converted into journal file, and stores said journal file;
Determining device is used for judging whether to exist the original journal file corresponding with said second statistical condition according to said second statistical condition and said resources bank information;
Statistics is first added up and generated to first counter when being used for adding up first, according to said second statistical condition to said resource information;
Second counter when being used for not being adding up first, judges whether record is arranged in the said journal file, and according to second statistical condition non-statistics is first added up and generated to said resource information.
Above-mentioned device, preferred, also comprise:
Buffer is used for the said resource information of buffer memory.
Above-mentioned device, preferred, also comprise:
Display device is used to show said statistics first or said non-statistics first.
Above-mentioned device, preferred, also comprise:
Storer is used to store said statistics first or said non-statistics first.
The method and apparatus of a kind of configuration management resources bank Information Statistics that the application provides is when needs are added up, according to the statistics request; Parse first statistical condition and second statistical condition, according to first statistical condition, obtain the resource information that meets first statistical condition in the resources bank and the operation note of obtaining in the configuration management tool resources bank; And conversion operation is recorded as journal file; Judge whether to be to add up first according to second statistical condition, statistics is first added up and generated to above-mentioned foundation second statistical condition to said resource information into adding up first; Not to add up first; Whether judge has the record that meets second statistical condition, have, description operation is crossed said resources bank in the said journal file; The information generating of said resources bank variation, non-statistics is first added up and generated to the said information that meets said first statistical condition according to said second statistical condition.Employing the application is that the method and apparatus of a kind of configuration management resources bank Information Statistics can be added up the situation of detail knowledge project as required to resources bank information.
Description of drawings
In order to be illustrated more clearly in the technical scheme among the application embodiment; The accompanying drawing of required use is done to introduce simply in will describing embodiment below; Obviously, the accompanying drawing in describing below only is some embodiment of the application, for those of ordinary skills; Under the prerequisite of not paying creative work property, can also obtain other accompanying drawing according to these accompanying drawings.
Fig. 1 is the process flow diagram of method embodiment 1 of a kind of configuration management resources bank Information Statistics of the application;
Fig. 2 is method embodiment 1 one particular flow sheets of a kind of configuration management resources bank Information Statistics of the application
Fig. 3 is the process flow diagram of method embodiment 2 of a kind of configuration management resources bank Information Statistics of the application;
Fig. 4 is the process flow diagram of method embodiment 3 of a kind of configuration management resources bank Information Statistics of the application;
Fig. 5 is the process flow diagram of method embodiment 4 of a kind of configuration management resources bank Information Statistics of the application;
Fig. 6 is the use scene of device of a kind of configuration management resources bank Information Statistics of the application;
Fig. 7 is the structured flowchart of device embodiment 1 of a kind of configuration management resources bank Information Statistics of the application;
Fig. 8 is the structured flowchart of device embodiment 2 of a kind of configuration management resources bank Information Statistics of the application;
Fig. 9 is the structured flowchart of device embodiment 3 of a kind of configuration management resources bank Information Statistics of the application;
Figure 10 is the structured flowchart of device embodiment 4 of a kind of configuration management resources bank Information Statistics of the application.
Embodiment
To combine the accompanying drawing among the application embodiment below, the technical scheme among the application embodiment is carried out clear, intactly description, obviously, described embodiment only is the application's part embodiment, rather than whole embodiment.Based on the embodiment among the application, those of ordinary skills are not making the every other embodiment that is obtained under the creative work prerequisite, all belong to the scope of the application's protection.
The application is applied in the Trustie cooperative development environment, to common configuration management tools such as SVN, CVS, according to the historical operation record to resources bank that configuration management tool obtains, adopts the application's method, and resources bank information is carried out analytic statistics.
With reference to figure 1, show the process flow diagram of the method embodiment 1 of a kind of configuration management resources bank of the application Information Statistics, can may further comprise the steps:
Step S101: obtain statistics request to resources bank information;
When needs are added up resources bank information, at first get access to the request that resources bank information is added up.
If the time period till need be when beginning to set up resources bank to the statistics request from project in the information bank; The information of the merging of the engineering project corresponding with information bank is added up, the statistics request of the information that merges in the time period till then assigning when beginning to set up resources bank to the statistics request from project.
Adopt this method, the statistics request of the information that merges in the time period till when beginning to set up resources bank from project in the acquisition to the statistics request.
Step S102: resolve said statistics request, obtain first statistical condition and second statistical condition that comprise in the said statistics request;
After obtaining the statistics request, this statistics request is resolved, analyze the statistical condition that comprises in this request.
The statistics request of the information that merges in the time period till when beginning to set up resources bank to the statistics request from project; First statistical condition that comprises is a time conditions: till when beginning to set up resources bank to the statistics request from project, second statistical condition is a class conddition: merge.
Step S103:, obtain the resource information that meets said first statistical condition in the said resources bank according to said first statistical condition;
According to first statistical condition, the information in the resources bank is filtered, obtain meeting the resource information of first statistical condition.
All information in time period till when retrieval filters out and begins to set up resources bank to the statistics request from project in resources bank.
Step S 104: according to said first statistical condition, obtain in the said configuration management tool operation note that said resources bank is met said first statistical condition;
According to first statistical condition, all operations record that in the time period till retrieval is filtered when obtaining beginning to set up resources bank to the statistics request from project in configuration management tool this resources bank is carried out.
Step S105: said operation note is converted into journal file, and stores said journal file;
The operation note that obtains is converted into journal file, satisfies the operation of first statistical condition with the form record of journal file.
Operation note in time period till in the time of will beginning to set up resources bank to the statistics request from project is converted into journal file, notes these operations with the form of journal file.
Step S106: according to said second statistical condition and said resources bank information, judge whether to exist the original journal file corresponding, not with said second statistical condition; The Information Statistics of this time resources bank are to add up first, according to said second statistical condition statistics is first added up and generated to said resource information, are; The Information Statistics of this time resources bank are not to add up first; Whether judge has the record that meets second statistical condition, have, description operation is crossed said resources bank in the said journal file; The information generating of said resources bank variation, non-statistics is first added up and generated to said resource information according to second statistical condition.
Like Fig. 2, show the idiographic flow of this step, comprising:
Step S201: according to said second statistical condition and said resources bank information, judging whether to exist the original journal file corresponding with said second statistical condition, not, get into step S202, is to get into step S203;
In resources bank information, retrieve whether there is the journal file that meets second statistical condition according to second statistical condition.
Step S202: the Information Statistics of this time resources bank are to add up first, according to said second statistical condition statistics is first added up and generated to said resource information;
If there be not the original journal file corresponding with second statistical condition; Just the information that meets second statistical condition was not carried out statistics before the explanation; That is to say that current statistics is added up the first statistical condition resource information of obtaining that satisfies according to second statistical condition for adding up first; Obtain simultaneously satisfying the information of first statistical condition and second statistical condition, this information is exactly this i.e. statistics first of statistics;
Whether step S203: judging has the record that meets second statistical condition, have in the said journal file, gets into step S204;
If have; Then before the explanation the corresponding information of second condition was carried out statistics, promptly current statistics is not to add up first, so; Extract and judge in the journal file that obtains whether the record that meets second statistical condition is arranged; If have, explain resources bank carried out the operation corresponding with second statistical condition that the information of this resources bank changes.
Step S204: non-statistics is first added up and generated to said resource information according to second statistical condition.
The information of this resources bank changes, and resource information is added up according to second statistical condition, obtains satisfying simultaneously the information of first statistical condition and second statistical condition, this information be exactly this statistics be non-statistics first.
According to " information of merging " this statistical condition; Resources bank information is retrieved; If in resources bank, do not find the journal file corresponding with this statistics; That is to say that this information that is combined is added up and is statistics first, according to this statistical condition of information that merges to before obtain begin to set up the information of resources bank in the time period till when statistics is asked from project and filter statistics; The information that merges in time period till being met when beginning to set up resources bank to the statistics request, the just i.e. statistics first of this statistics from project.
According to " information of merging " this statistical condition; Resources bank information is retrieved; If in resources bank, find the journal file corresponding with this statistics; That is to say; This information that is combined is added up and is not to add up first, and the information in the journal file that then conversion is obtained is extracted judgement, if include the operation note of satisfied " pooling information " in this journal file; That is to say in the time period till resources bank is when beginning from project to set up resources bank to the statistics request pooling information is arranged; According to " information of merging " this statistical condition to obtain begin to set up resources bank to the statistics request from project the time till time period in resource information add up, just can be met from project and begin to set up the information that resources bank merged in the time period till when statistics is asked, just this statistics is non-statistics first.
If in journal file, do not comprise the operation note of satisfied " pooling information ", that is to say in the time period till resources bank is when beginning from project to set up resources bank to the statistics request does not have pooling information, needn't add up.
With reference to figure 3, show the process flow diagram of the method embodiment 2 of a kind of configuration management resources bank of the application Information Statistics, on the basis of the application embodiment 1, after step S103, can also may further comprise the steps:
Step S107: the said resource information of buffer memory.
After obtaining meeting the resource information of first statistical condition in the resources bank, this resource information is carried out buffer memory, use this resource information for the step of back and prepare.
With reference to figure 4, show the process flow diagram of the method embodiment 3 of a kind of configuration management resources bank of the application Information Statistics, on the basis of the application embodiment 2, after step S 108, can also may further comprise the steps:
Step S108: store said statistics first or said non-statistics first.
To the statistics that obtains: statistics or non-statistics are first stored first.
With reference to figure 5, show the process flow diagram of the method embodiment 4 of a kind of configuration management resources bank of the application Information Statistics, on the basis of the application embodiment 3, after step S 106, can also may further comprise the steps:
Step S109: show said statistics first or said non-statistics first.
When needs are showed statistics, just the statistics first or the non-statistics first that obtain are showed.
As the result of statistics during for statistics first, to this first statistics show.
When statistics is non-statistics first, this non-statistics is first showed.
When confirming as in the statistic processes when needn't add up, then the statistics of last time is showed.
The method of showing comprises multiple, can show for the form of form or patterned intuitively form.
Corresponding with the method for a kind of configuration management resources bank information of above-mentioned the application, the application also provides a kind of device of configuration management resources bank information.
Referring to Fig. 6, show the use scene of the device of a kind of configuration management resources bank of the application information, this device and the supporting use of configuration management tool receive the operation note to resources bank that this configuration management tool provides.
Corresponding with the method embodiment 1 of a kind of configuration management resources bank information of above-mentioned the application, referring to Fig. 7, the application also provides a kind of device embodiment 1 of configuration management resources bank information, and in the present embodiment, this device can comprise:
Wherein:
Corresponding with the method embodiment 2 of a kind of configuration management resources bank information of above-mentioned the application, referring to Fig. 8, the application also provides a kind of device embodiment 2 of configuration management resources bank information, and in the present embodiment, this device also comprises:
After message recipient 103 obtained meeting the resource information of first statistical condition in the resources bank, 109 pairs of these resource informations of buffer were carried out buffer memory, used this resource information for the step of back and prepared.
Corresponding with the method embodiment 3 of a kind of configuration management resources bank information of above-mentioned the application, referring to Fig. 9, the application also provides a kind of device embodiment 3 of configuration management resources bank information, and in the present embodiment, this device also comprises:
After first counter 107 obtains first statistics or second counter 108 and obtains non-statistics first, storer 110 said statistics first of storage or said non-statisticses first.
Corresponding with the method embodiment 4 of a kind of configuration management resources bank information of above-mentioned the application, referring to Figure 10, the application also provides a kind of device embodiment 4 of configuration management resources bank information, and in the present embodiment, this device also comprises:
When need be to the statistics first that obtains or non-first when statistics is showed, 111 pairs of said statisticses first of display device or said non-statistics be first showed.
First statistical condition of mentioning among the application and second statistical condition are not limited to timing statistics and statistics kind; Timing statistics is not limited to be set up resources bank from project and begins to end when requiring to add up; Also can be section sometime; The statistics kind is not limited to the data that merge in the statistics resources bank, also can be the corresponding data class of other operations or other conditions, and statistical condition also is not limited to the sequencing of timing statistics and statistics kind.
Each embodiment adopts the mode of going forward one by one to describe in this instructions, and what each embodiment stressed all is and the difference of other embodiment that same or similar part is mutually referring to getting final product between each embodiment.
To the above-mentioned explanation of the disclosed embodiments, make this area professional and technical personnel can realize or use the application.Multiple modification to these embodiment will be conspicuous concerning those skilled in the art, and defined General Principle can realize under the situation of spirit that does not break away from the application or scope in other embodiments among this paper.Therefore, the application will can not be restricted to these embodiment shown in this paper, but will meet and principle disclosed herein and features of novelty the wideest corresponding to scope
Claims (8)
1. the method for configuration management resources bank Information Statistics is applied to after configuration management tool obtains the operation note to resources bank, it is characterized in that, comprising:
Obtain statistics request to resources bank information;
Resolve said statistics request, obtain first statistical condition and second statistical condition that comprise in the said statistics request;
According to said first statistical condition, obtain the resource information that meets said first statistical condition in the said resources bank;
According to said first statistical condition, obtain in the said configuration management tool operation note to said resources bank;
Said operation note is converted into journal file, and stores said journal file;
According to said second statistical condition and said resources bank information, judge whether to exist the original journal file corresponding, not with said second statistical condition; The Information Statistics of this time resources bank are to add up first, according to said second statistical condition statistics is first added up and generated to said resource information, are; The Information Statistics of this time resources bank are not to add up first; Whether judge has the record that meets second statistical condition, have, description operation is crossed said resources bank in the said journal file; The information generating of said resources bank variation, non-statistics is first added up and generated to said resource information according to second statistical condition.
2. method according to claim 1 is characterized in that, according to the first corresponding statistical condition of said statistics request, obtains the resource information that meets first statistical condition in the said resources bank and also comprises afterwards: the said resource information of buffer memory.
3. method according to claim 1 is characterized in that, also comprises:
Store said statistics first or said non-statistics first.
4. method according to claim 1 is characterized in that, also comprises:
Show said statistics first or said non-statistics first.
5. the device of configuration management resources bank Information Statistics is characterized in that, comprising:
The request receiver is used to obtain the statistics request to resources bank information;
The condition resolver is used to resolve said statistics request, obtains first statistical condition and second statistical condition that comprise in the said statistics request;
Message recipient is used for obtaining the resource information that meets said first statistical condition in the said resources bank according to said first statistical condition;
The operation note getter is used for according to said first statistical condition, obtains in the said configuration management tool operation note to said resources bank;
Converter is used for said operation note is converted into journal file, and stores said journal file;
Determining device is used for judging whether to exist the original journal file corresponding with said second statistical condition according to said second statistical condition and said resources bank information;
Statistics is first added up and generated to first counter when being used for adding up first, according to said second statistical condition to said resource information;
Second counter when being used for not being adding up first, judges whether the record that meets second statistical condition is arranged in the said journal file, and according to second statistical condition non-statistics is first added up and generated to said resource information.
6. device according to claim 5 is characterized in that, also comprises:
Buffer is used for the said resource information of buffer memory.
7. device according to claim 5 is characterized in that, also comprises:
Storer is used to store said statistics first or said non-statistics first.
8. device according to claim 5 is characterized in that, also comprises:
Display device is used to show said statistics first or said non-statistics first.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110456032.9A CN102521717B (en) | 2011-12-30 | 2011-12-30 | The method and apparatus of a kind of configuration management resources bank Information Statistics |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201110456032.9A CN102521717B (en) | 2011-12-30 | 2011-12-30 | The method and apparatus of a kind of configuration management resources bank Information Statistics |
Publications (2)
Publication Number | Publication Date |
---|---|
CN102521717A true CN102521717A (en) | 2012-06-27 |
CN102521717B CN102521717B (en) | 2016-03-30 |
Family
ID=46292628
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201110456032.9A Active CN102521717B (en) | 2011-12-30 | 2011-12-30 | The method and apparatus of a kind of configuration management resources bank Information Statistics |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN102521717B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103593605A (en) * | 2013-10-24 | 2014-02-19 | 复旦大学 | Android platform applications dynamic analysis system based on permission use behaviors |
CN105608087A (en) * | 2014-11-19 | 2016-05-25 | 阿里巴巴集团控股有限公司 | Resource dispatching method and equipment |
CN106933573A (en) * | 2017-02-22 | 2017-07-07 | 广东网金控股股份有限公司 | A kind of method and system that user and role are obtained by SVN configuration files |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1343933A (en) * | 2000-09-20 | 2002-04-10 | 株式会社日立制作所 | Terminating machine for computer network and method for recording operation history |
CN1496522A (en) * | 2000-03-29 | 2004-05-12 | �ʼҷ����ֵ�������˾ | Data serch user interface with ergonomic mechanism for user profile definition and manipulation |
CN1504867A (en) * | 2002-11-29 | 2004-06-16 | 爱信艾达株式会社 | Map displaying device and its program |
JP2007279883A (en) * | 2006-04-04 | 2007-10-25 | Hitachi Ltd | File configuration management system |
CN102163228A (en) * | 2011-04-13 | 2011-08-24 | 北京百度网讯科技有限公司 | Method, apparatus and device for determining sorting result of resource candidates |
-
2011
- 2011-12-30 CN CN201110456032.9A patent/CN102521717B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1496522A (en) * | 2000-03-29 | 2004-05-12 | �ʼҷ����ֵ�������˾ | Data serch user interface with ergonomic mechanism for user profile definition and manipulation |
CN1343933A (en) * | 2000-09-20 | 2002-04-10 | 株式会社日立制作所 | Terminating machine for computer network and method for recording operation history |
CN1504867A (en) * | 2002-11-29 | 2004-06-16 | 爱信艾达株式会社 | Map displaying device and its program |
JP2007279883A (en) * | 2006-04-04 | 2007-10-25 | Hitachi Ltd | File configuration management system |
CN102163228A (en) * | 2011-04-13 | 2011-08-24 | 北京百度网讯科技有限公司 | Method, apparatus and device for determining sorting result of resource candidates |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103593605A (en) * | 2013-10-24 | 2014-02-19 | 复旦大学 | Android platform applications dynamic analysis system based on permission use behaviors |
CN103593605B (en) * | 2013-10-24 | 2016-11-09 | 复旦大学 | A kind of Android platform application program dynamic analysis system based on authority usage behavior |
CN105608087A (en) * | 2014-11-19 | 2016-05-25 | 阿里巴巴集团控股有限公司 | Resource dispatching method and equipment |
CN105608087B (en) * | 2014-11-19 | 2020-01-31 | 菜鸟智能物流控股有限公司 | resource scheduling method and device |
CN106933573A (en) * | 2017-02-22 | 2017-07-07 | 广东网金控股股份有限公司 | A kind of method and system that user and role are obtained by SVN configuration files |
Also Published As
Publication number | Publication date |
---|---|
CN102521717B (en) | 2016-03-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103425572B (en) | Code analysis methods and code analysis system | |
US10031746B2 (en) | Analyzing components related to a software application in a software development environment | |
CN109446274B (en) | Method and device for managing BI metadata of big data platform | |
CN104537015A (en) | Log analysis computer implementation method, computer and system | |
US8924336B2 (en) | Feature and deployment recommendation systems and methods for content management systems to provide recommendations for enhanced feature usage based on usage patterns | |
CN105893259A (en) | Code detection system, method and device | |
CN106250303A (en) | Business diary collection and early warning system and business diary collection and method for early warning | |
US20170193409A1 (en) | Business resource modeling | |
CN102521717A (en) | Method and device for carrying out statistics on configuration management resource library information | |
CN107506422A (en) | The distributed information log processing system and method for a kind of multi-data source | |
CN104268671A (en) | Management method and device for drawing and document file data | |
CN111950248B (en) | Product report generation method and system based on XML | |
CN103092617A (en) | High reliability workflow development method based on backup services | |
CN114064678A (en) | Event data processing method and device and terminal equipment | |
CN113609237B (en) | Construction land change data processing method, device, equipment and medium | |
CN113672497B (en) | Method, device and equipment for generating non-buried point event and storage medium | |
CN115795118A (en) | Information cooperative processing method and device for multi-source heterogeneous data | |
CN111859041B (en) | Data reporting method and device | |
CN107679230B (en) | Information processing method, system, medium, and computing device | |
CN113055243B (en) | DPI interface data processing method and device | |
US20110047001A1 (en) | Method and system for creating an instance of an adaptable business object | |
CN111897827B (en) | Data updating method and system for data warehouse and electronic equipment | |
CN110069765B (en) | Method and device for monitoring compilation process of merged report | |
CN111356011B (en) | Television program production monitoring probe and computer program product | |
CN101887455A (en) | Method and system for managing multi-version report data |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20211214 Address after: 250014 No. 41-1 Qianfo Shandong Road, Lixia District, Jinan City, Shandong Province Patentee after: SHANDONG CIVIC SE COMMERCIAL MIDDLEWARE Co.,Ltd. Address before: 250014 No. 41-1 Qianfo Shandong Road, Jinan City, Shandong Province Patentee before: SHANDONG CVIC SOFTWARE ENGINEERING Co.,Ltd. Patentee before: Shandong Zhongchuang software commercial middleware Co., Ltd |